Loading...
HomeMy WebLinkAboutDDW-2024-008883 July 11, 2024 Levi Jones Moab City 217 East Center St. Moab, Utah 84532 Subject:Operating Permit, Spring #2 Improvements, Spring #2 (WS002); Moab City, System #10003, File#13385 Dear Levi Jones:The Division of Drinking Water (the Division) received a request for an Operating Permit for the proposed Spring #2 Improvements from your consultant, Matt Filla P.E., JUB Engineers, on June 28, 2024. The Division issued Plan Approval for this project on May 31, 2023. Division staff conducted an onsite final inspection of this project on June 10, 2024. This project included the replacement of a spring collection box for Spring #2 (WS002), the replacement of approximately 300 feet of existing asbestos pipe with 8-inch diameter DR-25 C900 PVC water pipe, the installation of a new 8-inch Octave Ultrasonic Flowmeter inside a new concrete vault and related work. A new fence and berm were also installed around the spring collection area. We have received the following information for Spring #2 Improvements, Spring #2 (WS002): Certification of Rule Conformance with plan approval conditions by a professional engineer in conformance with rules R309-500 through 550 As-built or record drawings. Satisfactory bacteriological results as evidence of proper disinfection and flushing. Evidence of O&M manual delivery. We have determined that all conditions for operating permit issuance have been met. On this basis, an Operating Permit for Spring #2 Improvements, Spring #2 (WS002) is hereby issued as constituted by this letter. You may now place Spring #2 (WS002) in service in your water system. Please maintain a copy of this letter with your permanent records for future reference. If you have any questions regarding this Operating Permit, please contact Curtis Page, P.E., of this office, at (435) 650-7795, or Michael Newberry, P.E., Permitting and Engineering Manager, at (385) 515-1464. Sincerely, Russell Seeley, P.E. Assistant Director CP/mrn/Admin (processing)/Admin (mailing) [Initials]cc:Orion Rogers, SEU Health Department, orogers@utah.govMatt Filla, P.E., JUB Engineers, mfilla@jub.comLevi Jones, Moab City, ljones@moabcity.orgMark Jolissaint, Moab City, mjolissaint@moabcity.org Curtis M. Page P.E., DEQ SE District, cmpage@utah.gov Jennifer Yee, Division of Drinking Water, jyee@utah.gov CPage 10003 13385 OP - Improvements Spring #2 (WS002)