HomeMy WebLinkAboutDDW-2024-010226Sanitary Survey - Deficiency Report PWS Number:UTAH18055 Deficiency Points:170 Survey Date:08/22/2024 Survey Name:MT HAVEN OWNERS ASSOCIATION Surveyor:Colt Smith Sanitary Survey Category: SM SDWIS Severity Code: Significant Deficiency Management and Operations | DS001 | UTAH18055 DISTRIBUTION SYSTEM 24. Are there any individual home booster pumps installed in the distribution system (not for fire suppression)? Rule: R309-550-11(3)R309-550-11(3) Notes:There are 37 known home booster pumps with associated hydropneumatic tanks. These are not required for pressure when the system is in operation. However, they do present a cross- connection risk. I discussed this with Tom and Ryan and we decided this was still the most appropriate deficiency for this system. Deficiency Points: 50 Days until points become effective on IPS: 120 SDWIS Deficiency Description: M008 SERVICE CONNECTIONS IN DISTRIBUTION SYSTEM RELY ON INDIVIDUAL HOME BOOSTER PUMP DUE TO INADEQUATE PRESSURE Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Management and Operations | DS001 | UTAH18055 DISTRIBUTION SYSTEM 28A. System lacks up to 20% of required source capacity Rule: R309-510-7(1)Rule requires a water system's source capacity to legally and physically meet the peak day demand and the average yearly demand. Notes:Still deficient Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: S091 SYSTEM LACKS UP TO 20% OF REQUIRED SOURCE CAPACITY Sanitary Survey Category: SO SDWIS Severity Code: Significant Deficiency Management and Operations | DS001 | UTAH18055 DISTRIBUTION SYSTEM 28B. System lacks more than 20% of required source capacity Rule: R309-510-7(1)Rule requires a water system's source capacity to legally and physically meet the peak day demand and the average yearly demand. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:The system is still deficient and is working on system-specific sizing. Deficiency Points: 50 Days until points become effective on IPS: 120 SDWIS Deficiency Description: S094 SYSTEM LACKS MORE THAN 20% OF REQUIRED SOURCE CAPACITY Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH18055 DISTRIBUTION SYSTEM 38. Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps installed within the system) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes written records of cross connection control activities. Notes:The system has written records, but they were incomplete because they did not note the individual home booster pumps and hydropneumatic tanks. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M006 CCC-LACKS WRITTEN RECORDS OF CCC ACTIVITIES Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH18055 DISTRIBUTION SYSTEM 39. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. Notes:The system has written records, but they were incomplete because they did not note the individual home booster pumps and hydropneumatic tanks, and the ongoing enforcement is part of eliminating the potential cross connection from the booster pumps. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION Sanitary Survey Category: SO SDWIS Severity Code: Significant Deficiency Springs | WS001 | MT. HAVEN SPRNG 65B. Spring box lid is gasketed Rule: R309-515-7(7)(d), R309-545-14 (2)Access openings shall comply with R309-545 and be provided with a cover furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:The gasket needs to be replaced. Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: SS10 SPRING BOX LID LACKS A GASKET