HomeMy WebLinkAboutDSHW-2024-007801Caution: External Kelly Shaw <kellyshaw@utah.gov> Plan of Operations and C&D Closure Costs Andrew Alvaro <aalvaro@halengineers.com>Mon, Apr 8, 2024 at 9:10 AM To: Kelly Shaw <kellyshaw@utah.gov> Hey there Kelly! Sorry I was gone the last week or so. Here is the closure cost. From: Kelly Shaw <kellyshaw@utah.gov> Sent: Tuesday, April 2, 2024 12:30 PM To: Andrew Alvaro <aalvaro@halengineers.com> Subject: Re: Plan of Operaons and C&D Closure Costs [Quoted text hidden] Financial Assurance C&D.pdf 56K 8/14/24, 1:57 PM State of Utah Mail - Plan of Operations and C&D Closure Costs https://mail.google.com/mail/u/0/?ik=180c714eb1&view=pt&search=all&permmsgid=msg-f:1795779790451619762&simpl=msg-f:1795779790451619762 1/1 Item Unit Unit Cost Quantity For Total C&D Site Total Cost (2023 dollars) Topo Survey Initial (Drone)LS $6,069 1 $6,069 Topo Survey Final (Drone)LS $3,423 1 $3,423 Site Reconnaissance hr $163 18 $2,934 Boundary Survey hr $175 24 $4,200 Construction Plans/Specs LS $57,200 1 $57,200 Bidding and Award LS $6,600 1 $6,600 Quality Control Testing LS $10,000 1 $10,000 Construction Management/QA/QC LS $154,171 1 $154,171 Closure Report/As-Builts LS $30,000 1 $30,000 Obtain UPDES and other permits LS $16,000 1 $16,000 $290,597 Final Waste Grading SY $1.70 197,472 $335,702 Placement of Initial Cover CY $5.00 98,736 $493,680 Placement of Final Cover CY $5.00 98,736 $493,680 Seeding Acre $1,600 41 $65,280 Dust Control (water)Loads $100 79 $7,899 Storm Drainage (Pipes, Concrete Structures)LS $50,000 1 $50,000 $1,446,241 Post Closure Plan LS $15,000 1 $15,000 Site Insepction and Recordkeeping quarterly yr $2,500 120 $300,000 Correctional Plans and Specs annual yr $2,000 30 $60,000 Site Monitoring Semiannually yr $2,500 60 $150,000 Maintenance Costs yr $15,000 30 $450,000 $72,649 $361,560 $243,750 $363,246 $1,807,802 $1,218,750 $169,490 $3,559,288 Closure costs were based on closing the complete site. Financial Assurance is only required for that portion of the area that is open and operating (without final cover). Therefore, the totals provided can be adjusted by applying a multiplier of the area that is open and operating divided by the total Post Closure Contingency - 25% Financial Assurace Cost Estimate Total for C&D Cell Construction Total Post Closure Total Legal/Oversight Contingency - 5% Engineering Total Intermountain Regional Landfill Worst Case Closure and Post-Closure Maintenance and Care Financial Assurance Cost Estimate - Construction and Demolition Cell Engineering Contingency - 25% Construction Contingency - 25% Post Closure Total $975,000 Engineering Construction Post Closure Engineering Total Construction Total permitted area.