Loading...
HomeMy WebLinkAboutDDW-2024-009143Sanitary Survey - Deficiency Report PWS Number:UTAH04052 Deficiency Points:105 Survey Date:07/15/2024 Survey Name:MADSEN BAY SUBDIVISION Surveyor:Chris Martin Sanitary Survey Category: SM SDWIS Severity Code: Significant Deficiency Management and Operations | DS001 | UTAH04052 DISTRIBUTION SYSTEM 23. There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through or in process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a different question] Rule: R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:Well has a pressure tank located near it that is not in the system inventory. Deficiency Points: 50 Days until points become effective on IPS: 120 SDWIS Deficiency Description: G001 UNAPPROVED FACILITY IN SERVICE Sanitary Survey Category: SM SDWIS Severity Code: Recommendation Management and Operations | DS001 | UTAH04052 DISTRIBUTION SYSTEM 31. Does your water system have an Emergency Response Plan? Rule: R309-105-18 All suppliers are advised to develop contingency plans to cope with possible emergency situations. In many areas of the state the possibility of earthquake damage shall be realistically considered. Notes:System has no Emergency Response Plan (ERP) Deficiency Points: 0 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M001 NO CURRENT EMERGENCY RESPONSE PROGRAM Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH04052 DISTRIBUTION SYSTEM 39. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. Notes:System didn't have all program documents. Please submit these if you have them. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION Sanitary Survey Category: SO SDWIS Severity Code: Significant Deficiency Wells | WS001 | SUBD. WELL 71C. Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor Rule: R309-515-6(12)(d)(v)Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:Needs to be routed outside of the vault Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: S030 END OF AIR RELEASE VACUUM RELIEF VALVE PIPING LACKS A CLEARANCE OF AT LEAST 6 INCHES Sanitary Survey Category: FW SDWIS Severity Code: Minor Deficiency Storage Tanks | ST001 | 43K TANK 80A. Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. Rule: R309-545-14(1)Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. Notes:Still Deficient Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: V008 TANK ACCESS HEIGHT LESS THAN 4 INCHES ABOVE TANK ROOF OR LESS THAN 18 INCHES ABOVE EARTHEN COVER