Loading...
HomeMy WebLinkAboutDSHW-2024-007979ENVIRONMENTAL CLEANUP PROGRAM – SITE VISIT REPORT SITE NAME: DATE: LOCATION: PROJECT MANAGER: SITE STATUS Active Investigation Ongoing Cleanup Activities Confirmation Sampling Long-term Institutional Controls in-place (Site Management Plan &/or Environmental Covenant) Long-term Groundwater Monitoring Closed w/ No More Work Needed OTHER (describe): PURPOSE OF SITE VISIT Drive-by (windshield survey) Sample Observation &/or Collection Site Investigation Cleanup Activities Inspection Confirm Current Land Usage Confirm Cleanup Completed Confirm Integrity of Engineering Controls Confirm SMP is Being Complied With Post-Closure Permit Verification Document Change in Land Usage OTHER (describe) FIELD OBSERVATIONS: SAMPLE COLLECTION Were Environmental Samples Collected by the Consultant per the approved Sampling & Analysis Plan? YES NO COMMENTS: Geneva Nitrogen Plant August 22, 2024 West of Geneva Road Jasin Olsen Is the Work Being Performed in a Manner Consistent with the Approved Workplan(s)? YES NO COMMENTS: CURRENT LAND USAGE Residential Commercial Industrial Mixed Commercial w/ Residential Under Construction &/or Development OTHER (Describe): FUTURE LAND USAGE Residential Mixed Commercial w/ Residential Commercial Other: (describe below) Industrial POST-CLEANUP SITE VISITS Is the Completed Cleanup Remedy Still Protective Based on Current Land Use? YES NO COMMENTS: LONG-TERM INSTITUTION CONTROL(S) VERIFICATION Are Components or Restrictions of the SMP &/or EC Currently Being Complied with? YES NO COMMENTS: SITE VISIT CONCLUSIONS RECOMMENDATIONS ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES NO SIGNATURE: