Loading...
HomeMy WebLinkAboutDDW-2024-008882 July 11, 2024 Ben Sessions Peterson Pipeline Association 3800 West 3900 North Morgan, Utah 84050 Subject:RenewalTemporaryException to to R309-515-4(3), Number of Sources and Quantity Requirements; Peterson Pipeline Association, System #15010, File #12433 This Temporary Exception Expires on December 31, 2025 Dear Ben Sessions: On June 30, 2024, your Temporary Exception to R309-515-4(3), Number of Sources and Quantity Requirements expired. This temporary exception was issued on February 23, 2023. The rule states community water systems serving more than 100 connections shall have a minimum of two sources, except when served by a surface water treatment plant. Peterson Pipeline Association currently serves an approximate population of 460 residents, including 140 residential connections and 2 commercial connections. Current source availability for the system consists of the existing Peterson Well (WS001) with a pumping capacity of 300 gallons per minute (gpm). Peterson Pipeline Association has been continuing to acquire a second ground water source. In association with the development of a second water source, the Division of Drinking Water (the Division) has previously received the following information for the proposed Well #2 (WS002). Plans and specifications for borehole and well drilling. Recorded Land Use Agreement with future homes for protection zones. Exception Request The basis for your renewal request for an exception to R309-515-4(3), Number of Sources and Quantity Requirements is that Peterson Pipeline is ongoing in their pursuit of the completion of a second ground water source and is requesting time to complete the well drilling, well equipping, and connection to the Peterson Pipeline distribution system. Well Driller Mike Zimmerman has been retained by Peterson Pipeline and has begun drilling of the proposed well WS002. The well drilling is estimated to be completed by August 2024. Peterson Pipeline has also retained Sunrise Engineering to design and oversee the well equipping and well house construction. Site geotechnical work has been completed, along with the site survey and base mapping. Sunrise Engineering has submitted a project schedule with a December 2025 completion date. In the event of an emergency water need, water will be provided to Peterson Pipeline Association from the Highlands Water Company (HWC, System #15005), in accordance with the signed water hauling contract submitted to the Division signed September 1, 2021. Peterson Pipeline Association and Highland Water Company recognize that a public water system may only use water hauling during emergencies and follow the conditions described in R309-550-10, Water Hauling. On this basis and due to your continued work and efforts in completing the project, a renewal temporary exception to R309-515-4(3), Number of Sources and Quantity Requirements, is hereby granted for Peterson Pipeline Association. This Temporary Exception expires onDecember 31, 2025. You will be required to re-submit an exception request along with confirmation that all conditions outlined in this temporary exception have been fulfilled and obtain an exception renewal prior to December 31, 2025. Exceptions granted by the Division include an expiration date to ensure that the basis and conditions for granting the exception are verified periodically and that the drinking water quality remains protected. After receiving your request, the Division will determine whether this exception can be re-issued. This Temporary Exception may be rescinded at any time if new evidence indicates that the conditions of this exception are no longer being met or a public health risk exists due to this exception.The issuance of this exception temporarily resolves your water system’s deficiency related to theTGR7 COM SYSTEM SERVING 100 OR MORE CONNECTIONS LACKS REDUNDANTSOURCE. An updated IPS report is available at https://waterlink.utah.gov. Please contact JenniferYee at (385) 515-1501 or jyee@utah.gov for questions related to your water system’s IPS reportor deficiencies. Please maintain a copy of this letter with your permanent records for future reference. If you have any questions regarding this temporary exception, please contact Brent Arns, of this office, at (385) 549-7420, or Michael Newberry, Permitting and Engineering Manager, at (385) 515-1464. Sincerely, Russell Seeley, P.E. Assistant Director BA/mrn/mdbcc:Michelle Cooke, Weber-Morgan Health Department, mcooke@co.weber.ut.usBen Sessions, Peterson Pipeline Association, brsessions@gmail.comBrent Arns, Division of Drinking Water, barns@utah.govJennifer Yee, Division of Drinking Water, jyee@utah.govColt Smith, Division of Drinking Water, acsmith@utah.govBrandi Smith, Division of Drinking Water, brandismith@utah.govMichael Newberry, Division of Drinking Water, mnewberry@utah.gov Arns 12433 15010 Renewal Temp Exception Granted