Loading...
HomeMy WebLinkAboutDSHW-1992-002098 - 0901a0688013ed35* 0C5-27-1993 04:29PM FROM HERCULES BACCHUS MflGNfl.UT TO ^ 953S6715 P.02 UEDOIII PQ Hereuies Aerospace Company "*"*'"*-^^ Spaca«trateglc Propursten ^^^^^^^^^^" Bacchus Works Magna, Utah 840444)098 (801} 250^911 DSHW TN May 27, 1992 1992.20405 Dennis Downs Director, Depaitment of Environmental Quality Division of Solid and Hazardous Waste 288 North 1460 West Salt Lake City, UT 84114-4810 Re: Request for Third Emergency Permit for Storage of Waste Rocket Motor Dear Mr. Downs: An emergency pennii for storage of a waste rocket motor (Pennit irr-02-93) was granted to Hercules on 3 March 1993 and covers the period from 8 March 1993 to 6 June 1993. This permit was the second such emergency permit requested. The rocket motor in quesiion is Titan IV forward segment TF009. The segment contains over 118,000 pounds of propeUant and is 10.5 feet in diameter and 15.2 feet long. Hercules is still preparing to dispose of the rocket motor this year at the Thermal Treatment Unit (TTU) of the Hill AFB Test and Training Range. The HAFB TTU Subpart X pennit application is currently under review by the State Division of Environmental Quality. Certain permit issues are still being resolved between the State and HAFB that have impacted the operation of the TTU Thennal Treatment Unit HAFB will notify Hercules when these issues have been resolved and disposal of the rocket motor can be scheduled. This letter requests a third emergency 90 day permit for storage of the segment in response to this delay. The segment is still being stored at our Shipping 3 facUity (Building 2495). Hercules continues to believe that the unforeseen delays with the HAFB TTU permit qualify this request for an emergency permit per 40 CFR 262.34 (B). If you have any further questions on this issue, please contact me at 251-3574. Sincerely, E. Richard Anderson, Manager Environmental Engineering and Hygiene ERA/CDFalkenberg/