HomeMy WebLinkAboutDDW-2024-009350David Kruse <dbkruse@utah.gov>
DDW - UTAH25014 Is Missing Sample(s) for 2023 YR- Respond By 5pm 01/18/2024
7 messages
David Kruse <dbkruse@utah.gov>Fri, Jan 12, 2024 at 9:16 AM
To: David Griffin <dgriffin@highlandcity.org>
Hello,
The Division of Drinking Water does not have a record of the following samples from the following facilities:
HIGHLAND CITY (UTAH25014): WELL #4 REPL-1 (WS007) - VOC-COMPL
HIGHLAND CITY (UTAH25014): WELL #4 REPL-1 (WS007) - NITRATE
This is required Yearly per the systems monitoring schedule located at waterlink.utah.gov.
If this sample has been taken and this email is sent in error, please respond by 5pm on 01/18/2024
Failure to sample/respond will result in a violation and corresponding IPS points added to the water system.
Thank you for all your efforts maintaining a clean drinking water system
--
David Kruse
Source Water Monitoring Rules Manager
Environmental Scientist | Division of Drinking Water
P: (385) 566-7789
dbkruse@utah.gov
drinkingwater.utah.gov
David Kruse <dbkruse@utah.gov>Fri, Jan 12, 2024 at 10:49 AM
To: David Griffin <dgriffin@highlandcity.org>
Hello,
The Division of Drinking Water does not have a record of the following samples from the following facilities:
HIGHLAND CITY (UTAH25014): WELL #4 REPL-1 (WS007) - RADS - COMPLIANCE
This is required Quarterly per the systems monitoring schedule located at waterlink.utah.gov.
If this sample has been taken and this email is sent in error, please respond by 5pm on 01/18/2024
[Quoted text hidden]
David Griffin <dgriffin@highlandcity.org>Tue, Jan 16, 2024 at 9:11 AM
To: David Kruse <dbkruse@utah.gov>
Mr. Kruse,
6/12/24, 3:19 PM State of Utah Mail - DDW - UTAH25014 Is Missing Sample(s) for 2023 YR- Respond By 5pm 01/18/2024
https://mail.google.com/mail/u/0/?ik=503da97be2&view=pt&search=all&permthid=thread-a:r-1376589519670999802&simpl=msg-a:r-3882577275422…1/4
Well #4 has been offline due to maintenance and is likely to come back online by July. We are wai ng for
some electrical components. We discussed this a couple of months ago and Highland City plans to perform
all the required sampling and submit it directly to you before pu ng the well in line. Please let me know if
we need to do anything else to avoid a viola on and IPS points.
On a separate note, I would like to adjust the loca on of one of my rou ne coliform sampling sites to
be er represent the en re water system as we have new developments in previously undeveloped areas of
the city. Is there anything special I need to do with the state and my sampling plan before making this
change?
Thanks,
Dave Griffin
Culinary Water Superintendent
From: David Kruse <dbkruse@utah.gov>
Sent: Friday, January 12, 2024 10:49 AM
To: David Griffin <dgriffin@highlandcity.org>
Subject: Re: DDW - UTAH25014 Is Missing Sample(s) for 2023 YR- Respond By 5pm 01/18/2024
[Quoted text hidden]
David Kruse <dbkruse@utah.gov>Tue, Jan 16, 2024 at 11:05 AM
To: David Griffin <dgriffin@highlandcity.org>
Hi David,
Thank you for reminding me. I have dismissed the violations. Please keep me updated when it comes closer to putting
this source online.
Thanks
[Quoted text hidden]
David Griffin <dgriffin@highlandcity.org>Mon, Jun 10, 2024 at 2:53 PM
To: David Kruse <dbkruse@utah.gov>
Cc: "tavis@b-t-eng.com" <tavis@b-t-eng.com>
Mr. Kruse,
WS004 or well #4 for Highland City (25014) was disconnected from the culinary system over the winter and
connected to the PI system for redundancy. Can we place WS004 in inac ve status or remove it from
waterlink as it is no longer associated with the culinary system?
Thanks,
Dave Griffin
Culinary Water Superintendent
6/12/24, 3:19 PM State of Utah Mail - DDW - UTAH25014 Is Missing Sample(s) for 2023 YR- Respond By 5pm 01/18/2024
https://mail.google.com/mail/u/0/?ik=503da97be2&view=pt&search=all&permthid=thread-a:r-1376589519670999802&simpl=msg-a:r-3882577275422…2/4
(385)-789-7693
From: David Kruse <dbkruse@utah.gov>
Sent: Tuesday, January 16, 2024 11:05 AM
[Quoted text hidden]
[Quoted text hidden]
David Kruse <dbkruse@utah.gov>Tue, Jun 11, 2024 at 3:23 PM
To: David Griffin <dgriffin@highlandcity.org>
Cc: "tavis@b-t-eng.com" <tavis@b-t-eng.com>, Chris Martin <cmartin@utah.gov>
Hello,
Yes, we can do that. Can you send me pictures of the pipe where it was disconnected and provide more information on
the PI system? I want to be sure I document the situation correctly.
Thank you!
[Quoted text hidden]
David Kruse
Source Water Monitoring Rule Manager
Environmental Scientist | Division of Drinking Water
P: (385) 566-7789
dbkruse@utah.gov
drinkingwater.utah.gov
David Griffin <dgriffin@highlandcity.org>Wed, Jun 12, 2024 at 3:11 PM
To: David Kruse <dbkruse@utah.gov>
Cc: "tavis@b-t-eng.com" <tavis@b-t-eng.com>, Chris Martin <cmartin@utah.gov>
I have a ached a couple photos showing that the line was terminated at the valve. We now have an above
ground backflow assembly and it is connected to the pressurized irriga on system.
Dave
From: David Kruse <dbkruse@utah.gov>
Sent: Tuesday, June 11, 2024 3:23 PM
To: David Griffin <dgriffin@highlandcity.org>
Cc: tavis@b-t-eng.com <tavis@b-t-eng.com>; Chris Mar n <cmartin@utah.gov>
[Quoted text hidden]
[Quoted text hidden]
2 attachments
6/12/24, 3:19 PM State of Utah Mail - DDW - UTAH25014 Is Missing Sample(s) for 2023 YR- Respond By 5pm 01/18/2024
https://mail.google.com/mail/u/0/?ik=503da97be2&view=pt&search=all&permthid=thread-a:r-1376589519670999802&simpl=msg-a:r-3882577275422…3/4
IMG_0272.jpg
363K
IMG_0276.jpg
287K
6/12/24, 3:19 PM State of Utah Mail - DDW - UTAH25014 Is Missing Sample(s) for 2023 YR- Respond By 5pm 01/18/2024
https://mail.google.com/mail/u/0/?ik=503da97be2&view=pt&search=all&permthid=thread-a:r-1376589519670999802&simpl=msg-a:r-3882577275422…4/4