Loading...
HomeMy WebLinkAboutDDW-2024-008793Morgan City Water System 15008 DS001 S091 See attached explanation NA ST002 V011 See attached photo 4/31/2024 ST004 V011 See attached explanation 4/31/2024 Matthew E. Hartvigsen 6/14/2024 CONSULTING ENGINEERS MEMORANDUM To: Division of Drinking Water, Improvement Priority System (IPS) From: Matt Hartvigsen, PE Jones & Associates Consulting Engineers Date: June 14, 2024 Subject: Morgan City Water System (UTAH15008) Thank you for providing a sanitary survey of the Morgan City Water System. We wish to correct some items noted on the deficiency report as follows: System Sources Lack Capacity We assume that the surveyor did not have correct source production information. Below is an excerpt from the city’s 2022 Culinary Water Capital Facilities Plan and Impact Fee Facilities Plan: We request that the IPS points be removed for the lack of source capacity. As shown, the production rate of the city’s water sources is approximately double the current demand. If you need further documentation, please let us know. 6080 Fashion Point Dr. ● South Ogden, Utah 84403 ● (801) 476-9767 ● www.jonescivil.com Robinson Tank Overflow The Robinson Tank has been fitted with an air gap on the overflow discharge line. See the following image. There is also a correction requested for the overflow on the North Morgan Water Tank. The Robinson Tank and the North Morgan Tank share the same overflow discharge line. The North Morgan Water Tank is hydraulically connected to the Robinson Tank. They are connected through an isolated connection line. The one tank directly connects to the other and then they discharge through the shared overflow pipe. We request that the IPS points be removed for the air-gap clearance on the overflow discharge lines for both the Robinson Tank and the North Morgan Tank. North Morgan Tank Overflow Thank you for taking time to review the above deficiency corrections listed on the Improvement Priority System (IPS) report. Please let us know if you have any questions.