Loading...
HomeMy WebLinkAboutDDW-2024-009009 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4284 www.deq.utah.gov Printed on 100% recycled paper State of Utah Drinking Water Board Kristi Bell, Chair Eric Franson, P.E., Vice-Chair Dawn Ramsey Justin Maughan Corinna Harris Jeff Coombs Shazelle Terry Blake Tullis, Ph.D. Kimberly D. Shelley Nathan Lunstad Executive Secretary SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF DRINKING WATER Nathan Lunstad Director The Honorable Jean Krause, Mayor mayor@virgin.utah.gov Virgin Town 114 Mill Street Virgin, Utah 84779 Subject: Extension; Virgin Town, System #27020, Loan #3F1909 Dear Mayor Jean Krause and Town Council: On May 16, 2023, the Drinking Water Board (hereinafter called the "Board") authorized a construction loan of $3,070,489 with $930,489 in principal forgiveness, for a net repayable amount of $2,140,000 for 40 years at 0% interest to Virgin Town (hereinafter called the "Recipient") to build a new 500,000-gallon storage tank and install new distribution waterlines throughout the water system (hereinafter called the "Project"). As the construction on this Project has progressed, Virgin has encountered significant delays with the project. The Bureau of Land Management right-of-way that was granted as part of this project required the access of the road to be in a specific location. The amount of access granted was not wide enough and had to be re-designed. This road still has not been built and the geotechnical engineer who is to design the water tank still has limited access to the site. This has delayed the completion of the design stage of the water tank. On June 25, 2024, the Drinking Water Board authorized an extension of the loan that was authorized on May 16, 2023 for one year. This will extend the term of time to complete the obligations of the project to June 25, 2025. The financial assistance is subject to the same conditions and requirements as stated in the authorization letter dated May 31, 2023 to Virgin Town. July 16, 2024 Virgin Town, Mayor Krause Page 2 If you have any questions, please contact Allyson Spevak at (385) 249-0324 or me at (801) 674- 2563. Sincerely, DRINKING WATER BOARD Michael J. Grange, P.E. Assistant Executive Secretary MJG/as/lr Enclosures cc: William Prater, Esq., William L. Prater, LLC, PO Box 71368, SLC, UT 84171, bill@billprater.com Krystal Percival, Virgin Town, clerk@virgin.utah.gov Rod Mills, Galloway, rodmills@gallowayus.com Boyd Preece, Galloway, boydpreece@gallowayus.com Paul Wright, District Engineer, DEQ, pwright@utah.gov DDW Finance July 16, 2024