Loading...
HomeMy WebLinkAboutDDW-2024-008763J. Paul Wright, P.E. June 9, 2024 Michael Newberry. P.E. 6/10/2024 Water/Sewer Separation - Exception Request Spreadsheet STA 20+87 (sheet C-PP5) Existing sewer is only 4.75' deep and water line cannot cross over because of bury depth requirements 10' 18" Below None Condition (New/Existing)New Material C900 PVC Size 8" Pressure Rating 11 Is the line pressurized year-round?Yes Condition (New/Existing)Existing Material SDR-35 PVC Size 8" Pressure Rating Unknown Is the line pressurized?No Water line will be wrapped in Trenton Guard-Wrap wax tape installed 10' upstream and 10' downstream of the existing sewer line crossing. 1. Separation distances shall be measured edge-to-edge. 2.     Examples of proposed means to mitigate risks include: a.     remove/replace the aged vitrified clay sewer pipe; b.     replace the aged or cracked existing sewer pipe; c.      use thicker or higher pressure class PVC instead d.     of the typical thin-wall sewer pipe; install an in-situ lining to the existing sewer pipe for XX feet; e.     center the sewer line over the crossing to keep the joints as far as possible from the water line; f.      add detectable or magnetic warning tape placed 12 inches above the sewer and/or the water line(s) to minimize possible damage during future excavations; g.     use HDPE pipe for water line or sewer line to eliminate the joints [if there is no sagging or lack-of-sufficient slope problems for HDPE sewer pipes]; h.     use restrained joints for water line and/or sewer line near the crossing Sewer Line Water Line Reason for not meeting R309-550-7 Mitigation Efforts2 Station or Location Horizontal Clearance1 Vertical Clearance1 Water is Above or Below Sewer Groundwater conditions