Loading...
HomeMy WebLinkAboutDRC-2024-006484 DRC-20 Salt Lake City, UT -4880 Telephone (801) 536-Fax (801) 536-T.D.D. (801) 536-4284 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL Douglas J. Hansen Director MEMORANDUM TO: Adam Wingate FROM: Dean Henderson DATE: June 25, 2024 SUBJECT: 2024 Annual Seeps and Springs Monitoring Event, Field Inspection and Split Sampling Groundwater Discharge Permit No. UGW370004 Energy Fuels Resources (USA), Inc. White Mesa Uranium Mill, near Blanding, Utah This staff summary on the inspection of the 2024 Annual Seeps and Springs Monitoring event 4 June 18, 2024, at I The 2024 Event was inspected against the following enforcement documents: The EFRI Quality 8, 2021. Sampling Plan for Seeps and Springs In the Vicinity of the White Mesa Uranium Mill. Revision 2. July Summary of Inspection EFRI informed the Division by email on June 4, 2024 with an attached letter dated June 4, 2024, that EFRI would be sampling the seeps and springs on June 18, 2024 . The Letter from EFRI provided notice prior to sampling as required in Section 3 of the Sampling Plan. In Section 2.1 of the Sampling Plan EFRI is required to sample annually the seeps and springs between May 1 and July 15 each year; therefore, the June 18, 2024, sampling date meets this requirement. On June 18. 2024 Division staff (Dean Henderson and Adam Wingate) observed the EFRI staff (Tanner Holliday and Deen Lyman) sample Cottonwood Spring, Entrance Spring, and Ruin Spring (see photographs in Figures 1, 2 and 3 in attachment 1 below). The Division staff split a water sample with the EFRI from Ruin Spring. Page 2 Conclusion Based on Division staff observation of EFRI staff performing the sampling and monitoring on June 18, 2024, it appears that they appropriately followed the field requirements in the Permit, QAP and Sampling Plan. The findings of this inspection and results of the analytical analysis for the Division split sample of Ruin Spring will also be included as part of the review to complete the inspection for the Annual 2024 Seeps and Springs Monitoring Report. A letter will be drafted notifying EFRI of the closeout of the field inspection and split sampling for the annual 2024 seeps and springs monitoring event. Page 3 References Energy Fuels, White Mesa Uranium Mill Ground Water Quality Assurance Plan, Revision 7.6, September 10, 2019. Energy Fuels Resources (USA) Inc, White Mesa Uranium Mill Annual Seeps and Springs Sampling Notice Pursuant to Utah Groundwater Discharge Permit UGW370004. June 4, 2024. Sampling Plan for Seeps and Springs In the Vicinity of the White Mesa Uranium Mill. Revision 2. July 8, 2016. Utah Department of Environmental Quality, Groundwater Discharge Permit No. UGW370004 Permit version that was signed on March 8, 2021. Page 4 Attachment 2 Figures 1, 2 and 3 Page 5 Figure 1. EFRI staff sampling Entrance Spring. Page 6 Figure 2. EFRI staff sampling Ruin Spring. Page 7 Figure 3. EFRI staff sampling Cottonwood Spring.