HomeMy WebLinkAboutDERR-2024-010258VCP/Brownfields Section - Site Visit Report
SITE NAME: Alice Claim
SITE LOCATION: Park City
DATE OF SITE VISIT: 20 August 2024
PURPOSE OF SITE VISIT: DERR participation in Annual Inspection for Site Management Plan
FIELD OBSERVATIONS: David Bird met Kathy Harris of DK Environmental at the site. Each lot of the
planned development and the upper stream channel where capping had taken place was examined.
The status of revegetation in upland areas recently capped or disturbed was found to be good. The
DERR and DK Environmental also noted an area adjacent to the roadway upgradient of Lot 1 where
there was erosion ~ 6 inches in depth. DK noted that this location had at least 4 feet of fill above the
contaminated area as opposed to the minimum 12 inches called for in the RAP. DK will check this and
note it accordingly in the Annual Inspection Report. Excavation at Lot 6 was underway for construction
of a residence. The contractor had not disturbed the area where contamination was capped, and was
aware of the required procedure if that area is to be disturbed. The DERR looks forward to receiving the
Annual Inspection Report from DK Environmental.
Looking to the east at Lot 6. Construction of home underway.
Looking to the south in the drainage area where revegetation is re-establishing.
Looking to the south in an area of erosion south of Lot 1, and possibly on Lot 1 in the foreground.
SPLIT SAMPLES COLLECTED: N/A
IS THE WORK BEING PERFORMED IN A MANNER CONSISTENT WITH THE ACCEPTED SITE MANAGEMENT
PLAN?
Yes