Loading...
HomeMy WebLinkAboutDSHW-2024-007222CORRECTIVE ACTION SECTION – SITE VISIT REPORT SITE NAME: _________________________________________ DATE: ______/_______/___________ EPA ID #: _________________________________________ UTCA ID#: ______________________ LOCATION: ___________________________________________________________________________ PROJECT MANAGER: ____________________________________________________________________ SITE STATUS ___ Active Investigation ___ Long-term Institutional Controls in-place ___ Long-term Groundwater Monitoring ___ Closed w/ No More Work Needed OTHER (describe): PURPOSE OF SITE VISIT ___ Confirm Cleanup Completed ___ Confirm Integrity of Engineering Controls ___ Confirm SMP is Being Complied With D2# for SMP: DSHW-________-_______________ ___ Post-Closure Permit Verification ___ Document Change in Land Usage ___Drive-by (windshield survey) ___Sample Observation &/or Collection ___Site Investigation ___Cleanup Activities Inspection ___Confirm Current Land Usage OTHER (describe): FIELD OBSERVATIONS: SAMPLE COLLECTION Were Environmental Samples Collected per the approved Sampling & Analysis Plan? YES ___ NO ___ N/A ___ COMMENTS: Ongoing Cleanup Activities Confirmation Sampling Univar Woods Cross 7 09 2024 UTD000710723 2465 South 1100 West, Woods Cross, Utah Jasin Olsen 4 4 4 2023 002669 The site is currently used for industrial purposes, occupied by a chemical supply company (Tucker Chemical). 4 Is the Work Being Performed in a Manner Consistent with the Approved Workplan(s)? YES ___ NO ___ N/A ___ Unknown (Drive-By Inspection Only) ___ COMMENTS: CURRENT LAND USAGE ___ Residential ___ Commercial ___ Industrial ___ Mixed Commercial w/ Residential ___ Under Construction &/or Development ___ Other: __________________________________ COMMENTS: FUTURE LAND USAGE ___ Residential ___ Mixed Commercial w/ Residential ___ Commercial ___ Other: (describe below) ___ Industrial ___ Unknow at this time COMMENTS: POST-CLEANUP SITE VISITS Is the Completed Cleanup Remedy Still Protective Based on Current Land Use? YES ___ NO ___ Unknown (Drive-By Inspection Only) ___ COMMENTS: LONG-TERM INSTITUTION CONTROL(S) VERIFICATION Are Components or Restrictions of the SMP &/or EC Currently Being Complied with? YES ___ NO ___ Unknown (Drive-By Inspection Only) ___ COMMENTS: SITE VISIT CONCLUSIONS RECOMMENDATIONS ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES ___ NO ___ SIGNATURE: 4 4 Used for industrial purposes (chemical company). 4 Zoned industrial/commercial. 4 4 NA 4 No residential uses, no groundwater use, no soil disturbances. The site is in compliance with the SMP/EC. Revisit site next year. 4 Jasin Olsen