HomeMy WebLinkAboutDWQ-2024-005104PROJECT LOCATION LISBON VALLEY MINE STAGE 4 HEAP LEACH FACILITY EXPANSION SAN JUAN COUNTY, UTAH LISBON VALLEY MINING COMPANY, LLC HDPE LLDPE MAX. MIN. TYP. A.M.S.L. OD ID N.T.S. APPROX. SDR EST. S.F. EL. DIA. HIGH DENSITY POLYETHYLENE LINEAR LOW DENSITY POLYETHYLENE MAXIMUM MINIMUM TYPICAL ABOVE MEAN SEA LEVEL OUTSIDE DIAMETER INSIDE DIAMETER NOT TO SCALE APPROXIMATE STANDARD DIMENSION RATIO ESTIMATED SQUARE FOOT ELEVATION DIAMETER LIST OF ABBREVIATIONS HATCH LEGEND TITLE SHEET WITH DRAWING LIST AND LOCATION MAP GENERAL SITE LAYOUT GRADING PLAN HEAP LEACH PAD SECTIONS MISCELLANEOUS DETAILS VADOSE ZONE MONITORING AND SOLUTION COLLECTION PIPING LAYOUT 1 2 3 4 5 6 7 CLAY LINER FILL STRUCTURAL FILL PREPARED SUBGRADE CONCRETE GENERAL NOTES: 1.THIS DRAWING SET PRESENTS THE DESIGN REQUIREMENTS FOR CONSTRUCTION OF THE STAGE 4 HEAP LEACH FACILITY EXPANSION AT THE LISBON VALLEY MINE. 2.PREPARED SUBGRADE, AS DEFINED ON THE DRAWINGS, INCLUDES CLEARING, GRUBBING, TOP SOIL REMOVAL (IF ANY), REMOVAL OF UNSUITABLE MATERIAL, MOISTURE CONDITIONING, AND COMPACTION AS DEFINED IN THE SPECIFICATIONS. 3.CONTRACTOR IS RESPONSIBLE FOR LOCATING, STAKING, AND PROTECTING ANY SUBSURFACE UTILITIES AND PIPES PRIOR TO EARTHWORKS CONSTRUCTION ACTIVITIES. 4.THE CONTRACTOR IS RESPONSIBLE FOR THE CONSTRUCTION PROCESS AND SAFETY OF ITS WORKERS. THIS INCLUDES, BUT IS NOT LIMITED TO, THE CONSTRUCTION SEQUENCE, EXCAVATION, ACCESS AND BARRIERS. IT ALSO INCLUDES TEMPORARY SHORING OF EXCAVATIONS AND STABILITY OF TEMPORARY CUT SLOPES. 5.TWO-FOOT CONTOUR BASE MAP PROVIDED BY LISBON VALLEY MINING COMPANY, ACTUAL GROUND SURFACE EXPECTED TO VARY BY PLUS OR MINUS ONE FOOT. LOCATION MAP OVERLINER FILL ORE B B B B B B B LEACH PAD DETAILS TANK PAD AND TRUCK TURN AROUND PLAN AND SECTIONS8B DRAIN GRAVEL COMPACTED BACKFILL DRAWING NUMBER REVISION DRAWING TITLE 0 1 i n 31407443.000 DRAWING 10 SALT LAKE CITY OFFICE 10876 S. RIVER FRONT PARKWAY, SUITE 250 SOUTH JORDAN, UTAH, 84095 USA [+1] (801) 382-6900A2007-02-01 ISSUED FOR PERMITTING AND CONSTRUCTION JWRKFM KFM REK B 2024-04-26 ISSUED FOR REVIEW JWRJWR REK DKF 0 2024-04-30 ISSUED FOR CONSTRUCTION JWRJWR REK DKF LISBON VALLEY MINE STAGE 4 HEAP LEACH FACILITY EXPANSION LISBON VALLEY MINING COMPANY, LLC TITLE SHEET WITH DRAWING LIST AND LOCATION MAP TITLE PROJECT NO.REV. PROJECTCLIENT CONSULTANT Pa t h : \\ g o l d e r . g d s \ c o m p l e x d a t a \ o f f i c e \ d e n v e r \ a c a d \ L I S B O N V A L L E Y M I N E \ P R O D U C T I O N \ S T A G E 4 I F C \ | F i l e N a m e : 06 3 2 2 5 3 A 0 0 2 . d w g | L a s t E d i t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 2: 1 0 : 2 6 P M | P r i n t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 2: 2 4 : 4 5 P M REV.DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED SEAL of IF T H I S M E A S U R E M E N T D O E S N O T M A T C H W H A T I S S H O W N , T H E S H E E T S I Z E H A S B E E N M O D I F I E D F R O M : A N S I D CPE PCPE PVC FT PERF. N-12 CORRUGATED POLYETHYLENE PERFORATED CORRUGATED POLYETHYLENE POLYVINYL CHLORIDE FEET PERFORATED ADS N-12 PCPE PIPE (OR APPROVED EQUIVALENT) HEAP LEACH PAD CONTROL POINTS9B 0 FEET 4000 8000 1'' = 4000' PLANT AREA WA S T E D U M P SENTINEL PIT 1 SENTINEL PIT 2 WASTE DUMP NO.2 NO.1 0260 26 08 0616 E 3 2 5 0 0 E 3 2 5 0 0 E 3 5 0 0 0 E 3 5 0 0 0 E 3 7 5 0 0 E 3 7 5 0 0 E 4 0 0 0 0 E 4 0 0 0 0 E 4 2 5 0 0 E 4 2 5 0 0 E 4 5 0 0 0 E 4 5 0 0 0 E 4 7 5 0 0 E 4 7 5 0 0 N 35000 N 35000 N 37500 N 37500 N 40000 N 40000 N 42500 N 42500 N 45000 N 45000 N 47500 N 47500 EXISTING EMERGENCY OVERFLOW PONDEXISTING STORMWATER POND EXISTING RAFFINATE POND EXISTING ILS POND WASTE DUMP NO.4 CENTENNIAL PIT WASTE DUMP NO.3 ORE STOCKPILE AND CRUSHER AREA GTO PIT PROPOSED STAGE 4 (NOTE 4) EXISTING STAGE 3 EXISTING STAGE 2 (NOTE 5) EXISTING STAGE 1 (NOTE 5) EXISTING PRE-RAFFINATE POND STORMWATER DIVERSIONS EXISTING PLS POND GTP-05 GTP-08 GTP-11 GTP-02 GTP-01 GTP-04 GTP-07 GTP-10 GTP-03 GTP-06 GTP-09 GTP-12 7D8D9D10D 11D12D 11C 11B GBH-01 GBH-02 GBH-04 GBH-03 GBH-05 GBH-06 GBH-08 GBH-09 GBH-10 GBH-11 GBH-12 GBH-07 MW-3 MW-1 MW-2 94MW5 94MW3 94MW1 94MW4 94MW2 EXISTING DRAINAGE MONITORING WELL PROPOSED FINISHED GRADE TOPOGRAPHY EXISTING GROUND TOPOGRAPHY 6460 6470 GBH-08 GOLDER 2006 BOREHOLE LOCATION (NOTE 1) GTP-10 GOLDER 2006 TEST PIT LOCATION (NOTE 1) EXISTING COUNTY ROAD EXISTING MINE ROAD PROJECT BOUNDARY EXISTING BUILDINGS OR FACILITIES DIVERSION CHANNEL 12D SHEPHERD MILLER 1995 STAGE 3 AND 4 CPT LOCATION (NOTE 2) MW-1 NOTES REFERENCES 1.LOCATIONS OF GOLDER 2006 BOREHOLES AND TEST PITS WERE SURVEYED BY LISBON VALLEY MINING COMPANY. 2.CPT LOCATIONS ONLY SHOWN WITHIN THE STAGE 3 AND 4 FOOTPRINT AREA. LOCATIONS ARE APPROXIMATE, SCALED FROM A FIGURE IN THE STAGE 1 DESIGN REPORT. 3.LOCATIONS OF SHEPHERD MILLER AND TELESTO BOREHOLES AND TEST PITS WITHIN STAGES 1 AND 2 FOOTPRINTS ARE NOT SHOWN. 4.ADDITIONAL BOREHOLES AND TEST PITS WILL BE CONDUCTED WITHIN THE PROPOSED STAGE 4 FOOTPRINT PRIOR TO CONSTRUCTION TO CONFIRM SUBSURFACE CONDITIONS. 5.ORE IS CURRENTLY STACKED AND BEING LEACHED WITHIN STAGES 1,2 AND 3. TOPOGRAPHY SHOWN IS REPRESENTATIVE OF BASE (I.E. LINER) CONDITIONS. 1. BASE TOPOGRAPHY, PROPOSED TOPOGRAPHY, AND AS-BUILT TOPOGRAPHY SUPPLIED BY LISBON VALLEY MINING COMPANY. LEGEND 0 FEET 750 1500 1'' = 750' 0 1 i n 31407443.000 DRAWING 20 SALT LAKE CITY OFFICE 10876 S. RIVER FRONT PARKWAY, SUITE 250 SOUTH JORDAN, UTAH, 84095 USA [+1] (801) 382-6900A2007-02-01 ISSUED FOR PERMITTING AND CONSTRUCTION JWRKFM KFM REK B 2024-04-26 ISSUED FOR REVIEW JWRJWR REK DKF 0 2024-05-01 ISSUED FOR CONSTRUCTION JWRJWR REK DKF LISBON VALLEY MINE STAGE 4 HEAP LEACH FACILITY EXPANSION LISBON VALLEY MINING COMPANY, LLC GENERAL SITE LAYOUT TITLE PROJECT NO.REV. PROJECTCLIENT CONSULTANT Pa t h : \\ g o l d e r . g d s \ c o m p l e x d a t a \ o f f i c e \ d e n v e r \ a c a d \ L I S B O N V A L L E Y M I N E \ P R O D U C T I O N \ S T A G E 4 I F C \ | F i l e N a m e : 06 3 2 2 5 3 A 0 0 9 . d w g | L a s t E d i t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 2 6 T i m e : 9: 2 4 : 2 4 A M | P r i n t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 2: 2 6 : 3 8 P M REV.DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED SEAL of IF T H I S M E A S U R E M E N T D O E S N O T M A T C H W H A T I S S H O W N , T H E S H E E T S I Z E H A S B E E N M O D I F I E D F R O M : A N S I D ELECTRICAL STATIONS 5-300' CELLS 41 000 N 41 000 N 36 0 0 0 E 36 0 0 0 E 42 000 N 42 000 N 43 000 N 43 000 N 40 000 N 40 000 N 39 000 N 39 000 N 35 0 0 0 E 35 0 0 0 E 34 0 0 0 E 34 0 0 0 E 33 0 0 0 E 33 0 0 0 E 32 0 0 0 E 32 0 0 0 E 37 0 0 0 E 37 0 0 0 E 38 0 0 0 E 38 0 0 0 E 39 0 0 0 E 39 0 0 0 E A 4 A' 4 B 4 C 4 C' 4 RS1 RW EARTHWORKS VOLUMES: CUT= 138,000 C.Y. FILL= 54,000 C.Y. STAGE 3/STAGE 4 SEPARATION BERM SEE DETAIL EXISTING EMERGENCY OVERFLOW POND EXISTING PRE-RAFFINATE POND EXISTING RAFFINATE POND EXISTING PLS POND EXISTING STORMWATER POND PLANT SITE EXISTING ILS POND COLLECTION CHANNEL LINER ANCHOR TRENCH SEE DETAIL TYP. LINER ANCHOR TRENCH SEE DETAIL TYP. LEACH PAD LINER SEE DETAIL TYP. EXISTING STAGE 2 (NOTE 3) EXISTING STAGE 1 (NOTE 3) STAGE 4 (~68.0 ACRES) STAGE 3 (~68.2 ACRES) CHANNEL TIE-IN SEE DETAIL BEGIN CHANNEL RS1 BEGIN CHANNEL RS3 NOTE 4 NOTE 4 LEACH PAD LINER CELL BERM SEE DETAIL TYP. B' 4 DITCH SLOPE TRASITIONS FROM 2% TO 0.8% PAD FOR TANKS AND TRUCK TURN AROUND AREA SEE DRAWING 8 4 5 8 7 7 5 8 5 11 5 10 5 6 5 LEGEND NOTES REFERENCES 1.GRADING CONTOURS REFLECT TOP OF CLAY LINER FILL WITHIN LIMITS OF STAGE 4 EXPANSION, EXISTING STAGES 1,2 AND 3, EXISTING PONDS AND SOLUTION CHANNEL. GRADING CONTOURS REFLECT TOP OF STRUCTURAL FILL OUTSIDE OF THESE LIMITS. 2.TWO-FOOT CONTOUR BASE MAP PROVIDED BY LISBON VALLEY MINING COMPANY, ACTUAL GROUND SURFACE EXPECTED TO VARY BY PLUS OR MINUS ONE FOOT. 3.ORE IS CURRENTLY STACKED AND BEING LEACHED WITHIN STAGES 1,2 AND 3. TOPOGRAPHY SHOWN IS REPRESENTATIVE OF ORE SURFACE. 4.CUT SLOPES AS SHOWN ARE DESIGNED AT 1(H):1(V). ACTUAL SLOPES ARE TO BE INSPECTED BY A QUALIFIED GEOTECHNICAL ENGINEER TO VERIFY OR MODIFY THIS SLOPE FOR THE CONDITIONS ENCOUNTERED. WHERE COMPETENT BEDROCK IS ENCOUNTERED, THE SLOPE MAY BE STEEPENED TO A MAXIMUM OF 0.5(H):1(V) IF APPROVED BY ENGINEER. 1. EXISTING GROUND TOPOGRAPHY PROVIDED BY LISBON VALLEY MINING COMPANY, LLC. PROPOSED GRADING CONTOURS (NOTE 1) 6410 6420 EXISTING GROUND TOPOGRAPHY (SEE REFERENCE 1) CROSS SECTION IDENTIFIER SHEET WHERE SECTION IS LOCATED C 4 EXISTING BUILDINGS OR FACILITIES 1 3 STAGE 4 GRADING PLAN SCALE: 1"=300' RS1 DIVERSION CHANNEL AND REACH DESIGNATION 0 1 i n 31407443.000 DRAWING 30 SALT LAKE CITY OFFICE 10876 S. RIVER FRONT PARKWAY, SUITE 250 SOUTH JORDAN, UTAH, 84095 USA [+1] (801) 382-6900A2007-02-01 ISSUED FOR PERMITTING AND CONSTRUCTION JWRKFM KFM REK B 2024-04-26 ISSUED FOR REVIEW JWRJWR REK DKF 0 2024-04-30 ISSUED FOR CONSTRUCTION JWRJWR REK DKF LISBON VALLEY MINE STAGE 4 HEAP LEACH FACILITY EXPANSION LISBON VALLEY MINING COMPANY, LLC STAGE 4 GRADING PLAN TITLE PROJECT NO.REV. PROJECTCLIENT CONSULTANT Pa t h : \\ g o l d e r . g d s \ c o m p l e x d a t a \ o f f i c e \ d e n v e r \ a c a d \ L I S B O N V A L L E Y M I N E \ P R O D U C T I O N \ S T A G E 4 I F C \ | F i l e N a m e : 06 3 2 2 5 3 A 0 1 0 . d w g | L a s t E d i t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 2: 3 1 : 1 9 P M | P r i n t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 2: 4 0 : 3 8 P M REV.DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED SEAL of IF T H I S M E A S U R E M E N T D O E S N O T M A T C H W H A T I S S H O W N , T H E S H E E T S I Z E H A S B E E N M O D I F I E D F R O M : A N S I D 0 FEET 300 600 1'' = 300' STACKED ORE SURFACE CONTOURS (NOTE 3) 6410 6420 A 3 HEAP LEACH PAD SECTION A-A' SCALE: 1"=100' B 3 HEAP LEACH PAD SECTION B-B' SCALE: 1"=100' C 3 HEAP LEACH PAD SECTION C-C' SCALE: 1"=100' ANGLE OF REPOSE ANGLE OF REPOSE ANGLE OF REPOSE ANGLE OF REPOSE ANGLE OF REPOSE PREPARED SUBGRADE PREPARED SUBGRADE PREPARED SUBGRADE 6450 6470 6490 6510 0 400 800 1200 1600 2000 2400 2800 3200 6470 6490 6510 6530 0 400 800 1200 1600 2000 2400 6440 6460 6480 6500 0 400 800 1200 1600 2000 2400 WEST A EAST A' NORTH B SOUTH B' SOUTH C' NORTH C HORIZONTAL DISTANCE - FEET HORIZONTAL DISTANCE - FEET HORIZONTAL DISTANCE - FEET EL E V A T I O N - F E E T A M S L EL E V A T I O N - F E E T A M S L EL E V A T I O N - F E E T A M S L EXISTING GROUND SURFACETOP OF LINER TOP OF LINER TOP OF LINER TIE-IN TO STAGE 2 SEE DETAIL ACCESS ROAD AND DIVERSION CHANNEL SEE DETAIL ACCESS ROAD AND DIVERSION CHANNEL SEE DETAIL SOLUTION COLLECTION CHANNEL SEE DETAIL SOLUTION COLLECTION CHANNEL SEE DETAIL 6430 6450 6420 STAGE 4 STAGE 3 STAGE 3 AND 4 SEPARATION BERM SEE DETAIL SEE DETAIL (TYP.) NORTH-SOUTH CELL BERM STAGE 4 STAGE 3 EXISTING STAGE 2 6450 6470 6490 6510 EL E V A T I O N - F E E T A M S L 6430 6470 6490 6510 6530 EL E V A T I O N - F E E T A M S L 6450 6440 6460 6480 6500 EL E V A T I O N - F E E T A M S L 6420 EXISTING GROUND SURFACE EXISTING GROUND SURFACE LIFT 1 LIFT 2 LIFT 3 LIFT 4 OVERALL SLOPE 2.5 1 6530 6550 6570 6590 6610 6530 6550 6570 6590 6610 OVERALL SLOPE 2.5 1 6550 6570 6590 6610 6630 6550 6570 6590 6610 6630 LIFT 1 LIFT 2 LIFT 3 LIFT 4 LIFT 1 LIFT 2 LIFT 3 LIFT 4 OVERALL SLOPE 2.5 1 6520 6540 6560 6580 6600 6520 6540 6560 6580 6600 2.5 1 2.5 1 OVERALL SLOPE OVERALL SLOPE LEACH PAD LINER TYP. LEACH PAD LINER TYP. CELL SEPARATION BERM TYP. EXISTING STAGE 3 LEACH PAD LINER PROPOSED STAGE 4 LEACH PAD LINER TYP. DESIGN ORE LIFTS SURVEYED STAGE 3 ORE SURFACE 1 5 12 5 12 5 4 5 4 5 7 5 8 5 8 5 6 5 6 5 DESIGN ORE LIFTS SURVEYED STAGE 3 ORE SURFACE 8 5 EXISTING GROUND SURFACE TOP OF 2-ft. THICK CUSHION LAYER EXISTING GROUND 300'300'300' 300'300' TOP OF 2 ft THICK CUSHION LAYER LEGEND NOTES 1.PLACE LOCAL ORE IN LIFTS A ANGLE OF REPOSE. BENCH AND/OR RESLOPE AS NECESSARY TO ACHIEVE OVERALL ORE SIDESLOPES OF 2.0H DURING OPERATIONS, WITH FINAL EXTERIOR SLOPES BENCHED TO PROVIDE A COMPOSITE CLOSURE SLOPE OF 2.5H:1V. MAXIMUM HEIGHT OF LIFT 1 SHALL NOT EXCEED 25 FEET. EXISTING GROUND SURFACE STAGE 4 LINER SURFACE PROPOSED TOP OF HEAP OR STRUCTURAL FILL GRADING 0 1 i n 31407443.000 DRAWING 40 SALT LAKE CITY OFFICE 10876 S. RIVER FRONT PARKWAY, SUITE 250 SOUTH JORDAN, UTAH, 84095 USA [+1] (801) 382-6900A2007-02-01 ISSUED FOR PERMITTING AND CONSTRUCTION JWRKFM KFM REK B 2024-04-26 ISSUED FOR REVIEW JWRJWR REK DKF 0 2024-04-30 ISSUED FOR CONSTRUCTION JWRJWR REK DKF LISBON VALLEY MINE STAGE 4 HEAP LEACH FACILITY EXPANSION LISBON VALLEY MINING COMPANY, LLC HEAP LEACH PAD SECTIONS TITLE PROJECT NO.REV. PROJECTCLIENT CONSULTANT Pa t h : \\ g o l d e r . g d s \ c o m p l e x d a t a \ o f f i c e \ d e n v e r \ a c a d \ L I S B O N V A L L E Y M I N E \ P R O D U C T I O N \ S T A G E 4 I F C \ | F i l e N a m e : 06 3 2 2 5 3 A 0 1 3 . d w g | L a s t E d i t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 2 6 T i m e : 9: 4 1 : 0 7 A M | P r i n t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 2: 3 8 : 5 9 P M REV.DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED SEAL of IF T H I S M E A S U R E M E N T D O E S N O T M A T C H W H A T I S S H O W N , T H E S H E E T S I Z E H A S B E E N M O D I F I E D F R O M : A N S I D STAGE 3 LINER SURFACE SURVEYED TOP OF HEAP SURFACE 0 FEET 100 200 1'' = 100' REMOVE EXCESS MATERIAL FROM EXISTING BERM HDPE LINER 1 FT. CLAY LINER FILL 10 FT. (TYP.) FUSION WELD STAGE 3 LLDPE LINER TO EXISTING STAGE 2 HDPE LINER STEP 1 STAGE 3STAGE 4 1 5 STAGE 3 / STAGE 4 TIE-IN DETAIL N.T.S. 1 FT. CLAY LINER FILL STAGE 3STAGE 4 STEP 2 60-MIL LLDPE 1 FT. CLAY LINER FILL HDPE LINER TEMPORARY DIVERSION DITCH SLOPE LINER SYSTEM 1 LEACH PAD ORE ~1.4 LIFT 1 LIFT 2 OVERALL SLOPE 1 2.5 LIFT 3 2 5 HEAP CROSS-SECTION - UPGRADIENT SIDE N.T.S. 8 5 SEE DETAIL 5 5 CONVEYOR CORRIDOR LIFT 4 25 F T . (M A X . ) 108 FT. (TYP.) LINER SYSTEM LEACH PAD SLOPE (SEE DETAIL ) AND ACCESS ROAD COLLECTION BERM, SOLUTION CHANNEL, 3 5 HEAP CROSS-SECTION - DOWNGRADIENT SIDE N.T.S. 1ORELIFT 1 LIFT 2 OVERALL SLOPE 1 2.5LIFT 3 8 5 LIFT 4 4 5 ~1.4 25 F T . (M A X . ) 108 FT. (TYP.) 1 3 4 5 PERIMETER BERM AND COLLECTION CHANNEL N.T.S. COLLECTION BERM 5 FT. MIN6 FT. MIN. 1 2 1 2.5 3 FT. MIN. SLOPE 60-MIL LLDPE 1FT. CLAY LINER FILL 4 FT. MIN. 12 FT. SOLUTION CHANNEL 80 MIL HDPE RUBSHEET BENEATH ALL 8 IN. DIA. OR GREATER SOLUTION PIPES 15 FT. ACCESS ROAD 1 FT. CLAY LINER FILL 2.5 FT. MIN PROTECTIVE CUSHION LAYER STRUCTURAL FILL FUSION WELD, TRANSITION FROM 60 MIL LLDPE TO 80 MIL HDPE 2 FT. PREPARED SUBGRADE 10 5 2 FT. 9 5 TYP. 24" DIA. NON-PERFORATED HDPE SDR17 (MIN.) SOLUTION TRANSPORT PIPES 9 5 TYP. 1 FT. MIN. 1 FT. MIN. BEGIN 60 MIL LLDPE SECONDARY LINER AND GEONET AT ANCHOR TRENCH 13 5 14 5 1 FT. MIN. 21 LEACH PAD LINER SYSTEM3 FT. SLOPE 60 FT. ORE OVERLINER FILL 2 FT. OF 5 5 CONVEYOR CORRIDOR CROSS-SECTION N.T.S. 8 5 11 5 PREPARED SUBGRADE1 FT. (MIN.) CLAY LINER FILL SLOPE 3 1 6 5 NORTH-SOUTH CELL BERM CROSS-SECTION N.T.S. 8 5 4 IN. DIA. TERTIARY PERFORATED CPE COLLECTION PIPES (@ 15 FT. O.C.) SECONDARY PERFORATED CPE COLLECTION PIPE (SEE DRAWING 6 FOR SIZES) 60-MIL LLDPE BERM CONSTRUCTED WITH CUSHION LAYER MATERIAL 2 FT THICK (MIN.) PROTECTIVE CUSHION LAYER PREPARED SUBGRADE 60 MIL LLDPE 8 5 TYPICAL LEACH PAD LINER SYSTEM DETAIL N.T.S. 2 FT. THICK (MIN.) PROTECTIVE CUSHION LAYER 1 FT. THICK (MIN.) CLAY LINER FILL 60 MIL LLDPE 1.5 FT. MIN. MI N . 1. 5 F T . 2 FT. MIN. BACKFILL COMPACTED 11 5 LEACH PAD LINER ANCHOR DETAIL N.T.S. PREPARED SUBGRADE 1 FT. CLAY LINER FILL 60 MIL LLDPE 10 FT. (TYP.) 7 5 STAGE 3 AND 4 SEPARATION BERM N.T.S. 3 1 3 1 4 FT. 1 FT. CLAY LINER FILL SLOPE OVERLINER FILL 8 5 2 FT. MIN. SECONDARY PERFORATED CPE COLLECTION PIPE (SEE DRAWING 6 FOR SIZES) 4 IN. DIA. TERTIARY PERFORATED CPE COLLECTION PIPES STRUCTURAL FILL OR PREPARED SUBGRADE SLOPE EXISTING STAGE 3 NEW CONSTRUCTION STAGE 4 2 FT. PROTECTIVE CUSHION LAYER OVERLINER FILL CUSHIO N L A Y E R STAGE 4 1 FT. THICK RIPRAP D50=6 INCHES TYPE VL 12 5 PERIMETER ACCESS ROAD AND DIVERSION CHANNEL DETAIL N.T.S. PREPARED SUBGRADE 10 FT. 3 13 1 VARIES SEE DETAIL 6 IN. ALL WEATHER ROAD SURFACE 30 FT. ACCESS ROAD LEACH PAD 11 5 7 7 ANCHOR PREPARED SUBGRADE 60 MIL LLDPE 1.5 FT. MIN. MI N . 1. 5 F T . 80 MIL HDPE EXTEND INTO GEONET 2 FT. MIN. BACKFILL COMPACTED 10 5 COLLECTION CHANNEL / TANK PAD LINER ANCHOR DETAIL N.T.S. 1 FT. CLAY LINER FILL 9 5 TYP. 9 5 TYPICAL SOLUTION COLLECTION CHANNEL / TANK PAD LINER SYSTEM DETAIL N.T.S. 60 MIL LLDPE GEOMEMBRANE 80 MIL HDPE GEOMEMBRANE GEONET 1 FT. CLAY LINER FILL PREPARED SUBGRADE 60 MIL LLDPE 80 MIL HDPE GEONET 14 5 COLLECTION CHANNEL PARTIAL LINER ANCHOR DETAIL N.T.S. 1 FT. CLAY LINER FILL 1.5 FT. MIN. PREPARED SUBGRADE OR STRUCTURAL FILL 1.5 FT. MIN. EXTENDANCHOR GEONET AND 60 MIL LLDPE 80 MIL HDPE60 MIL LLDPE PREPARED SUBGRADE FUSION WELD 1 FT. (MIN.) CLAY LINER FILL 13 5 LLDPE TO HDPE TRANSITION N.T.S. 0 1 i n 31407443.000 DRAWING 50 SALT LAKE CITY OFFICE 10876 S. RIVER FRONT PARKWAY, SUITE 250 SOUTH JORDAN, UTAH, 84095 USA [+1] (801) 382-6900A2007-02-01 ISSUED FOR PERMITTING AND CONSTRUCTION JWRKFM KFM REK B 2024-04-26 ISSUED FOR REVIEW JWRJWR REK DKF 0 2024-04-30 ISSUED FOR CONSTRUCTION JWRJWR REK DKF LISBON VALLEY MINE STAGE 4 HEAP LEACH FACILITY EXPANSION LISBON VALLEY MINING COMPANY, LLC LEACH PAD DETAILS TITLE PROJECT NO.REV. PROJECTCLIENT CONSULTANT Pa t h : \\ g o l d e r . g d s \ c o m p l e x d a t a \ o f f i c e \ d e n v e r \ a c a d \ L I S B O N V A L L E Y M I N E \ P R O D U C T I O N \ S T A G E 4 I F C \ | F i l e N a m e : 06 3 2 2 5 3 A 0 0 3 _ B . d w g | L a s t E d i t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 1: 1 4 : 3 2 P M | P r i n t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 2: 4 2 : 4 9 P M REV.DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED SEAL of IF T H I S M E A S U R E M E N T D O E S N O T M A T C H W H A T I S S H O W N , T H E S H E E T S I Z E H A S B E E N M O D I F I E D F R O M : A N S I D BEGIN CHANNEL RS2 BEGIN CHANNEL RS1 EXISTING STAGE 2 EXISTING STAGE 3 HEAP LEACH FACILITY STAGE 4 HEAP LEACH FACILITY EXPANSION 5 X 300-FT CELLS LEGEND TERTIARY 4 INCH DIA. PERFORATED PCPE PIPE NOTES REFERENCES PROPOSED FINISHED GRADE TOPOGRAPHY (NOTE 1) EXISTING GROUND TOPOGRAPHY (REFERENCE 1) SECONDARY 6 INCH DIA. PERFORATED N-12 CPE SOLUTION PIPE SECONDARY 8 INCH DIA. PERFORATED N-12 CPE SOLUTION PIPE SECONDARY 10 INCH DIA. PERFORATED N-12 CPE SOLUTION PIPE SECONDARY 12 INCH DIA. PERFORATED N-12 CPE SOLUTION PIPE LYSIMETER (NOTE 2) 6 5 7 5 5 7 TYP 6 7 1 74 5 8 7 CHANNEL TIE-IN 12 5 SEE DETAIL 7 7 10 7 2 7 PROTECTIVE COVER FOR LYSIMETER INSTALLATION 10 7 1.FINAL GRADE ELEVATIONS SHOWN ON THIS DRAWING ARE TOP OF GEOMEMBRANE LINER ON THE PAD AND LINED SOLUTION CHANNEL, AND TOP OF STRUCTURAL FILL IN UNLINED AREAS. 2.TERMINATE LYSIMETER PVC CONDUIT WITH A PROTECTIVE COVER PER DETAIL 10 ON DRAWING 7. PROTECT BY PLACING THREE CONCRETE BALLARDS AT NOMINAL 5-FT SPACING IN THREE DIRECTIONS. 3.FOUR 24-IN. PIPES LOCATED WITHIN SOLUTION COLLECTION CHANNEL PER DETAIL 2, DRAWING 7. 4.CAP UPSTREAM ENDS OF NEW PRIMARY, SECONDARY, AND TERTIARY SOLUTION PIPES. 5.INSTALL ALL SOLUTION PIPE WITH A MINIMUM GRADE OF 1 PERCENT. 1.BASE TOPOGRAPHY SUPPLIED BY LISBON VALLEY MINING COMPANY. 24 INCH DIA. NON-PERFORATED HDPE SDR17 (MIN.) CPE SOLUTION TRANSPORT PIPE (NOTE 3) STAGE 3/4 CELL SEPARATION BERM TERTIARY TO SECONDARY PIPE CONNECTION LYSIMETER (TYP.) 12 IN. TEE (TYP.) EXISTING SOLUTION COLLECTION CHANNEL 12 INCH DIA. NON-PERFORATED HDPE SDR17 (MIN.) CPE SOLUTION PIPE NORTH-SOUTH CELL BERM TYP. CELL OUTLET SEE DETAIL TYP. PERIMETER BERM AND COLLECTION CHANNEL PERIMETER ACCESS ROAD AND DIVERSION CHANNEL DIVERSION CHANNEL PROTECTIVE COVER FOR LYSIMETER INSTALLATION TYP. SOLUTION COLLECTION CHANNEL SUMP (1 PER STAGE) TYP. 0 1 i n 31407443.000 DRAWING 60 SALT LAKE CITY OFFICE 10876 S. RIVER FRONT PARKWAY, SUITE 250 SOUTH JORDAN, UTAH, 84095 USA [+1] (801) 382-6900A2007-02-01 ISSUED FOR PERMITTING AND CONSTRUCTION JWRKFM KFM REK B 2024-04-26 ISSUED FOR REVIEW JWRJWR REK DKF 0 2024-04-30 ISSUED FOR CONSTRUCTION JWRJWR REK DKF LISBON VALLEY MINE STAGE 4 HEAP LEACH FACILITY EXPANSION LISBON VALLEY MINING COMPANY, LLC VADOSE ZONE MONITORING AND SOLUTION COLLECTION PIPING LAYOUT TITLE PROJECT NO.REV. PROJECTCLIENT CONSULTANT Pa t h : \\ g o l d e r . g d s \ c o m p l e x d a t a \ o f f i c e \ d e n v e r \ a c a d \ L I S B O N V A L L E Y M I N E \ P R O D U C T I O N \ S T A G E 4 I F C \ | F i l e N a m e : 06 3 2 2 5 3 A 0 1 2 . d w g | L a s t E d i t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 1: 1 5 : 1 8 P M | P r i n t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 2: 4 5 : 5 6 P M REV.DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED SEAL of IF T H I S M E A S U R E M E N T D O E S N O T M A T C H W H A T I S S H O W N , T H E S H E E T S I Z E H A S B E E N M O D I F I E D F R O M : A N S I D 15 FT. SPACING (TYP.) STAGE 4 PIPE QUANTITIES TERTIARY 3 INCH DIA. PERFORATED PCPE PIPE - 181,371 FT SECONDARY 6 INCH DIA. PERFORATED N-12 CPE SOLUTION PIPE -2,140 FT SECONDARY 8 INCH DIA. PERFORATED N-12 CPE SOLUTION PIPE - 2,434 FT SECONDARY 10 INCH DIA. PERFORATED N-12 CPE SOLUTION PIPE - 3,753 FT SECONDARY 12 INCH DIA. PERFORATED N-12 CPE SOLUTION PIPE - 2,860 FT 12 INCH DIA. NON-PERFORATED HDPE SDR17 (MIN.) CPE SOLUTION PIPE - 180 FT NOTE: QUANTITIES DO NOT ACCOUNT FOR WASTE. FL O W T O R A F F I N A T E P O N D / I L S P O N D FL O W T O P L S P O N D TERTIARY 3 IN. DIA. PCPE COLLECTION PIPE (20 FT. O.C.) F L O W BERM COLLECTION 12 FT.5 FT. FLOW 36 IN. COLLECTION CAN SEE DETAIL 1 7 SOLUTION COLLECTION PIPING OUTLET PLAN VIEW N.T.S 3 7 6 FT. MIN. SECONDARY SOLUTION 12 IN. DIA. PERFORATED CPE COLLECTION PIPE TERTIARY TO SECONDARY SOLUTION COLLECTION PIPE 5 7 TEE PIPE FITTING 12 IN. DIA. NON-PERFORATED HDPE SOLUTION COLLECTION PIPE FL O W RA F F I N A T E S O L U T I O N F E E D PERIPHERAL LINER FUSION WELDED TO PRIMARY LINER AT DOWNGRADIENT SIDE OF EACH LEAK DETECTION SUMP (NOTE 7) 24 IN. DIA. NON-PERFORATED HDPE SOLUTION TRANSPORT PIPES, SDR 17 (MIN.) SOLUTION COLLECTION CHANNEL LEAK DETECTION SUMP (NOTE 7) 2 FT. MIN. F L O W FLOW 12 IN. DIA. PERFORATED CPE SECONDARY SOLUTION COLLECTION PIPE STAGE OR CELL DIVIDER BERM TRANSITION FROM 12 IN. CPE TO 12 IN. HDPE PIPE SEE DETAIL 9 7 SOLUTION COLLECTION CHANNEL IN T E R M E D I A T E S O L U T I O N F E E D NOTE: SHADED AREA INDICATES THE EXTENT OF SOLUTION COLLECTION CHANNEL LINER SYSTEM. ~ 2 7 2 7 4 7 4 7 START OF PERIPHERAL 60 MIL LLDPE SECONDARY LINER AND GEONET 13 5FUSION WELD TRANSITION TO 80 MIL HDPE PRIMARY LINER TYP. 14 5TYP. 12 FT. 1 FT. CLAY LINER FILL 1 3 ACCESS ROAD 36 IN. COLLECTION CAN SEE DETAIL (NOTE 9) 1 FT. LEAK DETECTION RISER PIPE LINER BOOT (4 IN. DIA SOLID HDPE PIPE, COLLECTION CHANNEL LINER ANCHOR SEE DETAIL 4 FT. 3 FT. SANDBAG AND SOIL DAM (NOTE 1) SEE DETAIL POLYETHYLENE SANDBAGS PREPARED SUBGRADE EXTRUSION WELD POLYETHYLENE DAM TO 80-MIL HDPE 12 IN. DIA. NON- PERF. HDPE SOLUTION PIPES SDR 17 (MIN.) BACKFILL WITH MATERIAL APPROVED BY ENGINEER 80-MIL HDPE RUBSHEET 12 IN. DIA. PERFORATED CPE SECONDARY SOLUTION COLLECTION PIPE EXTRUSION WELD BOOT TO HDPE PIPE ALL AROUND (SEE NOTE 1) LEACH PAD LINER SYSTEM TYP.SOLUTION COLLECTION CHANNEL LINER SYSTEM TYP.24 IN. DIA. NON-PERFORATED SOLUTION TRANPORT PIPES SDR 17 (MIN.) LOWER 1 FT. SLOTTED) THREADED PLUG DRAIN GRAVEL 80-MIL HDPE RUBSHEET UNDER SOLUTION TRANSPORT PIPES 6.5 FT. 2 FT. 12 IN. DIA. PCPE TO 12 IN. DIA. NON-PERF. HDPE PIPE SEE DETAIL FUSION WELD 60 MIL LLDPE TO 80 MIL HDPE PREPARED SUBGRADE 4 7 8 5 3 7 10 5 9 5 9 7 VALVES (BY OWNER) 2 7 TYPICAL SOLUTION COLLECTION CHANNEL OUTLET AND SUMP SECTION (NOTE 7) N.T.S. 80 MIL HDPE RUBSHEET CONNECT BY 24 IN. BY 12 IN. PIPE TEE 14 5 2 FT. THICK PROTECTIVE CUSHION LAYER 36 IN. DIA. SDR 32.5 12 IN. DIA. INLET 30° 12 IN. DIA. OUTLET PIPES FLANGED OUTLETS 12 IN. SDR 17 W/ SS BACKING RINGS 16 IN. 4 FT. SOLID BOTTOM (NOTE 9) REMOVABLE OR HINGED TOP FOR ACCESS TO CAN FOR SOLUTION SAMPLING VALVES (BY OWNER) 3 7 COLLECTION CAN FOR PAD RETURN FLOW N.T.S. 10 FT.DEPTH, D (NOTE 3) 3 1 3 1 PREPARED SUBGRADE TYPE VL RIPRAP (D50=6 INCHES) 12 IN. (NOTE 4) CHANNEL DESIGNATION DEPTH, D (FT) RS1 3.0 RS2 4.0 RS3 5.0 RW 3.5 7 7 TYPICAL TRAPEZOIDAL DIVERSION CHANNEL N.T.S. 10 FT. TERTIARY 3 IN. DIA. PCPE COLLECTION PIPE END CAP PERFORATED CPE SECONDARY SOLUTION COLLECTION PIPE (NOTE 2)PLASTIC TIES FLO W FLOW 5 7 SOLUTION COLLECTION PIPE CONNECTION N.T.S. FLOW TYPICAL TERTIARY TO SECONDARY 3: 1 EXISTING CHANNEL BASE WITH HDPE LINER 1 FT. MIN CLAY LINER FILL EXISTING TOP OF CHANNEL NEW CHANNEL BASE AND 80 MIL HDPE LINER EXISTING GROUND PREPARED SUBGRADE 3: 1 FUSION WELD EXISTING HDPE LINER TO NEW LINER PROPOSED TOP OF CHANNEL 9 5 8 7 CHANNEL TIE-IN PROFILE DETAIL N.T.S. 200 MESH SILICA SAND (12 IN. ABOVE TOP OF LYSIMETER) 2 IN. DIA. NON-PERF. SCH. 80 PVC CONDUIT PIPE 2 IN. PVC 90 DEGREE ELBOW 1 FT. MIN. CLAY LINER FILL 60 MIL LLDPE GEOMEMBRANE LYSIMETER PREPARED SUBGRADE 6-8 IN. DIA BORING 1 4-INCH DIA POLY TUBING BACKFILL AROUND PVC (WITH FINE-GRAINED, NATIVE DRILL CUTTINGS) COMPACTED BACKFILL (SEE NOTE 6) PVC PIPE PLUG 5 FT. TYP. 6 7 TYPICAL LYSIMETER DETAIL, 10 LOCATIONS N.T.S. 3' MIN. 6 FT.9 FT. MIN. 3 FT. MIN. PREPARED SUBGRADE 4 7 SANDBAG AND SOIL DAM SECTION N.T.S. 12 IN. DIA. COLLECTION PIPE ORIGINAL GROUND SURFACE STRUCTURAL FILL OR PREPARED SUBGRADE 1 FT. MIN. CLAY LINER FILL 1 3 1 3 9 5 TYP. SOLUTION COLLECTION CHANNEL LINER SYSTEM 80 MIL RUBSHEET BENEATH PIPE FROM PADTO COLLECTION CAN 5 FT. 12 IN. DIA. NON-PERFORATED SDR 17 (MIN.) HDPE PIPE 3 EA - STAINLESS STEEL PIPE CLAMPS 12 IN. DIA. PERFORATED CPE PIPE (NOTE 5) 18 IN. TO 12 IN. SDR 17 HDPE REDUCER 5 FT. 12 OZ/YD2 NONWOVEN GEOTEXTILE (NOTE 5) 9 7 NON-PERFORATED HDPE PIPING CONNECTION N.T.S. TYPICAL PERFORATED PCPE TO 2 FT. MIN. LOCKING COVER PROTECTIVE MONUMENT STEEL CASING OR SIMILAR CONCRETE TYPE V 10 7 N.T.S. PROTECTIVE MONUMENT FOR LYSIMETER MONITORING CABLES NOTES 1.EXTRUSION WELD PIPE BOOT TO POLYETHYLENE DAM. INSTALL PIPE AND WELD DAM TO 80 MIL HDPE RUBSHEET. 2.DRAWING 6 SHOWS THE DIMENSIONS OF SOLUTION COLLECTION PIPES. 3.DIVERSION CHANNEL DESIGN INCLUDES 1 FT OF FREEBOARD. CHANNELS WERE DESIGNED TO CONVEY THE 100-YR 24-HR STORM. 4.SLOPE THE DIVERSION CHANNELS AT MINIMUM 1% SLOPE. 5.INSERT 12 IN. DIA. PERFORATED CPE PIPE (14.5 IN. O.D.) 5 FT INTO 18 IN. SDR-17(MIN.) HDPE PIPE. WRAP CONNECTION WITH 12 OZ./YD2 NONWOVEN GEOTEXTILE 5 FT ON BOTH SIDES OF THE CONNECTION AND CLAMP GEOTEXTILE TO THE PIPES WITH STAINLESS STEEL PIPE CLAMPS. 6.INSTALL LYSIMETERS IN BOREHOLES PRIOR TO LINER CONSTRUCTION. EXTEND PVC PIPE AND LYSIMETER TUBING IN SHALLOW TRENCH 12-INCHES BELOW SUBGRADE. BACKFILL TRENCH WITH FINE-GRAINED, NATIVE SOILS (1-INCH MINUS) AND COMPACT AS PER SPECIFICATI0NS. 7.INSTALL ONE LEAK DETECTION SUMP AT THE DOWNGRADIENT CELL OUTLET FOR EACH STAGE (I.E. ONE SUMP PER STAGE). 8.PLACE 12 OZ./YD2 NONWOVEN GEOTEXTILE OR GEOMEMBRANE RUBSHEET BELOW ALL PIPING GREATER THAN 8 IN. DIAMETER. 9.EXCAVATE AT EACH COLLECTION CAN LOCATION TO ALLOW INSTALLATION OF PIPING FROM PAD TO LIE FLAT ON HDPE GEOMEMBRANE AND RUBSHEET. 0 1 i n 31407443.000 DRAWING 70 SALT LAKE CITY OFFICE 10876 S. RIVER FRONT PARKWAY, SUITE 250 SOUTH JORDAN, UTAH, 84095 USA [+1] (801) 382-6900A2007-02-01 ISSUED FOR PERMITTING AND CONSTRUCTION JWRKFM KFM REK B 2024-04-26 ISSUED FOR REVIEW JWRJWR REK DKF 0 2024-04-30 ISSUED FOR CONSTRUCTION JWRJWR REK DKF LISBON VALLEY MINE STAGE 4 HEAP LEACH FACILITY EXPANSION LISBON VALLEY MINING COMPANY, LLC MISCELLANEOUS DETAILS TITLE PROJECT NO.REV. PROJECTCLIENT CONSULTANT Pa t h : \\ g o l d e r . g d s \ c o m p l e x d a t a \ o f f i c e \ d e n v e r \ a c a d \ L I S B O N V A L L E Y M I N E \ P R O D U C T I O N \ S T A G E 4 I F C \ | F i l e N a m e : 06 3 2 2 5 3 A 0 0 4 . d w g | L a s t E d i t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 1: 1 5 : 0 5 P M | P r i n t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 2: 4 7 : 3 1 P M REV.DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED SEAL of IF T H I S M E A S U R E M E N T D O E S N O T M A T C H W H A T I S S H O W N , T H E S H E E T S I Z E H A S B E E N M O D I F I E D F R O M : A N S I D PERIMETER ROAD B 9 A 9 155 FT 11 0 F T 150 FT 40 F T PARKING / TRUCK TURN AROUND LINED TANK PAD DOUBLE LINER SYSTEM TANK PAD PERIMETER BERM AND ANCHOR TRENCH 1% 1% STAGE 4 LINER STAGE 3 ORE STAGE 3 DIVERSION STAGE 4 DIVERSION PERIMETER ROAD 64 6 0 64 6 5 6460 6465 3.4% R55 ' 1.5% DRAINAGE DIVERSION TO BE DETERMINED 1 89 5 3 H : 1 V 3H : 1 V 3H : 1 V 3 0 ' 15 ' 30 ' 15 ' ANCHOR TRENCH 42 300 N 42 300 N 34 1 0 0 E 34 1 0 0 E 42 200 N 42 200 N 42 100 N 42 100 N 34 0 0 0 E 34 0 0 0 E 33 9 0 0 E 33 9 0 0 E 33 8 0 0 E 33 8 0 0 E 34 2 0 0 E 34 2 0 0 E 34 3 0 0 E 34 3 0 0 E EL E V A T I O N ( F T ) EL E V A T I O N ( F T ) 6440 6450 6460 6470 6480 6440 6450 6460 6470 6480 0+00 1+00 2+00 2+51 110 FT PARKING / TRUCK TURN AROUND 15 FT PERIMETER ROAD 40 FT TANK PAD COLLECTION CHANNEL4 5 1%1% EXISTING GROUND TANK PAD CONTAINMENT BERM / ANCHOR TRENCH 1 8 TANK PAD DOUBLE LINER SYSTEM 9 5 10 5 1V 3H EL E V A T I O N ( F T ) EL E V A T I O N ( F T ) 6440 6450 6460 6470 6480 6440 6450 6460 6470 6480 0+00 1+00 2+002+00 150 FT TANK PAD TANK PAD CONTAINMENT BERM / ANCHOR TRENCH 1 8 TANK PAD DOUBLE LINER SYSTEM 9 5EXISTING GROUND 10 5 5 FT 1.5 FT 2 FT MIN. 2 F T 1 FT CLAY LINER TANK PAD DOUBLE LINER ANCHOR TRENCH PREPARED SUBGRADE 1V 1.5H 1V 1.5H LINED TANK PAD FINISHED GRADE ON THE EAST AND WEST SIDE, PERIMETER ROAD ON THE NORTH 1.5 FT TANK PAD DOUBLE LINER SYSTEM 9 5 10 5 LEGEND NOTESREFERENCES 1.GRADING CONTOURS REFLECT TOP OF CLAY LINER FILL WITHIN LIMITS OF STAGE 4 LINER EXPANSION, THE TANK PAD, AND SOLUTION CHANNEL. GRADING CONTOURS REFLECT TOP OF STRUCTURAL FILL OUTSIDE OF THESE LIMITS. 2.TWO-FOOT CONTOUR BASE MAP PROVIDED BY LISBON VALLEY MINING COMPANY, ACTUAL GROUND SURFACE EXPECTED TO VARY BY PLUS OR MINUS ONE FOOT. 3.ORE IS CURRENTLY STACKED AND BEING LEACHED WITHIN STAGES 1,2 AND 3. TOPOGRAPHY SHOWN IS REPRESENTATIVE OF ORE SURFACE. PROPOSED GRADING CONTOURS (NOTE 1) 6410 6420 EXISTING GROUND TOPOGRAPHY (SEE REFERENCE 1) CROSS SECTION IDENTIFIER SHEET WHERE SECTION IS LOCATED C 4 B 8 TANK PAD WEST-EAST SECTION B-B' SCALE: 1"=15' 0 1 i n 31407443.000 DRAWING 80 SALT LAKE CITY OFFICE 10876 S. RIVER FRONT PARKWAY, SUITE 250 SOUTH JORDAN, UTAH, 84095 USA [+1] (801) 382-6900A2007-02-01 ISSUED FOR PERMITTING AND CONSTRUCTION JWRKFM KFM REK B 2024-04-26 ISSUED FOR REVIEW JWRJWR REK DKF 0 2024-04-30 ISSUED FOR CONSTRUCTION JWRJWR REK DKF LISBON VALLEY MINE STAGE 4 HEAP LEACH FACILITY EXPANSION LISBON VALLEY MINING COMPANY, LLC TANK PAD AND TRUCK TURN AROUND PLAN AND SECTIONS TITLE PROJECT NO.REV. PROJECTCLIENT CONSULTANT Pa t h : \\ g o l d e r . g d s \ c o m p l e x d a t a \ o f f i c e \ d e n v e r \ a c a d \ L I S B O N V A L L E Y M I N E \ P R O D U C T I O N \ S T A G E 4 I F C \ | F i l e N a m e : 06 3 2 2 5 3 A 0 1 6 . d w g | L a s t E d i t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 2 6 T i m e : 10 : 0 7 : 5 8 A M | P r i n t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 2: 4 9 : 5 3 P M REV.DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED SEAL of IF T H I S M E A S U R E M E N T D O E S N O T M A T C H W H A T I S S H O W N , T H E S H E E T S I Z E H A S B E E N M O D I F I E D F R O M : A N S I D 0 FEET 30 60 1'' = 30' STACKED ORE SURFACE CONTOURS (NOTE 3) 6410 6420 DRAFT NOT FOR CONSTRUCTION A 8 TANK PAD NORTH-SOUTH SECTION A-A' SCALE: 1"=15' 0 FEET 15 30 1'' = 15' 1.EXISTING GROUND TOPOGRAPHY PROVIDED BY LISBON VALLEY MINING COMPANY, LLC. 1 8 TANK PAD CONTAINMENT BERM DETAIL SCALE: 1"=2' 0 FEET 42 1'' = 2' TANK PAD AND TRUCK TURN AROUND PLAN VIEW SCALE 1"=30' STAGE 3/4 SEPARATION BERM 1 234 5 67 8910111213 141516 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 6 4 6 0 6470 6490 6480 6 5 0 0 EXISTING STAGE 3 LINER 345 2 1 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 0 1 i n 31407443.000 DRAWING 90 SALT LAKE CITY OFFICE 10876 S. RIVER FRONT PARKWAY, SUITE 250 SOUTH JORDAN, UTAH, 84095 USA [+1] (801) 382-6900A2007-02-01 ISSUED FOR PERMITTING AND CONSTRUCTION JWRKFM KFM REK B 2024-04-26 ISSUED FOR REVIEW JWRJWR REK DKF 0 2024-04-30 ISSUED FOR CONSTRUCTION JWRJWR REK DKF LISBON VALLEY MINE STAGE 4 HEAP LEACH FACILITY EXPANSION LISBON VALLEY MINING COMPANY, LLC STAGE 4 CONTROL POINTS TITLE PROJECT NO.REV. PROJECTCLIENT CONSULTANT Pa t h : \\ g o l d e r . g d s \ c o m p l e x d a t a \ o f f i c e \ d e n v e r \ a c a d \ L I S B O N V A L L E Y M I N E \ P R O D U C T I O N \ S T A G E 4 I F C \ | F i l e N a m e : 06 3 2 2 5 3 A 0 1 5 . d w g | L a s t E d i t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 2 6 T i m e : 10 : 1 3 : 1 7 A M | P r i n t e d B y : jr o b e r t s D a t e : 20 2 4 - 0 4 - 3 0 T i m e : 2: 5 2 : 2 8 P M REV.DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED SEAL of IF T H I S M E A S U R E M E N T D O E S N O T M A T C H W H A T I S S H O W N , T H E S H E E T S I Z E H A S B E E N M O D I F I E D F R O M : A N S I D STAGE 4 LINER SURFACE CONTOURS 1 8 STAGE 4 LINER CONTROL POINT LOCATIONS CONTROL POINT1010 1.PROPOSED STAGE 4 GRADING CONTOURS REFLECT TOP OF CLAY LINER FILL WITHIN LIMITS OF STAGE 4 LINER, TOP OF STRUCTURAL FILL OUTSIDE OF THESE LIMITS. 2.STAGE 4 CELLS 1-5 ARE ~300 FT WIDE. 3.CONTROL POINT ELEVATIONS REPRESENT TOP OF CLAY LINER FILL. 4.CONTROL POINTS 1-70 REPRESENT THE PERIMETER TOE OF THE TOP OF CLAY LINER FILL. 5.CONTROL POINTS 102-365 REPRESENT THE TOP OF CLAY LINER FILL ON A 100-FT GRID. 6.CONTROL POINTS 501-584 REPRESENT THE NORTHING / EASTING COORDINATES OF THE SEPARATION BERM CENTERLINE. 2 STAGE 4 CELL DESIGNATION Point#Easting Northing Point El. 1 34,146.66 40,118.36 6,506.72 2 34,046.65 40,129.90 6,507.87 3 33,946.65 40,141.43 6,508.17 4 33,846.65 40,152.97 6,510.19 5 33,746.65 40,164.50 6,512.20 6 33,646.65 40,176.04 6,514.26 7 33,546.65 40,187.57 6,516.32 8 33,446.65 40,199.11 6,518.38 9 33,346.65 40,210.64 6,520.44 10 33,246.65 40,222.18 6,522.50 11 33,146.65 40,233.71 6,524.56 12 33,046.65 40,245.24 6,526.62 13 32,946.65 40,256.78 6,528.68 14 32,846.65 40,268.31 6,530.74 15 32,746.65 40,279.85 6,532.79 16 32,657.06 40,290.70 6,534.57 17 32,657.06 40,385.11 6,529.94 18 32,657.00 40,485.11 6,526.45 19 32,657.06 40,585.11 6,522.91 20 32,657.06 40,685.11 6,519.40 21 32,657.06 40,785.11 6,515.57 22 32,657.06 40,885.11 6,511.97 23 32,657.06 40,985.11 6,509.43 24 32,657.06 41,085.11 6,507.20 25 32,657.06 41,185.11 6,504.16 26 32,657.06 41,285.11 6,501.45 27 32,657.06 41,385.11 6,498.60 28 32,657.06 41,485.11 6,496.28 29 32,657.06 41,585.11 6,494.37 30 32,657.06 41,685.11 6,492.91 31 32,657.06 41,785.11 6,491.81 32 32,657.06 41,885.11 6,490.59 33 32,657.06 41,985.11 6,489.03 34 32,657.06 42,085.11 6,487.39 35 32,656.68 42,185.11 6,485.92 36 32,656.56 42,209.47 6,485.57 37 32,746.65 42,201.96 6,484.72 38 32,846.65 42,193.64 6,482.88 39 32,946.65 42,185.31 6,481.05 40 33,046.65 42,176.98 6,479.21 41 33,146.65 42,168.65 6,477.37 42 33,246.65 42,160.32 6,475.53 43 33,346.65 42,152.00 6,473.69 44 33,446.65 42,143.67 6,471.86 45 33,546.65 42,135.34 6,470.02 46 33,646.65 42,127.01 6,468.18 47 33,746.65 42,118.68 6,466.34 48 33,846.65 42,110.36 6,464.50 49 33,946.65 42,102.03 6,462.67 50 34,046.65 42,093.70 6,460.83 51 34,146.46 42,085.39 6,458.99 52 34,146.47 41,985.39 6,458.95 53 34,146.48 41,885.39 6,458.97 54 34,146.49 41,785.39 6,460.17 55 34,146.50 41,685.39 6,461.88 56 34,146.51 41,585.39 6,464.11 57 34,146.52 41,485.39 6,466.28 58 34,146.53 41,385.39 6,468.45 59 34,146.54 41,285.39 6,470.88 60 34,146.55 41,185.39 6,473.63 61 34,146.56 41,085.39 6,476.45 62 34,146.57 40,985.39 6,479.23 63 34,146.58 40,885.39 6,481.50 64 34,146.59 40,785.39 6,483.99 65 34,146.60 40,685.39 6,487.95 66 34,146.61 40,585.39 6,492.00 67 34,146.62 40,485.39 6,495.03 68 34,146.64 40,385.39 6,498.14 69 34,146.65 40,285.39 6,501.99 70 34,146.66 40,185.39 6,504.58 Point#Easting Northing Point El. 102 32,746.65 42,085.11 6,485.70 103 32,846.65 42,085.11 6,483.78 104 32,946.65 42,085.11 6,481.85 105 33,046.65 42,085.11 6,479.89 106 33,146.65 42,085.11 6,477.91 107 33,246.65 42,085.11 6,475.82 108 33,346.65 42,085.11 6,473.87 109 33,446.65 42,085.11 6,471.89 110 33,546.65 42,085.11 6,469.99 111 33,646.65 42,085.11 6,468.16 112 33,746.65 42,085.11 6,466.31 113 32,746.65 41,985.11 6,486.90 114 32,846.65 41,985.11 6,484.62 115 32,946.65 41,985.11 6,482.67 116 33,046.65 41,985.11 6,480.70 117 33,146.65 41,985.11 6,478.64 118 33,246.65 41,985.11 6,476.34 119 33,346.65 41,985.11 6,474.14 120 33,446.65 41,985.11 6,471.94 121 33,546.65 41,985.11 6,469.95 122 33,646.65 41,985.11 6,468.11 123 33,746.65 41,985.11 6,466.20 124 33,846.65 41,985.11 6,464.48 125 33,946.65 41,985.11 6,462.64 126 34,046.65 41,985.11 6,460.74 127 32,746.65 41,885.11 6,488.46 128 32,846.65 41,885.11 6,485.47 129 32,946.65 41,885.11 6,483.51 130 33,046.65 41,885.11 6,481.53 131 33,146.65 41,885.11 6,479.42 132 33,246.65 41,885.11 6,477.08 133 33,346.65 41,885.11 6,474.63 134 33,446.65 41,885.11 6,472.19 135 33,546.65 41,885.11 6,469.99 136 33,646.65 41,885.11 6,468.06 137 33,746.65 41,885.11 6,466.09 138 33,846.65 41,885.11 6,464.45 139 33,946.65 41,885.11 6,462.60 140 34,046.65 41,885.11 6,460.65 141 32,746.65 41,785.11 6,490.36 142 32,846.65 41,785.11 6,486.62 143 32,946.65 41,785.11 6,484.41 144 33,046.65 41,785.11 6,482.51 145 33,146.65 41,785.11 6,480.49 146 33,246.65 41,785.11 6,478.28 147 33,346.65 41,785.11 6,475.44 148 33,446.65 41,785.11 6,472.96 149 33,546.65 41,785.11 6,470.51 150 33,646.65 41,785.11 6,468.60 151 33,746.65 41,785.11 6,466.34 152 33,846.65 41,785.11 6,464.63 153 33,946.65 41,785.11 6,463.18 154 34,046.65 41,785.11 6,461.77 155 32,746.65 41,685.11 6,492.17 156 32,846.65 41,685.11 6,488.81 157 32,946.65 41,685.11 6,485.61 158 33,046.65 41,685.11 6,483.70 159 33,146.65 41,685.11 6,481.70 160 33,246.65 41,685.11 6,479.38 161 33,346.65 41,685.11 6,476.64 162 33,446.65 41,685.11 6,473.85 163 33,546.65 41,685.11 6,471.91 164 33,646.65 41,685.11 6,469.84 165 33,746.65 41,685.11 6,467.77 166 33,846.65 41,685.11 6,466.12 167 33,946.65 41,685.11 6,464.91 168 34,046.65 41,685.11 6,463.54 169 32,746.65 41,585.11 6,493.56 170 32,846.65 41,585.11 6,491.09 171 32,946.65 41,585.11 6,487.57 172 33,046.65 41,585.11 6,484.96 173 33,146.65 41,585.11 6,482.93 174 33,246.65 41,585.11 6,480.70 175 33,346.65 41,585.11 6,478.22 176 33,446.65 41,585.11 6,475.84 177 33,546.65 41,585.11 6,473.62 178 33,646.65 41,585.11 6,471.43 179 33,746.65 41,585.11 6,469.38 180 33,846.65 41,585.11 6,468.04 181 33,946.65 41,585.11 6,466.83 182 34,046.65 41,585.11 6,465.54 183 32,746.65 41,485.11 6,495.27 184 32,846.65 41,485.11 6,493.22 185 32,946.65 41,485.11 6,489.98 186 33,046.65 41,485.11 6,486.47 187 33,146.65 41,485.11 6,484.21 188 33,246.65 41,485.11 6,482.11 189 33,346.65 41,485.11 6,480.01 190 33,446.65 41,485.11 6,478.06 191 33,546.65 41,485.11 6,475.69 192 33,646.65 41,485.11 6,473.27 193 33,746.65 41,485.11 6,471.53 194 33,846.65 41,485.11 6,470.29 195 33,946.65 41,485.11 6,468.94 196 34,046.65 41,485.11 6,467.58 197 32,746.65 41,385.11 6,497.42 198 32,846.65 41,385.11 6,495.16 199 32,946.65 41,385.11 6,492.71 200 33,046.65 41,385.11 6,489.05 201 33,146.65 41,385.11 6,485.59 202 33,246.65 41,385.11 6,483.79 203 33,346.65 41,385.11 6,481.98 204 33,446.65 41,385.11 6,479.99 205 33,546.65 41,385.11 6,477.85 206 33,646.65 41,385.11 6,475.66 207 33,746.65 41,385.11 6,474.24 208 33,846.65 41,385.11 6,472.67 209 33,946.65 41,385.11 6,471.24 210 34,046.65 41,385.11 6,469.89 211 32,746.65 41,285.11 6,499.90 212 32,846.65 41,285.11 6,497.61 213 32,946.65 41,285.11 6,495.09 214 33,046.65 41,285.11 6,492.12 215 33,146.65 41,285.11 6,488.32 216 33,246.65 41,285.11 6,485.66 217 33,346.65 41,285.11 6,483.84 218 33,446.65 41,285.11 6,482.04 219 33,546.65 41,285.11 6,479.97 220 33,646.65 41,285.11 6,478.28 221 33,746.65 41,285.11 6,476.97 222 33,846.65 41,285.11 6,475.50 223 33,946.65 41,285.11 6,474.06 224 34,046.65 41,285.11 6,472.34 225 32,746.65 41,185.11 6,502.61 226 32,846.65 41,185.11 6,500.25 227 32,946.65 41,185.11 6,497.85 228 33,046.65 41,185.11 6,495.07 229 33,146.65 41,185.11 6,491.87 230 33,246.65 41,185.11 6,488.62 231 33,346.65 41,185.11 6,485.80 232 33,446.65 41,185.11 6,483.89 233 33,546.65 41,185.11 6,482.09 234 33,646.65 41,185.11 6,480.56 235 33,746.65 41,185.11 6,479.38 236 33,846.65 41,185.11 6,478.24 237 33,946.65 41,185.11 6,476.78 238 34,046.65 41,185.11 6,475.20 239 32,746.65 41,085.11 6,505.06 240 32,846.65 41,085.11 6,502.69 241 32,946.65 41,085.11 6,500.54 242 33,046.65 41,085.11 6,498.07 243 33,146.65 41,085.11 6,495.28 244 33,246.65 41,085.11 6,492.26 245 33,346.65 41,085.11 6,489.18 246 33,446.65 41,085.11 6,485.95 247 33,546.65 41,085.11 6,483.94 248 33,646.65 41,085.11 6,482.60 249 33,746.65 41,085.11 6,481.54 250 33,846.65 41,085.11 6,480.46 251 33,946.65 41,085.11 6,479.34 252 34,046.65 41,085.11 6,478.14 253 32,746.65 40,985.11 6,508.02 254 32,846.65 40,985.11 6,504.95 255 32,946.65 40,985.11 6,502.79 256 33,046.65 40,985.11 6,500.73 257 33,146.65 40,985.11 6,498.28 258 33,246.65 40,985.11 6,495.50 259 33,346.65 40,985.11 6,492.68 260 33,446.65 40,985.11 6,489.72 261 33,546.65 40,985.11 6,486.20 262 33,646.65 40,985.11 6,484.92 263 33,746.65 40,985.11 6,483.74 264 33,846.65 40,985.11 6,482.65 265 33,946.65 40,985.11 6,481.52 266 34,046.65 40,985.11 6,480.42 267 32,746.65 40,885.11 6,510.27 268 32,843.68 40,885.11 6,507.88 269 32,946.65 40,885.11 6,504.84 270 33,046.65 40,885.11 6,502.94 271 33,146.65 40,885.11 6,500.92 272 33,246.65 40,885.11 6,498.50 273 33,346.65 40,885.11 6,495.74 274 33,446.65 40,885.11 6,493.06 275 33,546.65 40,885.11 6,490.45 276 33,646.65 40,885.11 6,488.51 277 33,746.65 40,885.11 6,486.59 278 33,846.65 40,885.11 6,485.17 279 33,946.65 40,885.11 6,483.86 280 34,046.65 40,885.11 6,482.69 281 32,746.65 40,785.11 6,512.82 282 32,846.65 40,785.11 6,510.24 283 32,946.65 40,785.11 6,507.89 284 33,046.65 40,785.11 6,505.29 285 33,146.65 40,785.11 6,503.15 286 33,246.65 40,785.11 6,501.11 287 33,346.65 40,785.11 6,498.80 288 33,446.65 40,785.11 6,496.01 289 33,546.65 40,785.11 6,494.13 290 33,646.65 40,785.11 6,492.39 291 33,746.65 40,785.11 6,490.56 292 33,846.65 40,785.11 6,488.80 293 33,946.65 40,785.11 6,487.09 294 34,046.65 40,785.11 6,485.47 295 32,746.65 40,685.11 6,516.65 296 32,846.65 40,685.11 6,512.65 297 32,946.65 40,685.11 6,510.34 298 33,046.65 40,685.11 6,508.34 299 33,146.65 40,685.11 6,505.80 300 33,246.65 40,685.11 6,503.44 301 33,346.65 40,685.11 6,501.67 302 33,446.65 40,685.11 6,499.63 303 33,546.65 40,685.11 6,497.35 304 33,646.65 40,685.11 6,495.33 305 33,746.65 40,685.11 6,493.89 306 33,846.65 40,685.11 6,492.49 307 33,946.65 40,685.11 6,490.82 308 34,046.65 40,685.11 6,489.28 309 32,746.65 40,585.11 6,520.37 310 32,846.65 40,585.11 6,516.70 311 32,946.65 40,585.11 6,513.05 312 33,046.65 40,585.11 6,510.88 313 33,146.65 40,585.11 6,508.79 314 33,246.65 40,585.11 6,506.37 315 33,346.65 40,585.11 6,504.12 316 33,446.65 40,585.11 6,502.52 317 33,546.65 40,585.11 6,500.60 318 33,646.65 40,585.11 6,498.40 319 33,746.65 40,585.11 6,496.90 320 33,846.65 40,585.11 6,495.48 321 33,946.65 40,585.11 6,494.12 322 34,046.65 40,585.11 6,493.03 323 32,746.65 40,485.11 6,523.88 324 32,846.65 40,485.11 6,520.32 325 32,946.65 40,485.11 6,516.75 326 33,046.65 40,485.11 6,513.84 327 33,146.65 40,485.11 6,511.52 328 33,246.65 40,485.11 6,509.34 329 33,346.65 40,485.11 6,507.13 330 33,446.65 40,485.11 6,504.99 331 33,546.65 40,485.11 6,503.24 332 33,646.65 40,485.11 6,501.56 333 33,746.65 40,485.11 6,500.22 334 33,846.65 40,485.11 6,498.83 335 33,946.65 40,485.11 6,497.40 336 34,046.65 40,485.11 6,496.11 337 32,746.65 40,385.11 6,527.40 338 32,846.65 40,385.11 6,524.05 339 32,946.65 40,385.11 6,520.55 340 33,046.65 40,385.11 6,518.09 341 33,146.65 40,385.11 6,515.31 342 33,246.65 40,385.11 6,512.76 343 33,346.65 40,385.11 6,510.51 344 33,446.65 40,385.11 6,508.36 345 33,546.65 40,385.11 6,505.82 346 33,646.65 40,385.11 6,503.97 347 33,746.65 40,385.11 6,502.98 348 33,846.65 40,385.11 6,502.01 349 33,946.65 40,385.11 6,500.80 350 34,046.65 40,385.11 6,499.48 351 32,946.65 40,285.11 6,526.72 352 33,046.65 40,285.11 6,523.86 353 33,146.65 40,285.11 6,521.02 354 33,246.65 40,285.11 6,518.31 355 33,346.65 40,285.11 6,515.50 356 33,446.65 40,285.11 6,512.83 357 33,546.65 40,285.11 6,510.00 358 33,646.65 40,285.11 6,508.22 359 33,746.65 40,285.11 6,506.25 360 33,846.65 40,285.11 6,504.75 361 33,946.65 40,285.11 6,503.73 362 34,046.65 40,285.11 6,502.91 363 33,846.65 40,185.11 6,508.80 364 33,946.65 40,185.11 6,507.44 365 34,046.65 40,185.11 6,506.02 Point#Easting Northing Point El.Point#Easting Northing Point El.Point#Easting Northing 501 32,958.65 40,255.39 502 32,958.64 40,335.11 503 32,958.63 40,435.11 504 32,958.62 40,535.11 505 32,958.61 40,635.11 506 32,958.60 40,735.11 507 32,958.59 40,835.11 508 32,958.58 40,935.11 509 32,958.57 41,035.11 510 32,958.56 41,135.11 511 32,958.55 41,235.11 512 32,958.54 41,335.11 513 32,958.53 41,435.11 514 32,958.52 41,535.11 515 32,958.51 41,635.11 516 32,958.50 41,735.11 517 32,958.49 41,835.11 518 32,958.48 41,935.11 519 32,958.47 42,035.11 520 32,958.44 42,135.11 521 32,958.41 42,184.33 522 33,258.65 40,220.79 523 33,258.64 40,335.11 524 33,258.63 40,435.11 525 33,258.62 40,535.11 526 33,258.61 40,635.11 527 33,258.60 40,735.11 528 33,258.59 40,835.11 529 33,258.58 40,935.11 530 33,258.57 41,035.11 531 33,258.56 41,135.11 532 33,258.55 41,235.11 533 33,258.54 41,335.11 534 33,258.53 41,435.11 535 33,258.52 41,535.11 536 33,258.51 41,635.11 537 33,258.50 41,735.11 538 33,258.49 41,835.11 539 33,258.48 41,935.11 540 33,258.47 42,035.11 541 33,258.44 42,135.11 542 33,258.42 42,159.34 543 33,558.66 40,186.19 544 33,558.65 40,235.11 545 33,558.64 40,335.11 546 33,558.63 40,435.11 547 33,558.62 40,535.11 548 33,558.61 40,635.11 549 33,558.60 40,735.11 550 33,558.59 40,835.11 551 33,558.58 40,935.11 552 33,558.57 41,035.11 553 33,558.56 41,135.11 554 33,558.55 41,235.11 555 33,558.54 41,335.11 556 33,558.53 41,435.11 557 33,558.52 41,535.11 558 33,558.51 41,635.11 559 33,558.50 41,735.11 560 33,558.49 41,835.11 561 33,558.48 41,935.11 562 33,558.47 42,035.11 563 33,558.44 42,134.36 564 33,858.66 40,151.58 565 33,858.65 40,235.11 566 33,858.64 40,335.11 567 33,858.63 40,435.11 568 33,858.62 40,535.11 569 33,858.61 40,635.11 570 33,858.60 40,735.11 571 33,858.59 40,835.11 572 33,858.58 40,935.11 573 33,858.57 41,035.11 574 33,858.56 41,135.11 575 33,858.55 41,235.11 576 33,858.54 41,335.11 577 33,858.53 41,435.11 578 33,858.52 41,535.11 579 33,858.51 41,635.11 580 33,858.50 41,735.11 581 33,858.49 41,835.11 582 33,858.48 41,935.11 583 33,858.47 42,035.11 584 33,858.46 42,109.37 CONTROL POINTS (SEE NOTES 4-6) LEGEND NOTES