Brian Head 2024 Infrastructure Projects File #13343 (with reminder about Salt Pile
Well PER)
1 message
J. Paul Wright <pwright@utah.gov>Thu, May 16, 2024 at 8:17 AM
To: Rhett Beazer <rhettbeazer@alphaengineering.com>
Cc: Todd Gardner <toddgardner@alphaengineering.com>, Kjori Shelley <kashelley@utah.gov>, Aldo Biasi
<abiasi@bhtown.utah.gov>, Chris Leigh <cleigh@bhtown.utah.gov>
Rhett,
Thank you for sending this hydraulic model certification for these projects. I have one more comment after having looked
at the plans and specifications:
1) Since Brian Head is sewered, I assume there are areas where water and sewer lines either are installed in the same
street or cross, along with sewer laterals. There should be details in the water line plans and/or a written description in
the specifications that required water/sewer line separation for these newly installed water lines and for the new sewer
lines. The minimum horizontal separation should be 10 feet, edge to edge of pipe, and when the water and sewer lines
cross, there should be a minimum of 18 inches of vertical separation, with the water line above the sewer line. Please
provide revised and finalized plans and/or the specification package that includes this construction requirement.
I also wanted to remind you that while you submitted the well drilling plans/specifications for the Salt Pile Well on May 8,
2024, a PER is also required to be submitted to the DDW and it has to be concurred with before well drilling can be
approved. You should submit that PER to Deidre Beck, Melissa Noble, or Noah Zorsky at the DDW.
Let me know if you have any questions.
Paul
On Thu, May 16, 2024 at 7:46 AM Rhett Beazer <rhettbeazer@alphaengineering.com> wrote:
Paul,
Attached is the Hydraulic Model Certification. Let me know if you have any questions.
Rhett Beazer, PE
rhettbeazer@alphaengineering.com
43 South 100 East, Suite 100 • St George, Utah 84770
T: 435.628.6500 • F: 435.628.6553 • alphaengineering.com
From: J. Paul Wright <pwright@utah.gov>
Sent: Friday, April 26, 2024 10:41 AM
To: Rhe Beazer <rhettbeazer@alphaengineering.com>; Todd Gardner <toddgardner@alphaengineering.
com>; chleigh@bhtown.utah.gov
5/16/24, 8:17 AM State of Utah Mail - Brian Head 2024 Infrastructure Projects File #13343 (with reminder about Salt Pile Well PER)
https://mail.google.com/mail/u/0/?ik=f3bcb897f8&view=pt&search=all&permthid=thread-a:r4308596519991493379&simpl=msg-a:r304444630517735…1/6
Cc: Kjori Shelley <kashelley@utah.gov>; Aldo Biasi <abiasi@bhtown.utah.gov>
Subject: Re: Brian Head 2024 Infrastructure Projects
Rhett,
On March 25, I sent a reminder email about the hydraulic modeling needed for one portion of this project. I have not
received the hydraulic model certification (attached) on this project yet, so therefore I have not completed a review yet.
In talking to Kjori, she mentioned that she has not been kept in the loop regarding the funding portion also. You need to
be working with her to make sure the funding language is in the bid package so that bidding can be done correctly.
Anyway, once I receive everything I need for the engineering side of things. I can begin my review. This needs to
happen prior to bidding out the project because we need to ensure that your water line installation details and specs are
in compliance with the DDW rules.
Let me know if you have any questions.
Paul
On Mon, Mar 25, 2024 at 2:08 PM J. Paul Wright <pwright@utah.gov> wrote:
Rhett,
I don't need the model or any results. I just need to know that as their engineers you have done that. You should
complete the certification form that I sent to you verifying that it has been done and it meets the pressure
requirements. Let me know if you need that form again, but I had attached it to the previous email
Paul
---------- Forwarded message ---------
From: Rhett Beazer <rhettbeazer@alphaengineering.com>
Date: Mon, Mar 25, 2024 at 11:41 AM
Subject: RE: Brian Head 2024 Infrastructure Projects
To: J. Paul Wright <pwright@utah.gov>
Paul,
I apologize for not getting that addressed earlier. I will have that model over for you by tomorrow.
Rhett Beazer, PE
rhettbeazer@alphaengineering.com
43 South 100 East, Suite 100 • St George, Utah 84770
5/16/24, 8:17 AM State of Utah Mail - Brian Head 2024 Infrastructure Projects File #13343 (with reminder about Salt Pile Well PER)
https://mail.google.com/mail/u/0/?ik=f3bcb897f8&view=pt&search=all&permthid=thread-a:r4308596519991493379&simpl=msg-a:r304444630517735…2/6
T: 435.628.6500 • F: 435.628.6553 • alphaengineering.com
From: J. Paul Wright <pwright@utah.gov>
Sent: Tuesday, March 19, 2024 2:42 PM
To: Rhe Beazer <rhettbeazer@alphaengineering.com>; Todd Gardner <toddgardner@alphaengineering.
com>
Cc: Kjori Shelley <kashelley@utah.gov>
Subject: Re: Brian Head 2024 Infrastructure Projects
Rhett,
Back on February 21, I had sent an email asking about a portion of the project"
"Looking at the PNF, it appears that one phase of this project includes adding 69 service connections. Have
you done hydraulic modeling for these connections? You should have at least done that. While I don't
necessarily need to review or see that, at a minimum, you need to provide a hydraulic modeling certification.
For the looped lines, normally that would not be the case, because you aren't adding additional service
connections, but for the one set, that should happen. I have attached a copy of the form."
It looks like you have addressed Kjori's comments about adding SRF language. But I need the above question
addressed.
Paul
On Tue, Mar 19, 2024 at 2:21 PM Rhett Beazer <rhettbeazer@alphaengineering.com> wrote:
Kjori,
See the attached for the Brian Head 2024 Infrastructure Projects. Let me know if you have any
questions or need any additional information.
Rhett Beazer, PE
rhettbeazer@alphaengineering.com
43 South 100 East, Suite 100 • St George, Utah 84770
T: 435.628.6500 • F: 435.628.6553 • alphaengineering.com
5/16/24, 8:17 AM State of Utah Mail - Brian Head 2024 Infrastructure Projects File #13343 (with reminder about Salt Pile Well PER)
https://mail.google.com/mail/u/0/?ik=f3bcb897f8&view=pt&search=all&permthid=thread-a:r4308596519991493379&simpl=msg-a:r304444630517735…3/6
From: Kjori Shelley <kashelley@utah.gov>
Sent: Wednesday, March 6, 2024 5:59 PM
To: Rhe Beazer <rhettbeazer@alphaengineering.com>
Cc: J. Paul Wright - Utah Department of Environmental Quality (pwright@utah.gov) <pwright@utah.gov>;
Todd Gardner <toddgardner@alphaengineering.com>
Subject: Re: Brian Head 2024 Infrastructure Projects
Rhett,
Before the project goes out to bid, the attached boilerplate language needs to be included in the bid package.
They also need to comply with the Build America, Buy America Act (BABAA) so I've attached the boilerplate
language for that so it can also be included. Please resend it to me once it has been added.
Thank you,
Kjori Shelley
SRF Project Manager | Environmental Scientist II
Mobile: (385) 227-1638
Work Hours: Tuesday-Friday 8:00 AM-6:30 PM
195 North 1950 West
Salt Lake City UT
84116
drinkingwater.utah.gov
Emails to and from this email
address may be considered
public records and thus
subject to Utah GRAMA
requirements.
On Tue, Feb 20, 2024 at 7:37 AM Rhett Beazer <rhettbeazer@alphaengineering.com> wrote:
Paul,
5/16/24, 8:17 AM State of Utah Mail - Brian Head 2024 Infrastructure Projects File #13343 (with reminder about Salt Pile Well PER)
https://mail.google.com/mail/u/0/?ik=f3bcb897f8&view=pt&search=all&permthid=thread-a:r4308596519991493379&simpl=msg-a:r304444630517735…4/6
Attached are the drawings, specs and PNF form for the above project. This project consists of multiple phases,
and I’ve attached the portions that require review by the DEQ. All the waterlines loop existing dead end lines or
connect existing transmission lines. Let me know if you have any questions.
Rhett Beazer, PE
rhettbeazer@alphaengineering.com
43 South 100 East, Suite 100 • St George, Utah 84770
T: 435.628.6500 • F: 435.628.6553 • alphaengineering.com
--
J. Paul Wright, P.E. | District Engineer | Southwest Utah District
435.986.2590 (office) | 435.680.0163 (cell) | 435.986.2595 (fax)
620 S 400 E #400, St. George, UT 84770
DEQ WEBSITE
Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements.
This email has been scanned for spam and viruses by Proofpoint Essentials. Click here to report this email as spam.
--
J. Paul Wright, P.E. | District Engineer | Southwest Utah District
435.986.2590 (office) | 435.680.0163 (cell) | 435.986.2595 (fax)
620 S 400 E #400, St. George, UT 84770
DEQ WEBSITE
Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements.
--
J. Paul Wright, P.E. | District Engineer | Southwest Utah District
435.986.2590 (office) | 435.680.0163 (cell) | 435.986.2595 (fax)
620 S 400 E #400, St. George, UT 84770
5/16/24, 8:17 AM State of Utah Mail - Brian Head 2024 Infrastructure Projects File #13343 (with reminder about Salt Pile Well PER)
https://mail.google.com/mail/u/0/?ik=f3bcb897f8&view=pt&search=all&permthid=thread-a:r4308596519991493379&simpl=msg-a:r304444630517735…5/6
DEQ WEBSITE
Emails to and from this email address may be considered public records and thus subject to Utah
GRAMA requirements.
This email has been scanned for spam and viruses by Proofpoint Essentials. Click here to report this email as spam.
--
J. Paul Wright, P.E. | District Engineer | Southwest Utah District
435.986.2590 (office) | 435.680.0163 (cell) | 435.986.2595 (fax)
620 S 400 E #400, St. George, UT 84770
DEQ WEBSITE
Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements.
5/16/24, 8:17 AM State of Utah Mail - Brian Head 2024 Infrastructure Projects File #13343 (with reminder about Salt Pile Well PER)
https://mail.google.com/mail/u/0/?ik=f3bcb897f8&view=pt&search=all&permthid=thread-a:r4308596519991493379&simpl=msg-a:r304444630517735…6/6
J. Paul Wright <pwright@utah.gov>
Brian Head 2024 Infrastructure Projects
J. Paul Wright <pwright@utah.gov>Wed, Feb 21, 2024 at 3:19 PM
To: Rhett Beazer <rhettbeazer@alphaengineering.com>
Cc: Todd Gardner <toddgardner@alphaengineering.com>
Looking at the PNF, it appears that one phase of this project includes adding 69 service connections. Have you done
hydraulic modeling for these connections? You should have at least done that. While I don't necessarily need to review
or see that, at a minimum, you need to provide a hydraulic modeling certification. For the looped lines, normally that
would not be the case, because you aren't adding additional service connections, but for the one set, that should happen.
I have attached a copy of the form.
Also, is this a funded project through the state SRF program? The reason I ask is because you had included Kjori Shelley
in the email and she only gets involved when it is a funded project.
Paul
[Quoted text hidden]
--
J. Paul Wright, P.E. | District Engineer | Southwest Utah District
435.986.2590 (office) | 435.680.0163 (cell) | 435.986.2595 (fax)
620 S 400 E #400, St. George, UT 84770
DEQ WEBSITE
Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements.
Hyd Model Certification.docx
27K