HomeMy WebLinkAboutDSHW-2024-007981CORRECTIVE ACTION SECTION – SITE VISIT REPORT
SITE NAME: Former NU Cleaners DATE: 08 / 21 / 2024
EPA ID #: N/A UTCA ID#: UTCA-0063
LOCATION: 53 East Vine Street, Tooele, Utah
PROJECT MANAGER: Ethan Upton
SITE STATUS
_✔_ Active Investigation
___Ongoing Cleanup Activities
___Confirmation Sampling
___ Long-term Institutional Controls in-place [Site
Management Plan (SMP), Environmental
Covenant (EC), and/or Post Closure Plan (PCP)]
___ Long-term Groundwater Monitoring
OTHER (describe):
PURPOSE OF SITE VISIT
___Drive-by (windshield survey)
___Sample Observation &/or Collection
_✔_Site Investigation
___Cleanup Activities Inspection
___Confirm Current Land Usage
___ Confirm Cleanup Completed
___ Confirm Integrity of Engineering Controls
___ Confirm Compliance with SMP/EC
D2# for SMP/EC:
___ Post-Closure Permit Verification
___ Document Change in Land Usage
OTHER (describe):
FIELD OBSERVATIONS:
On August 14, 2024, Wasatch Environmental contacted Ethan Upton with preliminary results from the
sub-slab soil sampling. SS-14 and SS-15 both had exceedances of PCE and PCE/TCE respectively. As a
result, Wasatch requested the Division approve additional sampling to the north and west of these
locations to evaluate the extent of Volatile Organic Compound (VOC) sub-slab vapors. The Division
mobilized to the Site to discuss step off locations and to observe the sampling activities. The locations
were agreed upon and sampled. Additionally, the Division observed the sampling of VMW-2 prior to
demobilization.
SAMPLE COLLECTION
Were Environmental Samples Collected per the approved Sampling & Analysis Plan?
YES _✔_ NO __ N/A __
COMMENTS:
Is the Work Being Performed in a Manner Consistent with the Approved Workplan(s)?
YES _✔_ NO ___ N/A __ Unknown (Drive-By Inspection Only) ___
COMMENTS:
CURRENT LAND USAGE
___ Residential
_X_ Commercial
_X_ Industrial
___ Mixed Commercial w/ Residential
___ Under Construction &/or Development
___ Other: __________________________________
COMMENTS:
FUTURE LAND USAGE
___ Residential ___ Mixed Commercial w/ Residential
_X_ Commercial ___ Other: (describe below)
_X_ Industrial ___ Unknown at this time
COMMENTS:
POST-CLEANUP SITE VISITS
Is the Completed Cleanup Remedy Still Protective Based on Current Land Use?
YES ___ NO ___ Unknown (Drive-By Inspection Only) __
COMMENTS: N/A
LONG-TERM INSTITUTION CONTROL(S) VERIFICATION
Are Components or Restrictions of the SMP, EC &/or PCP Currently Being Complied with?
YES ___ NO ___ Unknown (Drive-By Inspection Only) ___
COMMENTS: No SMP or EC is currently in place.
SITE VISIT CONCLUSIONS
The active investigation appears to be in accordance with the current work plan. No observed issues.
RECOMMENDATIONS
N/A
ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES _ _ NO _X_
SIGNATURE: