Loading...
HomeMy WebLinkAboutDDW-2024-009350David Kruse <dbkruse@utah.gov> DDW - UTAH25014 Is Missing Sample(s) for 2023 YR- Respond By 5pm 01/18/2024 7 messages David Kruse <dbkruse@utah.gov>Fri, Jan 12, 2024 at 9:16 AM To: David Griffin <dgriffin@highlandcity.org> Hello, The Division of Drinking Water does not have a record of the following samples from the following facilities: HIGHLAND CITY (UTAH25014): WELL #4 REPL-1 (WS007) - VOC-COMPL HIGHLAND CITY (UTAH25014): WELL #4 REPL-1 (WS007) - NITRATE This is required Yearly per the systems monitoring schedule located at waterlink.utah.gov. If this sample has been taken and this email is sent in error, please respond by 5pm on 01/18/2024 Failure to sample/respond will result in a violation and corresponding IPS points added to the water system. Thank you for all your efforts maintaining a clean drinking water system -- David Kruse Source Water Monitoring Rules Manager Environmental Scientist | Division of Drinking Water P: (385) 566-7789 dbkruse@utah.gov drinkingwater.utah.gov David Kruse <dbkruse@utah.gov>Fri, Jan 12, 2024 at 10:49 AM To: David Griffin <dgriffin@highlandcity.org> Hello, The Division of Drinking Water does not have a record of the following samples from the following facilities: HIGHLAND CITY (UTAH25014): WELL #4 REPL-1 (WS007) - RADS - COMPLIANCE This is required Quarterly per the systems monitoring schedule located at waterlink.utah.gov. If this sample has been taken and this email is sent in error, please respond by 5pm on 01/18/2024 [Quoted text hidden] David Griffin <dgriffin@highlandcity.org>Tue, Jan 16, 2024 at 9:11 AM To: David Kruse <dbkruse@utah.gov> Mr. Kruse, 6/12/24, 3:19 PM State of Utah Mail - DDW - UTAH25014 Is Missing Sample(s) for 2023 YR- Respond By 5pm 01/18/2024 https://mail.google.com/mail/u/0/?ik=503da97be2&view=pt&search=all&permthid=thread-a:r-1376589519670999802&simpl=msg-a:r-3882577275422…1/4 Well #4 has been offline due to maintenance and is likely to come back online by July. We are waing for some electrical components. We discussed this a couple of months ago and Highland City plans to perform all the required sampling and submit it directly to you before pung the well in line. Please let me know if we need to do anything else to avoid a violaon and IPS points.  On a separate note, I would like to adjust the locaon of one of my roune coliform sampling sites to beer represent the enre water system as we have new developments in previously undeveloped areas of the city. Is there anything special I need to do with the state and my sampling plan before making this change? Thanks, Dave Griffin Culinary Water Superintendent From: David Kruse <dbkruse@utah.gov> Sent: Friday, January 12, 2024 10:49 AM To: David Griffin <dgriffin@highlandcity.org> Subject: Re: DDW - UTAH25014 Is Missing Sample(s) for 2023 YR- Respond By 5pm 01/18/2024 [Quoted text hidden] David Kruse <dbkruse@utah.gov>Tue, Jan 16, 2024 at 11:05 AM To: David Griffin <dgriffin@highlandcity.org> Hi David, Thank you for reminding me. I have dismissed the violations. Please keep me updated when it comes closer to putting this source online. Thanks [Quoted text hidden] David Griffin <dgriffin@highlandcity.org>Mon, Jun 10, 2024 at 2:53 PM To: David Kruse <dbkruse@utah.gov> Cc: "tavis@b-t-eng.com" <tavis@b-t-eng.com> Mr. Kruse, WS004 or well #4 for Highland City (25014) was disconnected from the culinary system over the winter and connected to the PI system for redundancy. Can we place WS004 in inacve status or remove it from waterlink as it is no longer associated with the culinary system? Thanks, Dave Griffin Culinary Water Superintendent 6/12/24, 3:19 PM State of Utah Mail - DDW - UTAH25014 Is Missing Sample(s) for 2023 YR- Respond By 5pm 01/18/2024 https://mail.google.com/mail/u/0/?ik=503da97be2&view=pt&search=all&permthid=thread-a:r-1376589519670999802&simpl=msg-a:r-3882577275422…2/4 (385)-789-7693 From: David Kruse <dbkruse@utah.gov> Sent: Tuesday, January 16, 2024 11:05 AM [Quoted text hidden] [Quoted text hidden] David Kruse <dbkruse@utah.gov>Tue, Jun 11, 2024 at 3:23 PM To: David Griffin <dgriffin@highlandcity.org> Cc: "tavis@b-t-eng.com" <tavis@b-t-eng.com>, Chris Martin <cmartin@utah.gov> Hello, Yes, we can do that. Can you send me pictures of the pipe where it was disconnected and provide more information on the PI system? I want to be sure I document the situation correctly. Thank you! [Quoted text hidden] David Kruse Source Water Monitoring Rule Manager Environmental Scientist | Division of Drinking Water P: (385) 566-7789 dbkruse@utah.gov drinkingwater.utah.gov David Griffin <dgriffin@highlandcity.org>Wed, Jun 12, 2024 at 3:11 PM To: David Kruse <dbkruse@utah.gov> Cc: "tavis@b-t-eng.com" <tavis@b-t-eng.com>, Chris Martin <cmartin@utah.gov> I have aached a couple photos showing that the line was terminated at the valve. We now have an above ground backflow assembly and it is connected to the pressurized irrigaon system. Dave From: David Kruse <dbkruse@utah.gov> Sent: Tuesday, June 11, 2024 3:23 PM To: David Griffin <dgriffin@highlandcity.org> Cc: tavis@b-t-eng.com <tavis@b-t-eng.com>; Chris Marn <cmartin@utah.gov> [Quoted text hidden] [Quoted text hidden] 2 attachments 6/12/24, 3:19 PM State of Utah Mail - DDW - UTAH25014 Is Missing Sample(s) for 2023 YR- Respond By 5pm 01/18/2024 https://mail.google.com/mail/u/0/?ik=503da97be2&view=pt&search=all&permthid=thread-a:r-1376589519670999802&simpl=msg-a:r-3882577275422…3/4 IMG_0272.jpg 363K IMG_0276.jpg 287K 6/12/24, 3:19 PM State of Utah Mail - DDW - UTAH25014 Is Missing Sample(s) for 2023 YR- Respond By 5pm 01/18/2024 https://mail.google.com/mail/u/0/?ik=503da97be2&view=pt&search=all&permthid=thread-a:r-1376589519670999802&simpl=msg-a:r-3882577275422…4/4