Loading...
HomeMy WebLinkAboutDDW-2024-009746Sanitary Survey - Deficiency Report PWS Number:UTAH22045 Deficiency Points:75 Survey Date:07/08/2024 Survey Name:LITTLE LYMAN LAKE CAMPGROUND Surveyor:Rocky Pace Sanitary Survey Category: SM SDWIS Severity Code: Recommendation Management and Operations | DS001 | UTAH22045 DISTRIBUTION SYSTEM 31. Does your water system have an Emergency Response Plan? Rule: R309-105-18 All suppliers are advised to develop contingency plans to cope with possible emergency situations. In many areas of the state the possibility of earthquake damage shall be realistically considered. Notes: Deficiency Points: 0 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M001 NO CURRENT EMERGENCY RESPONSE PROGRAM Sanitary Survey Category: DS SDWIS Severity Code: Significant Deficiency Distribution | DS001 | UTAH22045 DISTRIBUTION SYSTEM 44A. Open end of vent line covered with #14 mesh screen Rule: R309-550-6(6)(b)Rule states the open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible screen and a downward elbow, and where possible, be extended to at least one foot above grade. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:No screen on air relief at hand washing sink. Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: D004 AIR RELIEF VALVE PIPE LACKS NO. 14 SCREEN Sanitary Survey Category: FW SDWIS Severity Code: Significant Deficiency Storage Tanks | ST001 | STORAGE FACILITY ST001 80A. Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? Rule: R309-545-13 Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. Notes:Overflow line from tank needs to be dug out more to meet 12" separation. Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: V011 END OF STORAGE TANK OVERFLOW LACKS A CLEARANCE OF BETWEEN 12 AND 24 INCHES FROM GROUND SURFACE Sanitary Survey Category: PU SDWIS Severity Code: Significant Deficiency Pump Stations | PF001 | HYDROPNEUMATIC PUMP AND TANK 85. If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) Rule: R309-540-5(4)(b)Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:Only one pump. Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: PS18 IN-LINE BOOSTER PUMP STATION LACKS REDUNDANCY TO MEET PEAK DEMAND WITH ONE PUMP OUT OF SERVICE