HomeMy WebLinkAboutDDW-2024-009678Utah Department Of Environmental Quality
Division Of Drinking Water Sanitary Survey
Sanitary Survey
General System Information
Exception Granted: R309-510-8 | Existing storage volume does not meet the minimum indoor storage requirements for the 4 ERCS on the system.
Outdoor storage and fire volumes are not required for Emigration Brewing Company. The indoor storage of 400 gpd for 4 connections gives a
minimum of 1,600 gallons of storage. This system currently has 170 gallons
Site Visit Date Surveyor Name
08/06/2024 Colt Smith
EMIGRATION BREWING
COMPANY
PWS ID: UTAH18080 Rating: Approved 05/26/2023 Active
1 Admin Contact (AC) [ eMail address is REQUIRED ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: JAKE
*Last Name: CONNOR
*Organization:
*Address: Redacted
*City: SALT LAKE CITY
*State: UT
*Zip: 84108
*Email: jake@emigrationbrewing.com
*Phone: 801-882-1043
2 Legal Contact (LC) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: WADE
*Last Name: SHERMAN
*Organization:
*Address: 4170 Emigration Canyon Road
*City: SALT LAKE CITY
*State: UT
*Zip: 84108
*Email: wade@emigrationbrewing.com
*Phone: 801-907-0869
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 1 of 13
3 Owner Contact (OW) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: WADE
*Last Name: SHERMAN
*Organization:
*Address: 4170 Emigration Canyon Road
*City: SALT LAKE CITY
*State: UT
*Zip: 84108
*Email: wade@emigrationbrewing.com
*Phone: 801-907-0869
4 Direct Operator in Charge (DO) [ if no eMail address is available, enter
NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: LARRY A, SR
*Last Name: HALL
*Organization:
*Address: 6162 N SCHOONER LN
*City: STANSBURY PARK
*State: UT
*Zip: 84074
*Email: larryh@aquaenviron.com
*Phone: 801-209-6382
Emergency Phone: 801-209-6382
5 Does the system serve a Residential population?N
6 Does the system serve a Transient population? (A transient population is a rotating
population that is served by a water system that does not remain in the jurisdiction of
the water system for long periods of time. Examples of a transient population include,
but are not limited to, campers at a campground, users of a highway rest stop, skiers
at a ski resort, guests at a hotel, or patrons of a restaurant or a shopping center.)
Y
6A Population - Transient 80
6B Operating Period (Start Date) - Transient 01/01
6C Operating Period (End Date) - Transient 12/31
7 Does the system serve a Non-Transient population? (A non-transient population is a
population served by a water system that is the same population being served by the
system for at least six months of the year, but is not a resident in the system.
Examples of a non-transient population include, but are not limited to, employees of a
restaurant, shop, or ski resort; teachers and students at a school, day-care center, or
church; doctors, nurses, and other employees at a hospital or healthcare clinic.)
Y
7A Population - Non-Transient 6
7B Operating Period (Start Date) - Non-Transient 01/01
7C Operating Period (End Date) - Non-Transient 12/31
8 Population - Wholesale :0
9 Residential Connections:0
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 2 of 13
Site Visit Info
Management and Operations
10 Commercial Connections:1
11 Industrial Connections:0
12 Agricultural Connections:0
13 Date of Survey (First Day of Field Work)08/06/2024
14 Date of Survey (Last Day of Field Work) ** this should match the Date of Survey in the
header **
08/06/2024
15 Date final report sent to system (questionnaire, deficiency report and capacity
spreadsheet)
08/06/2024
16 Water system representative present during the survey:Larry Hall
17 How much time was spent to prepare survey documents prior to field survey? (Round
up to nearest quarter hour)
1
18 How much time was spent to complete the field survey (arrival to completion; include
travel time between water system facilities)? (Round up to nearest quarter hour)
2
19 How much time was spent traveling from the office to system and back again at the
end of the field survey? (Round up to nearest quarter hour)
.5
20 How much time did it take to finish the Survey Report? (Round up to nearest quarter
hour)
1
21 Did you survey multiple water systems in one trip? ... if yes, answer the following
question(s)
Y
21A If yes, how many?2 (Notes: Ruth's Diner)
22 For a community water system with water sources that require power to produce
sufficient flow, system is equipped with standby power option.
SIG | 25pts | SO | S033 | R309-515-6(2)(a) | Rule requires a community water system
without naturally flowing water sources, such as springs or flowing wells, to have one
or more of the system's sources equipped for operation during power outages. To
ensure continuous service when the primary power has been interrupted, a redundant
power supply is required. A redundant power supply may include a transfer switch for
auxiliary power such as a generator or a power supply service with coverage from two
independent substations. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
23 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through or in
process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE
MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a
different question]
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
24 Are there any individual home booster pumps installed in the distribution system (not
for fire suppression)?
SIG | 50pts | SM | M008 | R309-550-11(3) | R309-550-11(3)
C
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 3 of 13
Cross Connection and Operator Certification
25 Does the system haul water?N
26 For a community system serving 100 or more connections, at least 2 water sources
are available.
SIG | 50pts | SO | TGR7 | R309-515-4(3) | Rule requires Community Water Systems
serving more than 100 connections to have a minimum of two sources except where
served by a water treatment plant. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
27 Does system have a consecutive connection to another water system not listed in the
SOURCE section of Waterlink Report? If yes, answer the following question(s)
N
28 Does the system have a deficiency meeting the required source capacity? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
29 Does the system have a deficiency meeting the required storage capacity DUE
SOLELY TO FIRE SUPPRESSION NEEDS? (USE SPREADSHEET FOR
CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE
FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO."
N
30 Does the system have a deficiency meeting the required equalization storage capacity
for indoor/outdoor demands (but not because of fire suppression needs)? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
31 Does your water system have an Emergency Response Plan?
REC | 0pts | SM | M001 | R309-105-18 | All suppliers are advised to develop
contingency plans to cope with possible emergency situations. In many areas of the
state the possibility of earthquake damage shall be realistically considered.
Y
31A Does your Emergency Response Plan address cybersecurity? (required for systems
over 3,300 population)
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
N (Notes: The system's Emergency
Response plan does not address cyber
security, but the system's population is less
than 3,300)
31B Does your water system use any computers, laptops, phones, tablets, or any other
computer systems to manage, operate, or maintain the PWS (SCADA or Industrial
Control Systems)? This includes any water sources, treatment, distribution or any
process related to operation function
N
31C Does your water system use any computer systems in regular business operations
such as accounting, billing, payroll, human resources, or management?
Y
32 Legally adopted authority statement
MIN | 15pts | SM | M003 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes a legally adopted and functional
local authority to enforce the program (i.e., ordinance, bylaw, or policy).
C
33 Documentation of annual public awareness and/or employee training
MIN | 15pts | SM | M004 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes providing public education or
awareness material or presentations.
C
34 Documentation of personnel trained to manage the program (COMMUNITY WATER
SYSTEMS POPULATION 500 AND ABOVE REQUIRE A DDW CERTIFIED CCC
PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A
MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING)
MIN | 15pts | SM | M005 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes an operator with adequate
training in the area of cross connection control or backflow prevention.
C
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 4 of 13
General Maintenance and Environment
Distribution
35 Does the water system have detailed records of cross connection control activities?
(inventories of backflow assemblies, devices, and air gaps installed within the system)
MIN | 15pts | SM | M006 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes written records of cross
connection control activities.
C
36 Does the water system have records of on-going enforcement activities? (test history,
enforcement activities, hazard assessments)
MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes test history and documentation
of on-going enforcement activities.
C
37 Operator meets required level of certification for water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
SIG | 50pts | OC | C001 | R309-105-11, R309-300-5(3) | Rule requires every
community and NTNC water system and public water systems that utilize
treatment/filtration to have at least one operator certified at the classified grade of the
water system. Certification must be appropriate for the type of system operated
(treatment and/or distribution). This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
38 Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
MIN | 0pts | OC | C002 | R309-300-5(14) | Rule requires the operator to be within 1
hour travel time, under normal work and home conditions, of each drinking water
system for which he is considered in direct responsible charge.
C
39 Are there any visual indications of unsanitary conditions?
SIG | 50pts | SM | M017 | R309-200-6, R309-105-18, R309-215-4(3) | R309-200-6 The
Secondary Maximum Contaminant Levels for public water systems deals with
substances which affect the aesthetic quality of drinking water. They are presented
here as recommended limits or ranges and are not grounds for rejection. The taste of
water may be unpleasant and the usefulness of the water may be impaired if these
standards are significantly exceeded.
R309-105-18 The Director or the local health department shall be informed by
telephone by a water supplier of any "emergency situation". The term "emergency
situation...
R309-215-4(3) If the water fails to meet minimum standards, then certain public
notification procedures shall be carried out, as outlined in R309-220. Water suppliers
shall also keep analytical records in their possession, for a required length of time, as
outlined in R309-105-17.
D (Notes: The area where the water
softener and piping were used for storage
presents a risk of cross-contamination,
especially when storing items like potting
soil that is typically made from perlite,
animal dung, and other organic compounds
that can contaminate drinking water.)
40 No unprotected connection between the distribution system and a source of
contamination. (If there is an unprotected connection, describe the location in detail.)
SIG | 50pts | DS | D009 | R309-550-5(11) | R309-550-5(11)
C
41 Are air release/vacuum valves in the distribution system? ... if yes, answer the
following question(s)
N
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 5 of 13
General Disinfection
ST001 - STORAGE FACILITY ST001 - Inactive (AB - ABANDONED)
ST002 - STORAGE FACILITY ST002 - Inactive (AB - ABANDONED)
WS001 - SANTA FE WELL - Active
42 Water system has a program to maintain, operate, or control the use of fire hydrants.
REC | 0pts | DS | D012 | N/A | Fire hydrants provide a direct access to the water in the
distribution system. In order to protect the quality and integrity of the water, fire
hydrant access should be controlled.
C
43 Blow offs or air release valves are not directly connected to a sanitary sewer line.
SIG | 50pts | DS | D013 | R309-550-6(5)(a), R309-550-6(6)(c) and (7)(a) | Rule states
blow-offs or air relief valves shall not be connected directly to a sewer. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
44 Blow offs or air release valves do not discharge below flood level in ditches or
streams.
SIG | 50pts | DS | D016 | R309-550-9(1) and (2), R309-550-13(2) | R309-550-9(1 & 3)
C
45 All water mains installed after 1995 that provide fire flow are at least 8 inches in
diameter.
MIN | 15pts | DS | D019 | R309-550-5(4) & (5) | Rule states that the minimum line size
serving a fire hydrant lateral shall be 8-inch diameter unless a hydraulic analysis
indicates that required flow and pressures can be maintained by 6-inch lines.
C
46 Distribution system capable of providing minimum pressure of 20 psi at all service
connections.
SIG | 50pts | DS | D003 | R309-105-9, R309-550-5(1) | Rule states the distribution
system shall maintain minimum pressures as required by R309-105-9 at all points of
connection under all flow conditions. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
47 Was the water system constructed or new portions added after January 1, 2007? ... if
yes, answer the following question(s)
N
48 Water system follows AWWA disinfection procedures for new, repaired, or seasonal
water mains and tanks.
SIG | 25pts | MR | D018 | R309-550-8(10) | All new and repaired water mains and
appurtenances shall be disinfected in accordance with AWWA Standard C651. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
49 How often do you periodically disinfect any or all parts of your water system (i.e. batch
disinfection) other than for repairs or maintenance?
SIG | 50pts | SM | G006 | R309-105-6(1)(a), R309-500-6 | R309-105-6(1) Approval of
Engineering Plans and Specifications
R309-500-6 Plan Approval Procedure.
C
50 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N
51 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 6 of 13
52 Is this facility Active or Inactive?A
53 Operating Period (Start Date)01/01
54 Operating Period (Ending Date)12/31
55 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
56 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
57 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
D (Notes: The cap on the well casing is
cracked in two pieces, likely due to the road
salt used in the parking lot leading to
corrosion. Additionally, the electrical supply
for the well pump goes over the top of the
well casing and prevents the well cap from
sitting flush with the well casing. This
creates a pathway for contamination and
potential "critters" breaching the well.)
58 Is the well casing vented? ... if yes, answer the following question(s)N
59 Does the well have a pump to waste line? ... if yes, answer the following question(s)N
60 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C (Notes: The wellhead can access and use
sounders or tape measures to assess the
drawdown levels. This deficiency should be
resolved.)
61 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
D (Notes: We had to cut the locks to access
the well. However, the operator sent me
photos of the new locks added before I did
this write-up. Please create this deficiency
and then show the resolved date as the
same as the identified date (August 6,
2024))
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 7 of 13
62 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C (Notes: There is a drain line in the vault
that likely leads to the creek.)
63 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
64 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
65 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C (Notes: This is now a smooth tap. They
ground off the threads. Resolve this
deficiency.)
66 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
67 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
68 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
69 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
70 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
N
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 8 of 13
HD001 - SANTA FE PRESSURE TANK -- Hydropneumatic Tanks - Active
TP001 - SOFTENING AND 3 POU RO UNITS -- Treatment General - Active
71 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
72 Does well require oil-lubrication?N
73 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
74 A tank located below ground allows for adequate drainage, ventilation, maintenance,
and flood protection.
MIN | 15pts | PU | PT14 | R309-540-6(2) | Rule requires diaphragm or air tanks and
appurtenances located below ground to have adequate provisions for drainage,
ventilation, maintenance, and flood protection.
C
75 Is there a means to measure pressure to verify the tank is pressurizing properly?
MIN | 15pts | PU | PT08 | R309-540-6(3) | A pressure gauge shall be installed on the
pressure tank inlet line.
C
76 Pump station/Hydropneumatic tank and controls not protected against hazard?
SIG | 25pts | PU | PT13 | R309-540-5(1)(a)(i) | The pump station site meets the
requirements for sanitary protection of water quality, hydraulics of the system, and
protection against interruption of service by fire, flood, or any other hazard. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
77 Is this facility Active or Inactive?A
78 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
79 Operating Period (Start Date)01/01
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 9 of 13
80 Operating Period (Ending Date)12/31
81 What is the objective of the treatment process and how do you know it is working?
(e.g., surface water treatment, disinfection, arsenic removal, TDS removal etc.)
Softening and taste and odor
82 Walk me through the different process steps of your treatment plant. What is the
purpose of each step? Show me how you determine you are meeting your Treatment
Requirements.
There's a softener and POU carbon filters
83 What Chemicals are used? Why?Salt.
84 How is the chemical dose adjusted with flow and water quality? Prompts: What flow
rate is used for the adjustment (influent, effluent, CFE)? What water quality
parameters would make you change dose rate?
It's resin basin that uses salt of softening
85 Does influent flow rate vary?N
86 Process control testing is consistent with the specific treatment process
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
87 There is a means to accurately measure the quantities of chemicals used.
SIG | 25pts | TR | TD99 | R309-525-11(7)(d)(iv) | Provisions shall be made for
measuring the quantities of chemicals used. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
88 Treatment plant properly secured to protect the quality of the treated water, R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
89 Are liquid chemicals used? ... if yes, answer the following question(s)N
90 Treatment chemicals meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
91 Are all chemical feeders properly verified for accuracy?
SIG | 25pts | TR | TG21 | R309-525-11(7)(a)(i) | Feeders shall supply, at all times, the
necessary amounts of chemicals at an accurately controlled rate, throughout the
anticipated range of feed. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
92 Spare parts are available for all chemical feeders
MIN | 15pts | TR | TX09 | R309-525-11(7)(b)(i) and (ii) | R308-525-11(8)(b)(i) states
that a means consistent with the nature of the chemical solution shall be provided in a
solution tank to maintain a uniform strength of solution. Continuous agitation shall be
provided to maintain slurries in suspension. 2 dem
C
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 10 of 13
TP001 - SOFTENING AND 3 POU RO UNITS -- Ion Exchange
93 Incompatible chemicals stored separately
SIG | 25pts | TR | TG19 | R309-525-11(7)(a)(iv) | Rule prohibits chemicals that are
incompatible from being fed, stored, or handled together. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
94 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
95 Raw water compliance samples are collected before any treatment. R309-215-4(4)
SIG | 25pts | TR | T006 | R309-525-15(10)(a)(i) | R309-525-15(10)(a)(i)
Y
95A If yes, was location shown?The well.
96 Where are finished water quality monitoring samples collected?Yes, the distribution system
97 Does water system have a DEQ/DWQ (UPDES permit) discharge permit for the
proper disposal of treatment plant waste to land or water?
MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6
C
98 Which parameters are watched when running treatment plant?Flow and chemicals used
99 What type of alarm system is used?None
100 Does treatment plant have a SCADA system?N
101 Proper lab equipment on site to support required operations & maintenance of the
plant?
SIG | 25pts | TR | T019 | R309-525-17(1) | Sufficient laboratory equipment shall be
provided to assure proper operation and monitoring of the water plant. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
102 Salt used for the brine solution is certified to meet the ANSI/NSF 60 standard
SIG | 25pts | TR | T080 | R309-525-11(5), R309-525-25(1), R309-535-11(5)(d) | Rule
requires that all chemicals added to water being treated for use in a public water
system for human consumption comply with ANSI/NSF Standard 60. This significant
deficiency must be corrected within 120 days of notification or have a compliance
action plan approved by DDW.
C
103 Make-up water inlet is protected from back-siphonage
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 11 of 13
TP001 - SOFTENING AND 3 POU RO UNITS -- Reverse Osmosis
104 Overflows are protected with corrosion resistant screens and terminate with a down
turned discharge with at least 6 inches of clearance from the floor
SIG | 50pts | TR | TX08 | R309-525-11(8)(b)(v), R309-525-11(9)(b)(iii) | R309-525-
11(9)(b) For an ion exchange facility where the overflow discharge piping is not
protected with a corrosion resistant screen or is not terminated with a downturned
bend with adequate clearance to prevent cross connection 10 points shall be assess
C
105 There is a brine measuring tank or a means of metering proper dilution
MIN | 15pts | TR | TX09 | R309-525-11(7)(b)(i) and (ii) | R308-525-11(8)(b)(i) states
that a means consistent with the nature of the chemical solution shall be provided in a
solution tank to maintain a uniform strength of solution. Continuous agitation shall be
provided to maintain slurries in suspension. 2 dem
C
106 Does media type require regeneration or periodic replacement?Y
106A
If yes, what criteria is used to determine when to regenerate or replace the media?When the brine solution is low
106B
If yes, what is the time interval between media regeneration/replacement?About monthly.
107 Operational differential pressure is monitored and recorded?
SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify
that treatment processes are sufficient shall be properly calibrated and maintained. At
a minimum, this shall include turbidimeters. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
108 What is the treatment objective?taste and odor. It's mostly used for a coffee
machine.
109 Is the treatment process adequate and operating such that it is meeting the treatment
objective?
Y (Notes: It's a POU device.)
110 Pressure gauges on the upstream and downstream side of the filter? R309-535-
8(2)(b)(ii)
MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6
C
111 Conductivity meter present at the site? R309-535-8(2)(b)(ii)
MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6
Y
112 Does the system conduct direct integrity testing of the membranes? (If yes, list
frequency and method used.)
N (Notes: No, it's a POU device)
113 Does the system conduct continuous indirect integrity testing of the membranes? (If
yes, list frequency and method used.)
N (Notes: No, it's a POU device)
114 Where does rejected water go?Down the drain, it's a POU device
115 Does system use a routine cleaning process? R309-535-8(2)(b)(iv)
MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6
C
116 On what basis is chemical cleaning initiated? (Describe.)This is a POU device; they follow the
manufacturer's recommendations and do an
excellent job of marking the filter dates and
when they're replaced.
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 12 of 13
117 Membrane system isolated from potable water system during chemical cleaning to
prevent cross-connection issues?
SIG | 50pts | TR | TG35 | R309-520-7(1)(h), R309-525-11(9)(a) and (b) | Pre- and
post-chlorination systems must be independent to prevent possible siphoning of
partially treated water into the clear well. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
118 If the system recycles filter reject water, is it being operated per DDW plan approval
specifications? (If no, describe in notes.)
The system does not recycle filtered water.
DEQ | Drinking Water
Run Date: 08/06/2024 15:23:10 | Rating: Approved UTAH18080 EMIGRATION BREWING COMPANY page 13 of 13