HomeMy WebLinkAboutDDW-2024-010024
August 15, 2024
Joshua Bake
Roosevelt City Water System
255 South State
Roosevelt, Utah 84066
Subject:Operating Permit, 800 South water line replacement, System #07004, File #11095The Division of Drinking Water (the Division) received a request for an Operating Permit for the
subject project from your consultant, CIVCO Engineering on August 1, 2024. The project consisted of replacing the existing water line in 800 South from State Street to 500 East with
approximately 1,700 feet of 12-inch diameter C905 SDR 21 PVC water line and associated appurtenances. The Division issued Plan Approval for the project on January 8, 2018. The Operating
Permit request included a certification by a professional engineer, record drawings and satisfactory bacteriological results as evidence of proper disinfection and flushing.
The Division has determined that all conditions for operating permit issuance have been met. On this basis, an Operating Permit for the 800 South water line replacement projectis hereby
issued as constituted by this letter.Please maintain a copy of this letter with your permanent records for future reference. If you have any questions regarding this Operating Permit,
Nathan Hall, P.E., TriCounty DEQDistrict Engineer at (435) 630-3852, or Michael Newberry, P.E., Permitting and Engineering Manager, at (385) 515-1464.
Sincerely,
Russell Seeley, P.E.
Assistant Director
NDH/mrn/mdb
cc: Joe Hadlock, TriCounty Health Department, jhadlock@tricountyhealthut.gov
Josh Bake, Roosevelt City, jbake@rooseveltcity.com
Troy Ostler, CIVCO Engineering, troyostler@civcoengineering.com
Nathan Hall, P.E., DEQ District Engineer, nhall@utah.gov
NHall 07004 11095 OP