Loading...
HomeMy WebLinkAboutDDW-2024-009369August 1, 2024 Jamie Grandpre Tooele City 90 North Main Street Tooele City, Utah 84074 Subject:Plan Approval, 3100 North and SR-36 Backbone Water Line - Phase 2 (DS001); Tooele City, System #23004, File #15888 Dear Jamie Grandpre:The Division of Drinking Water (the Division) received the plans and specifications for the 3100 North and SR-36 Backbone Water Line - Phase 2 from you on July 30, 2024. This project has met the conditions for receiving a plan approval. Our understanding of the project includes the following: This project is Phase 2 for the SR-36 segment of the Perry Commercial Development waterline improvements for future development near the northern boundary of Tooele City between SR-36 and 400 West. Tooele City previously filed for and received Plan Approval for the 3100 North Compass Point project (System #23004, File #15419), dated July 9, 2024. The Phase 2 project will allow Tooele City to connect existing infrastructure to the Phase 1 - 3100 North segment. This project includes the installation of approximately two blow offs and 5,280 feet of 16-inch diameter C900 PVC, and other appurtenances. All phases of this overall project are included in the hydraulic analysis completed by Hansen Allen & Luce (HA&L). The water modeling study prepared by HA&L shows a requirement to install 14-inch diameter water lines extending from 2400 North along SR-36 North, to the 3100 North roadway. A hydraulic modeling analysis certification stamped and signed by Katie Gibson Jacobsen, P.E., dated May 29, 2024, was received for this project. The water line and related appurtenances will be installed in accordance with the Approved Water Line Standards. The 3100 North and SR-36 Backbone Water Line - Phase 2 is identified as DS001 in the Division’s database. We have completed our review of the plans and specifications, stamped, and signed byThomas M. Romney, P.E., dated July 15, 2024,and find they basically comply with the applicable portions of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for 3100 North and SR-36 Backbone Water Line - Phase 2 (DS001) are hereby approved. This approval pertains to construction only. An Operating Permit must be obtained from the Director before 3100 North and SR-36 Backbone Water Line - Phase 2 (DS001) may be put in service. A checklist outlining the items required for operating permit issuance is enclosed for your information.Approvals or permits from the local authority or the county may be necessary before beginning construction of this project. As the project proceeds, notice of any changes in the approved design, as well as any change affecting the quantity or quality of the delivered water, must be submitted to the Division. We may also conduct interim and final inspections of this project. Please notify us when actual construction begins so that these inspections can be scheduled. This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter.If you have any questions regarding this approval, please contact Chris Martin, P.E., of this office, at (385) 271-7040, or me at (385) 515-1464. Sincerely, Michael Newberry, P.E. Permitting and Engineering Support Manager CM/mrn/mdbEnclosures –Operating Permit Checklistcc:Bryan Slade, Tooele County Health Department, bslade@tooelehealth.orgThomas Romney, Focus Engineering and Surveying, tromney@focus-es.comJamie Grandpre, Tooele City, jamieg@tooelecity.govPaul Hansen, Tooele City, PaulH@tooelecity.govChris Martin, P.E., Division of Drinking Water, cmartin@utah.govBrent Arns, Division of Drinking Water, barns@utah.govCMartin 23004 15888 PA - SR-36 Water Line Utah Division of Drinking Water ― Checklist for Issuing Operating PermitsWater System Name:System Number: Project Description:File Number: Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7 and is not required to obtain an Operating Permit). Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating Permit if the water system has received items 1 and 4 below.☐1.Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished, and if applicable, changes made during construction were in conformance with rules R309-500 through 550☐2.As-built or record drawings incorporating all changes to approved plans and specifications (unless no changes were made to the previously approved plans during construction)☐3.Confirmation that as-built or record drawings have been received by the water system☐4.Satisfactory bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards: ☐ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water MainsTwo consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch)☐ANSI/AWWA C652-11 AWWA Standard for Disinfection of Water-Storage FacilitiesOne or more samples, none positive☐ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment PlantsTwo consecutive samples per unit, none positive, no less than 30 minutes apart☐ANSI/AWWA C654-13 AWWA Standard for Disinfection of WellsTwo consecutive samples, none positive, no less than 30 minutes apart☐5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.]☐6.If applicable, all other documentation that may have been required during the plan review process☐7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility☐8.If applicable, location data of new storage tank, treatment facility, or source