HomeMy WebLinkAboutDRC-2024-005559Facility Shootaring Canyon Mill - Lower Embankment Storage Level None Date Weather Sunny Name Representing Heather Mickelson UDWMRC LaMiya Morrill Anfield Resources Holding Company N/A Not Inspected Inundated Good Monitor Maintenance Critical Embankment ruts/erosion X cracks/settlements X poor alignment X road ruts X vegetation/riprap X1 beaching/slides/cracks X undermining/erosion X rodent burrows X2 vegetation/erosion X1 sloughs/slides/cracks X5 seepage/wetness X rodent burrows X2 vegetation/riprap X1 erosion X3,4 seepage/wetness X Abutment/Foundation vegetation/erosion X1 sloughs/slides/cracks X seepage/wetness X vegetation/erosion X1 sloughs/slides/cracks X seepage/wetness X cracks/slumps X embankment drains X seepage/wetness X cracks/slumps X embankment drains X seepage/wetness X Element Detail Dam Safety Inspection People Present April 17, 2024 5. L e f t Ab u t m e n t 6. R i g h t Ab u t m e n t 7. U / S T o e 8. D / S T o e 1. C r e s t 2. U / S S l o p e 3. D / S S l o p e 4. G r o i n s Reservoir Basins 9. Shore Stability X 10. Reservoir Bottom X Spillway 11. Freeboard X 12. Intake X 13. Concrete Structures X 14. Stilling Basin X 15. Outfall Channel X Instrumentation 22. Monuments X 23. Staff Gage X 24. Piezometers X6 25. Drains X 26. Other X Notes U/S = Upstream D/S = Downstream Phil Goble Date Radioactive Materials Section Manager Adam Wingate Date Uranium Recovery Section Manager Heather Mickelson, P.E., P.G. Date 1. Recommend continued efforts to minimze deep rooted plants. 2. Recommend continued efforts to minimze burrowing animals and backfill their holes. 3. Recommend continued efforts to minimze and repair erosion. 4. Maintenance is of an erosional area near the right groin and downstream toe is needed. 5. A road was previously constructed on the downstream toe from the right groin to the middle of the embankment and material near the middle of the embankment was excavated. Recommend monitoring for erosion into the embankment. 6. Per Anfield staff, piezometers are dry. Facility Shootaring Canyon Mill - Upper Embankment Storage Level None Date Weather Sunny Name Representing Heather Mickelson UDWMRC LaMiya Morrill Anfield Resources Holding Company N/A Not Inspected Inundated Good Monitor Maintenance Critical Embankment ruts/erosion X cracks/settlements X poor alignment X road ruts X vegetation/riprap X1 beaching/slides/cracks X undermining/erosion X rodent burrows X2 vegetation/erosion X1,3 sloughs/slides/cracks X seepage/wetness X rodent burrows X2 vegetation/riprap X1 erosion X4 seepage/wetness X Abutment/Foundation vegetation/erosion X1 sloughs/slides/cracks X seepage/wetness X vegetation/erosion X1 sloughs/slides/cracks X X1 seepage/wetness X cracks/slumps X embankment drains X seepage/wetness X cracks/slumps X embankment drains X seepage/wetness X 1. C r e s t Dam Safety Inspection April 17, 2024 People Present Detail Element 8. D / S T o e 2. U / S S l o p e 3. D / S S l o p e 4. G r o i n s 5. L e f t Ab u t m e n t 6. R i g h t Ab u t m e n t 7. U / S T o e Reservoir Basins 9. Shore Stability X 10. Reservoir Bottom X Spillway 11. Freeboard X 12. Intake X 13. Concrete Structures X 14. Stilling Basin X 15. Outfall Channel X Instrumentation 22. Monuments X 23. Staff Gage X 24. Piezometers X5 25. Drains X 26. Other X Notes U/S = Upstream D/S = Downstream Phil Goble Date Radioactive Materials Section Manager Adam Wingate Date Uranium Recovery Section Manager Heather Mickelson, P.E., P.G. Date 1. Recommend continued efforts to minimze deep rooted plants. 2. Recommend continued efforts to minimze burrowing animals and backfill their holes. 3. Repair of erosion on the downstream slope is needed. 4. Repair of an erosion near the right groin area is needed. 5. Per Anfield staff, piezometers are dry. Photo 1. Upstream slope of the lower embankment. Photo taken on April 17, 2024, and is looking west. Photo 2. Upstream slope of the lower embankment. Photo taken on April 17, 2024, and is looking east. Photo 3. Upstream right groin of the lower embankment. Photo taken on April 17, 2024, and is looking south. Photo 4. Erosion near the upstream right groin of the lower embankment. Photo taken on April 17, 2024, and is looking south. Photo 5. Erosion near the upstream right groin of the lower embankment. Photo taken on April 17, 2024, and is looking north. Photo 6. Upstream slope and left groin of the lower embankment. Photo taken on April 17, 2024, and is looking west. Photo 7. Downstream face of the lower embankment. Photo taken on April 17, 2024, and is looking east. Photo 8. Downstream right groin of the lower embankment with road cutting through dam face. Photo taken on April 17, 2024, and is looking east. Photo 9. Downstream slope and right groin of the lower embankment. Photo taken on April 17, 2024, and is looking west. Photo 10. Downstream slope and left groin of the lower embankment. Photo taken on April 17, 2024, and is looking east. Photo 11. Erosion near the downstream toe of the lower embankment. Photo taken on April 17, 2024. Photo 12. Crest of the upper embankment. Photo taken on April 17, 2024, and is looking west. Photo 13. Upstream face of the upper embankment. Photo taken on April 17, 2024, and is looking west. Photo 14. Upstream left groin of the upper embankment. Photo taken on April 17, 2024, and is looking east. Photo 15. Upstream right groin of the upper embankment. Photo taken on April 17, 2024 and is looking east . Photo 16. Downstream right groin of the upper embankment. Photo taken on April 17, 2024, and is looking east. Photo 17. Erosion on the downstream slope of the upper embankment near the left groin. Photo taken on April 17, 2024, and is looking north. Photo 18. Downstream left groin of the upper. Photo taken on April 17, 2024, and is looking west. Photo 19. Burrowing animal control placed near the upstream toe of the lower embankment. Photo taken on April 17, 2024.