Loading...
HomeMy WebLinkAboutDSHW-2024-007215CORRECTIVE ACTION SECTION – SITE VISIT REPORT SITE NAME: ATK Bacchus Facility DATE: 07 / 09 / 2024 EPA ID #: UTD001705029 UTCA ID#: LOCATION: P.O. Box 98, Magna UT 84044-0098 PROJECT MANAGER: Ethan Upton SITE STATUS _X_ Active Investigation ___Ongoing Cleanup Activities ___Confirmation Sampling ___ Long-term Institutional Controls in-place [Site Management Plan (SMP), Environmental Covenant (EC), and/or Post Closure Plan (PCP)] ___ Long-term Groundwater Monitoring OTHER (describe): PURPOSE OF SITE VISIT ___Drive-by (windshield survey) _X_Sample Observation &/or Collection _X_ Site Investigation ___Cleanup Activities Inspection ___Confirm Current Land Usage ___ Confirm Cleanup Completed ___ Confirm Integrity of Engineering Controls ___ Confirm Compliance with SMP/EC D2# for SMP/EC: DSHW-________- _______________ ___ Post-Closure Permit Verification ___ Document Change in Land Usage OTHER (describe) FIELD OBSERVATIONS: Active investigation of SWMU SL-2/3. Solvents and laboratory waste were potentially released into both SWMUs from two historic buildings that were used to develop various chemicals for rocket propulsion. Observed drilling to and collection of soil samples from ground surface to eight feet below ground surface (bgs). Soil appeared to be interbedded gravel with silt and clay. Soil is being analyzed for VOCs, RCRA 8 metals, perchlorate, and explosives. The drilling contractor was RMEC Environmental, Inc. while Tim Jimenez of Northrop Grumman was the sampler and performed driller oversight. The drill rig was able to access the pond furthest away from the historic buildings. The pond closest was more difficult to access. The drillers were going to attempt to access the pond before the end of the day. No issues with sampling were observed during the Site visit. SAMPLE COLLECTION Were Environmental Samples Collected per the approved Sampling & Analysis Plan? YES ___ NO ___ N/A _X_ COMMENTS: Is the Work Being Performed in a Manner Consistent with the Approved Workplan(s)? YES _X_ NO ___ N/A ___ Unknown (Drive-By Inspection Only) ___ COMMENTS: CURRENT LAND USAGE ___ Residential ___ Commercial _X_ Industrial ___ Mixed Commercial w/ Residential ___ Under Construction &/or Development ___ Other: __________________________________ COMMENTS: FUTURE LAND USAGE ___ Residential ___ Mixed Commercial w/ Residential ___ Commercial ___ Other: (describe below) _X_ Industrial ___ Unknow at this time COMMENTS: POST-CLEANUP SITE VISITS Is the Completed Cleanup Remedy Still Protective Based on Current Land Use? YES ___ NO ___ Unknown (Drive-By Inspection Only) ___ COMMENTS: N/A LONG-TERM INSTITUTION CONTROL(S) VERIFICATION Are Components or Restrictions of the SMP, EC &/or PCP Currently Being Complied with? YES ___ NO ___ Unknown (Drive-By Inspection Only) ___ COMMENTS: N/A SITE VISIT CONCLUSIONS The investigation activities appear to be in compliance with the approved Work Plan. RECOMMENDATIONS N/A ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES _X_ NO ___ SIGNATURE: