Loading...
HomeMy WebLinkAboutDERR-2024-009982 WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 SPILL BUCKET INTEGRITY TESTING HYDROSTATIC TEST METHOD SINGLE- AND DOUBLE-WALLED VACUUM TEST METHOD Facility Name: Smith’s #475 Owner: Smith’s Food and Drug Centers, Inc. Address: 3171 East 3300 South Address: P.O. Box 305103 City, State, Zip: Salt Lake City, Utah 84109 City, State, Zip: Nashville, Tennessee 37230 Facility I.D.#: 4002338 Phone #: 801-977-2012 Testing Company: Westech Phone #: 801-266-2545 Date: 4/9/24 This procedure is to test the leak integrity of single- and double-walled spill buckets. See PEI/RP1200 Section 6.2 for hydrostatic test method, Section 6.3 for single-walled vacuum test method and Section 6.4 for double-walled vacuum test method. Tank Number 1 (South) Product Stored RUL Spill Bucket Capacity 5-Gallon Manufacturer OPW Construction ☒Double-walled ☐Single-walled ☐Double-walled ☐Single-walled ☐Double-walled ☐Single-walled ☐Double-walled ☐Single-walled Test Type ☒Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled ☐Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled ☐Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled ☐Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled Spill Bucket Type ☒Product ☐Vapor ☐Product ☐Vapor ☐Product ☐Vapor ☐Product ☐Vapor Liquid and debris remove from spill bucket?* ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No Visual Inspection (no cracks, loose parts or separation of the bucket from the fill pipe.) ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No Tank Riser cap included in test? ☒Yes ☐No ☐NA ☐Yes ☐No ☐NA ☐Yes ☐No ☐NA ☐Yes ☐No ☐NA Drain valve included in test? ☐Yes ☐No ☒NA ☐Yes ☐No ☐NA ☐Yes ☐No ☐NA ☐Yes ☐No ☐NA Starting Level 11 7/8” Test Start Time 2:24 Ending Level 11 7/8” Test End Time 3:24 Test Period 1 Hour Level Change 0” Pass/fail criteria: Must pass visual inspection. Hydrostatic: Water level drop of less than 1/8 inch; Vacuum single-walled only: Maintain at least 26 inches water column; Vacuum double-walled: maintain at least 12 inches water column. Test Results ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: RUL (south) inner bucket replaced and retested on 4/9/24. *All liquids and debris must be disposed of properly Tester’s Name Sean Jardine, UT-0397 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 UST OVERFILL EQUIPMENT INSPECTION AUTOMATIC SHUTOFF DEVICE AND BALL FLOAT VALVE Facility Name: Smith’s #475 Owner: Smith’s Food and Drug Centers, Inc. Address: 3171 East 3300 South Address: P.O. Box 305103 City, State, Zip: Salt Lake City, Utah 84109 City, State, Zip: Nashville, Tennessee 37230 Facility I.D.#: 4002338 Phone #: 801-977-2012 Testing Company: Westech Phone #: 801-266-2545 Date: 4/9/24 This data sheet is for inspecting automatic shutoff devices and ball float valve. See PEI/RP1200 Section 7 for inspection procedures. Product Grade RUL Tank Number 1 (South) Tank Volume, gallons 19,703 Tank Diameter, inches 117 3/4 Overfill Prevention Device Brand OPW Type ☒ Automatic Shutoff Device☐ Ball Float Valve ☐ Automatic Shutoff Device ☐ Ball Float Valve ☐ Automatic Shutoff Device ☐ Ball Float Valve ☐ Automatic Shutoff Device ☐ Ball Float Valve AUTOMATIC SHUTOFF DEVICE INSPECTION 1. Drop tube removed from tank? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 2. Drop tube and float mechanisms free of debris? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 3. Float moves freely without binding and poppet moves into flow path? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 4. Bypass valve in the drop tube open and free of blockage (if present)? ☒Yes ☐No ☐Not Present ☐Yes ☐No ☐Not Present ☐Yes ☐No ☐Not Present ☐Yes ☐No ☐Not Present 5. Flapper adjusted to shut off flow at 95% capacity? * ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No A "No" to any item in Lines 1-5 indicates a test failure. BALL FLOAT VALVE INSPECTION** 1. Tank top fitting vapor-tight and leak free? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 2. Ball float cage free of debris? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 3. Ball free of holes and cracks and moves freely in cage? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 4. Vent hole in pipe open and near top of tank? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 5. Ball float pipe proper length to restrict flow to 90% capacity? *** ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No A "No" to any item in Lines 1-5 indicates a test failure. Test Results ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: Drop tube replaced and retested on 4/9/24. *Use manufacturer’s suggested procedure for determining if automatic shutoff device will shut off flow at 95% capacity. **If a ball float valve is found to fail the inspection, another method of overfill must be used. ***Use manufacturer’s suggested procedure for determining if flow restriction device will restrict flow at 90% capacity. Tester’s Name Sean Jardine, UT-0397 Tester’s Signature