HomeMy WebLinkAboutDSHW-2024-007215CORRECTIVE ACTION SECTION – SITE VISIT REPORT
SITE NAME: ATK Bacchus Facility DATE: 07 / 09 / 2024
EPA ID #: UTD001705029 UTCA ID#:
LOCATION: P.O. Box 98, Magna UT 84044-0098
PROJECT MANAGER: Ethan Upton
SITE STATUS
_X_ Active Investigation
___Ongoing Cleanup Activities
___Confirmation Sampling
___ Long-term Institutional Controls in-place [Site
Management Plan (SMP), Environmental
Covenant (EC), and/or Post Closure Plan (PCP)]
___ Long-term Groundwater Monitoring
OTHER (describe):
PURPOSE OF SITE VISIT
___Drive-by (windshield survey)
_X_Sample Observation &/or Collection
_X_ Site Investigation
___Cleanup Activities Inspection
___Confirm Current Land Usage
___ Confirm Cleanup Completed
___ Confirm Integrity of Engineering Controls
___ Confirm Compliance with SMP/EC
D2# for SMP/EC: DSHW-________-
_______________
___ Post-Closure Permit Verification
___ Document Change in Land Usage
OTHER (describe)
FIELD OBSERVATIONS:
Active investigation of SWMU SL-2/3. Solvents and laboratory waste were potentially released into both
SWMUs from two historic buildings that were used to develop various chemicals for rocket propulsion.
Observed drilling to and collection of soil samples from ground surface to eight feet below ground surface
(bgs). Soil appeared to be interbedded gravel with silt and clay. Soil is being analyzed for VOCs, RCRA 8
metals, perchlorate, and explosives. The drilling contractor was RMEC Environmental, Inc. while Tim
Jimenez of Northrop Grumman was the sampler and performed driller oversight. The drill rig was able to
access the pond furthest away from the historic buildings. The pond closest was more difficult to access.
The drillers were going to attempt to access the pond before the end of the day. No issues with sampling
were observed during the Site visit.
SAMPLE COLLECTION
Were Environmental Samples Collected per the approved Sampling & Analysis Plan?
YES ___ NO ___ N/A _X_
COMMENTS:
Is the Work Being Performed in a Manner Consistent with the Approved Workplan(s)?
YES _X_ NO ___ N/A ___ Unknown (Drive-By Inspection Only) ___
COMMENTS:
CURRENT LAND USAGE
___ Residential
___ Commercial
_X_ Industrial
___ Mixed Commercial w/ Residential
___ Under Construction &/or Development
___ Other: __________________________________
COMMENTS:
FUTURE LAND USAGE
___ Residential ___ Mixed Commercial w/ Residential
___ Commercial ___ Other: (describe below)
_X_ Industrial ___ Unknow at this time
COMMENTS:
POST-CLEANUP SITE VISITS
Is the Completed Cleanup Remedy Still Protective Based on Current Land Use?
YES ___ NO ___ Unknown (Drive-By Inspection Only) ___
COMMENTS: N/A
LONG-TERM INSTITUTION CONTROL(S) VERIFICATION
Are Components or Restrictions of the SMP, EC &/or PCP Currently Being Complied with?
YES ___ NO ___ Unknown (Drive-By Inspection Only) ___
COMMENTS: N/A
SITE VISIT CONCLUSIONS
The investigation activities appear to be in compliance with the approved Work Plan.
RECOMMENDATIONS
N/A
ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES _X_ NO ___
SIGNATURE: