Loading...
HomeMy WebLinkAboutDDW-2024-010026CC: Water/Sewer Separation - Exception Request Form INSTRUCTIONS Send the completed Exception Request Form, drawings, and Water/Sewer Exception Request Spreadsheet to ddwpnf@utah.gov PROJECT INFORMATION Water System Number*: DDW File Number: Water System Name*: Project Title*: Project Description*: Attachments: Drawings of water line and sewer line alignments Water/Sewer Exception Request Spreadsheet SUBMITTED BY Engineer of Record Name (Print): PE License Number: Title: Email: Phone: Organization: Signature: Date: REVIEWED BY DDW Permitting Engineer Name (Print):Date: APPROVED BY DDW Permitting Manager Name (Print): Signature: Date: EQ Docs #: Enclosures: Administrative Contact: Address: 11001 Brian Head Water Supply Brian Head 2024 Infrastructure Projects (Phase 3 - HWY Waterline Replacement) Installation of approx. 4,250 lineal feet of 8" ductile iron pipe to replace existing 6" wrapped steel pipe and to include additional looping throughout system. 12626240 rhettbeazer@alphaengineering.com (435) 628-6500 Alpha Engineering Rhett Beazer P.E. 7/30/2024 Michael Newberry. P.E. 07/31/2024 - 3DXO :rigKW 3(  5KHWW %HD]Hr 3( $OSKD (nginHHring rKHWWEHD]Hr#DOSKDHnginHHringFoP CKrisWoSKHr /HigK %riDn +HDG 7oZn :DWHr 6\sWHP FOHigK#EKWoZnXWDKgoY $OGo %iDsi %riDn +HDG 7oZn 3XEOiF :orNs 'irHFWor DEiDsi#EKWoZnXWDKgoY - 3DXO :rigKW 3( '(4 6oXWKZHsW 'isWriFW (nginHHr SZrigKW#XWDKgoY CKrisWoSKHr * /HigK 32 %o[  %riDn +HDG 87  Water/Sewer Separation - Spreadsheet Water/Sewer Separation - Exception Request Spreadsheet STA 502+00, Sheet 4 Constraint due to existing utilities 10' 1'-8" Below None Condition (New/Existing)New Material Ductile Iron Size 8" Pressure Rating 200 Is the line pressurized year-round?Yes Condition (New/Existing)Existing, condition unknown Material PVC Size 8" Pressure Rating Unknown Is the line pressurized?No 15" steel casing extending a minimum 10' either side of the crossing per Detail G (Sheet 11); add magnetic warning tape 12" above water and sewer lines 1. Separation distances shall be measured edge-to-edge. 2. Examples of proposed means to mitigate risks include: a. remove/replace the aged vitrified clay sewer pipe; b. replace the aged or cracked existing sewer pipe; c. use thicker or higher pressure class PVC instead d. of the typical thin-wall sewer pipe; install an in-situ lining to the existing sewer pipe for XX feet; e. center the sewer line over the crossing to keep the joints as far as possible from the water line; f. add detectable or magnetic warning tape placed 12 inches above the sewer and/or the water line(s) to minimize possible damage during future excavations; g. use HDPE pipe for water line or sewer line to eliminate the joints [if there is no sagging or lack-of-sufficient slope problems for HDPE sewer pipes]; h. use restrained joints for water line and/or sewer line near the crossing Sewer Line Water Line Reason for not meeting R309-550-7 Mitigation Efforts2 Station or Location Horizontal Clearance1 Vertical Clearance1 Water is Above or Below Sewer Groundwater conditions