Loading...
HomeMy WebLinkAboutDSHW-2011-005138 - 0901a0688021e4b7HAZARDOUS WASTE INSPECTION REPORT Date of Inspection Facility EPA ID No Facility Contact Notification Applicable Regulations Type of Inspection Participants Time In Time Out Weather Conditions Report Prepared by Wednesday, March 16, 2011 Nucor - Vulcraft Group 1875 West Highway 13 South P O Box 637 Brigham City, Utah 84302 UTD980959035 Aaron Bell, Environmental Coordinator 435 734-4443 Large Quantity Generator R315,Part5UAC Compliance Evaluation Inspection (CEI) Jon Parry, DSHW Sam Schroyer, DSHW Aaron Bell, Vulcraft 0900 hrs inOhrs Rain, ~ 45° F Jon Parry Facility Description Vulcraft, a subsidiary of Nucor Steel builds and paints metal trusses and cold rolls steel into various forms and shapes The Company presently employs about 320 people at the Bngham City plant Credentials, Purpose, and Scope The inspector met with and presented credentials to Aaron Bell The purpose of the inspection was to assess the facility's hazardous waste management practices for compliance with R315 of the Utah Administrative Code (the Rules) The scope of the inspection included a review of required records and plans and a tour of the facility Waste Streams, Management Practices The facility has recently switched from a lacquer to a water based truss fimsh Vulcraft shipped 2 5 5-gallon drums of waste paint related material in March 2011 and 42 drums in February of 2011 This is reportedly the last of the lacquer based paint material All the truss dip vats are now filled with water based pamt Vulcraft still has a number of satellite areas that are used for the disposal of paint spray cans These are primarily empty cans which are punctured and drained The cans are sent for recycle at Nucor and any remaining contents are managed as hazardous waste Vulcraft does have a few parts washers that are serviced under Safety Kleen's continued use program Universals wastes are collected and appropriately managed The facility expects to drop to a small quantity hazardous waste generator However they may wait until after the next bienmal reporting cycle to submit a revised notification form Facility Inspection R315-5 Hazardous Generator Requirements 5-1 10 Applicability No problems noted 5-111 Hazardous Waste Determination No problems noted 5-112 Identification Numbers No problems noted 5-2 Manifest No problems noted See checklist 5-3 Packaging. Labeling. Marking, and Placarding No problems noted 5-3 34 Accumulation Time No problems noted See checklist 5-4 Recordkeeping No problems noted 5-441 Biennial Reporting No problems noted 5-4 42 Exception Reporting No problems noted 5-4 43 Additional Reporting No problems noted 5-4 44 Requirements for Generators of between 100 and 1000 kg/month NA 5-5 Exports of Hazardous Waste NA 5-6 5-7 Imports of Hazardous Waste NA Farmers NA 7-9 7 Personnel Training No problems noted See checklist 7-10 Preparedness/Prevention Plan No problems noted See checklist 7-11 Contingency/Emergencv Plan No problems noted See checklist R315-13-1 Land Disposal^e^trictions No problems noted Sign^^^ Date 777-1 XLS Site (lolr^vcA-ft^ ID# Date 3llU("Z<=>ti La INSPECTION ITEM Hazardous Was irge Quantity Gen Page 1 CITATION te Inspection erator Checklist of 2 COMMENTS Waste Determination Has the generator determined whether his/her solid waste is a hazardous waste Has a waste determination been done for each waste stream'' R315-5 R315-5-1 11 262 11 R315-2-3 261 3 Has the generator notified of regulated activity and obtained an EPA ID# in accordance with the requirements of Section 3010 of RCRA'' R315 5-1 12 262 12 Manifest 1 Is the generator using a Uniform Hazardous Waste Manifest for its shipments of hazardous waste'' 2 Did the generator designate a facility permitted to handle its waste'' 3 Was an alternate facility designated'? 4 Did the generator use the correct manifesf R315-5-2 20(a) 262 20(a) R315-5-2 20(b) 262 20(b) R315-5-2 20(c) 262 20(c) R315-5 2 20(a) 262 20(a) Manifest requirements for the Generator 1 Did the generator sign the manifest certification by hand'' 2 Did the generator obtain a handwritten signature from the initial transporter and the date of acceptance'' 3 Did the generator retain a copy of the manifest in accordance with R315 5-4 40(a)'' R315-5-2 23(a)(1) 262 23(a)(1) R315-5-2 23(a)(2) 262 23(a)(2) R315-5-2 23(a)(3) 262 23(a)(3) Recordkeeping Is the generator maintaining signed copies of the hazardous waste manifest for three years'' R315-5 4 40(a) 262 40(a) Is the generator maintaining copies of each Biennial Report and all Exception Reports for a period of at least three years'? R315 5-4 40(b) 262 40(b) Inspector's Initials Page. of 777-1 XLS Site La INSPECTION ITEM ID# Hazardous Wast rge Quantity Gen Paae 2 CITATION Date e Inspection erator Checklist of 2 COMMENTS Is the facility maintaining records sufficient to determine quantities and disposition of hazardous waste or other determinations test results or waste analyses made in accordance with R315-5 1 11 for a period of at least three years from the date of last shipmenf R315 5-4 40(C) 262 40(c) LjO > Biennial Reporting Has the generator submitted complete Biennial Report(s)'' R315-5-4 41 262 41 <^ e.{ Exception Reporting Has the generator been required to prepare an Exception Report if yes descnbe the circumstances R315-5-4 42 262 42 Packaging, Labeling, Marking, and Placarding 1 Is the generator packaging his/her hazardous waste is the appropriate DOT shipping containers'? 2 Are containers labeled and marked in accordance with DOT shipping requirement prior to shipping'? 3 Is the generator providing the appropriate placarding to the initial transporter when initiating his/her shipmenf R315-5-3 30 262 30 R315-5-3 31 & R315-5-3 32 262 31 & 262 32 R315-5-3 33 262 33 f Accumulation Times (See Satellite 90 Day and Tank Checklists as applicable) R315-5-3 34 Also see checklist for Personnel Training Prepardness & Prevention Contingency Plan & Emergency Procedures and Manifest Comments Inspector's Initials. Page. of 777-1 XLS Site 1 ID# Date -iU£>/vciti Hazardous Waste Inspection Satellite Accumulation Checklist Site Manaaer < 55 gallons INSPECTION ITEM CITATION COMMENTS Is the satellite accumulation area at or near the point of generation'' R315-5-3 34 262 34(c)(1) Is the satellite area under the control of the operator of the process generating the waste'' 262 34(c)(1) ^« Does the generator have the accumulation container labeled with the words hazardous waste or with other words that identify the contents of the container'? 262 34(c)(1)(il) The generator can not store more than 55 gallons of hazardous waste or 1 quart of acutely hazardous waste at the satellite accumulation area 262 34(c)(1) Are the containers in good conditions'' 262 34(c)(1)(i) Is the hazardous waste stored in containers that are compatable with the waste'? 262 34(c)(1)(l) is the accumulation container being maintained in a closed condition except when waste is being added or removed'? 262 34(0(1)0) Is the generator managing the accumulation container in a manner that will not cause it to leak or spilP 262 34(0(1 )(i) Is the generator correctly labeling and moving hazardous waste in excess of the 55 gallon or 1 quart limits to a 90-day storage area within 72 hours of exceeding the limif? 262 34(c)(2) inspector's Initials. Page. of 777-1 XLS Site Ju \r(t.A.^ -V^ ID# Hazardous Waste Inspection 90 Day Storage Site > 55 gallons Site Manager. Date 3 Izt^ l\ INSPECTION ITEM CITATION COMMENTS Is the container labeled with the words Hazardous Waste"'? Is the date upon which accumulation began clearly marked and visibly for inspection'? Is that date <= 90 days old'' R315-5-3 34 262 34(a)(3) 262 34(a)(2) 262 34(a) Is there a Preparedness and Prevention Plan for this site or the facility as a whole including this site •? (see separate Check List) Operated to minimize chance of Spill or Fire '? Spill and Fire control equipment'? Emergency communication device Internal'' Emergency communication device External'' Sufficient Aisle and Access space'' 262 34(a)(4) 265 Subpart C R315-7-10 2 R315 7-10 3(c) R315-7 10 3(a) R315-7-10 3(b) R315-7-10 6 Is there a Contingency Plan for this site or the facility as a whole including this site '' (see separate Check List) Descnption of actions that should be taken '? Name & Phone # for Emergency Coordinator'? Primary and alternate evacuation routes '? List of emergency equipment & location '' 262 34(a)(4) 265 Subpart D R315-7 11 3(a) R315-7-11 3(d) R315-7 11 3(f) R315 7-11 3(e) Have personnel at this site Successfully completed up to date Personnel Training on HzW Handling & Fire & Spill Response'' Is the training documented'' (see separate Check List) 262 34(a)(4) R315-7-9 7(a) 265 16(a) R315-7-9 7(e) 262 16(e) J 1 Are the containers accumulating and holding hazardous waste in good condition'' Are they compatible with the HzW in them'? 262 34(a)(1)(i) 265 Subpart I AA BB and CC R315 7-16 2 R315 7-16 3 Is the generator maintaining his/her containers in a closed condition except when adding or removing waste from the container*? R315 7-16 4(a) 262 173(a) Containers holding hazardous waste must not be opened handled and/or stored in a manner which could cause it to leak R315-7-16 4(b) 262 173(b) Is the generator inspecting his/her containers at least weekly and do the inspections look for leaks deterioration and any factor that may cause a release of hazardous waste*? R315-7-16 5 262 174 No ignitable or reactive HzW within 50 feet of the facility s property line R315-7-16 6 265 176 Inspector's Initials Page. of Site OwVt/iA-P'V- ID# Date Hazardous Waste Inspection Manifest Checklist (Rev 3-05) Requirements Manifests Reviewed Manifest Number (box 4) # # Generator EPA ID# R315-5 2 (box1) Generator information Mailing Address (box 5) Phone Number o<— Transporter #1 information Company Name (box 6) EPA ID# (box 6) i Transporter #2 information Company Name (box 7) EPA ID# (box 7) e><~- OL- i Q. _r Desianated Facilifv information Name and Address (box 8) EPA ID# (box 8) OL-J Waste ShiDDina requirements DOT Descnption (Including proper name Hazard class and ID #) (box 9b) (box 9a X If hazardous matenals) Containers No & Type (box 10) Total Quantity (box 11) Unit - WtA/ol (box 12) Waste Codes (box 13) 0^ i 0 0 Special Handling Instructions (h"^ 14) 0 1 Manifest Certifications Generators Signature (box15) International Shipments (box 16) Transporters Signature (box 17) Discrepancy Indication (box 18) Hazardous Waste Report Management Method Codes (box 19) 0 hi 0 { Final Observations and / p " ' C^- Comments LTM^ - -1- Or-— Common container codes DM - metal drum\barrel DF - fiberbarrel TT carao tank TC - tank car DT - dump truck CM metal box\carton (includes roll-offs) Common Units of Measure G - aallons P - oounds T - tons Y - cubic yards) Inspector's Initials Page. of 777-1 XLS Site do\cL<^i^\— ID# Date 3ll^|-2.T>n INSPECTION ITEM Hazardous Waste Inspection Personnel Training Checklist Page 1 of 2 CITATION COMMENTS Facility personnel must successfully complete classroom instruction or on-the-job training which teaches them to perform their jobs such that the facility is operated in compliance with the applicable hazardous waste management requirements R315-5-3 34 262 34(a)(4) R315-7 9 7(a)(1) 265 16(a)(1) Is the program directed by a person trained in hazardous waste management procedures'? R315-7 9 7(a)(2) 265 16(a)(2) 1 Does the training teach facility personnel hazardous waste management and contingency plan implementation procedures'? R315-7 9 7(a)(2) 265 16(a)(2) Does the training program include at a minimum the following where applicable 1 Procedures for using inspecting repainng and replacing facility emergency equipment 2 Key parameters for automatic waste cut-off systems 3 Communications or alarm systems 4 Response to fires or explosions 5 Response to groundwater contamination incidents 6 Shutdown of operations and 7 Evacuation of personnel procedures R315 7-9 7(a)(3) 265 16(a)(3) R315-7 9 7(a)(3)(i) 265 16(a)(3)(i) R315 7-9 7(a)(3)(ii) 265 16(a)(3)(ii) R315 7-9 7(a)(3)(iii) 265 16(a)(3)(iii) R315 7-9 7(a)(3)(iv) 265 16(a)(3)(iv) R315-7-9 7(a)(3)(v) 265 16(a)(3)(v) R315 7-9 7(a)(3)(vi) 265 16(a)(3)(vi) Site Inspector' ID# •'s Initials 4-J ^5 Date Page. of 777-1 XLS INSPECTION ITEM Hazardous Waste Inspection Personnel Training Checklist Paae 2 of 2 CITATION COMMENTS Have facility personnel successfully completed the personnel training program within SIX months of the their date of employment or assignment to the facility'' R315-7-9 7(b) 265 16(b) Do the facility personnel recieve an annual review of their initial training'? R315 7-9 7(c) 265 16(0 The owner/operator of the facility must maintain the following documents at the facility 1 The job title for each position at the facility related to hazardous waste management and the name of the employee filling each job 2 A writtem job descnption for each position listed under #1 3 A written descnption of the type and amount of both introductory and continuing training that will be given to the employees listed in #1 and 4 Records that document that employees have the training or job expenence required by paragraphs 265 16 (a) (b) and (c) R315-7-9 7(d) 265 16(d) R315-7 9 7(d)(1) 265 16(d)(1) R315-7-9 7(d)(2) 265 16(d)(2) R315-7 9 7(d)(3) 265 16 (d)(3) R315-7-9 7(d)(4) 265 16 (d)(4) Are training records maintained at the facility for current employees and for at least three years for employees that have left the company'' R315 7-9 7(e) 265 16(e) 1 Inspector's Initials. Page. of 777-1 XLS Site "^x^XcytJ^ ID# Date -SMC/Zot/ Hazardous Waste Inspection Preparedness and Prevention Measures Checklist Page 1 of 2 INSPECTION ITEM CITATION COMMENTS Is the facility maintained and operated to minimize the possibility of a fire explosion or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents'' R315-7 10 2 265 31 R315-5-3 34 262 34(a)(4) The facility must be equipped with items (1)-(4) identified below unless it can be shown that hazardous waste managed at the site would not require the particular kind of equipment specified R315-7-10 3 265 32 1 Does the facility have an internal communications or alarm system capable of providing immediate emergency instruction to Its personnel R315 7-10 3(a) 265 32(a) 2 Does the facility have a device capable of summoning external emergency assistance to the facility (phone or two-way radio)'? R315 7-10 3(b) 265 32(b) 3 Does the facility have portable extinguishers fire control equipment (including special extinguishing equipment necessary for their facility) spill control equipment and decontamination equipment"? R315-7-10 3(0 265 32(0 ^ t( 4 Does the facility have water at adequate volume and pressure to supply water hoses or foam producing equipment or automatic spnnklers or water spray systems R315-7-10 3(d) 265 32(d) Are facility communications or alarm systems fire protection equipment spill control equipment and decontamination equipment tested and maintained to assure its proper operation in time of an emergency"? R315-7-10 4 265 33 Do facility personnel have immediate access to an internal alarm or emergency communication device either directly through visual or voice contact while managing hazardous waste"? R315-7-10 5(a) 265 34(a) Is there ever just one employee on the premises while the facility is operating*? If yes does that person have immediate access to device capable of summoning external emergency assistance'' R315 7 10 5(b) 265 34(b) Site ID# Date Inspector's initials. Page of. 777-1 XLS Hazardous Waste Inspection Preparedness and Prevention Measures Checklist Page 2 of 2 INSPECTION ITEM CITATION COMMENTS Is aisle space maintained to allow the unobstructed movement of emergency personnel or equipment (un/essaisle space is not needed for any of these purposes)*? R315-7-10 6 265 35 The facility must arrange the following types agreements or arrangements with local organizations (as appropnate) R315-7 10 7(a) 265 37(a) 1 Has the facility made or attempted to make arrangements to familarize local police fire departments and emergency response teams with the layout of the facility character of the hazardous waste(s) managed locations where facility personnel normally work location of facility entrances and possible evacuation routes*? R315-7-10 7(a)(1) 265 37(a)(1) 2 Has the facility designated pnmary emergency authority to a specific police or fire department when more than one police or fire department might respond in the event of an emergency*? R315 7-10 7(a)(2) 265 37(a)(2) Y' 3 Have agreements with State emergency response teams emergency responses contractors and equipment suppliers been made*? R315-7-10 7(a)(3) 265 37(a)(3) 4 Have arrangements been made to familiarize local hospitals with the properties of hazardous waste handled at the facility and the types of injuries or illnesses which could result from fires explosions or releases at the facility*? R315 7 10 7(a)(4) 265 37(a)(4) If any State or local authorities have declined to enter into such arrangements has the facility documented the refusal in the operating record"? R315-7-10 7(b) 265 37(b) Inspector's Initials. Page. of 777-1 XLS Site ID# Date 2(/u/zot( Hazardous Waste Inspection Contingency Plan and Emergency Procedures Checklist Page 1 of 3 INSPECTION ITEM CITATION COMMENTS General Requirements Is a copy maintained at the facility"? Have copies been distributed to all local police and fire departments hospitals and State and local emergency response teams that may be called upon for assistance*? R315 5-3 34 262 34(a)(4) R315-7-11 4(a) 265 53(a) R315-7 11 4(0 265 53(b) Content of the Continqencv Plan 1 Does the contingency plan descnbe the actions facility personnel will take to minimize the hazard to human health or the environment when responding to fires explosions or any unplanned sudden or nonsudden release of hazardous waste"? 2 Does the contingency plan descnbe arrangements agreed to by local police and fire departments hospitals contractors and State and local emergency response teams"? 3 Does the contingency plan list the names addresses and phone numbers (office and home) of pnmary and all other persons qualified to act as emergency coordinator*? 4 Does the contingency plan include a list of all emergency equipment at the facility"? The list must be kept up to date and include the location and a physical descnption of each Item on the list and a bnef outline of the equipment s capability 5 Does the contingency plan include an evacuation plan for the facility*? This plan must include a descnption of signal(s) to be used to begin an evacuation evacuation routes and alternate evacuation routes R315-7 11 3(a) 265 52(a) R315-7-11 3(c) 265 52(0 R315-7-11 3(d) 265 52(d) R315 7-11 3(e) 265 52(e) R315 7-11 3(f) 265 52(f) Y> 1 Y'> -e: Does the facility have a least one employee on-site or on-call at all time who is qualified to act as the emergency coordinator*? Site R315-7-11 6 265 55 ,^5 ID# Date Inspector's Initials ^ Page. of 777-1 XLS Hazardous Waste Inspection Contingency Plan and Emergency Procedures Checklist Page 2 of 3 INSPECTION ITEM CITATION COMMENTS Does the contingency plan include procedures for activation of the internal alarm by the emergency coordinator*? R315 7-11 7(a)(1) 265 56(a)(1) Does the contingency plan include provision for notifying the appropnate State and\or local response agencies*? R315-7-11 7(a)(2) 265 56(a)(2) Does the contingency plan outline the procedure(s) that the emergency coordinator will follow to immediately identify the character source amount and extent of released matenal*? R315-7 11 7(b) 265 56(b) Does the contingency plan include procedures for the emergency coordinator to follow in order to assess possible hazards to human health or the environment*? R315-7 11 7(0 265 56(0 v« If It IS determined that the incident could threaten human health or the environment outside the facility the emergency coordinator must notify the appropnate local State and Federal agencies Does the contingency plan include provision for notifying the appropnate agencies'? Do the notification measures include information to be reported (name and telephone # of reporter name and address of facility name and quantity of matenal(s) involved extent of injuries and possibility of exposure outside the facility) and identify the National Response Center and the State as parties to be notified'? R315 7-11 7(d)(1) and (d)(2) 265 56(d)(1) and (d)(2) Does the plan include procedure to prevent the spread of the incident to other hazardous waste at the facility'? R315-7-11 7(e) 265 56(e) Are measure included to monitor for leaks pressure buildup gas generation or ruptures in valves pipes or other equipment when it is necessary to shut-down operations as a response to an incident*? R315-7 11 7(f) 265 56(f) CC Site ID# Date Hazardous Waste Inspection Contingency Plan and Emergency Procedures Checklist Page 3 of 3 Inspector's initials Page. of 777-1 XLS oiiu Hazardous Waste inspection Contingency Plan and Emergency Procedures Checklist Page 3 of 3 INSPECTION ITEM CITATION COMMENTS Does the contingency plan provide procedures to follow to manage the hazardous waste generated as a result of an incidenf? R315-7-11 7(g) 265 56(g) Following implementation of the contingency plan are provisions included to ensure that in the affected area(s) 1 No waste that may be incompatible with the released material is treated stored or disposed of until the cleanup is complete 2 That all equipment listed in the contingency plan IS cleaned and fit for use pnor to resuming activities at the facility R315 7-11 7(h) 265 56(h) R315-7-11 7(h)(1) 265 56(h)(1) R315-7-11 7(h)(2) 265 56(h)(2) Does the contingency plan include provisions for notifying the appropriate federal State and local authorities that the facility is in compliance with 40 CFR 265 56(h) prior to resuming operations in the affected area'? R315-7-11 7(1) 265 56(0 The contingency plan must include provision for recording the incident requinng implementation of the contingency plan and specifying information that will be recorded and reported The requirements are as follows 1 Will a written report on the incident be provided to the Utah State Department of Environmental Quality within 15 days'? 2 The following information needs to be recorded and reported a) The name address and telephone # of the owner/operator b) The name address and telephone # of the facility c) Date time and type of incident d) Name and quantity of matenal(s) involved e) Extent of injury if any f) An assessment of the actual or potential hazard to human health or the environment and g) An estimate of the quantity and disposition of recovered material(s) that resulted from the incident R315 7-11 70) 265 56(j) R315-7-11 70) 265 560) R315-7-11 70)(1) thru 0)(7) 265 560)(1)thru 0)(7) Inspector's Initials Page. of