Loading...
HomeMy WebLinkAboutDDW-2024-008848SCALE:2 NONE BLOW OFF DETAIL 1'-5 1/2" 2'X2'X2' GRAVEL BED WITH 1/2" (MIN) TO 2" (MAX) CLEAN GRAVEL 1 4" WEEP HOLE EXTEND GALVANIZED ABOVE SURFACE & CAP END COVER END OF PIPE WITH GALVANIZED THREADED CAP (6" ABOVE FINISH GROUND) WATERLINE FULL LENGTH 2" GATE VALVE (TYP.) TRENCH BACKFILL FINISH GRADE WORD WATER CAST IN CENTER OF C.I. COVER T-POST TO MARK LOCATION CAST IRON SLIDING TYPE VALVE BOX SCALE:1 NONE WATER VALVE BOX DETAIL UNPAVED AREASPAVED AREAS 12"12" PAVEMENT STRUCTURE 2 1 2 "ASPHALT MIN. MATCH EXISTING ELEVATION FINISH GRADE #4 BAR 16" w/ FIBERS (TYP.) CAST IRON SLIDING TYPE VALVE BOX GATE VALVE (TYP.) SEE DETAIL W-03 FOR THRUST BLOCK INFO WATER LINE TRENCH BACKFILL 4- #4 BARS EVENLY SPACED BOTH WAYS (TYP.) WORD "WATER" CAST IN CENTER OF C.I. COVER FINISH GRADE CAST IRON SLIDING TYPE VALVE BOX SEE DETAIL W-03 FOR THRUST BLOCK INFO 24" SQUARE 48" SQUARE 12" 3" 8" MIN.4" 4"ARROW SKETCH SHOWING DIRECTION OF FLOW IN CONCRETE COLLAR 2" X 6" STAINLESS STEEL NIPPLE W-01 CICWCD WATER VALVE BOX AND BLOW OFF IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 KENNEDY FIRE HYDRANT WITH STORZ FITTING 1.TOP OF VALVE BOX AND CONCRETE COLLAR TO BE 1/4" BELOW FINAL GRADE. CONCRETE THRUST BLOCK WEEP HOLE 1 2" MIN. - 2" MAX. CLEAN GRAVEL UNDISTURBED EARTH 6" DUCTILE IRON GATE VALVE W/2" SQ AWWA NUT FLANGE X MJ (THRUST RESTRAINT) STD. VALVE BOX RISER REQ'D 6" PVC PIPE THRUST RESTRAIN LOCK JOINT REQ'D MEGA LUG (O.A.E.) MJ (THRUST RESTRAINT) 2' VARIES 6" TEE (MJ X FLANGE) WATER MAIN SEE PLAN FOR SIZE CONCRETE THRUST BLOCK 4" M I N . 6 " M A X CONC. SIDEWALK, CURB & GUTTER 12" MIN. 4' NOTE: SCALE:1 NONE STANDARD FIRE HYDRANT DETAIL (PAVED) COMPACT BACKFILL MATERIAL TO 96% AASHTO T-180 KENNEDY FIRE HYDRANT WITH STORZ FITTING 1.TOP OF VALVE BOX AND CONCRETE COLLAR TO BE 1/4" BELOW FINAL GRADE. CONCRETE THRUST BLOCK WEEP HOLE 1 2" MIN. - 2" MAX. CLEAN GRAVEL UNDISTURBED EARTH 6" DUCTILE IRON GATE VALVE W/2" SQ AWWA NUT FLANGE X MJ (THRUST RESTRAINT) STD. VALVE BOX RISER REQ'D 6" PVC PIPE THRUST RESTRAIN LOCK JOINT REQ'D MEGA LUG (O.A.E.) MJ (THRUST RESTRAINT) 2' 0 " SEE WATER VALVE BOX DETAIL VARIES 6" TEE (MJ X FLANGE) WATER MAIN SEE PLAN FOR SIZE CONCRETE THRUST BLOCK 4" M I N . 6 " M A X FINISH GRADE 12" MIN. 4' 0" NOTE: SCALE:2 NONE STANDARD FIRE HYDRANT DETAIL (UNPAVED) COMPACT BACKFILL MATERIAL TO 96% AASHTO T-180 SEE WATER VALVE BOX DETAIL W-01 12"12" W-02 CICWCD STANDARD FIRE HYDRANT DETAIL IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 SCALE:1 NONE THRUST BLOCKS 1.CONCRETE SHALL NOT BE PLACED AROUND JOINTS AND BOLTS. 2.BLOCKING SHALL BE POURED IN PLACE PORTLAND CEMENT CONCRETE A MINIMUM OF 12 INCHES THICK BETWEEN SOLID UNDISTURBED OR COMPACTED EARTH AND FITTING. THRUST BLOCK SHALL BE PLACED TO PERMIT ACCESS TO THE PIPE AND FITTING. 3.MINIMUM BEARING AREAS ASSUME A WORKING PRESSURE OF UP TO 150 PSI (TEST PRESSURE 200 PSI) AND A MINIMUM SOIL BEARING PRESSURE OF 2000 PSI. IF THESE CONDITIONS ARE NOT MET, LARGER BLOCKING WILL BE REQUIRED. NOTE: BEND TEE PLUG TEE PLUG CROSS REDUCER PLUG CROSS PLUG END W-03 CICWCD THRUST BLOCKS IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 8' - 0 " M I N . 12"MIN.12" MIN. 1'-4" TYP. SAW CUT ASPHALT 1" CLEARANCES (TYP.) PIPE SIZE VARIES BACKFILL ALL AROUND SAW CUT ASPHALTABC DE F H I J S 6'-0" SCALE:1 NONE 6" PRESSURE REDUCING VALVE W/2" BYPASS-PROFILE VIEW LEGEND NOTE: 1. UNLESS OTHERWISE SHOWN ALL MATERIALS PER BWPSSSD ENGINEERING STANDARDS CONCRETE VAULT TOP (6'X 12') MANHOLE RING AND COVER (RIBLESS) x" X 6" FLANGED REDUCER (IF REQ'D) 6" FLANGED STEEL SPOOL WITH 2" OUTLET 2" GATE VALVE WITH HANDWHEEL 9" X 18" FOOTING W/ 3-#4 BARS 4' / X 8" THICK CONCRETE COLLAR 8" COMPACTED UNTREATED BASE J N L K M I H G D C F E *NO. A B CONCRETE SUPPORT BLOCKING x" M.J. X FLANGE ADAPTOR 3" ASPHALT MAT SUMP MANHOLE STEP GRADE RING(S) ITEM CEMENT LINED CEMENT LINED EPOXY COATED AND LINED D&L A-1180 O.A.E. DESCRIPTION AMCOR UV6127T O.A.E. W/ 40" / #4 BARS & FIBERS (M.A. INDUSTRIES INC. O.A.E.) Q R O P 6" PRESSURE REDUCING VALVE 2" PRESSURE REDUCING VALVE 2" K-COPPER PIPE AND FITTINGS AS SHOWN 6" GATE VALVE WITH HANDWHEEL NON-RISING STEM WATTS ACV 115/6115 O.A.E. S 3/4" TAPPS w/ PRESSURE GAUGE 2 1/2", 0-300 PSI, GLYCERIN FILLED 12" X 12" X 12" W/SUMP PUMP & GRATE W-04B CICWCD 6" PRESSURE REDUCING VALVE W/2" BYPASS IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 12'-0" 3' - 0 " 6' - 0 " 1" CLEARANCE (TYP.) PIPE SIZE VARIES A F K L N R Q N L K M O P O M SCALE:4 NONE 6" PRESSURE REDUCING VALVE W/2" BYPASS-PLAN VIEW LEGEND NOTE: 1. UNLESS OTHERWISE SHOWN ALL MATERIALS PER BWPSSSD ENGINEERING STANDARDS CONCRETE VAULT TOP (6'X 12') MANHOLE RING AND COVER (RIBLESS) x" X 6" FLANGED REDUCER (IF REQ'D) 6" FLANGED STEEL SPOOL WITH 2" OUTLET 2" GATE VALVE WITH HANDWHEEL 9" X 18" FOOTING W/ 3-#4 BARS 4' / X 8" THICK CONCRETE COLLAR 8" COMPACTED UNTREATED BASE J N L K M I H G D C F E *NO. A B CONCRETE SUPPORT BLOCKING x" M.J. X FLANGE ADAPTOR 3" ASPHALT MAT SUMP MANHOLE STEP GRADE RING(S) ITEM CEMENT LINED CEMENT LINED EPOXY COATED AND LINED D&L A-1180 O.A.E. DESCRIPTION AMCOR UV6127T O.A.E. W/ 40" / #4 BARS & FIBERS (M.A. INDUSTRIES INC. O.A.E.) Q R O P 6" PRESSURE REDUCING VALVE 2" PRESSURE REDUCING VALVE 2" K-COPPER PIPE AND FITTINGS AS SHOWN 6" GATE VALVE WITH HANDWHEEL NON-RISING STEM WATTS ACV 115/6115 O.A.E. S 3/4" TAPPS w/ PRESSURE GAUGE 2 1/2", 0-300 PSI, GLYCERIN FILLED 12" X 12" X 12" W/SUMP PUMP & GRATE W-04A CICWCD 6" PRESSURE REDUCING VALVE W/2" BYPASS IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 LP PL METER SIZE BOX DIAMETER D&L RING & COVER, OAE FORD SETTER, OAE 1" 18" L-2241 VBHC 74-18W-44-44-G or Q 1 1/2" 24" B-5074 VBHH 76-18-44-66-G or Q 2"30" B-5076 VBHH 77-18-44-77-G or Q CAST IRON METER RING & LID (AUTO READ) 2" HOLE NATURAL GROUND AROUND METER BOX GENERALLY WATER METER TO BE PLACED IN CCENTER OF LOT. (NOT IN DRIVEWAY OR SIDEWALK) EXCEPT ON TWIN HOME LOTS. (SEE NOTES) DISTANCE VARIES 15' ON HIGH SIDE OF ROAD (TYP.) WATER MAIN PIPE SADDLE 1" MIN. POLY SERVICE LATERAL FROM MAIN (SEE NOTES) (1-1/2" MIN. FOR TWIN HOME LOTS) SCALE:1 NONE 1"-2" WATER METER-PLAN VIEW SIDEWALK PARKSTRIP CURB AND GUTTER W-05A CICWCD 1"-2" WATER METER- PLAN VIEW IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 SCALE:1 NONE 3/4"-2" WATER METER-PROFILE VIEW 3/4" LATERAL ALLOWED ONLY BY APPROVAL OF THE DISTRICT ENGINEER ON TWIN HOME LOTS THE WATER METERS SHALL BE TEED OFF A COMMON 1-1/2" MIN. LATERAL COMING FROM THE MAIN AND PLACED ON EACH SIDE THE LOT DIVIDING LINE ACCORDING TO THE LAYOUT OF THE HOMES. 1- 2- NOTES: 2" ASPHALT CURB BOX FORD MODEL # EAZ-40-40-30R (O.A.E) CAST IRON METER RING AND COVER (SEE TABLE) PULL TUFF TUBE TO SURFACE, CAP, AND MARK WITH INDICATION TAPE OR PAINT METER LID MUST BE FULLY SUPPORTED BY METER BOX OR GRADE RING L-2250 22" MIN. 26" MAX. ± 1" (NO EXCEPTIONS) MASTER METER TO BE INSTALLED BY CICWCD ZERO CLEARANCE BETWEEN WALL OF BOX AND CHECK VALVE SIDE OF WATER SETTER 1" TUFF TUBE (LENGTH AS NEEDED) TUFF TUBE ADAPTER 1"x12" BRASS NIPPLE PLACE 1"x15" PVC PIPE THROUGH HOLE FOR STABILIZATION METER BOX HDP A.D.S. N-12 (O.A.E.) CORRUGATED POLYETHYLENE PIPE CORRUGATED EXTERIOR/ SMOOTH INTERIOR (SEE TABLE) WHITE INSIDE COLOR, BOX TO BE A CONTINUOUS PIECE OF PIPE WITH NO EXTENSIONS CURB STOP FORD MODEL B11-444 (O.A.E.), 1" BALL VALVE, 1" FM I.P.T. x 1" FM 1.P.T. 1" MIN. POLY SERVICE PIPE (O.A.E.) (TUFF TUBE) SADDLE CLAMP (STAINLESS STEEL) VARIES 7' PARKSTRIP SIDEWALK VARIES 22 " M I N 26 " M A X 40 " M I N BEDDING COMPACTED BACK FILL 6" BASE COURSE W-05B CICWCD 3/4"-2" WATER METER- PROFILE VIEW IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 NOTES: 1. MATCH EXISTING SERVICE. BEND PIPE AROUND OBSTRUCTION. 2. THRUST BLOCKS: NOT REQUIRED FOR FLANGE, WELDED, OR RESTRAINED JOINT PIPE SYSTEMS. 3. WATERLINES SHALL MAINTAIN 10 FOOT HORIZONTAL SEPERATION (EDGE TO EDGE) AND 18" VERTICAL SEPERATION FROM SEWERLINES. WHEN CROSSING SEWER LINES, LOOP WATER MAINS OVER TOP OF SEWER LINES AND MAINTAIN MINIMUM 18" VERTICAL SEPERATION 4.CONTRACTOR SHALL SUBMIT DETAILS OF RESTRAINED JOINT PIPE TO ENGINEER FOR 5.APPROVAL PRIOR TO INSTALLATION. C 18" 12" D MIN FULL PIPE LENGTH O.D. + 12" No. OBSTRUCTION OTHER SEWER MAIN TABLE OF DIMENSIONS SCALE:1 NONE WATERLINE UTILITY CROSSING DETAIL STAINLESS STEEL OR EPOXY COATED STEEL TIE RODS MEGA LUGS FOLLOWERS (EXISTING PIPE) MEGA LUGS FOLLOWERS 45° BEND STAINLESS STEEL OR EPOXY COATED STEEL TIE RODS CONCRETE THRUST BLOCKS MEGA LUGS FOLLOWERS CONCRETE THRUST BLOCKS 45° BEND MEGA LUGS FOLLOWERS 12" D MINIMUM C MI N I M U M W-06 CICWCD WATERLINE UTILITY CROSSING IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 A F S Q P O KL M N M LK O G PIPE SIZE VARIES SCALE:1 NONE WATER METER WITH FIRE FLOW-PLAN VIEW 1" CLEARANCES (TYP.) 4- 0 " 2'-6" VARIES 12" MIN. 1" CLEARANCES (TYP.) E F A BT S C H I J BACKFILL ALL AROUND SAW CUT ASPHALT (TYP.) R SCALE:2 NONE WATER METER WITH FIRE FLOW-PROFILE VIEW PIPE SIZE VARIES 3' - 6 " M I N . 1'-4" TYP 12" 15" 15" MIN.3'-0"12" MIN. CENTERED IN BOX D NO.*ITEM DESCRIPTION 6" MIN. FLANGE ADAPTOR 8" COMPACTED UNTREATED BASE GRADE RING(S) MANHOLE STEP SUMP CONCRETE SUPPORT BLOCKING 4' / X 8" THICK CONCRETE COLLAR 9" X 18" FOOTING W/ 3-#4 BARS CEMENT LINED (M.A. INDUSTRIES INC. O.A.E.) W/ 40" / #4 BARS & FIBERS A 6" SINGLE DETECTOR CHECK VALVE 6" GATE VALVE WITH HANDWHEEL x" X 6" FLANGED REDUCER (IF REQ'D) WATTS SERIES SS07F O.A.E. CEMENT LINEDMANHOLE RING AND COVER (RIBLESS)D&L A-1180 O.A.E. 3" ASPHALT MAT CONCRETE VAULT TOP (6'X 12')AMCOR UV6127T O.A.E. CICWCD WATER MAIN GATE VALVE WITH BOX CEMENT LINED SEE W1 NON-RISING STEM 18" DIA. HDPE PIPE RING & LID w/ 2" HOLE 30"x30"x8" THICK CONCRETE COLLAR PER PIPE SPEC. D&L-2241 O.A.E. NOTE: 1. ALL MATERIALS PER CICWCD ENGINEERING STANDARDS UNLESS OTHERWISE SHOWN B C D E F G H I J K L M N O P Q R S T 6" MIN. D.I. PIPE (TO OUTSIDE OF VAULT) 12" X 12" X 12" W/SUMP PUMP & GRATE W-07A CICWCD WATER METER WITH FIRE FLOW IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 A F N X Z N U T S KLO R V Q P OL K S G NO.*ITEM DESCRIPTION 6" MIN. FLANGE ADAPTOR 8" COMPACTED UNTREATED BASE GRADE RING(S) MANHOLE STEP SUMP CONCRETE SUPPORT BLOCKING 4' / X 8" THICK CONCRETE COLLAR 9" X 18" FOOTING W/ 3-#4 BARS CEMENT LINED (M.A. INDUSTRIES INC. O.A.E.) W/ 40" / #4 BARS & FIBERS A 6" SINGLE DETECTOR CHECK VALVE 6" GATE VALVE WITH HANDWHEEL 2" GATE VALVE WITH 4" NIPPLE 6" FLANGED STEEL SPOOL WITH 2" OUTLET x" X 6" FLANGED REDUCER (IF REQ'D) WATTS SERIES 07F O.A.E. EPOXY COATED AND LINED CEMENT LINED MANHOLE RING AND COVER (RIBLESS)D&L A-1180 O.A.E. 3" ASPHALT MAT CONCRETE VAULT TOP (6'X 12')AMCOR UV6127T O.A.E. 6" PRESSURE REDUCING VALVE (IF REQ'D) CITY WATER MAIN GATE VALVE WITH BOX CEMENT LINED SEE W1 6" FLANGED SPOOL 12" LONG CEMENT LINED NON-RISING STEM COMPOUND W/ STRAINER 18" DIA. HDPE PIPE RING & LID w/ 2" HOLE 30"x30"x8" THICK CONCRETE COLLAR PER PIPE SPEC. D&L-2241 O.A.E. 2" PRESSURE REDUCING VALVE WATTS ACV 115/6115 O.A.E PIPE SIZE VARIES NOTE: 1. ALL MATERIALS PER CICWCD ENGINEERING STANDARDS UNLESS OTHERWISE SHOWN B C D E F G H I J K L M N O P Q R S T U V W X Y Z 6" COMPOUND FLOW METER (PURCHASED FROM CITY) 6" MIN. D.I. PIPE (TO OUTSIDE OF VAULT) 12" X 12" X 12" W/SUMP PUMP & GRATE SCALE:1 NONE WATER METER WITH FIRE FLOW-PLAN VIEW 1" CLEARANCES (TYP.) M 6' - 0 " 3'-0" 12'-0" 3'-0" MIN. 12" MIN. M W-07A CICWCD WATER METER WITH FIRE FLOW IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 1" CLEARANCES (TYP.) E F A B Y X C H I J BACKFILL ALL AROUND SAW CUT ASPHALT (TYP.) W NO.*ITEM DESCRIPTION 6" MIN. FLANGE ADAPTOR 8" COMPACTED UNTREATED BASE GRADE RING(S) MANHOLE STEP SUMP CONCRETE SUPPORT BLOCKING 4' / X 8" THICK CONCRETE COLLAR 9" X 18" FOOTING W/ 3-#4 BARS CEMENT LINED (M.A. INDUSTRIES INC. O.A.E.) W/ 40" / #4 BARS & FIBERS A 6" SINGLE DETECTOR CHECK VALVE 6" GATE VALVE WITH HANDWHEEL 2" GATE VALVE WITH 4" NIPPLE 6" FLANGED STEEL SPOOL WITH 2" OUTLET x" X 6" FLANGED REDUCER (IF REQ'D) WATTS SERIES 07F O.A.E. EPOXY COATED AND LINED CEMENT LINED MANHOLE RING AND COVER (RIBLESS)D&L A-1180 O.A.E. 3" ASPHALT MAT CONCRETE VAULT TOP (6'X 12')AMCOR UV6127T O.A.E. 6" PRESSURE REDUCING VALVE (IF REQ'D) CITY WATER MAIN GATE VALVE WITH BOX CEMENT LINED SEE W1 6" FLANGED SPOOL 12" LONG CEMENT LINED NON-RISING STEM COMPOUND W/ STRAINER 18" DIA. HDPE PIPE RING & LID w/ 2" HOLE 30"x30"x8" THICK CONCRETE COLLAR PER PIPE SPEC. D&L-2241 O.A.E. 2" PRESSURE REDUCING VALVE WATTS ACV 115/6115 O.A.E NOTE: 1. ALL MATERIALS PER CICWCD ENGINEERING STANDARDS UNLESS OTHERWISE SHOWN B C D E F G H I J K L M N O P Q R S T U V W X Y Z 6" COMPOUND FLOW METER (PURCHASED FROM CITY) 6" MIN. D.I. PIPE (TO OUTSIDE OF VAULT) 12" X 12" X 12" W/SUMP PUMP & GRATE SCALE:2 NONE WATER METER WITH FIRE FLOW-PROFILE VIEW PIPE SIZE VARIES 3' - 6 " M I N . 1'-4" TYP 12" 15" 15" MIN. 30" 3'-0"12" MIN. CENTERED IN BOX D W-07B CICWCD WATER METER WITH FIRE FLOW IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 CONSTRUCTION IN UNIMPROVED AREAS 3 4" SAND OR GRAVEL BACKFILL IN THE PIPE ZONE. PIPE ZONE EXTENDS A MINIMUM 12 INCHES ABOVE TOP OF PIPE TO A MINIMUM 6 INCHES BELOW BOTTOM OF PIPE. PLACE IN A MAXIMUM 12 INCH LIFTS COMPACTED TO 90% OF MINIMUM MODIFIED PROCTOR DENSITY AS DETERMINED BY ASTM D-1557 MINIMUM WIDTH OF TRENCH IN PIPE ZONE IS 2X PIPE O.D. CONSTRUCTION IN STREETS, OR OTHER PAVED AREAS SCALE:1 NONE TRENCH DETAIL GRANULAR BACKFILL ACCORDING TO SECTION 2.01 PLACED IN MAX. 12 INCH LIFTS COMPACTED TO 90% OF MINIMUM MODIFIED PROCTOR DENSITY AS DETERMINED BY ASTM D-1557 INSTALL WARNING TAPE 18" ABOVE WATER LINE 8 INCH MIN. TRENCH BOTTOM STABILIZATION MATERIAL TO BE USED AT THE DIRECTION OF THE ENGINEER TO REINFORCE UNSTABLE EXISTING MATERIALS. GRANULAR BACKFILL OR APPROVED EXCAVATED MATERIAL PLACED IN MAXIMUM 12 INCH LIFTS COMPACTED TO 95% OF MINIMUM MODIFIED PROCTOR DENSITY AS DETERMINED BY ASTM D-1557 8" COMPACTED ROAD BASE 3" MIN. BITUMINOUS SURFACE COURSE 36 " M I N 6" M I N 12 " M I N 14 GAUGE TRACER WIRE TO BE PLACED AND SECURED ON TOP OF ALL NON-METALLIC PIPE. WIRE TO EXTEND THROUGH VAULTS AND PULLED THROUGH VALVE CANS. W-08 CICWCD TRENCH DETAIL IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 12 " MI N . 12 " 6" SCALE:1 NONE AIR RELEASE VALVE DETAIL 30" C.I. MANHOLE RING AND COVER D&L SUPPLY A-118D (VENTED) OR EQUAL GRADE 6 RINGS WHERE REQ. PRE-CAST FLAT CONC. LID W/30" DIA. OPENING H-20 LOADING 5' DIA. CONC. MANHOLE 4' DEPTH WATER MAIN GRADING ROCK 1" MAX. DIA. MUSHROOM VENT 2" GALV. STEEL PIPE AND BENDS GROUT 2" COMBINATION AIR RELEASE VALVE APCO 145 C OR EQUAL 2" CORP. STOP BRASS 2" NIPPLE TAPPED TO MAIN BRASS 2" NIPPLE BRASS 2" BALL VALVE UNION W-09 CICWCD AIR RELEASE VALVE DETAIL IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 STEEL PIPE CASING SHALL CONFORM TO THE REQUIREMENTS OF ASTM A283, GRADE B, C, OR D. ALL JOINTS SHALL BE WELDED. INTERIOR JOINTS SHALL BE GROUND TO A SMOOTH FINISH. ALL WELDING SHALL BE PERFORMED IN ACCORDANCE WITH AWWA C206, "AWWA STANDARD FOR FIELD WELDING OF STEEL WATER PIPE." COATINGS FOR STEEL CASING ARE NOT REQUIRED. STEEL PIPE CASING SHALL BE INSTALLED SYMMETRICAL ABOUT WATER MAIN CENTERLINE (TYP). PIPE CASING SHALL BE LAID TRUE TO LINE AND GRADE WITH NO BENDS OR CHANGES IN GRADE FOR THE FULL LENGTH OF THE CASING. AGENCY APPROVED CASING SPACERS AND END SEALS SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. USE A "CENTERED CONFIGURATION AND PROVIDE THE MANUFACTURER WITH THE FOLLOWING: (PIPE O.D., CASING I.D., AND CASING LENGTH. ALL PIPE JOINTS WITHIN THE CASING ARE TO BE RESTRAINED. CASING TO BE FILLED WITH SAND OR GROUT AS APPROVED BY AGENCY. PIPE SIZE CASING O.D.THICKNESS * CARRIER PIPE 6" 8" 10" 12" 16" 18" 20" 24" 16" 18" 20" 24" 30" 30" 36" 42" 1/4" 1/4" 5/16" 5/16" 3/8" 3/8" 1/2" 1/2" NOTE: 1. 2. 3. 4. 5. CASING INSTALLATIONS OVER 25 FEET BELOW FINISH GRADE TO HAVE THICKNESS DETERMINED BY A UTAH LICENSED PROFESSIONAL ENGINEER. CASING INSTALLATIONS UNDER RAILROAD TRACKS TO HAVE THICKNESS DETERMINED BY A UTAH LICENSED PROFESSIONAL ENGINEER AND APPROVED BY UNION PACIFIC RAILROAD. * * CROSS-SECTION PIPE CASING 2'-0"10'-0" MAX (TYP) 2'-0" 18 " MI N . 10'-0" MIN (TYP) 10'-0" MIN (TYP) SCALE:1 NONE CARRIER PIPE DETAIL- CROSS SECTION STAINLESS STEEL CLAMP BANDS OVER LAPPING RUBBER END SEAL PLACEMENT OF SPACERS ON CARRIER PIPE PER MANUFACTURER SPECIFICATIONS CASING THICKNESS (SEE TABLE BELOW) NOT TO EXCEED DEFLECTION OF PIPE CARRIER PIPECONFIGURATION CENTERED CARRIER PIPE CASING SPACER ANGLES TO BE CONSTANT AROUND ENTIRE CIRCUMFERENCE OF THE PIPE. NUMBER OF SPACERS PER MANUFACTURER'S SPECIFICATIONS W-10 CICWCD CARRIER PIPE DETAIL IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 APPROVED DOUBLE CHECK DETECTOR OR REDUCED MIN 3/8" NON CASE HARDENED CHAIN WITH LOCK (KEY TO BE GIVEN TO FIRE DEPARTMENT) OS & Y GATE VALVE PIPE SUPPORT 4" CONCRETE SLAB - 36" WIDE WITH 4" THICK AGGREGATE BASE THRUST BLOCK WITH #5 REBARS 1. DOUBLE CHECK OR REDUCED PRESSURE PRINCIPLE DETECTOR ASSEMBLY TO BE APPROVED 2. ALL MATERIALS SHALL BE U.L. - F.M. APPROVED 3. TYPICAL LINE DRAWING. ACTUAL INSTALLATION MAY VARY WITH FIELD CONDITIONS AND FIRE DEPARTMENT REQUIREMENTS. 4. ALL JOINTS BETWEEN MAIN AND DETECTOR CHECK SHALL BE FLANGED CONNECTED. VARYING LENGTH NOTES: ATTENTION: NO WATER IS TO BE DRAWN THROUGH BACKFLOW DEVICE UNTIL THE SYSTEM PRESSURE PRINCIPLE ASSEMBLY WITH BYPASS METER AND HAS BEEN TESTED BY A CERTIFIED TESTER & CICWCD ACCEPTS THE REPORT. PER CICWCD. SCALE:11 NONE BACKFLOW DETAIL APPROVED PER SS-96 FINISH GRADE TO BLDG. TO PUBLIC WATER MAIN 12" MIN CLEARANCE TAMPER SWITCH 18" MIN 1 1/4" 4 6 2 1 4 5 6 4 3 1 2 3 4 5 6 7 77 W-11 CICWCD BACKFLOW DETAIL IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 PLAN VIEW NO.ITEM LEGEND MECHANICAL JOINT RESTRAINT (MEGALUG O.A.E) INSTALLED FLUSH AGAINST VAULT PRESSURE GUAGE AND HOSE BIB SEE DETAIL A MAGMETER (ENDRESS HAUSER O.A.E) W/ REMOTE MOUNT GATE VALVE (MUELLER RESILIENT O.A.E) BYPASS CHECK VALVE OR CHECKING PRV (APCO O.A.E OR CLA-VAL #93-01-ASCDKC) BYPASS MAGMETER (ENDRESS HAUSER O.A.E) W/ REMOTE MOUNT BYPASS GATE VALVE (MUELLER RESILIENT O.A.E) FLANGED BYPASS MAXIMUN OF 2 SIZES SMALLER THAN MAIN 30" MANHOLE ACCESS (D&L A-1180 COVER O.A.E) RING & LID (D&L-2241 O.A.E.) PIPE SUPPORT (TYP.) GALVANIZED STEEL/HDPE LADDER (RUNGS SPACED 9" APART O.C.) 12" x 12" x 2" CONCRETE BLOCK (TYP.) QUANTITY 2 2 2 1 1 1 1 1 1 1 1 3 3 ENGINEERED PRECAST CONCRETE VAULT, SIZE TO BE DETERMINED BY CICWCD 1 CHECK VALVE OR CHECKING PRV (APCO O.A.E OR CLA-VAL #93-01-BCSDKC) 1 RTU PEDESTAL SEE DETAIL D 1 LENGTH VARIES 1TIE ROD STYLE DISMANTLING JOINT (ROMAC DJ400 O.A.E.) VA R I E S 2THREADED SUBMERSIBLE TRANSDUCER 0-150 PSI RANGE (KPSI O.A.E) SCALE:1 NONE PIPE FIXTURES: PLAN VIEW FLOW 1' M I N . 2' MIN 1' MIN. 2X DIA. OF PIPE 5X DIA. OF PIPE 1 2 18 10 3 4 5 13 3 12 11 18 1 9 1 17 8768 17 13 12 16 10 2 17 3 4 1 5 14 15 18 13 12 11 9 8 7 6 16 W-12A CICWCD PIPE FIXTURES: PLAN VIEW IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 36" 13 " RTU PEDESTAL PLAN VIEW FLOW TRANSMITTER MOUNTING DETAIL PLAN VIEW 6" 2' 0 " 4' 0 " 1'-4" ELECTRICAL SERVICE PEDESTAL ELEVATION SCALE:1 1 ASSORTED DETAILS 1/16" THICK ALUMINUM FABRICATED BRACKET TO LOCATE FLOW TRANSMITTER INDICATOR 1/2" BEHIND WINDOW IN DOOR FLOW TRANSMITTER BACK PANEL ANTENNA MAST PVC CONDUITS (TYP.) CONCRETE RTU CABINETANCHOR BOLTS W-12B CICWCD ASSORTED DETAILS IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 SCALE:1 NONE METER PEDESTAL FOR RISER CONNECTION POWER CONNECTION TO POLE #113-36-11, 190001 TO BE COORDINATED WITH ROCKY MOUNTAIN POWER TYPICAL GALVANIZED STEEL METER PEDESTAL SUPPORTS TYPICAL WEATHER SEALED METER BOX W/ POWER DISCONNECT PER ROCKY MOUNTAIN POWER SPECS 1" RIGID STEEL CONDUIT GRADE LINE TO METER VAULT TO BE LAID BY CONTRACTOR METER PEDESTAL SHALL BE INSTALLED AT A 3' MIN. AND 6' MAX.DISTANCE FROM EXISTING POWER POLE W-12C CICWCD METER PEDESTAL FOR RISER CONNECTION IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 RTU PEDESTAL FRONT ELEVATION RTU PEDESTAL BACK ELEVATION 1/ 2 " SCALE:1 NONE RTU PEDESTAL ELEVATIONS- FRONT AND BACK ANTENNA MAST HOFFMAN A36P30 PANEL INSIDE ENCLOSURE ATTACHED TO REAR VERTICAL STRUT WITH THREE HORIZONTAL 1-5/8" X 13/16" STRUTS. USE STRUT NUTS AND BOLTS. TOP OF DOOR WINDOW CENTER FLOW TRANSMITTER BEHIND WINDOW (NOT SHOWN SEE DETAIL) GRADE GRADE ANTENNA MAST STUB 1" CONDUIT INSIDE 2" MAST SEE ENLARGED STEEL PLATE VIEW WELD PIPE TO PLATE CONTINUOUS ON BOTH SIDES OF PIPE 4 9 16" DIA. HOLES 1" LB SEALANT REQUIRED 1" RIGID STEEL CONDUIT W-12D CICWCD RTU PEDESTAL ELEVATIONS IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 24 " 30 " SCALE:1 NONE RTU PEDESTAL SIDE ELEVATION ANTENNA MAST, INSTALLED BY CONTRACTOR. 16" LENGTH OF 2" SCHEDULE 40 GALVANIZED STEEL PIPE WITH A 8" X 15" X 1/2" STEEL PLATE WELDED TO THE SIDE AT THE BOTTOM. HOT GALVANIZED AFTER FABRICATION. WEATHERHEAD ON TOP. ANTENNA AND CABLE INSTALLED BY CICWCD. 4 MAST ANCHOR BOLTS. 1/2" X 12" GALVANIZED FORMED CONCRETE PVC CONDUITS (TYP) (SEE PROJECT DRAWINGS FOR SPECIFIC REQUIREMENTS) RTU CABINET ECONOLITE 49" BASE MOUNT "M" CABINET WITH POLICE DOOR DELETED. INTERIOR COMPONENTS INSTALLED BY CICWCD. CABINET FRONT 2 ANCHOR BOLTS 1/2" X 12" GALVANIZED 45° FORMED ANGLE GRADE W-12E CICWCD RTU PEDESTAL SIDE ELVATION IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 2" 3" MIN. VENT PIPE NOTES: 1. WHEN VENT PIPES ARE INSTALLED GREATER THAN 36" APART, BOTH VENT PIPES SHALL BE 30" HIGH. 2. WHEN VENT PIPES ARE INSTALLED LESS THAN 36" FROM EACH OTHER, THE EXHAUST VENT SHALL BE 36" HIGH AND INTAKE SHALL BE 24" HIGH. 3. INSTALL INTAKE VENT PIPE END 18" ABOVE VAULT FLOOR. 4. INSTALL EXHAUST FAN A MINIMUM OF 48" ABOVE VAULT FLOOR SCALE:1 NONE VENT PIPE SIDE PENETRATION GALV. STEEL VENT CAP WITH #14 STAINLESS REMOVABLE MESH SCREEN (TYP.) VENT PIPE 4" SCH 10 GALV. STEEL 11 2'x11 2'x4" CONCRETE PAD IN PARK STRIP 2" OF GRAVEL CORE & GROUT FOR PIPE PENETRATION PIPE CLAMP (TYP) 1 1 4" W-12F CICWCD VENT PIPE SIDE PENETRATION IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 CHECK VALVE MAY BE REPLACED BY CHECKING PRV IF NECESSARY. LINE IN VAULT MAY BE REDUCED TO DECREASE THE SIZE OF METER AS APPROVED CICWCD. A MINIMUM OF (3) PIPE SUPPORTS TO BE PLACED UNDER MAIN AND BYPASS LINES BYPASS SHALL BE A MAXIMUM OF 2 SIZES SMALLER THAN MAINLINE UNLESS APPROVED BY CICWCD NOTE: 1. 2. 3. 4. PLAN VIEW 1 NO.ITEM 1 LEGEND GATE VALVE (MULLER RESILIENT SEAT OR APPROVED EQUAL) 2 3 4 5 6 7 8 MAGMETER (ENDRESS HAUSER OR APPROVED EQUAL) CHECK VALVE (APCO OR APPROVED EQUAL) TEE PIPE SUPPORTS 12" X 12" X 12" SUMP W/PUMP & GRATE 24" MIN. MANHOLE ACCESS W/ CAST IRON LID 24" TO 38" SECONDARY MAINTENANCE ACCESS (D&L 1426 COVER OR APPROVED EQUAL PROFILE VIEW 9 GALVANIZED STEEL/HDPE LADDER (RUNGS SPACED 9" APART O.C.) 2' MIN. FROM WALL TO O.D. OF PIPE 2' MIN. FROM WALL TO O.D. OF PIPE 3 X DIA. OF PIPE 2 X DIA. OF PIPE BYPASS FLOW FLOW AMCO PRECAST CONCRETE VAULT SCALE:1 NONE PIPE FIXTURES: PLAN & PROFILE VIEW FINISH GROUND 1 2 3 1 8 1 43 214 7 1 9 7 8 1 4 32 4 5 6 W-12G CICWCD PIPE FIXTURES: PLAN & PROFILE VIEW IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 PROFILE VIEW NO.ITEM LEGEND MECHANICAL JOINT RESTRAINT (MEGALUG O.A.E) INSTALLED FLUSH AGAINST VAULT PRESSURE GUAGE AND HOSE BIB SEE DETAIL A MAGMETER (ENDRESS HAUSER O.A.E) W/ REMOTE MOUNT GATE VALVE (MUELLER RESILIENT O.A.E) BYPASS CHECK VALVE OR CHECKING PRV (APCO O.A.E OR CLA-VAL #93-01-ASCDKC) BYPASS MAGMETER (ENDRESS HAUSER O.A.E) W/ REMOTE MOUNT BYPASS GATE VALVE (MUELLER RESILIENT O.A.E) FLANGED BYPASS MAXIMUN OF 2 SIZES SMALLER THAN MAIN 30" MANHOLE ACCESS (D&L A-1180 COVER O.A.E) RING & LID (D&L-2241 O.A.E.) PIPE SUPPORT (TYP.) GALVANIZED STEEL/HDPE LADDER (RUNGS SPACED 9" APART O.C.) 12" x 12" x 2" CONCRETE BLOCK (TYP.) QUANTITY 2 2 2 1 1 1 1 1 1 1 1 3 3 ENGINEERED PRECAST CONCRETE VAULT, SIZE TO BE DETERMINED BY CICWCD 1 CHECK VALVE OR CHECKING PRV (APCO O.A.E OR CLA-VAL #93-01-BCSDKC) 1 RTU PEDESTAL SEE DETAIL D 1 1TIE ROD STYLE DISMANTLING JOINT (ROMAC DJ400 O.A.E.) 6' 2THREADED SUBMERSIBLE TRANSDUCER 0-150 PSI RANGE (KPSI O.A.E) 5 X DIA. OF PIPE 2 X DIA. OF PIPE FLOWFLOW 4" THICK DRAIN GRAVEL 10 2 2 18 18 3 34 1 5 14 15 17 14 15 14 15 10 2 17 3 4 1 5 14 15 18 13 12 11 9 8 7 6 16 SCALE:1 NONE PIPE FIXTURES: PROFILE VIEW W-12H CICWCD PIPE FIXTURES: PROFILE VIEW IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 PRESSURE GAUGE W/ HOSE BIB W-13 CICWCD PRESSURE GAUGE W/ HOSE BIB IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 SCALE:1 NONE HOT TAP PLAN VIEW SCALE:2 NONE HOT TAP SECTION VIEW WATER MAIN CONCRETE THRUST BLOCK DUAL BAND EPOXY COATED SADDLE SEE PLAN FOR WATER MAIN SIZE STD. VALVE BOX RISER REQ'D SEE WATER VALVE BOX DETAIL HOT TAP DUCTILE IRON GATE VALVE W/2" SQ AWWA NUT FLANGE X MJ (THRUST RESTRAINT) DUAL BAND EPOXY COATED SADDLE SEE PLAN FOR WATER MAIN SIZE CONCRETE THRUST BLOCK WATER MAIN DUCTILE IRON GATE VALVE W/2" SQ AWWA NUT FLANGE X MJ (THRUST RESTRAINT) HOT TAP W-16 CICWCD HOT TAP IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 SCALE:2 NONE TYPICAL UNDERGROUND STREAM CROSSING 40 " M I N . INSTALL SHUT OFF VALVE, SAMPLING TAP, AND PRESSURE GAUGE. PER DETAIL A ABOVE THE HIGH FLOW LINE OF THE WATER INSTALL SHUT OFF VALVE AND SAMPLING TAPS PER DETAIL B ABOVE THE HIGH FLOW LINE OF THE WATER EXISTING STREAM BOTTOM NOTES: 1.PROPOSED WATERLINE TO BE INSTALLED AT A MIN. DEPTH OF 40" BELOW THE SURFACE OF THE CHANNEL. 2.PIPE JOINTS SHALL HAVE RESTRAINED JOINTS WITHIN THE SURFACE WATER COURSE AND FLEXIBLE JOINTS AT THE EDGES. A VAR SCALE: N.T.S SAMPLING TAP & GATE VALVE VAULT 30" C.I. MANHOLE RING AND COVER D&L SUPPLY A-118D (VENTED) OR EQUAL ENGRAVED "WATER" GRADE RINGS WHERE REQUIRED PRE-CAST FLAT CONC. LID W/30" DIA. OPENING H-20 LOADING 3' DIA. CONCRETE MANHOLE 4'-0" MIN DEPTH SMOOTH NOSE SAMPLING TAP WATER MAIN GATE VALVE GROUT GRADING ROCK 1" MAX. DIA. B VAR SCALE: N.T.S SAMPLING TAP & GATE VALVE VAULT 30" C.I. MANHOLE RING AND COVER D&L SUPPLY A-118D (VENTED) OR EQUAL ENGRAVED "WATER" GRADE RINGS WHERE REQUIRED PRE-CAST FLAT CONC. LID W/30" DIA. OPENING H-20 LOADING 3' DIA. CONCRETE MANHOLE 4'-0" MIN DEPTH PRESSURE GAUGE ON UNDERGROUND CROSSING SIDE OF VALVE WATER MAIN GATE VALVE GROUT GRADING ROCK 1" MAX. DIA. SCALE:1 NONE TYPICAL ABOVE WATER CROSSING PIPE SHALL BE PROPERLY SUPPORTED AND ANCHORED EXISTING STREAM BOTTOM NOTES: 1.PROPOSED WATERLINE TO BE INSTALLED IN A SLIP CASING WITH SPACERS. CASING SHALL BE MINIMUM 4 INCHES LARGER DIAMETER. AIR GAP AND CASING SHALL BE INSULATED AS CALCULATED BASED ON PIPE WALL THICKNESS . SMOOTH NOSE SAMPLING TAP W-17 CICWCD STREAM CROSSING DETAIL IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 SCALE:1 NONE JOINT RESTRAINT DETAIL INSTALL JOINT RESTRAINTS TWO PIPE LENGTHS BEFORE AND AFTER ALL 90°, 45°, 22.5° AND 11.25° BENDS BEND THRUST BLOCK W-18 CICWCD JOINT RESTRAINT DETAIL IRON COUNTY, UTAH STANDARD DETAILS PROJECT #DATE SU1037 07/12/2022 CICWCD 88 E Fiddlers Canyon Rd. Suite 220 Cedar City, Utah 84721 Phone 435-865-9901 Fax 435-865-9902 06/2024 INSIDE COVER SU1037E PAGE 00001 - 1 CENTRAL IRON COUNTY WATER CONSERVANCY DISTRICT CULINARY WATER SYSTEM CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION PAGE(S) C001 Cover.............................................................................................................00001 - 1 to 1 C003 Table of Contents ..........................................................................................00003 - 1 to 1 TECHNICAL SPECIFICATIONS DIVISION 1 - GENERAL REQUIREMENTS 01010 Summary of Work.........................................................................................01010 - 1 to 2 01070 Abbreviations/Definitions.............................................................................01070 - 1 to 2 01090 Reference Standards......................................................................................01090 - 1 to 2 01300 Contractor Submittals....................................................................................01300 - 1 to 3 01410 Testing Agency Services...............................................................................01410 - 1 to 3 01440 Quality Control Materials Testing.................................................................01440 - 1 to 5 DIVISION 2 - SITEWORK 02110 Clearing, Grubbing and Stripping.................................................................02110 - 1 to 2 02221 Excavation Backfill Buried Pipelines............................................................02221 - 1 to 7 02222 Excavation Backfill Structures .....................................................................02222 - 1 to 5 DIVISION 15 – PIPE, FITTINGS, AND MECHANICAL APPURTENANCES 15062 Ductile Iron-Pipe ..........................................................................................15062 - 1 to 6 15065 Poly Vinyl Chloride Pipe...............................................................................15065 - 1 to 4 15067 High Density Polyethylene Pipe....................................................................15067 - 1 to 5 15100 Mechanical Appurtenances ...........................................................................15100 - 1 to 4 DIVISION 1 GENERAL REQUIREMENTS 06/2024 SUMMARY OF WORK SU1037E PAGE 01010 - 1 SECTION 01010 SUMMARY OF WORK PART 1 GENERAL 1.01 GENERAL CONDITIONS A. The work to be performed under this project shall consist of furnishing all labor, materials, and equipment necessary or required to complete the work in all respects as shown on the plans and as herein specified. All work, materials, and services not expressly shown or called for in the Contract Documents that may be necessary to complete the construction of the work in good faith shall be performed, furnished, and installed by CONTRACTOR as though originally so specified or shown, at no increase in cost to OWNER. 1.02 WORK COVERED BY CONTRACT DOCUMENTS A. The purpose of this project is to construct a new culinary water distribution system incorporating the existing individual system in different subdivisions, if applicable. The work shall include the development of a well, installation of new culinary water pipelines with connections as shown on the Plans. Additionally, the work shall include the construction of a storage tank, a well house, new appurtenances, fire hydrant, valve vault with electrically-actuated valve, and miscellaneous other appurtenances. 1.03 CONTRACT METHOD A. The work hereunder will be constructed under an itemized sum contract. B. CONTRACTOR shall include the General Conditions and Supplementary Conditions of the Contract as a part of all of its subcontract agreements. 1.04 WORK SEQUENCE A. The contract time for substantial and final completion is as indicated in the Agreement (Section 00521), and is on a calendar day basis commencing from the date of the Notice to Proceed. 1.05 CONTRACTOR USE OF PROJECT SITE A. CONTRACTOR shall be responsible for obtaining and securing a project site to serve as a construction yard. CONTRACTOR's use of the project site shall be limited to its construction operations, including on-site storage of materials, on-site fabrication facilities, and field offices. 06/2024 SUMMARY OF WORK SU1037E PAGE 01010 - 2 1.06 PROJECT SECURITY A. CONTRACTOR shall make all necessary provisions to protect the project and CONTRACTOR's facilities from fire, theft, and vandalism, and the public from unnecessary exposure to injury. 1.07 CHANGES IN THE WORK A. It is mutually understood that it is inherent in the nature of municipal construction that some changes in the plans and specifications may be necessary during the course of construction to adjust them to field conditions, and that it is of the essence of the Contract to recognize a normal and expected margin of change. The ENGINEER shall have the right to make such changes, from time to time, in the plans, in the character of the work, and in the scope of the project as may be necessary or desirable to ensure the completion of the work in the most satisfactory manner without invalidating the Contract. A change order for work to be changed shall be submitted to the ENGINEER for approval. CONTRACTOR shall be paid only for the work included in the change order by OWNER if approved. - END OF SECTION - 06/2024 ABBREVIATIONS SU1037E PAGE 01070 - 1 SECTION 01070 ABBREVIATIONS/DEFINITIONS PART 1 GENERAL 1.01 DESCRIPTION A. Wherever in these Specifications references are made to the standards, specifications, or other published data of the various national, regional, or local organizations, such organizations may be referred to by their acronym or abbreviation only. As a guide to the user of these specifications, the following acronyms or abbreviations which may appear in these specifications shall have the meanings indicated herein. 1.02 ABBREVIATIONS AND ACRONYMS AASHTO American Association of the State Highway and Transportation Officials ACI American Concrete Institute AGA American Gas Association AGC American General Contractors AI The Asphalt Institute AIA American Institute of Architects AISC American Institute of Steel Construction AISI American Iron and Steel Institute ANSI American Nation Standards Institute, Inc. APWA American Public Works Association ASCE American Society of Civil Engineers ASHRAE American Society of Heating, Refrigerating, and Air- Conditioning Engineers ASME American Society of Mechanical Engineers ASCE American Society of Civil Engineers ASOC American Society of Quality Control ASSE American Society of Sanitary Engineers ASTM American Society for Testing and Materials AWS American Welding Society AWWA American Water Works Association BBC Basic Building Code, Building Officials and Code Administrators International CEMA Conveyors Equipment Manufacturer's Association CGA Compressed Gas Association CIWCD Central Iron County Water Conservancy District CLFMI Chain Link Fence Manufacturer's Institute CMA Concrete Masonry Association CRSI Concrete Reinforcing Steel Institute DCS Design and Construction Standards DEQ Department of Environmental Quality 06/2024 ABBREVIATIONS SU1037E PAGE 01070 - 2 DWQ Department of Water Quality DWR Drinking Water Regulations EIA Electronic Industries Association ETC Electrical Test Laboratories ICBO International Conference of Building Officials IEEE Institute of Electrical and Electronics Engineers IES Illuminating Engineering Society IME Institute of Makers of Explosives ISA Instrument Society of America ISO International Organization of Standardization ITE Institute of Traffic Engineers MBMA Metal Building Manufacturer's Association NACE National Association of Corrosion Engineers NBS National Bureau of Standards NEC National Electrical Code NEMA National Electrical Manufacturer's Association NFPA National Fire Protection Association NFPA National Forest Products Association OSHA Occupational Safety and Health Administration PCA Portland Cement Association RWMA Resistance Welder Manufacturer's Association SAE Society of Automotive Engineers UDOT Utah Department of Transportation UBC Uniform Building Code UL Underwriters Laboratories, Inc. UPRR Union Pacific Railroad WCRSI Western Concrete Reinforcing Steel Institute WRI Wire Reinforcements Institute, Inc. WWPA Western Wood Products Association 1.03 DEFINITIONS CONTRACTOR The person or persons performing the construction work. CUSTOMER Individual/institutions requiring utility services such as power, water or sewer. DEVELOPER The contractor, property owner or agent as applicable. OWNER Central Iron County Water Conservancy District - END OF SECTION - 06/2024 REFERENCE STANDARDS SU1037E PAGE 01090 - 1 SECTION 01090 REFERENCE STANDARDS PART 1 GENERAL 1.01 GENERAL A. TITLES OF SECTIONS AND PARAGRAPHS. Captions accompanying Specifications sections and paragraphs are for convenience of reference only, and do not form a part of the Specification. B. APPLICABLE PUBLICATIONS. Whenever in these specifications references are made to published specifications, codes, standards, or other requirements, it shall be understood that wherever no date is specified, only the latest specifications, standards or requirements of the respective issuing agencies which have been published as of the date that the work is advertised for bids, shall apply; except to the extent that said standards or requirements may be in conflict with applicable laws, ordinances, or governing codes. No requirements set forth herein or shown on the drawings shall be waived because of any provision of, or omission from, said standards or requirements. C. SPECIALISTS, ASSIGNMENTS. In certain instances, specifications test requires (or implies) that specific work is to be assigned to specialists or expert entities, who must be engaged for the performance of that work. Such assignments shall be recognized as special requirements and shall not be interpreted so as to conflict with the enforcement of building codes and similar regulations governing the work; also they are not intended to interfere with local union jurisdiction settlements and similar conventions. Such assignments are intended to establish which party or entity involved in a specific unit of work is recognized as "expert" for the indicated construction processes or operations. Nevertheless, the final responsibility for fulfillment of the entire set of contract requirements remains with CONTRACTOR. 1.02 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS A. Without limiting the generality of other requirements of the specifications, all work specified herein shall conform to or exceed the requirements of all applicable codes and the applicable requirements of the following documents to the extent that the provisions of such documents are not in conflict with the requirements of these Specifications nor the applicable codes. B. Reference herein to "Building Code" or IBC shall mean the International Building Code of the International Conference of Building Officials (ICBO). The latest edition of the code as approved and used by the local agency as of the date of award, as adopted by the agency having jurisdiction, shall apply to the work herein, including all addenda, modifications, amendments, or other lawful changes thereto. C. In case of conflict between codes, reference standards, drawings and the other 06/2024 REFERENCE STANDARDS SU1037E PAGE 01090 - 2 Contract Document, the most stringent requirements shall govern. All conflicts shall be brought to the attention of the ENGINEER for clarification and directions prior to ordering or providing any materials or labor. CONTRACTOR shall bid the most stringent requirements. D. APPLICABLE STANDARD SPECIFICATIONS. CONTRACTOR shall construct the work specified herein in accordance with the requirements of the Contract Documents and the referenced portions of those referenced codes, standards, and specifications listed herein; except, that wherever references to "Standard Specifications" are made, the provisions therein for measurement and payment shall not apply. E. References in the Contract Documents to "Standard Specifications" shall mean the CICWCD Design and Construction Standards including all current supplements, addenda, and revisions thereof. F. References herein to "OSHA Regulations for Construction" shall mean Title 29, Part 1926, Construction Safety and Health Regulations, Code of Federal Regulations (OSHA), including all changes and amendments thereto. G. References herein to "OSHA Standards" shall mean Title 29, Part 1910, Occupational Safety and Health Standards, Code of Federal Regulations (OSHA), including changes and amendments thereto. H. UTAH STATE DIVISION OF DRINKING WATER. New source development (such as well) and installations shall conform to the requirements of the Utah Administrative Code, Rule R309-515. “Facility Design and Operation: Source Development.” I. UTAH STATE DIVISION OF DRINKING WATER. New wellhouse installations and existing wellhouse modifications shall conform to the requirements of the Utah Administrative Code, Rule R309-520. “Facility Design and Operation: Disinfection.” J. UTAH STATE DIVISION OF DRINKING WATER. New Transmission Pipeline and Distribution Pipeline installations and modifications shall conform to the requirements of the Utah Administrative Code, Rule R309-550. “Facility Design and Operation: Transmission and Distribution Pipelines.” K. UTAH STATE DIVISION OF DRINKING WATER. New Drinking Water Storage Tank installations and modifications shall conform to the requirements of the Utah Administrative Code, Rule R309-545. “Facility Design and Operation: Drinking Water Storage Tanks.” L. UTAH STATE DIVISION OF DRINKING WATER. New wellhouse installations and existing wellhouse modifications and installation shall conform to the requirements of the Utah Administrative Code, R309-540, “Facility, Design & Operation: Pump Stations”. 06/2024 REFERENCE STANDARDS SU1037E PAGE 01090 - 3 M. Reference herein to APWA shall mean the latest edition of the “Manual of Standard Specifications” and “Manual of Standard Plans” as prepared by the American Public Works Association and the Associated General Contractors of America. N. AMERICAN IRON AND STEEL REQUIREMENTS Project Construction materials and municipal castings are subject to American Iron and Steel Requirements as laid out in RUS Bulletin 1780-35. - END OF SECTION - 06/2024 PROJECT MEETINGS SU1037E PAGE 01210 - 1 SECTION 01210 PROJECT MEETINGS PART 1 GENERAL 1.01 PRECONSTRUCTION CONFERENCE A. Prior to the commencement of work at the site, a preconstruction conference will be held at a mutually agreed time and place which shall be attended by CONTRACTOR, its superintendent, and its subcontractors as appropriate. Other attendees will be: 1. ENGINEER and the Resident Project Representative (RPR). 2. Representatives of OWNER. 3. Governmental representatives as appropriate. 4. Others as requested by CONTRACTOR, OWNER, or ENGINEER. B. Unless previously submitted to ENGINEER, CONTRACTOR shall bring to the conference one copy of each of the following: 1. Progress schedule. 2. Procurement schedule of major equipment and materials and items requiring long lead time. 3. Shop Drawings/Sample/Substitute or "Or Accepted equal" submittal schedule. C. The purpose of the conference is to designate responsible personnel and establish a working relationship. Matters requiring coordination will be discussed and procedures for handling such matters established. The complete agenda will be furnished to CONTRACTOR prior to the meeting date, which may include the following: 1. CONTRACTOR's tentative schedules. 2. Transmittal, review, and distribution of CONTRACTOR's submittals. 3. Processing applications for payment. 4. Maintaining record documents. 5. Critical work sequencing. 6. Field decisions and Change Orders. 7. Use of project site, office and storage areas, security, housekeeping, and OWNER's needs. 8. Major equipment deliveries and priorities. 9. CONTRACTOR's assignments for safety and first aid. D. ENGINEER will preside at the preconstruction conference and will arrange for keeping the minutes and distributing the minutes to all persons in attendance. 06/2024 PROJECT MEETINGS SU1037E PAGE 01210 - 2 1.02 PROGRESS MEETINGS A. CONTRACTOR shall schedule and hold regular on-site progress meetings at least weekly and at other times as required by ENGINEER or as required by progress of the work. CONTRACTOR, ENGINEER, and all subcontractors active on the site shall be represented at each meeting. CONTRACTOR may at its discretion request attendance by representatives of its suppliers, manufacturers, and other subcontractors. B. ENGINEER shall preside at the meetings and provide for keeping and distribution of the minutes. The purpose of the meetings will be to review the progress of the work, maintain coordination of efforts, discuss changes in scheduling, and resolve other problems which may develop. C. At each construction progress meeting a progress report shall be presented by the CONTRACTOR containing an updated Progress Schedule. Where the delayed completion data of a project phase is noted, the Contractor shall describe the anticipated delays or problems and outline the action plan being taken to counter their effect. 1.03 MEASUREMENT AND PAYMENT A. Project Meetings shall not be measured or paid as a separate item but shall be included as part of the various items to which it relates. - END OF SECTION - 06/2024 CONTRACTOR SUBMITTALS SU1037E PAGE 01300 - 1 SECTION 01300 CONTRACTOR SUBMITTALS PART 1 GENERAL 1.01 SHOP DRAWING SUBMITTAL A. CONTRACTOR shall furnish to the ENGINEER for review, 4 copies of each shop drawing submittal. The term "Shop Drawings" as used herein shall be understood to include detail design calculations, shop drawings, fabrication and installation drawings, erection drawings, list, graphs, operating instructions, catalog sheets, data sheets, and similar items. Shop drawings and submittal requirements shall include interpretations of proposed or required configurations not shown on the drawings, so as a document record of such can be approved. B. Drawings shall be submitted sufficiently in advance to allow the ENGINEER not less than ten regular working days for examining the drawings. These drawings shall be accurate, distinct, and complete and shall contain all required information, including satisfactory identification of items and unit assemblies in relation to the contract drawings and/or specifications. C. When the shop drawings are approved by the ENGINEER, two sets of prints will be returned to CONTRACTOR marked "Approved", "Approved, Except as Noted", or similar notification. If changes or corrections are necessary, one set will be returned to CONTRACTOR with such changes or corrections, indicated by a brief statement, and CONTRACTOR shall correct and resubmit the drawings, in triplicate, when requested by the ENGINEER. D. Approval of shop drawing will not be required of reinforcing steel that is detailed by CONTRACTOR in accordance with the plans and specifications. Any change from the plans and specifications that is made by CONTRACTOR in reinforcing steel as well as any other change shall be approved by the ENGINEER in a written change order prior to any work being altered from that already approved for construction. E. Fabrication of an item may be commenced only after the ENGINEER has reviewed the pertinent submittals and returned copies to CONTRACTOR marked “No Exception Taken”, “Make Corrections Noted”, “Rejected” or “Revise and Resubmit”. Corrections indicated on submittals shall be considered as changes necessary to meet the requirements of the Contract Documents and shall not be taken as the basis of claims for extra work. F. All CONTRACTOR shop drawing submittals shall be carefully reviewed by an authorized representative of CONTRACTOR, prior to submission to the ENGINEER. 06/2024 CONTRACTOR SUBMITTALS SU1037E PAGE 01300 - 2 G. The ENGINEER's review of CONTRACTOR shop drawing submittals shall not relieve CONTRACTOR of the entire responsibility for the corrections of details and dimensions. CONTRACTOR shall assume all responsibility and risk for any misfits due to any errors in CONTRACTOR submittals. CONTRACTOR shall be responsible for dimensions and the design of adequate connections and details. 1.02 SAMPLES SUBMITTAL A. Whenever requested of the ENGINEER, CONTRACTOR shall submit at least one sample of each item or material to the ENGINEER for acceptance at no additional cost to OWNER. B. Samples, as required herein, shall be submitted for acceptance prior to ordering such material for delivery to the jobsite, and shall be submitted in an orderly sequence so that dependent materials or equipment can be assembled and reviewed without causing delay in the Work. C. Unless otherwise specified, all colors and textures of specified items will be selected by the ENGINEER from the manufacturer's standard colors and standard materials, products, or equipment lines. 1.03 OPERATIONS AND MAINTENANCE MANUAL SUBMITTAL A. The Contractor shall furnish to the Engineer 4 (four) identical sets of Operations and Maintenance Manuals. Each set shall consist of one or more volumes, each of which shall be bound in a standard size, 3-ring, loose-leaf, vinyl, hard-cover binder suitable for bookshelf storage. Binder ring size shall not exceed 2.5 inches. A Table of Contents shall be provided which indicates all equipment in the Operations and Maintenance Manuals. B. The Contractor shall include in the Operations and Maintenance Manuals full details for care and maintenance for all visible surfaces as well as the following for each item of mechanical, electrical, and instrumentation equipment (except for equipment furnished by the Owner): 1. Complete operating instructions, including location of controls, special tools or other equipment required, related instrumentation, and other equipment needed for operation. 2. Preventative maintenance procedures and schedules. 3. Complete parts lists, by generic title, identification number, and catalog number, complete with exploded views of each assembly. 4. Disassembly and reassembly instructions. 5. Name and location of nearest supplier and spare parts warehouse. 06/2024 CONTRACTOR SUBMITTALS SU1037E PAGE 01300 - 3 6. Name and location of manufacturer. 7. Recommended troubleshooting and start-up procedures. 8. Prints of the record drawings, including diagrams and schematics, as required under the electrical and instrumentation portions of these specifications. C. All Operations and Maintenance Manuals shall be submitted in final form to the Engineer not later than the 75 percent of construction completion date. All discrepancies found by the Engineer in the Operations and Maintenance Manuals shall be corrected by the Contractor prior to final acceptance of the project. 1.04 PROGRESS SCHEDULE SUBMITTAL A. The CONTRACTOR shall prepare a project progress schedule using the Critical Path Method, and meeting the following requirements: 1. Minimum Sheet Size: as required to show appropriate level of detail. 2. Show complete sequence of construction by activity, with dates for beginning and completion of each element of construction. 3. Provide separate schedule of submittal dates for shop drawings, product data, and samples. 4. Submit revised Progress Schedule with each Application for Payment. 1.05 MEASUREMENT AND PAYMENT A. Contractor submittals shall not be measured or paid as a separate item but shall be included as part of the various items to which they relate. - END OF SECTION - 06/2024 TESTING AGENCY SERVICES SU1037E PAGE 01410 - 1 SECTION 01410 TESTING AGENCY SERVICES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall be responsible for providing Construction Quality Control Testing of all soils, concrete, etc. as required by the various sections of these specifications. This section includes the following: 1. Use of independent testing agency. 2. Control testing report submittal requirements. 3. Responsibilities of testing agency. 1.02 REFERENCES A. ASTM D 3740: Standard Recommended Practice for Evaluation of Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction. B. ASTM D 4561: Standard Practice for Quality Control Systems for an Inspection and Testing Agency for Bituminous Paving Materials. C. ASTM E 329: Standard Recommended Practice for Inspection and Testing Agencies for Concrete, Steel, and Bituminous Materials as Used in Construction. 1.03 DEFINITIONS A. Independent Testing Agency: A testing agency NOT owned by CONTRACTOR, and an agency that does not have any preferential affiliation or association with CONTRACTOR, or any of CONTRACTOR’s Subcontractors and Suppliers other than entering into a contract with CONTRACTOR to perform the duties defined in these specifications. B. Professional Engineer: An engineer who complies with Utah licensing law and is acceptable to the authority having jurisdiction. 1.04 QUALITY ASSURANCE A. CONTRACTOR shall employ and pay for services of an independent testing agency which complies with ASTM D 3740, ASTM D 4561, and ASTM E 329 to test materials for contract compliance. B. Concrete Technician: Approved by ENGINEER or ACI certified. 06/2024 TESTING AGENCY SERVICES SU1037E PAGE 01410 - 2 1.05 TESTING AGENCY SUBMITTALS A. Field Test Report: Submit report no later than the end of the current day. B. Laboratory Test Report: Submit original report within 48 hours after test results are determined. C. Final Summary Report: Submit prior to final payment. D. On all reports include: 1. Project title, number and date of the report. 2. Date, time and location of test 3. Name and address of material Supplier. 4. Identification of product being tested and type of test performed. 5. Identify whether test is initial test or retest. 6. Results of testing and interpretation of results. 7. Name of technician who performed the testing. 1.06 RESPONSIBILITIES OF TESTING AGENCY A. Calibrate testing equipment at least annually with devices of an accuracy traceable to either National Bureau of Standards or acceptable values of natural physical constraints. B. Provide sufficient personnel at site and cooperate with CONTRACTOR, ENGINEER and OWNER’s Representative in performance of testing service. C. Secure samples using procedures specified in the applicable testing code. D. Perform testing of products in accordance with applicable sections of the Contract Documents. E. Immediately report any compliance or noncompliance of materials and mixes to CONTRACTOR, ENGINEER and OWNER’s Representative. F. When an out-of-tolerance condition exists, perform additional inspections and testing until the specified tolerance is attained, and identify retesting on test reports. 1.07 LIMITS ON TESTING AGENCY AUTHORITY A. Agency may not release, revoke, alter, or enlarge on requirements of Contract Documents. B. Agency may not suspend Work. C. Agency possesses the authority to accept Work for OWNER. - END OF SECTION - 06/2024 QUALITY CONTROL & MATERIALS TESTING SU1037E PAGE 01440 - 1 SECTION 01440 QUALITY CONTROL & MATERIALS TESTING PART 1 GENERAL 1.01 SECTION INCLUDES A. Responsibilities for controlling quality of materials, products and workmanship. B. Responsibilities for manufacturer’s instructions, certificates and field service. 1.02 MATERIALS A. All materials incorporated in the project shall be new and shall fully comply with the specifications. Unless otherwise clearly provided in the specifications, all workmanship, equipment, materials, and articles incorporated in the work covered by the contract are to be of the best available grade of their respective kinds. Whenever in the specifications, any material, article, device, product, fixture, form, type of construction, or process indicated or specified by patent or proprietary name, by name of manufacturer, or by catalog number, such specifications shall be deemed to be used for the purpose of establishing a standard of quality and facilitating the description of the material or process desired and shall be deemed to be followed by the words "or accepted equal" and CONTRACTOR may in such case, upon receiving the ENGINEER's approval, purchase and use any item, type, or process which shall be substantially equal in every respect to that indicated or specified. B. Materials and equipment may be used in the Work based upon receipt of a Supplier’s certificate of compliance. Certificate must be in possession of CONTRACTOR and reviewed by ENGINEER prior to use. C. Quality Assurance Testing by the OWNER and/or ENGINEER shall not relieve CONTRACTOR of responsibility to furnish materials and work in full compliance with Contract Documents. 1.03 MANUFACTURER’S INSTRUCTIONS A. Should instructions conflict with Contract Documents, request clarification before proceeding. B. When required in individual sections, submit manufacturer’s instructions in the quantity required for product data, delivery, handling, storage, assembly, installation, start-up, adjusting, balancing, and finishing, as appropriate. 06/2024 QUALITY CONTROL & MATERIALS TESTING SU1037E PAGE 01440 - 2 1.04 MANUFACTURER’S CERTIFICATES A. When required in individual sections, submit manufacturer’s certificate in duplicate executed by responsible officer certifying that product meets or exceeds specified requirements. 1.05 MANUFACTURER’S FIELD SERVICES A. When required in individual sections, have manufacturer or Supplier provide qualified representative to observe field conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust, and balance of equipment as applicable and to make written report of observations and recommendations to ENGINEER. 1.06 WORKMANSHIP A. Maintain performance control and supervision over Subcontractors, Suppliers, manufacturer’s, products, services, workmanship, and site conditions, to produce work in accordance with Contract Documents. B. Comply with industry standards except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship. C. Provide suitable qualified personnel to produce specified quality. D. Ensure finishes match approved samples. 1.07 INSPECTION OF MATERIALS A. At the option of the ENGINEER, materials to be supplied under this contract will be tested and/or inspected either at their place of origin or at the site of the work. CONTRACTOR shall give the ENGINEER written notification well in advance of actual readiness of materials to be tested and/or inspected at point of origin. Satisfactory tests and inspections at the point of origin shall not be construed as a final acceptance of the material nor shall it preclude retesting or re-inspection at the site of the work. B. CONTRACTOR shall furnish such samples of materials as are requested by the ENGINEER, without charge. No material shall be used until it has been approved by the ENGINEER. See Section 01300, CONTRACTOR’s Submittal. 1.08 UNSATISFACTORY CONDITIONS A. Examine areas and conditions under which materials and products are to be installed. Do not proceed with work until unsatisfactory conditions have been corrected in a manner acceptable to installer. 06/2024 QUALITY CONTROL & MATERIALS TESTING SU1037E PAGE 01440 - 3 1.09 QUALITY CONTROL TESTING A. ENGINEER’s failure to detect any defective Work or materials does not prevent later rejection when such defect is discovered nor does it obligate ENGINEER for acceptance. B. CONTRACTOR shall provide 24-hours minimum notice to ENGINEER for all testing required by these specifications. 1.10 TESTING ACCEPTANCE AND FREQUENCY A. Minimum Quality Control Testing Frequency: As defined in Table 01440-1. The CONTRACTOR shall be responsible to ensure that testing is performed at the frequencies shown. CONTRACTOR shall uncover any work at no cost to OWNER to allow OWNER to perform required testing at the frequencies shown. B. Acceptance of Defective Work: As defined in Article 9.6 of the General Conditions. 1.11 MEASUREMENT AND PAYMENT A. Quality Control and Materials Testing required in Table 01440-1, is the responsibility of the CONTRACTOR. 06/2024 QUALITY CONTROL & MATERIALS TESTING SU1037E PAGE 01440 - 4 TABLE 01440-1: QUALITY CONTROL TESTING FREQUENCY SYSTEM or MATERIAL TESTS MINIMUM REQUIRED FREQUENCY SUBGRADE AND BACKFILL MATERIALS Field Density *1 test per 300 linear feet per 1.5 feet of backfill thickness placed. Section 02221 Excavation and Backfill for Buried Pipelines Laboratory 1 test for each material type which includes proctor, classification and gradation. Field Density *1 test per 300 linear feet per 1.5 feet of backfill thickness placed. Section 02222 Excavation and Backfill for Structures Laboratory 1 test for each material type which includes proctor, classification and gradation. ASPHALT Mix Design Marshall Test Method: 1 test initially per each type of material and each change in target, and for each day of production thereafter. Specific Gravity: 1 per each Marshall Test Extraction: 1 test per each Marshall Test Field Density *Bituminous surfaces: 1 test per 8,000 square feet placed or part thereof. Section 02500 Removal and Replacement of Surface Improvements Asphalt Thickness and Core Density Bituminous surfaces: 1 test sample every 300 linear feet of completed roadway. 06/2024 QUALITY CONTROL & MATERIALS TESTING SU1037E PAGE 01440 - 5 PORTLAND CEMENT CONCRETE Slump 1 test every day of placement or 1 test for every 50 cubic yards and more frequently if batching appears inconsistent. Conduct with strength tests. Entrained air 1 test with slump test. Ambient and concrete tem- peratures 1 test with slump test. Water cement ratio.to be verified and provided with batch tickets. Section 03300 Cast-in-Place Concrete Compressive strength 1 set of 4 cylinders every 50 c.y. or part thereof per day. NOTES: 1 Additional tests shall be conducted when variations occur due to the contractor's operations, weather conditions, site conditions, etc. 2 Classification, moisture content, Atterberg limits and specific gravity tests shall be conducted for each compaction test if applicable. 3 Tests can substitute for same tests required under "Aggregates" (from bins or source), although gradations will be required when blending aggregates. 4 Aggregate moisture tests are to be conducted in conjunction with concrete strength tests for water/cement calculations. 5. * All nuclear density meters used for in place field testing shall have been calibrated by ASTM methods within 1 year previous to current testing. DIVISION 2 SITEWORK 06/2024 CLEARING, GRUBBING AND STRIPPING SU1037E PAGE 02110 - 1 SECTION 02110 CLEARING, GRUBBING AND STRIPPING PART 1 GENERAL 1.01 SUMMARY A. This work shall consist of removing and disposing of all trees; shrubs; brush; stumps; windfalls; roots; and other vegetation, including dead and decayed matter; and debris that exist within the designated construction limits, borrow areas, and soil stockpile areas and which are not specifically designated to remain. 1.02 DEFINITIONS A. Clearing: Clearing operations shall consist of cutting, removing and disposing of trees, shrubs, bushes, windfalls and other vegetation within the construction limits, borrow areas, soil stockpile areas of Well site. All brush shall be cut off within six inches of the ground surface. All existing piles of vegetative debris will also be disposed of. B. Grubbing: Grubbing operations shall consist of removing and disposing of stumps, roots, debris deleterious materials, and other remains (such as organic and metallic materials) which if left in place would interfere with proper performance or completion of the contemplated work, would impair its subsequent use or form obstructions therein. Organic material from clearing or grubbing operations shall not be incorporated in fill or backfill. C. Stripping: Stripping operations shall consist of removing all soil material containing sod, grass, or other vegetation and topsoil to a minimum depth of six (6) inches from all areas that will receive fill or over all trenches in field or yard areas. 1.03 MEASUREMENT AND PAYMENT A. Measurement and payment for cleaning, grubbing and stripping shall not be paid as a unit item, but considered as included in the contract unit or lump sum prices for the various items of the contract to which it relates. 2 PRODUCTS (not applicable) 3 EXECUTION 3.01 CLEARING A. All trees, stumps, shrubs, bushes, windfalls and other vegetation (except such trees and vegetation as may be indicated or directed by the ENGINEER to be left standing) shall be cut off to within six inches of the ground surface and shall be removed from the construction limits. Trees and vegetation to be left standing shall 06/2024 CLEARING, GRUBBING AND STRIPPING SU1037E PAGE 02110 - 2 be protected from damage incident to clearing, grubbing, and construction operations by such means as the circumstances require. 3.02 GRUBBING A. All stumps, roots, debris, deleterious and other organic or metallic materials not suitable for foundations shall be removed completely from the construction limits, borrow areas and soil stockpile areas. Unless otherwise permitted by the ENGINEER, stumps shall be removed completely. If any stumps are permitted to remain, they shall be cut off not more than six inches above the ground. 3.03 STRIPPING A. Soil material containing sod, grass, or other vegetation and topsoil shall be removed to a minimum depth of six (6) inches from all areas to receive fill, from the area within lines 5 feet outside all foundation walls, over all trenches, and from beneath pavement and curb and gutter areas. The stripped material shall be deposited in such locations as are acceptable to the ENGINEER. Topsoil shall be placed over designated areas to be landscaped, and over all trench areas (outside of paved areas). B. All areas to be reseeded will have a minimum of 3 inches of topsoil. 3.04 DISPOSAL A. No open burning of combustible materials will be allowed. B. All trees, timber, stumps, roots, debris, shrubs, bushes, and other vegetation removed during the clearing and grubbing operations shall be removed from the project site and disposed of by CONTRACTOR subject to specific regulations imposed by laws and ordinances and in a manner, that will not create a public nuisance nor result in unsightly conditions. CONTRACTOR shall assume full responsibility for acceptable disposition of the material as well as for any damages resulting from his disposal operations. - END OF SECTION - 06/2024 EXCAVATION AND BACKFILL FOR BURIED PIPELINES SU1037E PAGE 02221 - 1 SECTION 02221 EXCAVATION AND BACKFILL FOR BURIED PIPELINES PART 1 GENERAL 1.01 DESCRIPTION A. This item shall consist of excavating all pipeline trenches to the lines and grades indicated directed by the Engineer in the field, and the backfilling of all pipeline trenches. Excavation shall include the removal of all materials of whatever nature encountered to the depths shown on the Drawings, or as modified in the Field by the Engineer. 1.02 REFERENCES A. The latest edition of the following publications form a part of this specification to the extent referred. The publications are referred to in the text by basic designation only. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO) AASHTO T 88- Particle Size Analysis of Soils AASHTO T 180- Moisture-Density Relations of Soils Using a 10-lb. (4.54 kg) Rammer and an 18-in (457 mm) Drop AASHTO T 191- Density of Soil In-Place by the Sand-Cone Method AASHTO T 205- Density of Soil In-Place by the Rubber-Balloon Method AASHTO T 238- Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth) AASHTO T 239- Moisture Content of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth) AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM D 422- Particle-Size Analysis of Soils ASTM D 698- Test Method of Moisture-Density Relations of Soils and Soil- Aggregate Mixtures Using 5.5 lb. (2.5-kg) Rammer and 12-in. (305- mm) Drop ASTM D 1556- Density of Soil in Place by the Sand-Cone method ASTM D 1557- Moisture-Density Relations of Soils and Soil-Aggregate Mixtures Using 10-lb (4.54-kg) Rammer and 18-in. (457-mm) Drop ASTM D 2487- Classification of Soils for Engineering Purposes ASTM D 2922- Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth) ASTM D 3017- Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth) 06/2024 EXCAVATION AND BACKFILL FOR BURIED PIPELINES SU1037E PAGE 02221 - 2 1.03 SITE CONDITIONS A. WEATHER SOFTENED SUBGRADE: CONTRACTOR shall remove and replace soft subgrade materials resulting from adverse weather conditions. B. PROTECTION OF GRADED AREAS: CONTRACTOR shall protect all graded areas from traffic and erosion and shall keep these areas free of trash and debris. Work required to repair and reestablish grades in settled, eroded, and rutted areas shall be completed to specified tolerances at CONTRACTOR’s expense. C. RECONDITIONING COMPACTED AREAS: All areas compacted to required specifications that become disturbed by subsequent construction operations or weather conditions shall be scarified, moisture conditioned and re-compacted to the required density prior to further construction. PART 2 PRODUCTS 2.01 PIPE BACKFILL A. Pipe Zone Backfill shall consist of the bedding material schedule shown in Table 2.01 (A) below. All backfill material shall be free of frozen material, organic material, and debris. Table 2.01 (A) Backfill Materials PERCENT PASSING FOR: SIEVE SIZE FOUNDATION MATERIAL* BEDDING MATERIAL PIPE ZONE MATERIAL FINAL BACKFILL MATERIAL 2 inch 100 ------ 3/4 inch 0 – 50 ---100 No. 4 0 – 10 100 40 - 70 No. 50 0 – 5 ---20 - 50 No. 200 0 – 3 0 - 15 5 - 30 Native material which contains no sod, vegeta- tion, rocks larger than 2" in diameter, asphalt or concrete chunks, etc. B. Trench backfill above the pipe zone shall be Import Granular Backfill Borrow meeting the requirements of APWA Section 02055 for Granular Backfill Borrow. No backfill material in the remainder of the trench shall have rocks larger than 2-inches in diameter. All backfill material shall be free of frozen material, organic material and debris. 06/2024 EXCAVATION AND BACKFILL FOR BURIED PIPELINES SU1037E PAGE 02221 - 3 C. Within State Roadways, backfill placed above 12" over the top of the pipe shall be controlled low strength material (CLSM)/(flowable fill) as required by UDOT. PART 3 EXECUTION 3.01 EXCAVATION A. Excavation shall be performed to the lines and grades indicated. Excavated material not required or not satisfactory for backfill shall be removed from the site. B. Blasting will not be allowed except by written permit from the Washington County Fire Chief. If the permit is granted, the CONTRACTOR shall comply with all laws, ordinances, and applicable safety code requirements and regulations relative to the handling, storage, and use of explosives and protection of life and property. The CONTRACTOR shall comply with the provisions outlined in the U.S. Bureau of Mines Bulletin No. 656 "Blasting Vibrations and their Effects on Structures", and other applicable ordinances as specified by the Fire Chief. C. The CONTRACTOR shall be fully responsible for all damage attributable to such blasting operations. Excessive blasting or overshooting will not be permitted and any material outside the authorized cross-section which may be shattered or loosened by blasting shall be removed and properly replaced. D. Pipe will be carefully inspected in the field by Inspectors before and after laying. If any cause for rejection is discovered in a pipe after it has been laid, it shall be removed and replaced by the CONTRACTOR. E. When connections are to be made to any existing pipe, conduit, or other appurtenances, the actual elevation or position of which cannot be determined without excavation, the CONTRACTOR shall excavate for, and expose the existing improvement before laying any pipe or conduit. The Resident Project Representative shall be given the opportunity to inspect the existing pipe or conduit before the connection is made. Any adjustments in line or grade which may be necessary to accomplish the intent of the plans will be made. F. Pipe shall be laid up grade with the socket or collar ends of the pipe up grade unless otherwise authorized by the Water Department and/or Engineer. 3.02 SAFETY A. Excavations shall be sloped or otherwise supported in a safe manner in accordance with applicable State safety requirements and the requirements of OSHA Safety and Health Standards for Construction (29 CFR1926). The CONTRACTOR is responsible for assessing safety needs to meet such requirements, arranging for proper equipment and/or construction methods, and maintaining such equipment, methods and construction practices so as to fully comply with all such safety requirements. 06/2024 EXCAVATION AND BACKFILL FOR BURIED PIPELINES SU1037E PAGE 02221 - 4 B. The CONTRACTOR is responsible for assessing safety needs related to confined space entry, as defined by OSHA. The CONTRACTOR shall meet all such requirements, arranging for proper equipment and/or construction methods, and maintaining such equipment, methods and construction practices so as to fully comply with all confined space safety requirements. 3.03 TRENCH WIDTH A. The bottom of the trench shall have a minimum width equal to two (2) times the outside diameter of the pipe. B. The width of the trench shall be ample to permit the pipe to be laid and jointed properly, and the backfill to be placed as specified. Trenches shall be of such extra width, when required, as will permit the convenient placing of timber supports, sheeting, and bracing, and the handling of special units as necessary. See standard drawing sheet number DT-02 for trench detail. 3.04 TRENCH PREPARATION A. Each trench shall be excavated so that the pipe can be laid to the alignment and grade as required. All excavations shall be sheeted, braced, and shored as required to protect the workers and existing utilities and improvements from sliding, sloughing or settling of the trench walls while the work is in progress. All such sheeting, bracing and shoring shall comply with the requirements of the Utah State Industrial Commission. All damage resulting from lack of adequate sheeting, bracing and shoring shall be the responsibility of the CONTRACTOR, and the CONTRACTOR shall affect all necessary repairs or reconstruction resulting from such damage. All trenches shall be drained so the pipe laying may take place in dewatered conditions. B. The trench bottom shall be given a final trim using a string line, laser, or another method approved by the Engineer for establishing grade, such that each pipe section when first laid will be continually in contact with the ground along the extreme bottom of the pipe. Bell holes shall be provided at each joint to permit the jointing to be made properly. The trench grade shall permit the pipe spigot to be accurately centered in the preceding-laid pipe joint, without lifting the pipe above the grade, and without exceeding the permissible joint deflection. C. Pipe shall be bedded a minimum of 6-inches with sand or gravel meeting the bedding requirements. In unstable ground areas, where the native soils are unsuitable for the type of pipe being installed or as directed by the Engineer, an additional 12-inches of free draining gravel shall be required beneath the 6-inches of bedding material. 3.05 REMOVAL OF WATER A. CONTRACTOR shall provide and maintain at all times ample means and devices with which to remove promptly and to properly dispose of all water entering the trench excavation. 06/2024 EXCAVATION AND BACKFILL FOR BURIED PIPELINES SU1037E PAGE 02221 - 5 B. CONTRACTOR shall obtain all necessary permits required for discharge of water. C. Water shall be disposed of in a suitable manner without damage to adjacent property or without being a menace to public health and convenience. No water shall be drained into work built or under construction without prior consent of the Engineer. D. Dewatering shall be accomplished by well points, sumping, or any other acceptable method which will ensure a dewatered trench. Any dewatering method shall be subject to the approval of the Engineer. 3.06 PIPELINE TRENCH BACKFILL A. Pipeline trenches shall be backfilled to a level 12-inches above the top of the pipe with Import Select Fill material as specified in paragraph 2.01. Such material shall be compacted to 90% minimum Modified Proctor density (ASTM D-1557) in six inch maximum lifts. See standard drawing sheet W-04 for trench detail. B. After the pipe has been installed and approved and the initial portion of backfill has been placed as specified above, backfilling of the remainder of the trench may proceed. All backfill above the protected pipe shall be carefully placed and compacted. Compaction shall be by mechanical tamping in 12-inch maximum lifts. All backfill material shall be free of frozen material, organic material, and debris. Backfill placed above 12-inches over the pipe in improved areas, and additional areas as designated on the drawings, shall be compacted to 90% minimum Modified Proctor density (ASTM D-1557). C. Backfill requirements for piping beneath the well pump house shall comply with the more stringent of the requirements designated in this Section (02221) and those designated in Section 02222 - Excavation and Backfill for Structures. 3.07 MAINTENANCE OF BACKFILL A. All backfill shall be maintained in satisfactory condition, and all places showing signs of settlement shall be filled and maintained during the life of the contract and for a period of one year following the day of final acceptance of all work performed under the contract. When CONTRACTOR is notified by the Engineer that any backfill is hazardous, CONTRACTOR shall correct such hazardous condition at once. Any utility, road and/or parking surfacing damage by such settlement shall be repair by CONTRACTOR to the satisfaction of the Engineer. In addition, CONTRACTOR shall be responsible for the cost of all claims for damage filed with the Court, actions brought against the for, and on account of, such damage. 3.08 FINISH GRADING, CLEANUP A. CONTRACTOR shall grade the trench line to a smooth grade to effect a neat and workmanlike appearance of the trench line. 06/2024 EXCAVATION AND BACKFILL FOR BURIED PIPELINES SU1037E PAGE 02221 - 6 B. All tools, equipment and temporary structures shall be removed. All excess dirt and rubbish shall be removed from the site by CONTRACTOR. C. CONTRACTOR shall restore the site to at least as good as original condition, including but not limited to final trench grade, native vegetation and restoration of affected public and private facilities whether in the public right of way or on private property. Any exception to this requirement must be in writing from the Engineer for the job specific conditions. See standard drawing sheet W-08 for trench detail. 3.09 COMPACTION TESTS A. Compaction Quality Control Testing shall be scheduled a minimum of 24 hours (or as otherwise specified) notice must be given to with the . B. It shall be the responsibility of the CONTRACTOR to accomplish the specified compaction for backfill, fill, and other earthwork. It shall be the responsibility of the CONTRACTOR to control his operations by performing any additional tests necessary to verify and confirm that CONTRACTOR has complied, and is complying at all times, with the requirements of these Specifications concerning compaction, control, and testing. 1. Testing of Backfill Materials a. Characteristics of backfill materials shall be determined in accordance with the requirements of paragraph 2.01. b. The CONTRACTOR shall demonstrate the adequacy of compaction equipment and procedures before exceeding 200 linear feet of trench backfill. c. Until the specified degree of compaction on the previously specified amounts of earthwork is achieved, no additional earthwork of the same kind shall be performed. d. After satisfactory conclusion of the initial compaction demonstration and at any time during construction, earthwork which does not comply with the specified degree of compaction shall not exceed the previously specified quantities. e. Periodic compliance tests may be made by the Engineer to verify that compaction is meeting the requirements previously specified at no cost to the CONTRACTOR. The Engineer may require retesting of backfill that has settled from water penetration in the trench. CONTRACTOR shall remove the overburden above the level at which the Engineer wishes to test and shall backfill and re-compact the excavation after the test is complete at no additional cost. 06/2024 EXCAVATION AND BACKFILL FOR BURIED PIPELINES SU1037E PAGE 02221 - 7 f. If compaction fails to meet the specified requirements, the CONTRACTOR shall remove and replace the backfill at proper density or shall bring the density up to specified level by other means acceptable to the Engineer. Subsequent tests required to confirm and verify that the reconstructed backfill has been brought up to specified density shall be paid by the CONTRACTOR. The CONTRACTOR's confirmation tests shall be performed in a manner acceptable to the Engineer. Frequency of confirmation tests for remedial work shall be double that amount specified for initial confirmation tests. - END OF SECTION - 06/2024 EXCAVATION AND BACKFILL FOR STRUCTURES SU1037E PAGE 02222 - 1 SECTION 02222 EXCAVATION AND BACKFILL FOR STRUCTURES PART 1 GENERAL 1.01 DESCRIPTION A. This section covers excavating, backfilling and compacting for structures as directed by ENGINEER. 1.02 REFERENCES A. The latest edition of the following publications form a part of these specifications to the extent referred. The publications are referred to in the text by basic designation only. AASHTO T 88- Particle Size Analysis of Soils AASHTO T 180- Moisture-Density Relations of Soils Using a 10-lb. (4.54 kg) Rammer and an 18-in (457 mm) Drop AASHTO T 191- Density of Soil In-Place by the Sand-Cone Method AASHTO T 205- Density of Soil In-Place by the Rubber-Balloon Method AASHTO T 238- Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth) AASHTO T 239- Moisture Content of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth) AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM D 422- Particle-Size Analysis of Soils ASTM D 698- Test Method of Moisture-Density Relations of Soils and Soil- Aggregate Mixtures Using 5.5 lb. (2.5-kg) Rammer and 12-in. (305-mm) Drop ASTM D 1556- Density of Soil in Place by the Sand-Cone method ASTM D 1557- Moisture-Density Relations of Soils and Soil-Aggregate Mixtures Using 10-lb (4.54-kg) Rammer and 18-in. (457-mm) Drop ASTM D 2487- Classification of Soils for ENGINEERING Purposes ASTM D 2922- Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth) ASTM D 3017- Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth) 1.03 SUBMITTALS A. If requested by the ENGINEER, the CONTRACTOR shall furnish a certified test result from an approved laboratory showing that the free draining gravel material and granular backfill material conforms to the Specification requirements of the Owner. 06/2024 EXCAVATION AND BACKFILL FOR STRUCTURES SU1037E PAGE 02222 - 2 B. The following shall be submitted: 1. Copies of Field Density Test reports shall be submitted to the ENGINEER at the beginning of each work day for the previous day’s testing of subgrades, gravel and structural fill. 1.01 MEASUREMENT AND PAYMENT A. Excavation and Backfill for Structures shall not be measured or paid as a separate item but shall be included as part of the various items to which it relates and according to Section 1025 – Measurement and Payment. PART 2 PRODUCTS 2.01 WALL BACKFILL A. Wall backfill material shall be free from frozen lumps, rocks larger than 4 inches in the largest dimension, roots, trash, lumber and organic material. 2.02 STRUCTURAL FILL A. Structural fill material placed below foundations shall be non-expansive granular soil with less than 15 percent passing the No. 200 sieve, a maximum size of not greater than 2-inches, and a liquid limit of less than 30 percent. B. Fill to support the floor slab shall be well-graded, structural fill consisting of non- expansive granular soil with less than 15 percent passing the No. 200 sieve and a maximum size of not greater than 2-inches. A 6-inch thick layer of free draining gravel (less than 5 percent passing the No. 200 sieve and a maximum size of not greater than 2-inches) shall be placed below the floor slab for the Pump House. PART 3 EXECUTION 3.01 EXCAVATION A. Excavation shall be performed to the lines and grades indicated. Excavated material not required or not satisfactory for backfill shall be removed from the site. 3.02 BACKFILL A. Backfill and structural fill material shall not be placed against concrete structure that have not been properly cured B. Backfill and structural fill material shall be placed in no more than 6-inch loose lifts. C. Structural fill placed beneath footings and the floor slab shall be placed and compacted to at least 95 percent of maximum dry density at a moisture content within 2 percent of optimum moisture content in accordance with ASTM D-1557. 06/2024 EXCAVATION AND BACKFILL FOR STRUCTURES SU1037E PAGE 02222 - 3 D. All other backfill material shall be placed and compacted to at least 90 percent of maximum dry density at a moisture content within 2 percent of optimum moisture content in accordance with ASTM D-1557. E. Where the moisture content is not suitable and/or sufficient compaction has not been obtained, the fill shall be reconditioned to an approved moisture content and recompacted to the minimum required compaction prior to placing any additional fill material. F. Unless otherwise specified, the developed/contractor shall be responsible for arranging for the placing and compacting of approved fill material in accordance with these Specifications. If the Testing Agency should determine that the CONTRACTOR is failing to meet the minimum requirements, the CONTRACTOR shall stop operations and make adjustments as necessary to produce a satisfactorily compacted. G. Sufficient personnel, equipment, sumps or other means should be provided to maintain the site in an acceptable dry condition for the duration of this contract. H. Excavations shall be so braced and supported as needed to prevent the ground, adjacent to the excavation, from sliding or settling. 3.03 REMOVAL OF WATER A. The CONTRACTOR shall provide and maintain at all times ample means and devices with which to remove promptly and to properly dispose of all water entering the trench excavation. B. Water shall be disposed of in a suitable manner without damaging the adjacent property or without being a menace to public health and convenience. No water shall be drained into work built or under construction without prior consent of the ENGINEER. C. Dewatering shall be accomplished by well points, sumping, or any other acceptable method which will insure a dewatered trench. Any dewatering method shall be subject to the approval of the ENGINEER. D. CONTRACTOR shall obtain all necessary permits required for discharge of water. 3.04 FINISHED GRADE A. The finished subgrade and grade of the fill shall not vary more than 0.05 feet from the established grades and cross-sections shown on the Drawings. 06/2024 EXCAVATION AND BACKFILL FOR STRUCTURES SU1037E PAGE 02222 - 4 3.05 COMPACTION TESTS A. Compaction Quality Control Testing shall be provided and paid for by the CONTRACTOR. A minimum of 24 hours (or as otherwise specified) notice must be given to schedule all tests. B. It shall be the responsibility of the CONTRACTOR to accomplish the specified compaction for backfill, structural fill, and other earthwork. It shall be the responsibility of the CONTRACTOR to control his operations by performing any additional tests necessary to verify and confirm that CONTRACTOR has complied, and is complying at all times, with the requirements of these Specifications concerning compaction, control, and testing. 1. Testing of Backfill Materials a. Characteristics of backfill materials shall be determined. b. The CONTRACTOR shall demonstrate the adequacy of compaction equipment and procedures before exceeding any of the following amounts of earthwork quantities: (1) One (1) test per 1.5 feet of backfill thickness placed per structure. c. Until the specified degree of compaction on the previously specified amounts of earthwork is achieved, no additional earthwork of the same kind shall be performed. d. After satisfactory conclusion of the initial compaction demonstration and at any time during construction, earthwork which does not comply with the specified degree of compaction shall not exceed the previously specified quantities. e. Periodic compliance tests may be made by the ENGINEER to verify that compaction is meeting the requirements previously specified at no cost to the CONTRACTOR. The ENGINEER may require retesting of backfill (by CONTRACTOR’s Testing Agency) that has settled from water penetration in the trench. CONTRACTOR shall remove the overburden above the level at which the ENGINEER wishes to test and shall backfill and re-compact the excavation after the test is complete at no additional cost. f. If compaction fails to meet the specified requirements, the CONTRACTOR shall remove and replace the backfill at proper density or shall bring the density up to specified level by other means acceptable to the ENGINEER. Subsequent tests required to confirm and verify that the reconstructed backfill has been brought up to specified density shall be paid by the CONTRACTOR. The CONTRACTOR's confirmation tests shall be performed in a manner acceptable to the ENGINEER. 06/2024 EXCAVATION AND BACKFILL FOR STRUCTURES SU1037E PAGE 02222 - 5 Frequency of confirmation tests for remedial work shall be double that amount specified for initial confirmation tests. C. Field density tests shall be made in accordance with ASTM D-1557. - END OF SECTION - DIVISION 15 PIPE, FITTINGS, AND MECHANICAL APPURTENANCES 06/2024 DUCTILE IRON PIPE SU1037E PAGE 15062 - 1 SECTION 15062 DUCTILE IRON PIPE PART 1 GENERAL 1.01 DESCRIPTION A. CONTRACTOR shall furnish and install all pipe, fittings, closure pieces, supports, bolts, nuts, gaskets, jointing material and appurtenances as shown and specified, and as required for a complete and workable piping system. 1.02 RELATED WORK A. Related work specified in other sections: Section 02221 - Excavation and Backfill for Pipelines Section 02222 - Excavation and Backfill for Structures Section 03300 - Cast-In-Place Concrete Section 15100 - Mechanical Appurtenances 1.03 REFERENCES A. Work covered by this Specification shall meet or exceed the provisions of the latest editions of the following Codes and Standards in effect at the time of award of the Contract: AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) ANSI B16.1 (1975) Cast-Iron Pipe Flanges and Flanged Fittings Class 25, 125, 250 and 800 AMERICAN WATER WORKS ASSOCIATION (AWWA) AWWA C 104 Standard for Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water AWWA C 105 Standard for Polyethylene Encasement for Ductile- Iron Piping for Water and Other Liquids AWWA C 110 Standards for Ductile-Iron and Gray-Iron Fittings, 3 In. Through 48 In., for Water and Other Liquids AWWA C 111 Standard for Rubber-Gasket Joints for Ductile-Iron and Gray-Iron Pressure Pipe and Fittings AWWA C 115 Standard for Flanged Ductile-Iron Pipe with Threaded Flanges AWWA C 150 Standard for the Thickness Design of Ductile-Iron Pipe AWWA C 151 Standard for Ductile-Iron Pipe, Centrifugally Cast in Metal Molds or Sand-Lined Molds, for Water or Other Liquids 06/2024 DUCTILE IRON PIPE SU1037E PAGE 15062 - 2 AWWA C 600 Standard for Installation of Ductile-Iron Water Mains and Their Appurtenances AWWA C 651 Standard for Disinfecting Water Mains 1.04 SUBMITTALS A. Submit catalog information on all fittings and valves shown on the Drawings, referencing each item by number as shown on the Drawings. Information shall indicate manufacture specification compliance and dimensional data. B. Submit shop drawings on all fabricated piping and pipe supports. Contractor shall submit the required AIS documentation with this product. 1.05 MEASUREMENT AND PAYMENT A. Ductile Iron Pipe shall be measured and paid per lineal foot unit bid price and according to Section 01025 – Measurement and Payment. PART 2 PRODUCTS 2.01 DUCTILE IRON PIPE A. Ductile iron pipe shall conform to the requirements of the "American National Standard for Ductile Iron Pipe, Centrifugally Cast in Metal Molds or Sand-Lined Molds, for Water or Other Liquids" (ANSI A21.51 AWWA C151) and "American National Standard for the Thickness Design of Ductile Iron Pipe" (ANSI A21.50 AWWA C150). Pipeline pressure rating shall be minimum Pressure Class 150 for all pipe. B. Buried Ductile Iron Pipe shall be encased with 8 mil. Class C polyethylene, conforming to AWWA C105. All seams in the polyethylene encasement shall be taped with Polycan #900 Adhesive Tape (or approved equal) to completely seal the seam. C. All materials that may come in contact with drinking water, including pipes, gaskets, lubricants and O-rings, shall be ANSI-certified as meeting the requirements of ANSI/NSF Standard 61, Drinking Water System Components – Health Effects. To Permit field-verification of this certification, all components shall be appropriately stamped with the NSF logo (ANSI/NSF Standard for Health Effects). 2.02 FITTINGS A. Fittings shall conform to the "American National Standard for Gray Iron and Ductile Iron Fittings for Water and Other Liquids" (ANSI/AWWA C110) and shall be 250 psi pressure rated. 06/2024 DUCTILE IRON PIPE SU1037E PAGE 15062 - 3 B. Flanges shall conform to ANSI B16.1, class 150 and shall have either raised or plain faces. C. All buried fittings shall be completely coated with Chevron FM Grease and shall be completely encased with 8 mil, Class C polyethylene, conforming to AWWA C105. All seams in the polyethylene encasement shall be taped with Polycan #900 Adhesive Tape (or approved equal) to completely seal the seam. 2.03 DUCTILE IRON PIPE JOINTS A. Ductile iron pipe shall be furnished with mechanical joints, push on or flanged joints as required and shall conform to the "American National Standard for Rubber-Gasket Joints for Cast Iron and Ductile Iron Pressure Pipe and Fittings" (ANSI A21.11 AWWA C111) and the "American National Standard for Flanged Cast Iron and Ductile Iron Pipe with Threaded Flanges" (ANSI A21.15 AWWA C115). 2.04 MECHANICAL-TYPE COUPLINGS A. Mechanical-type couplings shall be designed for a water working pressure not less than the design pressure of the pipe on which they are to be installed. Restraints shall be provided as required. 2.05 SLEEVE-TYPE COUPLINGS A. Sleeve-type couplings shall be provided where shown. Couplings shall be of ductile iron, without pipe stop, and shall be of sizes to fit the pipe and fittings shown. Couplings shall be Class 350. Where sleeves are utilized, proper anchoring shall be provided. 2.06 DUAL PURPOSE CUTTING-IN SLEEVE A. Dual Purpose Cutting-In Sleeves shall be furnished and installed as shown on the Drawings. Sleeves shall be of ductile iron (MJ x PE), and shall be of the proper sizes to fit the pipe and fittings shown. Where sleeves are utilized, proper restraint shall be provided. 2.07 GASKETS AND BOLTS A. Except as otherwise provided, gaskets for flanged joints shall be 1/8-inch thick rubber fabric. Wherever blind flanges are shown, the gaskets shall consist of 1/8- inch thick cloth-inserted rubber sheet which shall cover the entire inside surface of the blind flange and shall be cemented to the surface of the blind flange. All buried fittings using steel bolts shall be coated with no-oxide wax and wrapped with polyethylene or as otherwise approved by the ENGINEER. 06/2024 DUCTILE IRON PIPE SU1037E PAGE 15062 - 4 2.08 CEMENT MORTAR LINING A. Ductile iron pipe and fittings shall be lined with cement mortar in accordance with the requirements of the "American National Standard for Cement Mortar Lining for Cast Iron and Ductile Iron Pipe and Fittings for Water" (ANSI A21.4 AWWA C104) except that the lining thickness shall be not less than 1/8 of an inch. 2.09 PIPE SUPPORTS A. Pipe supports shall be AIS compliant. All pipe supports shall have a 1-inch high grouted pad to be used as a leveling base. 2.10 THRUST BLOCKS / RESTRAINTS A. All fittings shall have proper thrust blocks and restraints as noted for the type of installation required. Thrust blocks shall be concrete as noted on the Drawings and in Section 03300 of the Technical Specifications. Restraints shall be tie-rods, Megalug® or accepted equal, or Engineer approved anchoring devices. See Standard Drawing sheet number W-03 for thrust block detail. 2.11 SAFETY TAPE A. Safety tracer tape shall be a minimum of 3-inches wide by 5.0 mil overall thickness, with no less than a 50-gauge solid aluminum foil core. It shall be Safety Blue in color and shall be clearly labeled with the word “WATER”. Safety tape shall be as manufactured by Magnatec® or accepted equal. PART 3 EXECUTION 3.01 INSTALLATION A. Ductile iron pipe shall be installed in accordance with the "American National Standard for Installation of Gray and Ductile Cast-Iron Water Mains and Appurtenances" (ANSI/AWWA C600). All buried Ductile Iron pipe, fittings and valves shall be completely coated with Chevron FM Grease and shall be encased with polyethylene wrap and installed in conformance with AWWA C105 standards. All seams in the polyethylene encasement shall be taped with Polycan #900 Adhesive Tape (or approved equal) to completely seal the seam. B. The pipe shall be plugged at the end of each work day or period of suspension. C. Safety tracer tape shall be installed above pipe as required by the Drawings. 3.02 THRUST BLOCKS A. Thrust blocks shall be installed at points where the pipe changes direction such as: at all tees, elbows, wyes, caps, valves, hydrants, reducers, etc. except where restrained joints are called for on the Drawings. 06/2024 DUCTILE IRON PIPE SU1037E PAGE 15062 - 5 B. Thrust blocks shall be constructed so that the bearing surface is in direct line with the major force created by the pipe or fitting. C. Thrust blocks shall bear against solid undisturbed earth at the side and bottom of the trench excavation and shall be shaped so as not to obstruct access to the joints or the pipe or fitting. D. Thrust blocks shall be sized and constructed as indicated on the Drawings. 3.03 PRELIMINARY CLEANING AND FLUSHING A. CONTRACTOR shall flush the pipeline as the work progresses by a means in accordance with good practice to ensure that sand, rocks, or other foreign material are not left in any of the pipeline. If possible, the flushing shall be made with an open pipe end. 3.04 TESTING OF PIPELINE All new water mains or appurtenances shall be disinfected in accordance with AWWA Standard C651-05 or a method approved by the Director. The specifications shall include detailed procedures for the adequate flushing, disinfection and microbiological testing of all water mains. On all new and extensive distribution system construction, evidence of satisfactory disinfection shall be provided to the Division. Samples for coliform analyses shall be collected after disinfection is complete and the system is refilled with drinking water. A standard heterotrophic plate count is advisable. The use of water for public drinking water purposes shall not commence until the bacteriologic tests indicate the water is free from contamination. A. Source of Water 1. CONTRACTOR shall assume all responsibility to obtain the necessary water supplies for pressure testing of the pipeline. B. Testing Procedure 1. Ductile iron pipe shall be tested at a static pressure of 200 psi for 2 hours, and in accordance with the AWWA C600 standards. 2. In the case of pipelines that fail to pass the leakage test, CONTRACTOR shall determine the cause of the excessive leakage, shall take corrective measures necessary to repair the leaks, and shall again test the pipelines, all at no additional cost to CONTRACTOR. 3. The ENGINEER shall be notified at least 48 hours before the pipeline is to be tested so that he may be present during the test. 06/2024 DUCTILE IRON PIPE SU1037E PAGE 15062 - 6 3.05 DISINFECTING A. Source of Water 1. CONTRACTOR shall assume all responsibility to obtain the necessary water supplies for disinfection of the water line system. B. Testing Procedure 1. Leakage and pressure testing must be completed prior to disinfection procedures. 2. All water piping installed under this Contract (including ductile iron pipe, fittings, valves, etc.) shall be disinfected using an approved disinfection method in accordance with the "American Water Works Association Standard for Disinfecting Water Mains" (AWWA C651). 3. Heavily chlorinated water shall not be discharged onto the ground or into a drainage way. Upon completion of disinfection, Sodium Bisulfate (NaHSO3) shall be applied to the heavily chlorinated water to neutralize thoroughly the chlorine residual remaining. Water shall be neutralized to less than 1 ppm before release. 4. After approval of disinfection, CONTRACTOR shall flush the new system until the chlorine residual is a maximum of 0.3 ppm. 5. At the end of 24 hours, a bacteriological test will be performed by CONTRACTOR to insure adequate disinfection. If the initial disinfection fails to provide satisfactory bacteriological results, or shows the presence of coliform, then the line shall be rechlorinated, flushed, and retested until satisfactory results are obtained at the expense of CONTRACTOR. - END OF SECTION - 06/2024 POLYVINYL CHLORIDE PIPE SU1037E PAGE 15065 - 1 SECTION 15065 POLYVINYL CHLORIDE PIPE PART 1 GENERAL 1.01 DESCRIPTION A. CONTRACTOR shall furnish and install all pipe, fittings, closure pieces, supports, gaskets, jointing material, skids, seals, and appurtenances as shown and specified, and as required for a complete and workable piping system. 1.02 RELATED WORK A. Related work specified in other sections: Section 02221 - Excavation and Backfill for Pipelines Section 03300 - Cast-in-Place Concrete Section 15062 - Ductile Iron Pipe Section 15100 - Mechanical Appurtenances 1.03 REFERENCES A. Work covered by this Specification shall meet or exceed the provisions of the latest editions of the following Codes and Standards in effect at the time of award of the Contract: AMERICAN WATER WORKS ASSOCIATION (AWWA) AWWA C 651 Standard for Disinfecting Water Mains AWWA C 900 Standard for Polyvinyl Chloride (PVC) Pressure Pipe, 4 In. Through 12 In., for Water Distribution AWWA M 23 Manual of Water Supply Practices - PVC Pipe - Design and Installation 1.04 SUBMITTALS A. Submit manufacturer's affidavit certifying product was manufactured, tested and supplied in accordance with applicable references in this section together with a report of the test results and the date each test was completed. 1.05 MEASUREMENT AND PAYMENT A. PolyVinyl Chloride Pipe shall be measured and paid according to per lineal foot bid prices and according to Section 01025 – Measurement and Payment. 06/2024 POLYVINYL CHLORIDE PIPE SU1037E PAGE 15065 - 2 PART 2 PRODUCTS 2.01 POLYVINYL CHLORIDE PIPE A. All polyvinyl chloride pipe intended for use in public drinking water supply pipelines or in pressure pipeline systems shall be manufactured of material conforming to AWWA C900 PVC materials for Pressure Class 150. All plastic pipe must be approved for potable water use by the National Sanitation Foundation and must bear the logo "NSF-pw" or "NSF-61" indicating such approval. Pipe sections shall be clearly marked to: 1. Identify manufacturer's name or trademark. 2. Nominal pipe size and OD base. 3. AWWA material code designation. 4. Dimension ratio. 5. AWWA pressure class. 6. AWWA specification designation. 7. Product record code. B. All materials that may come in contact with drinking water, including pipes, gaskets, lubricants and O-rings, shall be ANSI-certified as meeting the requirements of ANSI/NSF Standard 61, Drinking Water System Components – Health Effects. To Permit field-verification of this certification, all components shall be appropriately stamped with the NSF logo (ANSI/NSF Standard for Health Effects). 2.02 POLYVINYL CHLORIDE JOINTS A. All joints and accessories shall be as manufactured and furnished by the pipe supplier and have bell and/or spigot configurations and have compatible pressure ratings with that of the pipe. 2.03 DUCTILE IRON FITTINGS A. Ductile iron fittings shall comply with the requirements of Section 15062 Ductile Iron Pipe. 2.04 CONCRETE A. Concrete for all thrust blocks shall comply with the requirements of Section 03300 Cast- In-Place Concrete. 2.05 SAFETY TAPE A. Safety tracer tape shall be a minimum of 3" wide by 5.0 mil overall thickness, with no less than a 50 gauge solid aluminum foil core. It shall be Safety Blue in color and shall be clearly labeled with the word “WATER”. Safety tape shall be as manufactured by Magnatec or accepted equal. 06/2024 POLYVINYL CHLORIDE PIPE SU1037E PAGE 15065 - 3 PART 3 EXECUTION 3.01 INSTALLATION A. Polyvinyl Chloride pipe shall be installed in accordance with the "American Water Works Association Manual of Water Supply Practices - PVC Pipe - Design and Installation" (AWWA No. M23). B. The pipe shall be plugged at the end of each work day, or period of work suspension. C. Safety tracer tape shall be installed above pipe as required by the Drawings. D. Ductile iron fittings shall be installed in accordance with the requirements of Section 15062 Ductile Iron Pipe. 3.02 THRUST BLOCKS A. Thrust blocks shall be installed at points where the pipe changes direction or velocity such as: at all tees, elbows, wyes, caps, valves, hydrants, reducers, etc. B. Thrust blocks shall be constructed so that the bearing surface is in direct line with the major force created by the pipe or fitting. C. Thrust blocks shall bear against solid undisturbed earth at the sides and bottom of the trench excavation and shall be shaped so as not to obstruct access to the joints or the pipe or fitting. D. Thrust blocks shall be sized and constructed as indicated on Standard Drawing W-03. 3.03 PRELIMINARY CLEANING AND FLUSHING A. CONTRACTOR shall flush the pipeline as the work progresses by a means in accordance with good practice to insure that sand, rocks, or other foreign material are not left in any of the pipeline. If possible the flushing shall be made with an open pipe end. 3.04 TESTING OF PIPELINE All new water mains or appurtenances shall be disinfected in accordance with AWWA Standard C651-05 or a method approved by the Director. The specifications shall include detailed procedures for the adequate flushing, disinfection and microbiological testing of all water mains. On all new and extensive distribution system construction, evidence of satisfactory disinfection shall be provided to the Division. Samples for coliform analyses shall be collected after disinfection is complete and the system is refilled with drinking water. A standard heterotrophic plate count is advisable. The use of water for public drinking water purposes shall not commence until the bacteriologic tests indicate the water is free from contamination. A. Source of Water 06/2024 POLYVINYL CHLORIDE PIPE SU1037E PAGE 15065 - 4 1. CONTRACTOR shall assume all responsibility to obtain the necessary water supplies for pressure testing of the pipeline. B. Testing Procedure 1. Polyvinyl Chloride pipe shall be tested at a static pressure of 200 psi for 2 hours in accordance with the "American Water Works Association Manual of Water Supply Practices - PVC Pipe -Design and Installation" (AWWA No. M23). 2. In the case of pipelines that fail to pass the leakage test, CONTRACTOR shall determine the cause of the excessive leakage, shall take corrective measures necessary to repair the leaks, and shall again test the pipelines, all at no additional cost to CONTRACTOR. 3. The ENGINEER shall be notified at least 48 hours before the pipeline is to be tested so that he may be present during the test. 3.05 DISINFECTING A. Source of Water 1. CONTRACTOR shall assume all responsibility to obtain the necessary water supplies for disinfection of the water line system. B. Testing Procedure 1. Leakage and pressure testing must be completed prior to disinfection procedures. 2. All water piping installed under this Contract shall be disinfected using an approved disinfection method in accordance with the "American Water Works Association Standard for Disinfecting Water Mains" (AWWA C651). 3. Heavily chlorinated water shall not be discharged onto the ground or into a drainage way. Upon completion of disinfection, Sodium Bisulfate (NaHSO3) shall be applied to the heavily chlorinated water to neutralize thoroughly the chlorine residual remaining. Water shall be neutralized to less than 1 ppm before release. 4. After approval of disinfection, CONTRACTOR shall flush the new system until the chlorine residual is a maximum of 0.3 ppm. 5. At the end of 24 hours, a bacteriological test will be performed by CONTRACTOR t to insure adequate disinfection. If the initial disinfection fails to provide satisfactory bacteriological results, or shows the presence of coliform bacteria, then the line shall be re-chlorinated, flushed, and retested until satisfactory results are obtained at the expense of CONTRACTOR. - END OF SECTION - 06/2024 HIGH DENSITY POLYETHYLENE PIPE SU1037E PAGE 15067 - 1 SECTION 15067 HIGH DENSITY POLYETHYLENE PIPE PART 1 GENERAL 1.01 DESCRIPTION A. This section covers furnishing and installation of high density polyethylene (HDPE) pipe for the pressurized piping system as shown on the drawings and specified herein. 1.02 REFERENCES A. The latest edition of the following publications form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM) ASTM D 1248 Standard Specifications for Polyethylene Plastics, Molding & Extrusion Materials. ASTM D 2321 Underground Installation of Flexible Thermoplastic Sewer Pipe. ASTM D 2837 Standard Method for Obtaining Design Basis for Thermoplastic Pipe Materials. ASTM D 3261 Butt Heat Fusion Polyethylene (PE) Plastic Fittings for Polyethylene (PE) Plastic Pipe and Tubing ASTM D 3350 Standard Specification for Polyethylene Plastic Pipe and Fittings Materials. AMERICAN WATER WORKS ASSOCIATION AWWA C 906Polyethylene (PE) Pressure Pipe and Fittings, 4 In. through 63 In., for Water Distribution PHILLIPS PETROLEUM DRISCOPIPE Technical Note No. 35, "Hydrostatic Testing of HDPE Pressure Pipelines." 1.03 SUBMITTALS A. The following shall be submitted: 1. Certified copies of test reports demonstrating conformance to applicable pipe specifications, before pipe is installed. 06/2024 HIGH DENSITY POLYETHYLENE PIPE SU1037E PAGE 15067 - 2 1.04 MEASUREMENT AND PAYMENT A. High Density Polyethylene pipe shall be measured and paid according to the unit cost per lineal foot bid prices and according to Section 01025 – Measurement and Payment. PART 2 PRODUCTS 2.01 POLYETHYLENE PIPE A. The piping material and fittings shall conform to AWWA C-906 and shall be made from PE 2406, PE 3406, or PE 3408 as referenced in ASTM D 3350 and ASTM 2837. The high-density polyethylene pipe shall have a manufacturer's recommended hydrostatic design stress rating of 800 psi based on a material with a 1600 psi design basis determined in accordance with ASTM D 2837. All high- density polyethylene pipe shall be provided from a single manufacturer. B. High density polyethylene pipe shall have an SDR and minimum pressure rating as shown in Table 1. HDPE Pipe shall be SDR 17, 100 psi pipe, conforming to the IPS sizing system. HDPE Pipe shall be Driscopipe series 4000 HDPE pipe or accepted equal. C. All materials that may come in contact with drinking water, including pipes, gaskets, lubricants and O-rings, shall be ANSI-certified as meeting the requirements of ANSI/NSF Standard 61, Drinking Water System Components – Health Effects. To Permit field-verification of this certification, all components shall be appropriately stamped with the NSF logo (ANSI/NSF Standard for Health Effects). EXECUTION 2.01 STORAGE AND HANDLING A. Pipe shall be stored on clean level ground to prevent undue scratching or gouging. Sections of pipe with deep cuts or gouges shall be removed and ends of pipes rejoined. Handling of the joined pipe shall be in such a manner that the pipe is not damaged by dragging over sharp or cutting objects. B. Lifting of joined pipe sections shall preclude concentration of bending stresses at joints and shall be done in a manner which evenly distributes lifting stresses along the full length of the pipe. C. Pipe shall be stored in a shaded area or covered to avoid temperature extremes which may cause the pipe to bow or warp. 06/2024 HIGH DENSITY POLYETHYLENE PIPE SU1037E PAGE 15067 - 3 TABLE 1 HDPE PIPE MINIMUM PRESSURE RATING SDR PRESSURE RATING (psi) 7 267 9 200 11 160 13.5 130 17 100 21 80 2.02 INSTALLATION A. High density polyethylene pipe shall be installed according to the requirements of ASTM D-2321, and the manufacturer's requirements. B. Care shall be exercised by the CONTRACTOR in placing the pipe to avoid damaging the pipe. C. Any damage to the HDPE pipes shall be repaired at the CONTRACTOR's expense. D. Stub ends and pipe fittings for butt fusion shall be fabricated of the same parent material as the HDPE pipe, and shall be of at least the same wall thickness and pressure rating as the pipe to be joined, unless otherwise recommended by the manufacturer. E. Joining techniques and operating procedures shall follow written instructions provided by the pipe manufacturer and the joint equipment supplier. A copy of such instructions shall be present at any location in which butt fusion is being carried out. F. Flanged joints shall be used for joining between HDPE and other materials or non- HDPE fittings. Flanged fittings shall have a pressure rating equal to or greater than the pressure rating of the pipe on which they are to be installed. Backup flanges for butt fused joints shall be epoxy-coated ductile iron, drilled to ANSI bolt circles and have a pressure rating of 160 psi. Backup flanges and bolts shall be as approved or supplied by the pipe manufacturer. It is the responsibility of the CONTRACTOR to ensure that the flange bolt circle diameter matches that of other flanged fittings used in the Work, and that bolt dimensions are suitable for the fittings to be joined. G. The pipe shall be installed with uniform bearing under the full length of the pipe. 06/2024 HIGH DENSITY POLYETHYLENE PIPE SU1037E PAGE 15067 - 4 H. The pipe shall be plugged at the end of each work day, or period of work suspension. 2.03 PRELIMINARY CLEANING AND FLUSHING A. The CONTRACTOR shall flush the pipeline as the work progresses by a means in accordance with good practice to ensure that sand, rocks, or other foreign material are not left in any of the pipeline. If possible, the flushing shall be made with an open pipe end. 2.04 TESTING OF PIPELINE All new water mains or appurtenances shall be disinfected in accordance with AWWA Standard C651-05 or a method approved by the Director. The specifications shall include detailed procedures for the adequate flushing, disinfection and microbiological testing of all water mains. On all new and extensive distribution system construction, evidence of satisfactory disinfection shall be provided to the Division. Samples for coliform analyses shall be collected after disinfection is complete and the system is refilled with drinking water. A standard heterotrophic plate count is advisable. The use of water for public drinking water purposes shall not commence until the bacteriologic tests indicate the water is free from contamination. A. Source of Water 1. CONTRACTOR shall assume all responsibility to obtain the necessary water supplies for pressure testing of the pipeline. B. Testing Procedure 1. HDPE Pipe shall be tested hydrostatically at 200 psi for 2 hours in accordance with the AWWA standards. 2. In the case of pipelines that fail to pass the leakage test, CONTRACTOR shall determine the cause of the excessive leakage, shall take corrective measures necessary to repair the leaks, and shall again test the pipelines, all at no additional cost to community. 3. The ENGINEER shall be notified at least 48 hours before the pipeline is to be tested so that he may be present during the test. DISINFECTING A. Source of Water 1. CONTRACTOR shall assume all responsibility to obtain the necessary water supplies for disinfection of the water line system. 06/2024 HIGH DENSITY POLYETHYLENE PIPE SU1037E PAGE 15067 - 5 Testing Procedure Leakage and pressure testing must be completed prior to disinfection procedures. All water piping installed under this Contract (including ductile iron pipe, fittings, valves, etc.) shall be disinfected using an approved disinfection method in accordance with the "American Water Works Association Standard for Disinfecting Water Mains" (AWWA C651). Heavily chlorinated water shall not be discharged onto the ground or into a drainage way. Upon completion of disinfection, Sodium Bisulfate (NaHSO3) shall be applied to the heavily chlorinated water to neutralize thoroughly the chlorine residual remaining. Water shall be neutralized to less than 1 ppm before release. After approval of disinfection, CONTRACTOR shall flush the new system until the chlorine residual is a maximum of 0.3 ppm. At the end of 24 hours, a bacteriological test will be performed by CONTRACTOR to insure adequate disinfection. If the initial disinfection fails to provide satisfactory bacteriological results, or shows the presence of coliform, then the line shall be re-chlorinated, flushed, and retested until satisfactory results are obtained at the expense of CONTRACTOR. - END OF SECTION - 06/2024 Mechanical Appurtenances SU1037E Page 15100 - 1 SECTION 15100 MECHANICAL APPURTENANCES PART 1 GENERAL 1.01 SUMMARY The developer/CONTRACTOR shall furnish and install all piping and equipment. 1.02 RELATED WORK A. Related work specified in other sections: Section 15062 - Ductile Iron Pipe Section 15065 - Polyvinyl Chloride Pipe Section 15067 - High-Density Polyethylene Pipe 1.03 MEASUREMENT AND PAYMENT Measurement and payment for mechanical appurtenances shall not be paid as unit item but shall be included in the item of work to which it pertains. 1.04 REFERENCES The latest edition of the following publications form a part of this specification to the extent referenced. The publications are referred to in the text to by basic designation only. 1.05 AMERICAN WATER WORKS ASSOCIATION (AWWA) AWWA C-500 Metal-Seated Gate Valves for Water Supply Services AWWA C-502 Dry-Barrel Fire Hydrants AWWA C-508 Swing-Check Valves for Waterworks Service, 2 in. through 24 in. AWWA C-509 Resilient-Seated Gate Valves for Water Supply Service AWWA C-512 Air-Release, Air/Vacuum, and Combination Air Valves for Waterworks Service AWWA C-701 Magnetic Meters 1.06 SUBMITTALS Submit catalog cuts on all mechanical appurtenances including: fittings, valves, or other 06/2024 Mechanical Appurtenances SU1037E Page 15100 - 2 items shown on the Drawings referencing each item by mark number. Information shall indicate manufacture specification compliance and dimensional data. Contractor shall submit required AIS documentation with these products. PART 2 PRODUCTS 2.01 GATE VALVES Gate valves shall conform to the latest revision of AWWA Resilient Seated gate valve Standard C-509 and be UL listed, FM approved. All internal parts shall be accessible without removing the body from the line. The wedge shall be of cast iron completely encapsulated with resilient material. The resilient sealing material shall be permanently bonded to the cast iron wedge with a rubber tearing bond to meet ASTM D 429. NRS stems shall be cast bronze with internal collars in compliance with AWWA. OS&Y stems shall be bronze. The NRS stuffing box shall have two "O"-Ring seals above the thrust collar. These rings shall be field replaceable without removing the valve from service. There shall be low friction thrust bearings above and below the stem collar. The stem nut shall be independent of the wedge and of solid bronze. The waterway in the seat area shall be smooth, unobstructed and free of cavities. Stuffing box shall be attached to the bonnet and the bonnet to the body with bolts and nuts. Blind bolts threaded directly into the body or bonnet will not be acceptable. The body and bonnet shall be coated interior and exterior with corrosion resistant coating. Each valve shall be hydrostatically tested at 400 PSI to the requirements of both AWWA and UL/FM. Valves shall be installed vertically in a horizontal run of pipe, and shall be provided with a two-inch square operating nut for manually operating the valve with a "T" handle wrench. The direction of rotation to open shall be to the left (counter-clockwise). 2.02 BUTTERFLY VALVES Butterfly Valves (AWWA): Butterfly valves shall comply with the requirements of AWWA C504 and requirements as specified hereinafter. Butterfly valves shall be constructed of the following materials: Component Material Shaft Type 316 Stainless Steel, ASTM A276 Disc Ductile Iron, ASTM A536 Grade 65-45-12 Disc Edge - Seat Surface Type 316, Stainless Steel, ASTM A276 Rubber Seat Neoprene or Buna-N Body Cast Iron, ASTM A126, Class B 06/2024 Mechanical Appurtenances SU1037E Page 15100 - 3 Valves shall be the stub or through-shaft design. Wafer type ends are not acceptable. Unless otherwise specified, valve flange drilling shall be per ANSI B16.1, Class 125. Mechanical joints shall meet the requirements of ANSI A21.11. Butterfly valves shall be rated at 150 psig and provide drip tight shutoff up to the full valve rating. For valves 24 in. and larger, disc seats shall be mechanically held in place and shall be field replaceable. Valve ends shall be as shown on the drawings. Butterfly valve interiors shall be factory painted with two coats (minimum 8 mils, each) of ScotchCote two-part polyamide epoxy (or approved equal). Valve exterior coating shall be per Section 09800, PAINTING AND SPECIAL COATING SYSTEMS. Manual operators shall be designed in accordance with AWWA C504 and shall have a disc position indicator designating the opened and closed position of the valve. Operators for butterfly valves, 6 in. diameter and smaller, shall permit locking the valves in any position between fully open and fully closed. Operators for butterfly valves, 8 in. diameter and larger, shall be the travelling nut or worm gear type. Operators for exposed service shall be gasketed for weatherproof service. A handwheel shall be provided for each operator. The direction of rotation for the operator shall be counter clockwise for opening. Operating torque shall be less than 40 ft-lb. Buried valves shall have 2 in. AWWA nut. Affidavits of compliance with AWWA C504 shall be provided as a submittal item in accordance with Section 01300, SUBMITTALS. All butterfly valves furnished shall be manufactured by Pratt, or equal and shall comply with American Iron and Steel Requirements. 2.03 CHECK VALVE The check valve shall be a Spring & Lever type (or equal), for installation at the location shown on the drawings. The pressure class shall be 150. Shall meet AIS requirements. 2.04 PIPE SUPPORTS Pipe supports shall be an adjustable pipe support meeting AIS requirements. All pipe supports shall have a 1-inch high grouted pad to be used as a leveling base. 2.05 VALVE BOXES Valve boxes shall be provided with a Cast Iron valve box of the extension sleeve type, and the correct adjustable height to bring the top of the valve box flush with the ground surface. The valve box shall not be less than five inches in diameter and shall have a minimum thickness of .375 inch. The box provided also shall be provided with a suitable base and cover. The word "WATER" shall be cast on the cover, refer to Detail W-05 06/2024 Mechanical Appurtenances SU1037E Page 15100 - 4 2.06 AIR/VACUUM VALVES A. Air/Vacuum valves shall be APCO No. 145-C with a 2-inch orifice (or approved equals), and shall be installed as shown on the drawings. 2.07 ALTITUDE VALVE A. Altitude valves shall be Cla-Val 210-01 (or approved equal). Valve will be installed according to manufactures recommendations. Valve settings will be supplied by ENGINEER. PART 3 EXECUTION 3.01 INSTALLATION A. Valves, valve-operating units, stem extensions and other accessories shall be installed by the CONTRACTOR where shown, or where required in the opinion of the ENGINEER, to provide for convenience in operation. Where buried valves are indicated, the CONTRACTOR shall furnish and install valve boxes to 3-inches above grade in unimproved areas, or at grade with concrete collar as shown on the Drawings in improved areas. All gate valves and boxes shall be new and recently manufactured. Install mechanical appurtenances as indicated on the plans and in accordance with the manufacturer's written instructions. Valve boxes shall be installed with concrete collars as noted on the drawings. - END OF SECTION -