Loading...
HomeMy WebLinkAboutDSHW-2024-007898Site Information Finalized Yes Facility Name Tremonton City Compost Facility_ID SW0227 Facility Name Tremonton City Compost Street Address 6000 North 8700 West City Tremonton ZIP Code 84337 County Box Elder County Inspection Date 08-15-2024 Type of Visit Routine Oversite Is the Visit Announced?Yes 40.016209, -111.734495 Weather Conditions 85 and partly cloudy Inspection Goal To determine compliance with Solid Waste Permitting and Management Rules. Facility Contact Paul Fulgham, Public Works Director Tremonton City Participants Alex Milne, DWMRC Paul Fulgham, Tremonton City Follow Up Inspection Needed?N/A Recommended Follow Up Date Depart Office Date 08-15-2024 Depart Office time 05:45 AM (-6 GMT) Return to Office Date 08-15-2024 Return to Office time 02:30 PM (-6 GMT) 1. Pre-Inspection Review 1.1 Permit Review Yes Comment The Plan of Operation was reviewed. The facility is a composting facility and utilizes greenwaste, wood chips, and biosolids in their products. 1.2 Annual Report Review Yes Comment The 2023 Annual Report was reviewed and 100% of the waste received is from Box Elder County. Total Materials Recycled Compost is noted to be 820.10 tons. $500 in disposal fees were paid. 1.3 Previous Inspection Review Yes Date Submitted: 08-16-2024 11:48 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 1 of 7 Comment The 08/29/2023 Inspection Report and Inspection Letter were reviewed. No issues were noted. 1.4 Facility Contacts Confirmed Yes Comment Paul Fulgham, Public Works Director, of Tremonton City is the current contact. 1.5 Facility Contacted (If an announced inspection) Yes Comment Paul Fulgham was notified of the inspection via email on 08/12/2024. 1.6 Local Health Contacted Yes Comment Grant Koford of the Bear River Health Department was notified of the inspection via email on 08/08/2024. This inspection did not have health department participation. 1.7 Other N/A Comment N/A 2. Facility / Operational Controls (1-Good, 5-Poor) 2.1 Litter NA 2.2 Roads 1 2.3 Gate House Operations 1 2.4 Vectors 1 2.5 Communications 1 2.6 Recycling Area 1 2.7 Fugitive Dust Control 1 2.8 Waste Inspection Area 1 2.9 Scavenging Control 1 2.10 Open Burning NA 2.11 Fences, Gates, Locks, Access Control 1 2.12 Working Face NA 2.13 Daily - Soil NA 2.14 Daily - Alternative NA 2.15 Leachate Collection System NA 2.16 Other NA Comment (Required)The facility maintains adequate signage and access is controlled by a locked gate. The gatehouse is staffed during operating hours. The composting area is well organized and clean. 3. Signs Required / Properly Posted Date Submitted: 08-16-2024 11:48 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 2 of 7 3.1 Operating Days / Hours Yes 3.2 Directions & Procedures Yes 3.3 Emergency Numbers Yes 3.4 List of Unacceptable Materials Yes 3.5 Other N/A Comment (Required)The facility maintains acceptable signage. 4. Operator / Representative / Employees 4.1 On-site While Open Yes 4.2 Training Yes 4.3 Other N/A Comment (Required)The facility conducts training for all staff and the gatehouse is staffed when the compost facility is open. 5. Monitoring 5.1 Methane N/A 5.2 Random Inspections N/A 5.3 Leachate N/A 5.4 Ground Water N/A 5.5 Other N/A Comment (Required)The facility does not have a groundwater monitoring requirement. Windrow temperatures are monitored daily and noted in logs stored at the gatehouse. 6. Drainage / Erosion 6.1 Water Run-on Yes 6.2 Water Run-off Yes 6.3 Other N/A Comment (Required)The facility maintains adequate drainage and erosion controls. The facility utilizes a capture basin for storm water runoff. 7. Proper Storage / Isolation / Disposal 7.1 Special Waste N/A 7.2 Batteries N/A 7.3 Hazardous Waste N/A 7.4 Infectious Waste N/A 7.6 Dead Animals N/A 7.7 Asbestos N/A 7.8 Bulky Waste N/A Date Submitted: 08-16-2024 11:48 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 3 of 7 7.9 Contaminated Soil N/A 7.10 Ash N/A 7.11 Sludge N/A 7.12 Other N/A Comment (Required)The facility is a compost facility and does not accept waste other than those listed in the Plan of Operation. 8. Cover 8.1 Intermediate N/A 8.2 Final N/A 8.3 Vegetation N/A 8.4 Other N/A Comment (Required)The facility is a compost facility and does not have waste to cover. 9. Inspection Records 9.1 Random Inspection Report N/A 9.2 Gas Monitoring System N/A 9.3 Surface Drainage Control Yes 9.4 Daily Records Yes 9.5 Weight or Volumes Yes 9.6 Intermediate Cover N/A 9.7 Final Cover N/A 9.8 Self Inspection (Quarterly Reports) Yes 9.9 Deviation From Plans N/A 9.10 Permit, Permit Application, and Rules Available Yes 9.11 Other N/A Comment (Required)Records were reviewed onsite and included temperature reports, site inspections, plan of operation, and daily tonnage. 10. Monitoring / Sampling / Analysis Records 10.1 Explosive Gas Monitoring N/A 10.2 Leachate Sampling & Treatment N/A 10.3 Ground Water Sampling Results N/A 10.4 Other N/A Comment (Required)The facility does not have groundwater or gas monitoring requirements. Date Submitted: 08-16-2024 11:48 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 4 of 7 11. Special Waste Records 11.1 Lab Analysis Results N/A 11.2 Manifests N/A 11.3 Treatment Certification N/A 11.4 Paint Filter Test Results N/A 11.5 Onsite Treatment Documentation N/A 11.6 Other N/A Comment (Required)No special waste records were reviewed. 12. Waste Tires 12.1 Acceptance procedures for Waste Tires N/A 12.2 Waste Tire Pile Segregated N/A 12.3 Estimated Quanitity of Waste Tires No Number of Tires 12.4 Waste Tire Fund Training N/A Comment (Required)The facility is not permitted to accept waste tires. 13 Other Items 13.1 Notice of Inspections Form Completed and Signed N/A 13.2 N/A 13.3 N/A 13.4 N/A Comment (Required)N/A 14. Special Permit Requirements 14.1 N/A 14.2 N/A 14.3 N/A Comment (Required)N/A General Comments Comments The facility was organized and staffed during operating hours. The facility maintains acceptable signage and records. At the time of the inspection, the facility turned away a load since it contained unpermitted materials. Date Submitted: 08-16-2024 11:48 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 5 of 7 DWMRC Inspector Signature DWMRC Inspector Name Alex Milne Date/Time 08-15-2024 Photos Attach Photos View of the facility's signage. View of the facility's gatehouse. The gatehouse is staffed during operating hours. View of the greenwaste pile. The greenwaste pile gets recycled as part of the composting operations. Date Submitted: 08-16-2024 11:48 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 6 of 7 View of the onsite trommel. View of windrows. Temperatures are monitored daily and windrows are turned frequently. View of the facility's capture basin to collect storm water runoff. Date Submitted: 08-16-2024 11:48 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 7 of 7