HomeMy WebLinkAboutDERR-2024-010066Le i gh Ande rson <ka nde rson@ uta h.gov>
GE N. Salt Lake V CP - Ne x t Call Date s & De liv e rable s
5 mes s ages
Foti , Da m i a n D (GE Ve rnova ) <damian.fot i@ge.c om>Thu, May 30, 2024 at 8:41
AM
To: B ill Rees <brees @ut ah.gov>, S c ot t Everet t <s everet t @ut ah.gov>, Leigh Anders on
<k anders on@ut ah.gov>
Cc : "Glis s on, B rad" <brad.glis s on@ws p.c om>, "Mat hews , S ara B"
<s ara.mat hews @ws p.c om>
Bi ll, Scott & Lei gh
Please see below proposed dates and ti mes for our call for next week
to follow up on the GE N. Salt Lake fi nal deli verables to reach VC P
closure. I have also provi ded the li st of key deli verables di scussed from
our last call to be updated, revi sed and submi tted to appropri ately
sati sfy the VC P closure.
GE & WSP Avai labi lity – Please provi de your team’s avai labi li ty
Mon 6/3: 10:00 am – 1:00 pm MTN
Tues 6/4 12:00 pm – 5:00 pm MTN
Wed 6/5 8:00 am – 1:00 pm MTN
Thurs 6/6 8:30 am – 11:00 am MTN
8/6/24, 5:07 PM State of Utah Mail - GE N. Salt Lake V CP - Nex t Call Dates & Deliv er ables
https ://mail.google.c om/mail/u/0/?ik=5be3741f 93&v iew =pt&s earc h=all&per mthid=thread-f :1800489005856549061&s impl=ms g-f :1800489005856549…1/7
Li st of D eli verable
GE – WS P
• Revised off-si te groundwater analyti cal results fi gure to show 1,4-
di oxane results at MD L i ncludi ng Pace Lab report – Completed &
provi ded to DERR May 23, 2024
• WS P revi sed 1,4-dioxane groundwater ri sk memorandum –
anti ci pated deli ver date anti ci pated deli ver date 1st week i n June
• WS P Remedi al A cti on Plan Addendum Letter – anti ci pated
deli ver early June
• Addi ti onal Off-si te Groundwater D eli neati on report - anti cipated
deli ver date 1st week i n June
• Apri l 2024 9th consecuti ve quarterly On-si te Groundwater Report
- anti ci pated deli ver date 1st week i n June
• Revised S MP and EC (to appropriately update groundwater
secti ons) – anti ci pated deli ver early June
• Further support to S MP revi si on, GE -WS P to provi de proposed
(reduced) groundwater sampli ng & analysi s plan – anti ci pated deli ver
early June
D ERR Acti ons
• C onfi rm southern most addi ti onal off-si te groundwater moni tori ng
well (# 13) i nstallati on i s not requi red
Thanks
8/6/24, 5:07 PM State of Utah Mail - GE N. Salt Lake V CP - Nex t Call Dates & Deliv er ables
https ://mail.google.c om/mail/u/0/?ik=5be3741f 93&v iew =pt&s earc h=all&per mthid=thread-f :1800489005856549061&s impl=ms g-f :1800489005856549…2/7
Dami an
Se nio r Environ m e nta l Ma na ger
Gas Po w er – En vi ron m en t, Health & Sa fety
M +1 518 796 233 0 (pri m ary co nta ct n um be r)
1 River R oa d Bld g 3 3 R oom 2 07
Sch en ecta dy, N Y 123 45 (USA)
Le i gh Ande rson <k anders on@utah.gov>Thu, May 30, 2024 at 6:04 PM
To: "Fot i, Damian D (GE Vernova)" <damian.foti@ge.c om>, "Glis s on, Brad"
<brad.glis s on@ws p.c om>, "Mat hews , Sara B" <s ara.mat hews @ws p.c om>
Cc : B ill Rees <brees @ut ah.gov>
Hey Damian, t hank s for t he email and t he updat e on every t hing t hat's s t ill
out s t anding, we'll be look ing at t his to help guide us through what we s till need t o get
bac k t o y ou on. I c an s ay t hat it look ed lik e the s ens it ivity c onc erns t hat we had
about the 1,4 Diox ane are in play bas ed on t he revis ed figure with t he MDLs lis ted. I
als o k now t hat we need t o get y ou a res pons e on the propos ed c hange to t he
groundwat er monit oring plan prior to t he t ime t hat y ou would be s c heduled for any
nex t quart erly groundwater monit oring.
In t erms of meeting times , unfortunat ely S c ot t is out for the nex t week , and s o we will
need t o look at a time t he week aft er for t his meet ing.
[Qu ote d te xt h i d d e n]
Bi l l Re e s <brees @ut ah.gov>Fri, Jun 14, 2024 at 7:38 AM
8/6/24, 5:07 PM State of Utah Mail - GE N. Salt Lake V CP - Nex t Call Dates & Deliv er ables
https ://mail.google.c om/mail/u/0/?ik=5be3741f 93&v iew =pt&s earc h=all&per mthid=thread-f :1800489005856549061&s impl=ms g-f :1800489005856549…3/7
To: "Fot i, Damian D (GE Vernova)" <damian.foti@ge.c om>
Cc : S c ot t Everet t <s everet t @ut ah.gov>, Leigh Anders on <k anders on@utah.gov>, "Glis s on,
Brad" <brad.glis s on@ws p.c om>, "Mathews , Sara B " <s ara.mat hews @ws p.c om>
Damian,
As a follow -up to our meeting yesterday, this email should ser ve as a summary and
quasi checklist for future activities. We discussed the DERR's June 5, 2024 letter and
the gener al direction set forth in the last par agraph.
1. Characterization - Based on the new data, it appears both on and off-site have been
w ell char acter ized relating to possible impacts from the GE site. I'm not sure I r ecall
the issue relating to off-site w ell (13) you noted below . Per haps, you or Brad can shed
some light on the matter. We did discuss S ensitivity issues relating to the 1,4 D MDLs.
S peaking w ith our chemist and r eflecting on our own exper iences with this compound,
it can be a huge challenge to hit the screening level w ith environmental samples. We
often use 8260 S IM and sometimes will go to 8270 S IM. S uccess varies and
sometimes depends on the day, matr ix and lab. A question of interest r elates to the
gain in trying 8270 versus the cur rent results. We talked about r isk and generally
agreed there is not much difference betw een the cur r ent MDL and the scr eening level,
especially since shallow gr oundw ater off-site is not being used for drinking water.
2. Risk - the off-site memorandum w ill be updated to reflect the new data. T his memo
should compliment the April off-site results and provide an overall view of site
characterization efforts. This memo will be review ed in concert w ith the Apr il data
included in the on and off-site repor ts (see list of futur e reports below) and w ill help us
make some final determinations regarding characterization efforts.
3. Remedy - Once char acterization has been completed, an amendment to the RAP w ill
be submitted to propose a remedy for the groundw ater impacts (both on and off-site
as appropriate). If justified, this r emedy could include MNA (w ith ongoing monitoring
pr ovided there is no immediate risk to the public), and cleanup levels and other
str ategies to demonstr ate the plume is stable and decr easing and goals have been
met. We can consider 10-4 onsite (with contr ols), but need to be 10-6 offsite. T he
remedy should consider all exposur e pathw ays. T he RAP has already been to public
comment and this is an amendment, but the adjacent land ow ner should be kept
informed.
4. Institutional contr ols - T he S MP and EC will need to be reviewed. T he RAP
amendment should make note of these tools, but ultimately they are
separ ate documents. Monitor ing frequencies, par ameters, etc.. should be defined in
these documents. Contingencies and procedur es to manage unknowns (if encountered
under the building or other portions of the site) should also be discussed as examples.
Typically an S MP includes pr ocedures to address r ebound if it occur s.
8/6/24, 5:07 PM State of Utah Mail - GE N. Salt Lake V CP - Nex t Call Dates & Deliv er ables
https ://mail.google.c om/mail/u/0/?ik=5be3741f 93&v iew =pt&s earc h=all&per mthid=thread-f :1800489005856549061&s impl=ms g-f :1800489005856549…4/7
Future Li st of D eli verable
• Revised off-si te groundwater analyti cal results fi gure to show 1,4-
di oxane results at MD L i ncludi ng Pace Lab report – S UBMIT T ED and UNDER
REVIEW
• WS P revi sed 1,4-dioxane groundwater ri sk memorandum –
anti ci pated deli ver date 1st week i n June
• WS P Remedi al A cti on Plan Addendum Letter – anti ci pated
deli ver early June
• Addi ti onal Off-si te Groundwater D eli neati on report - anti cipated
deli ver date 1st week i n June
• Apri l 2024 9th consecuti ve quarterly On-si te Groundwater Report -
anti ci pated deli ver date 1st week i n June - S UBMIT T ED and UNDER REVIEW
• Revised S MP and EC (to appropriately update groundwater
secti ons) – anti ci pated deli ver early June
• Further support to S MP revi si on, GE -WS P to provi de proposed
(reduced) groundwater sampli ng & analysi s plan – anti ci pated deli ver
early June
Regards,
Bill
Bil l Rees
Se c t io n Ma n a g e r
V CP/Br o w n fie ld s Se c t io n
P: (3 85 ) 3 9 1 -81 2 0
environmentalres pons e.ut ah.gov
8/6/24, 5:07 PM State of Utah Mail - GE N. Salt Lake V CP - Nex t Call Dates & Deliv er ables
https ://mail.google.c om/mail/u/0/?ik=5be3741f 93&v iew =pt&s earc h=all&per mthid=thread-f :1800489005856549061&s impl=ms g-f :1800489005856549…5/7
Em ai l s to and from thi s em ai l address m ay be consi dered publ i c records and thus subj ect to Utah GRAM A
requi rements.
On Thu, May 30, 2024 at 8:42 A M Fot i, Damian D (GE Vernova)
<damian.foti@ge.c om> wrot e:
[Qu ote d te xt h i d d e n]
Le i gh Ande rson <k anders on@utah.gov>Tue, Jun 18, 2024 at 11:13 AM
To: B ill Rees <brees @ut ah.gov>
Hey Bill, well 13 from what I rec all was a s out hern well loc at ion off-s ite along t he
s t reet t o t he wes t , it was int ended to be t he s out hernmos t loc ation. The ex is t ing
s out hernmos t wells s eem to be s outhwes t from the on-s it e wells t hat have been a
c onc ern for us , MW -17 and MW -3, and it was hones tly a ques tion at the time they
propos ed it whet her t o inc lude well 13. I t hink y ou did want it but given the us ual
groundwat er flow direc t ion (generally wes t t o northwes t) I was n't s ure if t hey would
really get any thing from it bec aus e it s eemed lik e it might be c ros s gradient.
The s out hernmos t well in t he figure att ac hed t o the let t er work plan is I believe what is
s uppos ed t o be t he off-s it e well 13, t hough it is not labeled.
W hen I was t here t hey finis hed out what t hey were c alling A 11 and A12, whic h were
on t he propert y nort h of this (s ec ond att ac hed figure). t hey were moved s light ly from
where t hey appeared in the delineat ion let ter work plan at t he reques t of t he property
owner, but I don't really have an is s ue wit h them having moved t hos e wells furt her
s out h along t he s out h boundary.
[Qu ote d te xt h i d d e n]
2 a tta chm e nts
GE_North S a l t La ke GW De l ine a ti on (offsite ) Scope of W ork 2024-02-
14.pdf
3842K
GE Uta h - 990 N Ma i n Acce ss Fi gure 1 R1.pdf
1564K
Bi l l Re e s <brees @ut ah.gov>Tue, Jul 30, 2024 at 7:00 AM
8/6/24, 5:07 PM State of Utah Mail - GE N. Salt Lake V CP - Nex t Call Dates & Deliv er ables
https ://mail.google.c om/mail/u/0/?ik=5be3741f 93&v iew =pt&s earc h=all&per mthid=thread-f :1800489005856549061&s impl=ms g-f :1800489005856549…6/7
To: "Fot i, Damian D (GE Gas P ower)" <damian.fot i@ge.c om>
Cc : Leigh A nders on <k anders on@ut ah.gov>, "Glis s on, B rad" <brad.glis s on@ws p.c om>,
"Mat hews , Sara B" <s ara.mat hews @ws p.c om>, Sc ot t E verett <s everett @utah.gov>
Damian,
As a follow -up to the meeting on 7/25/2024,
Future Li st of D eli verables
• W S P revis ed 1,4-diox ane groundwat er ris k memorandum – COMP LETE D
• Addit ional Off-s it e Groundwater Delineat ion report - COMPLE TED
• April 2024 9t h c ons ec utive quarterly On-s ite Groundwat er Report - antic ipated
deliver dat e 1s t week in June - COMPLET ED
• W SP Remedial Ac t ion Plan A ddendum Let t er – RECE IVED A ND UNDER
RE V IEW
• Further s upport to SMP revis ion, GE-W S P t o provide propos ed (reduc ed)
groundwat er s ampling & analy s is plan – RECE IV ED AND UNDE R RE V IEW
• Revis ed S MP and EC (t o appropriat ely update groundwat er s ec t ions ) –
ant ic ipat ed deliver early June (HAV E NOT RECE IVED)
As discussed, Leigh will be sending a letter acknowledging completion of the above
documents. W e ar e curr ently reviewing the RAP Addendum letter and the reduced
gr oundw ater monitoring pr oposal. A meeting will be arraigned later in August to
discuss.
No final comments w er e provided during the meeting other than w e ar e ready to
review a proposed gw remedy. We discussed arsenic, the natur e of the proposed
monitor ing network and potential milestones to discontinue monitoring. T hese w ill all
be discussed in the futur e.
Regards,
Bill
[Qu ote d te xt h i d d e n]
8/6/24, 5:07 PM State of Utah Mail - GE N. Salt Lake V CP - Nex t Call Dates & Deliv er ables
https ://mail.google.c om/mail/u/0/?ik=5be3741f 93&v iew =pt&s earc h=all&per mthid=thread-f :1800489005856549061&s impl=ms g-f :1800489005856549…7/7