HomeMy WebLinkAboutDDW-2024-008886Sanitary Survey - Deficiency Report
PWS Number:UTAH09022 Deficiency Points:25 Survey Date:06/19/2024
Survey Name:TICABOO UTILITY
IMPROVEMENT DISTRICT
Surveyor:Ryan Dearing
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST001 | TANK #1
98C. Access opening lid properly gasketed
Rule: R309-545-14(2)Rule requires the access opening to a tank to be furnished with a gasket between the lid
and frame. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
Notes:There was evidence that the gasket was not sealing properly.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V009 STORAGE TANK LID LACKS A FUNCTIONING GASKET BETWEEN THE LID AND
FRAME