August 26, 2024
Tracy Hobart Feltner
Central Iron County WCD
88 East Fiddlers Canyon Road
Suite A
Cedar City, Utah 84721
Subject:Plan Approval, Eight Mile Hills Water Line Project, System #11085, File #15892
Dear Tracy Feltner:The Division of Drinking Water (the Division) received the plans and specifications for the proposed Eight Mile Hills Water Line Project from Rianna Howard, Ensign
Engineering, on July 29, 2024. Review comments were provided to you and your consultant on August 19, 2024, by email. The Division received a response to the comments on August 22, 2024.
This project has met the conditions for receiving a plan approval.
Our understanding of the project is to extend the Central Iron County WCD’s (District) main transmission line with approximately 8,301 feet of 24-inch diameter SDR 17 HDPE pipe and 1,073
feet of 18-inch diameter HDPE pipe. The project also includes isolation valves, fire hydrants, and appurtenant fittings. This project will tie-in to the existing water line on Iron Springs
Road and will be stubbed on the other end for future connection to the proposed Eight Mile Hills 4-million-gallon culinary water tank (ST008).
We have completed our review of the plans and specifications, stamped, and signed byCurtis L.Nielson, P.E., dated January 3, 2024, and found they basically comply with the applicable
portions of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for the Eight Mile Hills Water Line Project are hereby approved.
This approval pertains to construction only. An Operating Permit must be obtained from the Director before the Eight Mile Hills Water Line may be put in service. A checklist outlining
the items required for operating permit issuance is enclosed for your information.Approvals or permits from the local authority or the county may be necessary before beginning construction
of this project. As the project proceeds, notice of any changes in the approved design, as well as any change affecting the quantity or quality of the delivered water, must be submitted
to the Division. We may also conduct interim and final inspections of this project. Please notify us when actual construction begins so that these inspections can be scheduled.
This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter.
If you have any questions regarding this approval, please contact J. Paul Wright, P.E., DEQ Southwest District Engineer, at (435) 986-2590, or me at (385) 515‑1464.
Sincerely,
Michael Newberry, P.E.
Permitting and Engineering Support Manager
JPW/mrn/mdbEnclosures –Operating Permit Checklistcc:Jeremy Roberts, Southwest Utah Public Health Department, joberts@swuhealth.orgJ. Paul Wright, P.E., DEQ Southwest District Office,
pwright@utah.govRianna Howard, Ensign Engineering, rhoward@ensignutah.comCurtis Nielson, P.E., Ensign Engineering, cnielson@ensignutah.comTracy Feltner, Central Iron County WCD, tracy@cicwcd.orgPWright
11085 15892 PA
Utah Division of Drinking Water ― Checklist for Issuing Operating PermitsWater System Name:System Number: Project Description:File Number:
Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7
and is not required to obtain an Operating Permit).
Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating
Permit if the water system has received items 1 and 4 below.☐1.Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished,
and if applicable, changes made during construction were in conformance with rules R309-500 through 550☐2.As-built or record drawings incorporating all changes to approved plans and
specifications (unless no changes were made to the previously approved plans during construction)☐3.Confirmation that as-built or record drawings have been received by the water system☐4.Satisfactory
bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards:
☐ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water MainsTwo consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch)☐ANSI/AWWA
C652-11 AWWA Standard for Disinfection of Water-Storage FacilitiesOne or more samples, none positive☐ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment PlantsTwo consecutive
samples per unit, none positive, no less than 30 minutes apart☐ANSI/AWWA C654-13 AWWA Standard for Disinfection of WellsTwo consecutive samples, none positive, no less than 30 minutes
apart☐5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be
taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.]☐6.If applicable, all other documentation that may have been required during the
plan review process☐7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility☐8.If applicable, location data of new storage tank, treatment
facility, or source