HomeMy WebLinkAboutDDW-2024-010182Utah Department Of Environmental Quality
Division Of Drinking Water Sanitary Survey
Sanitary Survey
General System Information
Exception Granted: R309-550-7(1) | Horizontal separation distance of water line and sewer line at Ellswood Dr. between Flint Dr. and Mumford Dr.
for White City Water System is less than 10 feet
Exception Granted: R309-550-7 | Minimum Separalion Distances not met for water mains and sewer
Site Visit Date Surveyor Name
08/06/2024 Brad Johnson
WHITE CITY WID PWS ID: UTAH18019 Rating: Approved 07/27/1977 Active
1 Admin Contact (AC) [ eMail address is REQUIRED ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: PAUL HINCKLEY
*Last Name: ASHTON
*Organization:
*Address: Redacted
*City: SANDY
*State: UT
*Zip: 84094
*Email: rjohnson@wcwid.org
*Phone: 801-571-3991
2 Legal Contact (LC) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name:
*Last Name:
*Organization: WHITE CITY WID
*Address: 999 E GALENA DR
*City: SANDY
*State: UT
*Zip: 84094
*Email:
*Phone: 801-571-3991
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 1 of 45
3 Owner Contact (OW) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name:
*Last Name:
*Organization: WHITE CITY WID
*Address: 999 E GALENA DR
*City: SANDY
*State: UT
*Zip: 84094
*Email:
*Phone: 801-571-3991
4 Direct Operator in Charge (DO) [ if no eMail address is available, enter
NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: RYAN ROBERT
*Last Name: JOHNSON
*Organization:
*Address: 1774 W NEWBOLD LN
*City: RIVERTON
*State: UT
*Zip: 84094
*Email: ryjohnson83@hotmail.com
*Phone: 801-571-3991
Emergency Phone: 801-231-0246
5 Does the system serve a Residential population?Y
5A Population - Residential 15800
5B Operating Period (Start Date) - Residential 01/01
5C Operating Period (End Date) - Residential 12/31
6 Does the system serve a Transient population? (A transient population is a rotating
population that is served by a water system that does not remain in the jurisdiction of
the water system for long periods of time. Examples of a transient population include,
but are not limited to, campers at a campground, users of a highway rest stop, skiers
at a ski resort, guests at a hotel, or patrons of a restaurant or a shopping center.)
N
7 Does the system serve a Non-Transient population? (A non-transient population is a
population served by a water system that is the same population being served by the
system for at least six months of the year, but is not a resident in the system.
Examples of a non-transient population include, but are not limited to, employees of a
restaurant, shop, or ski resort; teachers and students at a school, day-care center, or
church; doctors, nurses, and other employees at a hospital or healthcare clinic.)
N
8 Population - Wholesale :0
9 Residential Connections:4127
10 Commercial Connections:58
11 Industrial Connections:0
12 Agricultural Connections:0
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 2 of 45
Site Visit Info
Management and Operations
13 Date of Survey (First Day of Field Work)08/06/2024
14 Date of Survey (Last Day of Field Work) ** this should match the Date of Survey in the
header **
08/06/2024
15 Date final report sent to system (questionnaire, deficiency report and capacity
spreadsheet)
08/20/2024
16 Water system representative present during the survey:James Lucas (Notes: Dan)
17 How much time was spent to prepare survey documents prior to field survey? (Round
up to nearest quarter hour)
1 hours
18 How much time was spent to complete the field survey (arrival to completion; include
travel time between water system facilities)? (Round up to nearest quarter hour)
3.5 hours
19 How much time was spent traveling from the office to system and back again at the
end of the field survey? (Round up to nearest quarter hour)
0.5 hours
20 How much time did it take to finish the Survey Report? (Round up to nearest quarter
hour)
1.5 hours
21 Did you survey multiple water systems in one trip? ... if yes, answer the following
question(s)
N
22 For a community water system with water sources that require power to produce
sufficient flow, system is equipped with standby power option.
SIG | 25pts | SO | S033 | R309-515-6(2)(a) | Rule requires a community water system
without naturally flowing water sources, such as springs or flowing wells, to have one
or more of the system's sources equipped for operation during power outages. To
ensure continuous service when the primary power has been interrupted, a redundant
power supply is required. A redundant power supply may include a transfer switch for
auxiliary power such as a generator or a power supply service with coverage from two
independent substations. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
23 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through or in
process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE
MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a
different question]
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
24 Are there any individual home booster pumps installed in the distribution system (not
for fire suppression)?
SIG | 50pts | SM | M008 | R309-550-11(3) | R309-550-11(3)
C
25 Does the system haul water?N
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 3 of 45
Cross Connection and Operator Certification
26 For a community system serving 100 or more connections, at least 2 water sources
are available.
SIG | 50pts | SO | TGR7 | R309-515-4(3) | Rule requires Community Water Systems
serving more than 100 connections to have a minimum of two sources except where
served by a water treatment plant. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
27 Does system have a consecutive connection to another water system not listed in the
SOURCE section of Waterlink Report? If yes, answer the following question(s)
Y
27A Name of PWS that water is purchased from: (IF MORE THAN ONE NAME, LIST
OTHERS IN COMMENTS)
Sandy City (Notes: Jordan Valley WCD)
27B ID Number of PWS that water is purchased from: (IF MORE THAN ONE, LIST
OTHERS IN COMMENTS)
18028 (Notes: 18027)
27C The interconnection has been approved by DDW.
SIG | 50pts | SO | M025 | R309-550-9(3) | Interconnections between different drinking
water systems must be reviewed and approved by the Director. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C (Notes: Need to verify. Does not show up
on inventory.)
28 Does the system have a deficiency meeting the required source capacity? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
29 Does the system have a deficiency meeting the required storage capacity DUE
SOLELY TO FIRE SUPPRESSION NEEDS? (USE SPREADSHEET FOR
CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE
FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO."
N
30 Does the system have a deficiency meeting the required equalization storage capacity
for indoor/outdoor demands (but not because of fire suppression needs)? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
31 Does your water system have an Emergency Response Plan?
REC | 0pts | SM | M001 | R309-105-18 | All suppliers are advised to develop
contingency plans to cope with possible emergency situations. In many areas of the
state the possibility of earthquake damage shall be realistically considered.
Y
32 Does your Emergency Response Plan address cybersecurity? (required for systems
over 3,300 population)
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
Y
33 Does your water system use any computers, laptops, phones, tablets, or any other
computer systems to manage, operate, or maintain the PWS (SCADA or Industrial
Control Systems)? This includes any water sources, treatment, distribution or any
process related to operation function
Y
34 Does your water system use any computer systems in regular business operations
such as accounting, billing, payroll, human resources, or management?
Y
35 Legally adopted authority statement
MIN | 15pts | SM | M003 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes a legally adopted and functional
local authority to enforce the program (i.e., ordinance, bylaw, or policy).
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 4 of 45
General Maintenance and Environment
36 Documentation of annual public awareness and/or employee training
MIN | 15pts | SM | M004 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes providing public education or
awareness material or presentations.
C
37 Documentation of personnel trained to manage the program (ALL COMUNITY
WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC PROGRAM
ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM
BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING)
MIN | 15pts | SM | M005 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes an operator with adequate
training in the area of cross connection control or backflow prevention.
C
38 Does the water system have detailed records of cross connection control activities?
(inventories of backflow assemblies, devices, and air gaps installed within the system)
MIN | 15pts | SM | M006 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes written records of cross
connection control activities.
C
39 Does the water system have records of on-going enforcement activities? (test history,
enforcement activities, hazard assessments)
MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes test history and documentation
of on-going enforcement activities.
C
40 Operator meets required level of certification for water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
SIG | 50pts | OC | C001 | R309-105-11, R309-300-5(3) | Rule requires every
community and NTNC water system and public water systems that utilize
treatment/filtration to have at least one operator certified at the classified grade of the
water system. Certification must be appropriate for the type of system operated
(treatment and/or distribution). This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
41 Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
MIN | 0pts | OC | C002 | R309-300-5(14) | Rule requires the operator to be within 1
hour travel time, under normal work and home conditions, of each drinking water
system for which he is considered in direct responsible charge.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 5 of 45
Distribution
42 Are there any visual indications of unsanitary conditions?
SIG | 50pts | SM | M017 | R309-200-6, R309-105-18, R309-215-4(3) | R309-200-6 The
Secondary Maximum Contaminant Levels for public water systems deals with
substances which affect the aesthetic quality of drinking water. They are presented
here as recommended limits or ranges and are not grounds for rejection. The taste of
water may be unpleasant and the usefulness of the water may be impaired if these
standards are significantly exceeded.
R309-105-18 The Director or the local health department shall be informed by
telephone by a water supplier of any "emergency situation". The term "emergency
situation...
R309-215-4(3) If the water fails to meet minimum standards, then certain public
notification procedures shall be carried out, as outlined in R309-220. Water suppliers
shall also keep analytical records in their possession, for a required length of time, as
outlined in R309-105-17.
C
43 No unprotected connection between the distribution system and a source of
contamination. (If there is an unprotected connection, describe the location in detail.)
SIG | 50pts | DS | D009 | R309-550-5(11) | R309-550-5(11)
C
44 Are air release/vacuum valves in the distribution system? ... if yes, answer the
following question(s)
Y
44A Open end of vent line covered with #14 mesh screen
SIG | 25pts | DS | D004 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
44B For a valve in a chamber, open end of vent pipe is at least 12 inches above grade or
one foot above distribution line in a chamber that does not flood.
SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
44C Chamber has drain to daylight, gravel-filled adsorption pit if not subject to flooding, or
sump pump.
SIG | 25pts | DS | D007 | R309-550-6(6)(b) and (7)(b) | Rule states chambers shall be
provided with a drain to daylight, if possible. Where this is not possible, underground
gravel-filled absorption pits may be used if the site is not subject to flooding and
conditions will assure adequate drainage. Sump pumps may also be considered if a
drain to daylight or absorption pit is not feasible. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 6 of 45
General Disinfection
44D Open end of vent line down-turned.
SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
45 Water system has a program to maintain, operate, or control the use of fire hydrants.
REC | 0pts | DS | D012 | N/A | Fire hydrants provide a direct access to the water in the
distribution system. In order to protect the quality and integrity of the water, fire
hydrant access should be controlled.
C
46 Blow offs or air release valves are not directly connected to a sanitary sewer line.
SIG | 50pts | DS | D013 | R309-550-6(5)(a), R309-550-6(6)(c) and (7)(a) | Rule states
blow-offs or air relief valves shall not be connected directly to a sewer. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
47 Blow offs or air release valves do not discharge below flood level in ditches or
streams.
SIG | 50pts | DS | D016 | R309-550-9(1) and (2), R309-550-13(2) | R309-550-9(1 & 3)
C
48 All water mains installed after 1995 that provide fire flow are at least 8 inches in
diameter.
MIN | 15pts | DS | D019 | R309-550-5(4) & (5) | Rule states that the minimum line size
serving a fire hydrant lateral shall be 8-inch diameter unless a hydraulic analysis
indicates that required flow and pressures can be maintained by 6-inch lines.
C
49 Distribution system capable of providing minimum pressure of 20 psi at all service
connections.
SIG | 50pts | DS | D003 | R309-105-9, R309-550-5(1) | Rule states the distribution
system shall maintain minimum pressures as required by R309-105-9 at all points of
connection under all flow conditions. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
50 Was the water system constructed or new portions added after January 1, 2007? ... if
yes, answer the following question(s)
Y
50A Distribution system capable of maintaining the following pressures at all service
connections: (a) 20 psi during fire flow and fire demand during peak day demand; (b)
30 psi during peak instantaneous demand; and (c) 40 psi during peak day demand.
SIG | 50pts | DS | D010 | R309-105-9, R309-550-5(1) | Rule states that unless
otherwise specifically approved by the Director, public water systems constructed after
January 1, 2007, shall be designed and shall meet the following minimum water
pressures at points of connection: (a) 20 psi during conditions of fire flow and fire
demand experienced during peak day demand; (b) 30 psi during peak instantaneous
demand; and (c) 40 psi during peak day demand. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 7 of 45
WS002 - WELL NO 2 (ABND) - Inactive (AB - ABANDONED)
WS003 - WELL NO 3 (ABANDONED) - Inactive (AB - ABANDONED)
WS005 - WELL NO 5 (ABND) - Inactive (AB - ABANDONED)
WS007 - WELL NO 6 ABANDONED - Inactive (AB - ABANDONED)
WS009 - WELL NO 7 (ABND) - Inactive (AB - ABANDONED)
WS001 - WELL NO 1 - Active
51 Water system follows AWWA disinfection procedures for new, repaired, or seasonal
water mains and tanks.
SIG | 25pts | MR | D018 | R309-550-8(10) | All new and repaired water mains and
appurtenances shall be disinfected in accordance with AWWA Standard C651. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
52 How often do you periodically disinfect any or all parts of your water system (i.e. batch
disinfection) other than for repairs or maintenance?
SIG | 50pts | SM | G006 | R309-105-6(1)(a), R309-500-6 | R309-105-6(1) Approval of
Engineering Plans and Specifications
R309-500-6 Plan Approval Procedure.
C
53 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N
54 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N
55 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N
56 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N
57 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N
58 Is this facility Active or Inactive?A
59 Operating Period (Start Date)01/01
60 Operating Period (Ending Date)12/31
61 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 8 of 45
62 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
63 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
64 Is the well casing vented? ... if yes, answer the following question(s)Y
64A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
64B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
64C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
65 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
65A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
65B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 9 of 45
65C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
66 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
67 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
68 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
69 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
70 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
71 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
72 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 10 of 45
WS004 - WELL NO 4 - Active
73 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
74 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
75 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
76 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
N
77 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
78 Does well require oil-lubrication?N
79 Is this facility Active or Inactive?A
80 Operating Period (Start Date)01/01
81 Operating Period (Ending Date)12/31
82 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
83 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 11 of 45
84 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
85 Is the well casing vented? ... if yes, answer the following question(s)Y
85A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
85B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
85C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
86 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
86A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
86B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
86C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
87 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
88 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 12 of 45
89 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
90 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
91 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
92 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
93 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
94 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
95 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
96 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
97 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 13 of 45
WS008 - WELL NO 3A - Active
97A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
97B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
97C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
98 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
99 Does well require oil-lubrication?Y
99A Well shaft lubricants ANSI/NSF 60 certified
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
100 Is this facility Active or Inactive?A
101 Operating Period (Start Date)01/01
102 Operating Period (Ending Date)12/31
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 14 of 45
103 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
104 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
105 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
106 Is the well casing vented? ... if yes, answer the following question(s)Y
106A
Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
106B
Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
106C
Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
107 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
107A
Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 15 of 45
107B
Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
107C
Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
108 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
109 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
110 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
111 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
112 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
113 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 16 of 45
114 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
115 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
116 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
117 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
118 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
118A
Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
118B
Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
118C
Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
119 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
120 Does well require oil-lubrication?Y
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 17 of 45
WS010 - WELL NO 8 - Active
120A
Well shaft lubricants ANSI/NSF 60 certified
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
121 Is this facility Active or Inactive?A
122 Operating Period (Start Date)01/01
123 Operating Period (Ending Date)12/31
124 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
125 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
126 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
127 Is the well casing vented? ... if yes, answer the following question(s)Y
127A
Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
127B
Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 18 of 45
127C
Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
128 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
128A
Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
128B
Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
128C
Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
129 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
130 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
131 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
132 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 19 of 45
133 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
134 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
135 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
136 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
137 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
138 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
139 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
139A
Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
139B
Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
D (Notes: #4 mesh screen but no #14 mesh
screen)
139C
Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 20 of 45
WS011 - WELL NO 9 - Active
140 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
141 Does well require oil-lubrication?Y
141A
Well shaft lubricants ANSI/NSF 60 certified
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
142 Is this facility Active or Inactive?A
143 Operating Period (Start Date)06/01
144 Operating Period (Ending Date)09/30
145 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
146 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
147 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
148 Is the well casing vented? ... if yes, answer the following question(s)Y
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 21 of 45
148A
Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
148B
Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
148C
Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
149 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
149A
Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
149B
Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
149C
Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
150 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
151 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 22 of 45
152 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
153 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
154 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
155 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
156 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
157 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
158 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
159 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
160 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 23 of 45
WS013 - WELL NO 10 - Active
160A
Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
160B
Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
160C
Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
161 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
162 Does well require oil-lubrication?Y
162A
Well shaft lubricants ANSI/NSF 60 certified
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
163 Is this facility Active or Inactive?A
164 Operating Period (Start Date)01/01
165 Operating Period (Ending Date)12/31
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 24 of 45
166 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
167 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
168 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
169 Is the well casing vented? ... if yes, answer the following question(s)Y
169A
Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
D (Notes: #4 mesh screen but no #14 mesh
screen)
169B
Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
169C
Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
170 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
170A
Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 25 of 45
170B
Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
170C
Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
171 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
172 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
173 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
174 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
175 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
176 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 26 of 45
177 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
178 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
179 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
180 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
181 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
181A
Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
181B
Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
181C
Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
182 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
183 Does well require oil-lubrication?Y
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 27 of 45
WS014 - WELL NO 5A - Active
183A
Well shaft lubricants ANSI/NSF 60 certified
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
184 Is this facility Active or Inactive?A
185 Operating Period (Start Date)01/01
186 Operating Period (Ending Date)12/31
187 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
188 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
189 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
190 Is the well casing vented? ... if yes, answer the following question(s)Y
190A
Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
190B
Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 28 of 45
190C
Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
191 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
191A
Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
191B
Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
191C
Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
192 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
193 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
194 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
195 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 29 of 45
196 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
197 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
198 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
199 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
200 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
201 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
202 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
202A
Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
202B
Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
202C
Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 30 of 45
ST001 - #1 - Active
203 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
204 Does well require oil-lubrication?Y
204A
Well shaft lubricants ANSI/NSF 60 certified
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
205 Is this facility Active or Inactive?A
206 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
500000
207 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
208 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
209 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
210 Are air vents present? ... if yes, answer the following question(s)Y
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 31 of 45
210A
Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
210B
End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
210C
Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
210D
Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
211 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
211A
Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
211B
Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
211C
Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 32 of 45
212 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
213 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
214 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
215 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
216 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
217 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
217A
Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
217B
Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
217C
Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
218 Are the drain line and overflow combined?Y (Notes: ST001, ST002 and ST003 all
share a combined drain/overflow)
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 33 of 45
ST002 - #2 - Active
219 Is this facility Active or Inactive?A
220 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
1000000
221 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
222 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
223 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
224 Are air vents present? ... if yes, answer the following question(s)Y
224A
Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
224B
End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
224C
Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 34 of 45
224D
Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
225 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
225A
Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
225B
Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
225C
Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
226 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
227 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
228 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 35 of 45
ST003 - #3 - Active
229 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
230 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
231 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
231A
Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
231B
Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
231C
Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
232 Are the drain line and overflow combined?Y
233 Is this facility Active or Inactive?A
234 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
500000
235 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 36 of 45
236 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
237 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
238 Are air vents present? ... if yes, answer the following question(s)Y
238A
Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
238B
End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
238C
Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
238D
Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
239 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
239A
Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 37 of 45
239B
Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
239C
Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
240 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
241 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
242 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
243 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
244 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
245 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
245A
Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 38 of 45
ST004 - #4 - Active
245B
Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
245C
Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
246 Are the drain line and overflow combined?Y
247 Is this facility Active or Inactive?A
248 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
3000000
249 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
250 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
251 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
252 Are air vents present? ... if yes, answer the following question(s)Y
252A
Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 39 of 45
252B
End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
252C
Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
252D
Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
253 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
253A
Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
253B
Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
253C
Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
254 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 40 of 45
ST005 - HARSTON TANK NO.2 - Active
255 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
256 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
257 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
258 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
259 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
259A
Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
259B
Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
259C
Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
260 Are the drain line and overflow combined?Y
261 Is this facility Active or Inactive?A
262 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
2000000 (Notes: Two Million)
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 41 of 45
263 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
264 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
265 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
266 Are air vents present? ... if yes, answer the following question(s)Y
266A
Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
266B
End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
266C
Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
266D
Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 42 of 45
267 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
267A
Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
267B
Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
267C
Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
268 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
269 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
270 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
271 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
272 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 43 of 45
PF001 - TANK FARM PUMP STATION -- Pump Stations - Active
273 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
273A
Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
273B
Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
273C
Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
274 Are the drain line and overflow combined?Y
275 Is this facility Active or Inactive?A
276 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
277 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible,
Vertical turbine)
Vertical turbine
278 If the pump station is used to pressurize the distribution system, does it have at least
two functioning pumping units? ... if yes, answer the following question(s)
SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps,
withdrawing water directly from distribution lines without storage and feeding water
directly into distribution lines, shall have at least two pumping units. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
Y
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 44 of 45
278A
Demand is met by remaining pump(s) when largest pumping unit out of service
SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two
pumping units (such that with any one pump out of service, the remaining pump or
pumps shall be capable of providing the peak day demand of the specific portion of
the system serviced). This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
279 Pump station building and equipment are protected from flooding.
MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station
access shall be 6" above surrounding ground and located at least 3’ above 100-year
flood elevation or highest recorded flood elevation; station is accessible at all times
unless it can be taken out of service when inaccessible.
C
280 There are no unprotected cross-connections in the pump station.
SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless
controlled by an approved and properly operating backflow prevention assembly or
device. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
281 Discharge piping has a pressure gauge.
MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure
gauge be installed on the pump discharge line.
C
282 Does the pumping facility have an air relief valve located on the discharge piping? ... if
yes, answer the following question(s)
N
283 Pump station properly secured
MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to
prevent vandalism and entrance by animals or unauthorized persons.
C
DEQ | Drinking Water
Run Date: 08/20/2024 09:34:27 | Rating: Approved UTAH18019 WHITE CITY WID page 45 of 45