Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DSHW-2015-008751 - 0901a06880559087
Div of Waste Management and Radiation Control August 14, 2015 8200-FY16-027 Mr. Scott T. Anderson, Director Utah Department of Environmental Quality Division of Waste Management and Radiation Control 195 North 1950 West P.O. Box 144880 Salt Lake City, Utah 84114-4880 Re: ATK Launch Systems-Promontory EPA ID number UTD0090813571^ Permit Modification Request for the addition of Hazardous Waste Storage Building M- 629. Dear Mr. Anderson: ATK is requesting a Class 2 Permit Modification to Attachments 2, 4, 5, 6, 7, 8, 9, 11 and Module III of Hazardous Waste Storage Permit EPA ID number UTD009081357. The modifications are necessary to add Building M-629 for storage of hazardous waste and remove storage Buildings M-47 and M-603. The changes are identified in the attached documents. These changes have been reviewed with the Utah Division of Waste Management and Radiation Control (UDWMRC), and are being submitted as a Class 2 Modification. A closure cost estimate table for Building M-629 is also being submitted for approval. ATK received closure approval for hazardous waste storage Buildings M-47 and M-603 on March 3, 2015. This Class 2 Permit Modification will remove the language referencing the closed buildings M-47 and M-603 and insert the new language regarding building M-629. If you have questions regarding this correspondence, Please contact Blair Palmer at (435) 863- 2430. Sincerely, George Gooch, Manager Environmental Services cc: JeffVandel Orbital ATK, Inc. • P.O. Box 707, Brigham City, UT 84302 • 435-863-3511 Public Notice The ATK Launch Systems Inc., Promontory Facility (ATK) located in Promontory Utah has a Hazardous Waste Storage Permit. ATK is requesting a Class 2 permit modification to this permit to implement the following changes: • Removal of conditions related to two Hazardous Waste Storage Buildings, M-47 and M-603, that have been closed • Addition of conditions related to a new Hazardous Waste Storage Building, M-629 • Closure costs associated with the new Hazardous Waste Storage Building, M-629 • Update references to "Executive Secretary" changing to "Director" throughout the Permit Public comments are invited on these changes with the comment period commencing on August 17, 2015 and ending on October 19, 2015. ATK will hold a public information meeting for this Permit on September 14, 2015 from 6:00 - 7:00 PM at the Brigham City, 26 East Forest Street, Brigham City, Utah. A copy of the Permit incorporating the referenced modifications is available for review on the Division web site http://www.hazardouswaste.utah.gov/Public/PublicHearingsandCommentPeriods.htm. A copy of the permit is available for review during normal business hours at the Brigham City Library. A copy is also available for review at the Utah Division of Waste Management and Radiation Control office located at the Multi-Agency State Office Building, 195 North 1950 West, Second Floor, Salt Lake City, Utah. Written comments will be accepted if received by 5:00 PM on October 19, 2015, and should be mailed to: Scott T. Anderson, Director Utah Department of Environmental Quality Division of Waste Management and Radiation Control P.O. Box 144880 Salt Lake City, UT 84114-4880 Comments can also be sent by electronic mail to swpublic<S)utah.gov. Comments sent in electronic format should be identified by putting the following in the subject line: public comment on the ATK Promontory Plant permit. Electronic comments must be received by October 19, 2015 at 5:00 PM. All documents included in comments should be submitted as ASCII (text) files or in pdf format. Under Utah Code Section 19-1-301.5, a person who wishes to challenge a permit order may only raise an issue or argument during an adjudicatory proceeding that was raised during the public comment period and was supported with sufficient information or documentation to enable the director to fully consider the substance and significance of the issue. For further information, please contact George Gooch at ATK at (435)863-2018. The Utah Department of Environmental Quality contact is Jeff Vandel at (801)536-0257. The permittee's compliance history during the life of the permit being modified is available from the Agency contact person. In compliance with the Americans with Disabilities Act, individuals with special needs (including auxiliary communicative aids and services) should contact the Department of Environmental Quality Office of Human Resources at 801-536-4412, TDD 801-536-4414. I ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 2010Julv 1.2015 UTD009081357 ATTACHMENT 2 INSPECTION SCHEDULES AND PROCEDURE ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 201 OJulv 1. 2015 UTD009081357 INSPECTION SCHEDULES AND PROCEDURES II.A. Purpose and Scope The inspection schedule used by ATK for the hazardous waste management areas has been designed to meet the requirements of R315-8.2.6. The design of the schedule promotes the detection of malfunctions, deterioration, discharges, and other situations which may be causing or leading to a release of hazardous waste constituents into the environment or pose a threat to human health. Inspections are conducted by personnel trained to identify potential problem areas and to use the inspection schedule and the inspection log. Eight areas are designated for inspection: the container storage area at E-501, M-705S, M-186, the Thermal Treatment Areas at M-136 (including the LTTAs, burn trays and Burn Station 14), M-225, T-29B hydrazine dilution and the solid propellant/motor storage buildings, M-47-629, M 603 and storage pad S-633. Waste solid propellant and rocket motors are stored at buildings M-47-629, M 603, and storage pad S-633 only occasionally and waste hydrazine is treated (by dilution) at building T-29B periodically. Therefore inspections of these facilities, in accordance with their inspection schedules, are only required when hazardous waste is being stored or treated at the facility. A facility must be inspected, however, prior to receiving hazardous waste for storage or treatment if inspections were discontinued during the period of inactivity. If any problems are identified with the areas of concern that are listed in the inspection schedules (contained in this attachment), they must be corrected before the facility is put back into use. Repairs or corrective action for any deterioration or malfunction discovered by an inspection shall be conducted as outlined in Module II, Section F. Repairs to security equipment shall be completed as soon as practicable, but not later than 72 hours after the problem is discovered. As stated in R315-8-2.6(c), where a hazard is imminent or has already occurred, remedial action shall be taken immediately. All records of inspections and remedial actions shall be retained in the Operating Record, for a period of at least three years. At a minimum, inspection records shall include the date and time of the inspection, the name of the inspector, a notation of the observations made, and the date and nature of any repairs or maintenance taken. II.B. Remedial Action or Maintenance II.C. Inspection Records ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 2010Julv 1. 2015 UTD009081357 II.D. Inspection Schedules The inspection schedules appear in detail in Tables II-A through II-F. Each inspection schedule is designed so that the items appearing on the schedule are inspected frequently enough to avoid any deterioration of equipment and thus reduce the probability of an environmental or human health incident between inspection times. Each inspection schedule is divided into individual categories and each category contains a specific list of items to be inspected. Inspections are also required within 24 hours after a storm event as outlined in the schedules below. A storm event is defined as precipitation in excess of 1.0 inch in a one- hour period. It shall be documented in the inspection log that the inspection was conducted in response to a storm event. TABLE II-A INSPECTION SCHEDULE FOR DRUM STORAGE AT M-186 EQUIPMENT 1. Security Equipment Fences Signs Gates Lock 2. Area Roadway Loading/ Unloading Areas Periphery MINIMUM FREQUENCY Weekly Weekly Weekly Weekly Daily1 Daily1 Daily1 AREAS OF CONCERN Visually inspect all fence lines and look for broken or downed fence lines, loose wires Readable signs, signs in place Able to properly close gate, safety flags in place In working order, able to lock Inspect road for spills, soil discoloration Inspect loading areas for spills, soil discoloration Inspect grounds for any spills, soil discoloration or stressed vegetation I ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 2010Julv 1. 2015 UTD009081357 3. Safety Equipment Eyewash/Shower Monthly Telephone/Radio Monthly 4. Storage Containment Containers Weekly Pads Weekly3 Sumps/Pads Daily32 Drainage Area Weekly2 Roof Weekly 5. Emergency Equipment Fire Monthly Extinguisher Absorbent Monthly Repack Drums Monthly 5 5-Gallon drums Monthly Generator Monthly Pump Monthly Ensure in working order by testing, check water supply Working condition Number of containers, severe corrosion (i.e., flaking, large rust buildup, rusty bungs), dented drums, hazardous waste labels in place, properly marked, readable, open bungs, no standing liquid on drums, adequate aisle space (2.5 feet) Chips, cracks,or irregularities in concrete, general condition Standing liquid on pad or in sumps Spills, discolored soil General condition including holes or defects Fire extinguisher full, in working order Adequate supply (minimum 25 lbs) Two repack drums with seals Six empty 55-gallon drums with bungs in good condition, no dents, etc. Routine oil check, fill with gas, test startup Good working order, hoses intact, test startup and pump I ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 2010Julv 1. 2015 UTD009081357 Daily when in use (i.e. when loading or unloading operations occur at the facility). 2 And after each storm event. A storm event is defined as more than one inch of precipitation in a one hour period. - Daily except for weekendsnonscheduled work days and holidays TABLE II-B INSPECTION SCHEDULE FOR BURNING GROUNDS AT M-136 EQUIPMENT 1. Security Equipment Fences Signs Gates Lock 2. Area Roadway Loading/ Unloading Areas Periphery 3. S afety Equipment MINIMUM FREQUENCY Weekly Weekly Weekly Weekly Daily1 Daily1 Daily1 AREAS OF CONCERN Visually inspect all fence lines, look for loose wires or broken lines Readable signs, signs in place Able to properly close gate In working order, able to lock Spills, discolored soil Spills, discolored soil Spills, discolored soil, stressed vegetation Telephone/Radio Monthly 4. Burn Ground Area Erosion Weekly3 Check operating condition of equipment Survey area and note severe erosion on grounds ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 201 OJulv 1. 2015 UTD009081357 5. Storage/Containment Burn tray Fire Extinguisher Weekly2* Container Weekly2 6. Emergency Equipment Monthly Tray is intact and liquid tight, accumulation of liquids Closed, labeled, signs of leaks or spills Fire extinguisher full and in working order 1 Daily when in use (i.e. when loading or unloading operations occur at the facility). 2 Inspect upon arrival, then each calendar week 3 And after each storm event. A storm event is defined as more than one inch of precipitation in a one-hour period. TABLE II-C INSPECTION SCHEDULE FOR BURNING GROUNDS AT M-225 EQUIPMENT 1. Security Equipment Fences MINIMUM FREQUENCY Weekly Signs Weekly Gates Weekly Lock Weekly 2. Area Roadway Daily1 Loading/Unloading Daily1 AREAS OF CONCERN Visually inspect all fence lines, look for loose wires or broken lines Readable signs, signs in place Able to properly close gate In working order, able to lock Spills, discolored soil Spills, discolored soil ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 2010Julv 1. 2015 UTD009081357 Areas Periphery Daily1 3. S afety Equipment Telephone/Radio Monthly Spills, discolored soil, stressed vegetation Check operating condition of equipment 4. Burn Ground Area Erosion Weekly2 Burn Tray Weekly2 5. Emergency Equipment Fire Extinguisher Monthly Survey area and note severe erosion on grounds Tray is intact and liquid tight, accumulation of liquids Fire extinguisher full and in working order 1 Daily when in use (i.e. when loading or unloading operations occur at the facility). 2 And after each storm event. A storm event is defined as more than one inch of precipitation in a one-hour period. TABLE II-D INSPECTION SCHEDULE FOR STORAGE AND CONSOLIDATION ROOM AT M-705S EQUIPMENT 1. Security Equipment Signs MINIMUM FREQUENCY Weekly AREAS OF CONCERN Readable signs, signs in place I ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 2010Julv 1. 2015 UTD009081357 2. Area Roadway Daily1 Loading/Unloading Daily1 Areas Periphery Daily1 3. S afety Equipment Eyewash/Shower Monthly Telephone/Radio Monthly 4. Storage containment Containers Weekly Pads, Sumps Weekly Portable Secondary Daily2 Roof Weekly Sump, pads Daily2 5. Emergency Equipment Fire Extinguisher Monthly Absorbents Monthly Repack Drums Monthly Spills, discolored soil Spills, discolored soil Spills, discolored soil, stressed vegetation Ensure in working order by testing, check water supply Check operating condition of equipment Number of containers, severe corrosion (i.e. flaking, large rust buildup, rusty bungs), dented drums, hazardous waste labels in place, properly marked, readable, no open bungs, no standing liquid on the drums Chips, cracks, or irregularities in the concrete, general conditions Cracks, liquid, containment integrity General condition including holes or defects Check for standing liquids in the sump and containment system Fire extinguisher full and in working order Adequate supply (minimum 25 lbs.) Two repack drums with seals ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 2010Julv 1. 2015 UTD009081357 55-Gallon Drums Monthly Six empty 55-gallon drums with bungs in good condition, no dents, etc. 1 Daily when in use (i.e. when loading or unloading operations occur at the facility). 2 Daily except for weekends and holidays. TABLE II-E INSPECTION SCHEDULE FOR M-62947, M 603 (Note: As stated in section 11 . A. of this Attachment, inspections of these storage buildings are not required during periods when hazardous waste is not being stored at the facility) EQUIPMENT 1. Security Equipment Signs Bay Doors Lock 2. Area Roadway MINIMUM FREQUENCY Weekly Weekly Weekly Daily1 Loading/Unloading Areas Daily1 Periphery Daily1 3. Communications Equipment Telephone Monthly AREAS OF CONCERN Readable signs, signs in place Function properly Function properly Inspect road for spills, soil discoloration Inspect loading areas for spills, soil discoloration Inspect grounds for any spills, soil discoloration or stressed vegetation Working condition; place call to verify operation I ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 2010Julv 1. 2015 UTD009081357 4. Storage Containers Motors/bags, etc. Building Weekly Weekly Verify condition of motors/bags, properly marked and labeled, out of place material and check for leakage, or liquid discharge from waste solid rocket motors and propellant. Verify no damage done to exterior of facility Roof 5. Emergency Equipment Fire Extinguisher Weekly Monthly General condition including holes or defects In working order and full 1 Daily when in use (i.e. when loading or unloading operations occur at the facility). TABLE II-F INSPECTION SCHEDULE FOR DRUM STORAGE PAD AT E-501 EQUIPMENT 1. Security Equipment Fences Signs Gates MINIMUM FREQUENCY Weekly Weekly Weekly AREAS OF CONCERN Visually inspect all fence lines and look for broken or downed fence lines, loose wires Readable signs, signs in place Able to properly close gate, safety flags in place Lock Weekly In working order, able to lock ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 2010Julv 1. 2015 UTD009081357 2. Area Roadway Daily1 Inspect road for spills, soil discoloration Loading/ Daily1 Unloading Areas Periphery Daily1 3. S afety Equipment Eyewash/Shower Monthly Inspect loading areas for spills, soil discoloration Inspect grounds for any spills, soil discoloration or stressed vegetation Ensure in working order by testing, check water supply Telephone/Radio Monthly 4. Storage Containment Containers Weekly Pads Weekly Sumps/Pads Daily1 Drainage Area Weekly2 Roof Weekly 5. Emergency Equipment Fire Monthly Extinguisher Working condition Number of containers, severe corrosion (i.e., flaking, large rust buildup, rusty bungs), dented drums, hazardous waste labels in place, properly marked, readable, open bungs, no standing liquid on drums, adequate aisle space (2.5 feet) Chips, cracks,or irregularities in concrete, general condition Standing liquid on pad or in sumps Spills, discolored soil General condition including holes or defects Fire extinguisher full, in working order I ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 2010Julv 1. 2015 UTD009081357 Absorbent Monthly Adequate supply (minimum 25 lbs) Repack Drums Monthly One repack drum with seals 55-Gallon drums Monthly Three empty 55-gallon drums with bungs in good condition, no dents, etc. 1 Daily when in use (i.e. when loading or unloading operations occur at the facility). 2 And after each storm event. A storm event is defined as more than one inch of precipitation in a one-hour period. TABLE II-G INSPECTION SCHEDULE FOR T-29B Hydrazine Dilution Bay (Note: As stated in section II.A. of this Attachment, inspections of building T-29B are not required during periods when hazardous waste is not being treated at the facility) MINIMUM EQUIPMENT 1. Security Equipment Signs Door Locked 2. Area Roadway Loading/ Unloading Areas Periphery 3. S afety Equipment Eyewash/Shower FREQUENCY AREAS OF CONCERN Prior to treatment Readable signs, signs in place Prior to treatment In working order, locked Daily1 Daily1 Daily1 Inspect road for spills, soil discoloration Inspect loading areas for spills, soil discoloration Inspect grounds for any spills, soil discoloration or stressed vegetation Prior to treatment Ensure in working order by testing, check water supply I ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Telephone(cell) Prior to treatment 4. Storage Containment Containers Prior to treatment Modified September 30. 2010Julv 1. 2015 UTD009081357 Working condition Number of containers, severe corrosion (i.e., flaking, large rust buildup, rusty bungs), dented drums, hazardous waste labels in place, properly marked, readable, open bungs, no standing liquid on drums Floor Prior to treatment Chips, cracks,or irregularities in concrete, general condition Roof 5. Emergency Equipment Fire Extinguisher Absorbent Prior to treatment General condition including holes or defects Prior to treatment Fire extinguisher full, in working order Prior to treatment Adequate supply (minimum 25 lbs) 1 Daily when in use (i.e. when loading or unloading operations occur at the facility). TABLE II-H INSPECTION SCHEDULE FOR STORAGE PAD S-633 (Note: As stated in section HA. of this Attachment, inspections of this storage pad are not required during periods when hazardous waste is not being stored on the pad) EQUIPMENT 1. Security Equipment MINIMUM FREQUENCY AREAS OF CONCERN Fences Weekly Visually inspect all fence lines, look for ATK Launch Systems Inc. - Promontory Attachment 2 - Inspection Schedules and Procedures Modified September 30. 2010Julv 1. 2015 UTD009081357 Signs Gate Lock Weekly Weekly Weekly loose wires or broken lines Readable signs, signs in place Able to properly close gate In working order, able to lock 2. Area Roadway Daily1 Loading/Unloading Daily1 Areas Periphery Daily1 Erosion Weekly2 3. Storage Containers Motors/containers, etc. Weekly3 Spills, discolored soil Spills, discolored soil Spills, discolored soil, stressed vegetation Survey area and note severe erosion on or around storage pad Verify condition of motors/containers, properly marked and labeled, out of place material and check for leakage, or liquid discharge from waste solid rocket motors and propellant. Daily when in use (i.e. when loading or unloading operations occur at the facility). 2 And after each storm event. A storm event is defined as more than one inch of precipitation in a one-hour period. 3Inspect upon arrival, then each calendar week Attachment 4 - Contingency Plan ..---{ Field Code Changed HAZARDOUS WASTE MANAGEMENT Contingency Plan and Emergency Procedures For Spills of Hazardous Materials JanuaryJuly 20145 ATK Launch Systems Promontory FacilitvFJant P.O. Box 707 Brigham City UT 84302-0689 (435) 863-8545 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan July. 20145 UTDO09081357 PREFACE This document, HAZARDOUS WASTE MANAGEMENT CONTINGENCY PLAN AND EMERGENCY PROCEDURES FOR SPILLS OF HAZARDOUS MATERIALS, (herein referred to as Contingency Plan), provides written instructions on how to take care of spills of hazardous substances. It is intended to meet the requirements of the Utah Hazardous Waste Rules and Subpart D of the EPA Resource Conservation and Recovery Act. This CONTINGENCY PLAN does not replace, nor is it to be used instead of, the ATK Launch Systems - Promontory EMERGENCY AND DISASTER RESPONSE PLAN, or any other plan which outlines procedures to be followed during general emergencies, disasters, civil disturbances, riots, bomb threats, etc. Most spills involving hazardous substances will not require use of the EMERGENCY AND DISASTER RESPONSE PLAN. Spills that create an emergency situation involving possible injury to personnel or damage to property will require use of the EMERGENCY AND DISASTER RESPONSE PLAN to take care of the emergency. This CONTINGENCY PLAN applies to containment and cleanup of a hazardous waste spill. Definitions in the HAZARDOUS WASTE MANAGEMENT CONTINGENCY PLAN AND EMERGENCY PROCEDURES reflect EPA and State of Utah environmental language while those in the EMERGENCY AND DISASTER RESPONSE PLAN reflect OSHA, UOSH, FEMA, and ATK Launch Systems language. The user must be careful not to be confused by differences in language between these documents and must evaluate the applicability of each document to the particular situation. I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 TABLE OF CONTENTS I. INTRODUCTION 1 A. PURPOSE 1 B. SCOPE 1 C. NOTIFICATION 1 D. POSTING 1 E. REVISIONS AND UPDATING 1 F. DEFINITIONS 2 G. PLANT LOCATIONS AND SITE INFORMATION 5 H. PREVENTION OF RECURRENCE OR SPREAD OF FIRES, EXPLOSIONS, OR RELEASES 7 II. REPORTING PROCEDURES AND INCIDENT IDENTIFICATION 7 A. EVACUATION CRITERIA 7 B. IDENTIFICATION OF A HAZARDOUS WASTE IN A SPILL 7 C. REPORTING OF EMERGENCY INCIDENTS 8 D. PERSONNEL RESPONSIBILITIES 8 E. ALARM SYSTEMS 19 F. LOCAL LAW-ENFORCEMENT AGENCIES, FIRE DEPARTMENTS, AND HOSPITALS 15 III. SPILL CONTAINMENT AND CLEANUP 16 A. CONTROL PROCEDURES 16 B. SPILL CONTAINMENT AND CONTROL 16 C. SPILL CLEANUP 16 D. FOLLOWUP PROCEDURES 17 E. INCOMPATIBLE WASTE 18 F. CLEANUP MATERIAL AND EQUIPMENT 18 G. DECONTAMINATION EQUIPMENT AND PROCEDURES 20 H. EQUIPMENT DECONTAMINATION AND REPLENISHMENT 20 IV. INSTALLATION RESPONSE TEAM TRAINING 21 A. TRAINING 21 B. SIMULATION 22 V. TRAINING PLAN 22 A. SCOPE AND PURPOSE OF THE CONTINGENCY PLAN 22 B. REVIEW OF LEGAL REQUIREMENTS 22 C. LOCAL ATK CORPORATION REQUIREMENTS 22 D. CUSTOMER REQUIREMENTS 22 E. REVIEW AUTHORITY AND FUNCTION OF EACH RESPONSE TEAM MEMBER. 22 F. EMERGENCY COMMUNICATION SYSTEM 22 G. FIRE PLANS/FIRE DRILL 22 H. BOMB SEARCH TECHNIQUES 22 I. FIRE BARRICADE/CORDON AREAS 23 J. EMERGENCY MEDICAL TREATMENT 23 K. SECURITY OF SITE 23 L. INVESTIGATION 23 M. PUBLIC RELEASE OF INFORMATION 23 N. FACT-FINDING METHODS 23 0. SAFING THE AREA 24 P. CONTROL OF THE CURIOUS 24 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan January July. 20145 UTD009081357 Q. HANDLING OF REMAINS 24 R. NOTIFICATION PROCEDURES 24 S. RESCUE EFFORTS 24 TABLES TABLE I COMPATIBILITY INFORMATION 25 TABLE II EMERGENCY COORDINATOR CALL LIST 26 FIGURES FIGURE 1. DECONTAMINATION/SPILL SCENE 27 FIGURE 2. DECONTAMINATION 28 APPENDIX I NORTH PLANT SITE MAP 30 SOUTH PLANT SITE MAP 31 TEST AREA SITE MAP 32 PLANT 3 SITE MAP 33 M-136 BURNING GROUNDS FACILITY FUNCTION TABLE 34 M-186 HAZARDOUS WASTE AREA FACILITY FUNCTION TABLE... M-136 SITE MAP AND EVACUATION PLAN M-186 SITE MAP AND EVACUATION PLAN E-501 STORAGE YARD FACILITY FUNCTION TABLE E-501 SITE MAP AND EVACUATION PLAN M-225 BURNING GROUNDS FACILITY FUNCTION TABLE M-225 SITE MAP AND EVACUATION PLAN T-29B SATELLITE ACCUMULATION AREA FUNCTION TABLE T-29B SITE MAP AND EVACUATION PLAN M-705 WASTEWATER TREATMENT FACILITY FUNCTION TABLE. M-705 HAZARDOUS WASTE CONSOLIDATION ROOM M-705 SITE MAP AND EVACUATION PLAN M-62947 PROPELLANT STORAGE FUNCTION TABLE M-62947- SITE MAP AND EVACUATION PLAN M 603 PROPELLANT STORAGE FUNCTION TABLE M 603 SITE MAP AND EVACUATION PLAN ..34 ..35 ..36 ..37 ..38 ..39 ..40 ..41 ..42 ..43 ..43 ..44 ..45 ..46 S-633 PROPELLANT STORAGE FUNCTION TABLE. S-633 SITE MAP AND EVACUATION PLAN ./04N Formatted: Highlight Formatted: Highlight : Formatted: Highlight ' Formatted: Highlight I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 APPENDIX II A. BULK FLAMMABLE LIQUID STORAGE AREAS 50 B. PRACTICAL CONSEQUENCES OF A CATASTROPHIC FAILURE 51 APPENDIX III ARRANGEMENTS WITH LOCAL AUTHORITIES 52 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuorvJulv. 20145 UTD009081357 I. INTRODUCTION A. PURPOSE This plan may be activated by requesting emergency response on phone number 2222 or 911. The purpose of this Contingency Plan and Emergency Procedures is to set forth responsibilities, establish organizational structure, and outline the procedures required to ensure effective warning, response, and control to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water. B. SCOPE This organizational plan is intended to meet requirements of the Utah Hazardous Waste Management Rules and Subpart D of the Resource Conservation and Recovery Act. The provisions of this plan will be carried out immediately whenever there is a fire, explosion, or release of hazardous waste or hazardous waste constituents at one of the permitted facility that could threaten human health or the environment. This plan specifically addresses company actions to be initiated in the event of a spill or release of hazardous materials. C. NOTIFICATION Incidents covered by this contingency plan and which meet applicable State of Utah and U.S. EPA reporting requirements will be reported to the appropriate agencies by Environmental Specialists. The Environmental Specialist should confer with the Director or Manager of Environmental Services prior to notification. D. POSTING Copies of the Contingency Plan and all revisions must be: 1. Maintained at the facility and the Fire Department's Spill Response vehicle. 2. Submitted to all local police departments, fire departments, hospitals, and State and local emergency response teams that may be called upon to provide emergency services. (Arrangements have been made between ATK Launch Systems - Promontory and the hospitals located at Brigham City and Tremonton regarding emergency services that would be provided as required. Letters of agreement are kept in the Environmental Services Central Files.) This contingency plan will be reviewed and amended whenever: 1. Applicable regulations are revised. 2. The plan fails in an emergency. 3. The facility changes its design, construction, operations, maintenance, or other circumstances in a way that materially increases the potential for fires, explosions, or release of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency. E. REVISIONS AND UPDATING 1 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 4. The list of emergency coordinators change. 5. The list of emergency equipment changes. F. DEFINITIONS 1. Disaster - An event in which loss of life, serious and/or multiple injuries, major property or environmental damage, or major disruption of normal operations has occurred. This includes serious fires or major hazardous material spills, explosions, injuries to multiple people, and acts of nature such as floods, violent storms, or earthquakes. 2. Discharge - The accidental or intentional spilling (see Spill), leaking, pumping, pouring, emitting, emptying, or dumping of hazardous waste on or into the air, land, or water. 3. Emergency - A situation which, if not quickly controlled, can lead to death, serious and/or multiple injuries, major loss or damage to property, significant damage to the environment, or disruption of normal operations. 4. Emergency Command Unit - The group of personnel selected by the emergency commander to assist in the full scope administration of the emergency. 5. Emergency Commander - The General Manager or his designee, as head of the Command Unit, is responsible for the overall direction, coordination, and function of all units charged with providing countermeasures to cope with conditions and/or events within the scope of this plan. The Command Unit will consist of any and all persons selected by the Emergency Commander. NOTE The Emergency Commander will be the head of the Command Unit for all civil disturbances, bomb threats, national emergencies, and natural disasters. The Command Unit will operate from a pre-designated Emergency Operations Center specified by the Emergency Disaster Response Plan or the Emergency Commander. 6. Emergency Operations Center (E.O.C.) - The location of senior management where decisions and incident specific policies are made. 7. Environmental Specialist - The Environmental Specialist is the Spill Team Leader from Environmental Services. He or his designated alternate will assist the Incident Commander in the evaluation of the impact on the environment resulting from any emergency, disaster, or hazardous substance discharge. NOTE When required, notification of Federal, State, and/or local environmental agencies shall be through the Environmental Specialist Company policy requires that the event be discussed with the Vice President of the applicable division and A TK Corporate Environmental. 8. Fire Brigade - A group of employees, generally from maintenance, who have received HAZWOPER training and are called on as needed to assist the full-time fire department in emergency response. 2 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 9. Fire Warden - A designated individual assigned in advance to assist the fire department in evacuation procedures and give information on the building and surrounding area. 10. Hazardous Waste - Identified in 40 CFR 261 and in Utah Hazardous Waste Management Rules, Section 2.1 on the basis of specific listed material and general characteristics. Specific listed wastes are found in these documents. The EPA regulations provide detailed technical specifications of four characteristics: Ignitable(DOOl)- Corrosive (D002) - Reactive (D003) - An ignitable compressed gas, an oxidizer, a liquid having a flashpoint < 140EF, or a non-liquid capable of causing fire, under standard temperature and pressure, through friction, absorption, moisture, or spontaneous chemical changes. A solid waste that (1) is aqueous and has a pH < 2 or > 12.5; or (2) is a liquid and has a corrosion rate > 0.25 inches/year on steel. A solid waste that: a. Is unstable and readily undergoes violent change without detonating. b. Reacts violently with water. c. Forms potentially explosive mixtures with water. d. Generates toxic gases, vapors or fumes in a quantity sufficient to present a danger to human health or the environment when mixed with water. e. Is a cyanide or sulfide bearing waste which can generate toxic gases, vapors, or fumes in a quantity sufficient to present a danger to human health or the environment when exposed to pH conditions between 2 and 12.5. TCLP Toxicity - (as determined by Toxicity Characteristic Leachate Procedures) - Presence of certain listed toxic materials at levels greater than those specified in the regulation. 11. Chemical Safety Software EMS-E - a computer based system which contains a scanned image of the MSDS, plus additional safety and disposal information. 12. Hazardous Waste Profile Data (HWPD) Sheet - An ATK document that lists all EPA, DOT, and chemical information needed for marking, labeling, and identifying waste streams on plant. 13. Hazardous Waste Operations and Emergency Response (HAZWOPER) - Refers to specific training requirement for handling hazardous materials and for emergency operations. These requirements are found in 29 CFR 1910.120. 14. Human Resource Coordination - An intermediate between management and personnel who deals with employee concerns and interests. 15. Incident Commander/Emergency Coordinator - The Incident Commander will be the on-duty Assistant Fire Chief/Incident Commander. The Incident Commander will direct the activities of all Field Units from a designated control 3 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 point at the scene of the emergency, disaster, or other event. The Security Manager will be the Incident Commander for countermeasures in situations caused by hostile persons. The Fire Prevention Captain will act as Incident Commander until relieved by an Assistant Fire Chief. The following items are identified as principles for the Emergency Commander and Incident Commander to apply to the unique circumstances of the emergency or disaster: a. Assist the injured. b. Stabilize situation and site. c. Assure evidence is not destroyed, lost, or moved. d. Record situation through text, photographs, videos, and/or mapping. e. Notify State and local officials. f. Secure and admit only qualified essential personnel to the site. g. Debrief participants. 16. Material Safety Data Sheet (MSDS) - Provides information on safe handling , proper PPE, and disposal information for each chemical. This document is prepared by the chemical manufacture. For additional information, contact your local Industrial Hygiene representative. 17. Non-sudden Release - The accidental discharging (see Discharge), spilling, leaking, pumping, pouring, emitting, emptying, or dumping of hazardous wastes or materials which, when spilled become hazardous wastes, into or on any land or water over an extended period of time. This also includes spills onto asphalt or concrete pads. 18. Reportable Spill (Discharge) - A hazardous waste spill which must be reported to the Utah Department of Environmental Response and Remediation, National Response Center and/or other applicable Federal, State or local authorities. The Utah Hazardous Waste Management Rules list reportable spill quantities as: a. One kilogram (2.2 lb) of material in accordance with R315-9-l(b)(l). A spill of a lesser quantity must be reported if there is a potential threat to human health or the environment. b. One-hundred kilograms (220 lb) of hazardous waste or material which, when spilled, becomes hazardous waste, in accordance with R315-9-l(b)(2). A spill of a lesser quantity must be reported if there is a potential threat to human health or the environment. c. Subpart J of 40 CFR Part 265 of the Resource Conservation and Recovery Act stipulates that a spill of 1 lb from a leaking hazardous waste sump is a reportable quantity. NOTE For complete descriptions and listings, contact Environmental Services or refer to R315-9 of the Utah Hazardous Waste Management Rules. 4 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 The following is a partial list of materials used at ATK and the quantities which, if spilled, would require State or Federal notification: Utah • Quantity 220 lbs. 220 lbs. 220 lbs. 220 lbs. 220 lbs. 220 lbs. 2.2 lbs. 220 lbs. 2.2 lbs. 220 lbs. 220 lbs. 19. Solid Waste - Any discarded material that is a solid, liquid, semi-solid or contained gaseous material resulting from industrial, commercial, mining, or agricultural operations and is not excluded under 40 CFR 261.4(a), 260.30, or 260.31. 20. Spill - The accidental discharging (see Discharge), spilling, leaking, pumping, pouring, emitting, emptying, or dumping of hazardous wastes or materials which, when spilled become hazardous wastes, into or on any land or water. This also includes spills onto asphalt or concrete pads. 21. Environmental Services - A department with expertise in the areas of hazardous waste, air and water management, including environmental regulations in these areas. EPA Material Quantity Acetone 5000 lbs. Methanol 5000 lbs. Methylchloroform 1000 lbs. Methylene Chloride 1000 lbs. Methyl Ethyl Ketone 5000 lbs. Methyl Isobutyl Ketone 5000 lbs. Nitroglycerin 10 lbs. Propellants, reactive materials (HMX) oxidizers (AP) 100 lbs. Sodium Azide 1000 lbs. Toluene 1000 lbs. Xylene 100 lbs. G. PLANT LOCATIONS AND SITE INFORMATION 1. The ATK Launch Systems - Promontory (ATK) plant is located in Box Elder County approximately 30 miles northwest of Brigham City. The 30-square mile plant site is remote from any major population centers and is reasonably isolated from ranches located at varying distances from the area boundaries The plant site is composed of four major areas in which manufacturing and testing activities take place: South Plant, North Plant, Test Area, and Plant 3. There are approximately 675 buildings located on the plant site, (See Appendix I for facility site maps). ATK owns and operates these 4 areas. All of these areas are contiguous and waste disposal is managed by one organization. From the beginning of operations in 1956 to the present time, plant activities have encompassed a wide range of programs requiring the production of solid rocket propellants, rocket motor testing, and industrial support necessary to achieve each program's objectives. Solid rocket motors manufactured during this period vary from motors containing 7-9 lb of propellant to 1,100,000 lb. Programs have included Space Shuttle SRM, Peacekeeper, Trident, SRAM, HARM, Standard, Genie, Minuteman, Poseidon and a variety of ground and air launched flares. 5 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 2. The plant site has eiqhtftme hazardous waste treatment and storage facilities: Burning Grounds at M-136, and M-225; Drum Storage areas at E-501 and M-186; the T-29B Hydrazine Dilution Facility; the M-705 Wastewater Troatmont Plant; the M-705S Hazardous Waste Consolidation Room; and the solid propellant waste storage facilities at buildings M-47-629 and M-603 and storage pad S-633.. The site maps and evacuation plans for these facilities are shown in Appendix I. These eiqhtmne facilities serve as waste management units for the entire facility. Reactive wastes treated at the burning grounds include waste propellants, waste explosives, oxidizers, or solid waste contaminated with propellants, explosives, or oxidizers. No propellants or explosives are ever stored in the drum storage areas; hazardous wastes that are flammable, toxic, or corrosive are stored in these units. The Hydrazine Dilution Facility at T-29B dilutes waste hydrazine to between 5 to 50 percent by volume for shipment to an off-plant disposal site. The M-705 Wastewater Treatment Facility treats hazardous and industrial waters from building sumps. Hazardous wastes are consolidated and lab packed at the M-705S Hazardous Waste Consolidation Room. 3. Approved hazardous waste accumulation areas are described in Table I. 4. Fire hydrants are located as follows: 101 hydrants in the Administrative and Manufacturing area, 95 at North Plant, 47 in the Test Area, and 9 in Plant 3. Static and dynamic pressure heads have been measured for each hydrant and the Fire Department maintains this information. The fire protection system at the plant site meets the NFPA codes for fire protection. ATK owns and operates two pumper fire engines and two brush trucks which are used for emergency response. The following water tanks are interconnected: Location X-1 X-2 M-131 M-132 M-133 M-587 (North Plant) M-696 T-59 (Test) Capacity (gal) 200,000 20,000 50,000 50,000 100,000 1,000,000 20,000 1,000,000 The M-203 (Propellant Development Area) water tank with a 100,000 gallon capacity is not interconnected to the other tanks. Fire hydrants throughout the plant are color coded according to capacity. Color Code Flow Capacity (qpm) Green Fire Hydrant 1,000 or more Orange Fire Hydrant 500 - 1,000 Red Fire Hydrant 500 or less 5. Information depicting the capacity, location, and practical consequences of a catastrophic failure of large hazardous material storage areas is found in Appendix II C, p.67. 6. All buildings with 10 or more regular occupants have an evacuation plan posted at all major exits of the building. (See Appendix I for the site maps and evacuation routes of 6 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 the hazardous waste treatment and storage facilities). H. PREVENTION OF RECURRENCE OR SPREAD OF FIRES, EXPLOSIONS, OR RELEASES 1. There are many steps that can be taken to prevent the recurrence and spread of fires, explosions, or releases at the drum storage areas, burning grounds, and operating buildings. These include limiting propellant quantities placed in the burning trays, following safe handling procedures, personnel training, segregating incompatible and reactive materials in the burning trays and in the drum storage areas, practicing good housekeeping procedures, proper labeling, regular inspections, and separating the burning trays by safe distances. These procedures are outlined in company operating manuals. 2. Each fire, explosion, or release into the environment is unique. The Incident Commander must be an experienced individual who will take all possible steps to prevent a recurrence, to limit the extent of the damage, and to stop the discharge. These steps may include: a. Stopping processes and operations. b. Collecting and containing released wastes. c. Removing and isolating containers. d. Preventing additional harm to the environment through knowledge of the potential hazards associated with storage areas (found in Appendix II, A and B, pp. 65 and 66, their locations, capacities, and identification. 3. User organizations conduct regular inspections on items such as bulk storage containers that store hazardous wastes or materials which, if released to the environment, would become hazardous wastes. Audits are taken on volumes of stored materials versus consumption to ensure that non-sudden releases are not occurring. If a non-sudden release of materials is discovered, steps are taken immediately to minimize the impact on the environment. II. REPORTING PROCEDURES AND INCIDENT IDENTIFICATION A. EVACUATION CRITERIA 1. A fire that is a threat to human safety. 2. A spill that is a threat to human safety. B. IDENTIFICATION OF A HAZARDOUS WASTE IN A SPILL 1. The building personnel working the operation identify the material. 2. The Material Safety Data Sheet (MSDS) is referred to for chemical constituents, health hazards and protective clothing. 3. The Hazardous Waste Profile Data sheet, Chemical Safety Software EMS-E, or MSDS is referred to for proper disposal of the waste. 7 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv, 20145 UTD009081357 C. REPORTING OF EMERGENCY INCIDENTS 1. Spilled material is reported to Security. 2. Security contacts the Environmental Service's Spill Advisory Team and Safety for technical support and advice. 3. Environmental Services contacts the State and EPA to report the incident (if required). 4. Environmental Services obtains the log from Security to prepare the written report to the State. 5. Within 15 days, Environmental Services submits the written report to the State and maintains a permanent copy in the Environmental Services' Central File as required. D. PERSONNEL RESPONSIBILITIES 1. EMERGENCY MANAGER a. At all times, there shall be at least one employee either present on the facility premises or on call with the responsibility for coordinating all emergency response measures. b. The facility emergency coordinator is thoroughly familiar with all aspects of the facility's contingency plan, all operations and activities at the facility, the location and characteristics of waste handled, the location of manifests and all other records within the facility, and the facility layout, or has immediate access to persons with this information. c. This person shall have the authority to commit the resources needed to carry out the contingency plan. d. Arranges for and directs a spill contingency plan simulation. 2. EMPLOYEES, FIRST LINE SUPERVISORS AND FIRE WARDENS a. Report all fires or emergencies by activating the fire alarm or calling the emergency number. b. Report from a safe telephone location: Your name and phone number Type of incident (fire, explosion, injury, spill, etc.) Location of incident c. Stay on the line when possible until released by the emergency operator. d. Do not attempt to fight fires involving live or possibly toxic hazardous materials. e. Do not attempt to contain spills that are beyond capability or training. 3. FIRST LINE SUPERVISORS a. Ensure personnel evacuate buildings or areas to the assembly point indicated on the Emergency/Evacuation Plan located in each building. 8 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 NOTE Handicapped personnel must be provided priority and assistance during evacuation and assembly. b. Advise the Fire Captain and the Incident Commander of conditions at the scene. c. Account for all employees that were in or assigned to the affected building or area. d. Report any injured or missing personnel to the Incident Commander. e. Remain at the assembly point until released by the Incident Commander. f. Notify appropriate Safety Department and fill out a Mishap Report. 4. INCIDENT COMMANDER a. Initiate the first response actions. b. Contact line supervision at the assembly point to determine the details of the situation: i. Nature of incident ii. Number of personnel injured or not accounted for and the location of their last known assignment. iii. Location and type of hazardous materials that may be exposed to fire or explosion (Quantity Distance Criteria). c. Applicable Quantity Distance Criteria. d. Assume control of emergency area. e. Declare severity of event such as an emergency or disaster as appropriate. f. Establish emergency scene, coordinate road blocks, cordon the site, and control entry/exit from the area. g. Make an initial assessment of situation. h. Notify the Security Radio Dispatcher as appropriate, close the switchboard, if absolutely necessary. The Environmental Specialists must be included if a building deluge system has been activated and the building sump has overflowed or another known spill of hazardous material has taken place. i. Identify safe response routes for follow-on units, j. Coordinate activities with other emergency units, k. Commit rescue and first aid crews as necessary. I. Obtain emergency rescue and ambulance as required. m. Keep the Emergency Commander informed of the emergency situation. 9 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 n. Request outside assistance from the EOC as needed. p. Check with building's supervision to identify propellant ingredients and hazardous constituents in any building or building sump which must be pumped by Water Operations personnel. Evaluate what hazards, if any, exist which may hinder safe access to the building. q. Perform actions in accordance with 29 CFR 1910.120 (HAZWOPER). 5. SECURITY a. Set up road blocks as directed by the Incident Commander to preclude unauthorized entry of personnel and provide clear traffic flow for emergency vehicles. b. Coordinate with Incident Commander to ensure orderly evacuation of personnel. c. Provide protection for classified information, valuable records, and special equipment. d. Ensure protection of Company and Government property from theft or sabotage. e. Provide proper disposition, storage, and protection of classified material in accordance with the Department of Defense Industrial Security Manual. f. Establish perimeter boundary for emergency scene, set up road blocks, cordons, etc. g. Above actions must be consistent with HAZWOPER requirements. 6. SECURITY RADIO DISPATCHER a. When directed by the Incident Commander, notify appropriate personnel in accordance with the Emergency and Disaster Response Plan. b. Monitor and record all emergency radio communications, and establish required communications between radio units. c. Upon direction of the Incident Commander, notifies appropriate ATK management. 7. TELEPHONE OPERATORS a. When directed by the Incident Commander, refuse incoming and outgoing calls unless directed otherwise by the Emergency Commander. 8. INDUSTRIAL HYGIENIST a. Report to the Incident Commander at the assembly point or Field Command Post. b. Advise the Incident Commander on emergencies involving toxic chemical or radiation hazards. c. Perform the following activities as necessary: i. Sample air at the scene, including any sumps which have to be pumped, (if determined to be necessary by the Industrial Hygienist (IH) on the scene) 10 I ATK Launch Systems - Promontory JanuarvJulv. 20145 Attachment 4 - Contingency Plan UTD009081357 ii. Monitor radioactivity at the scene, (if determined to be necessary by the IH on the scene) iii. Advise Emergency Response Team concerning proper decontamination controls. iv. Notify Medical Services of personnel exposure to toxic chemicals or radioactive materials. v. Advise the Incident Commander to notify public health authorities, d. Performs these duties in accordance with HAZWOPER requirements. 9. MAINTENANCE CRAFTS PERSONNEL a. Respond to all alarms when notified by the Security Police Radio Dispatcher and report to the Incident Commander at the command post. b. Control distribution of air, water, steam, and electrical power as directed by the Incident Commander. c. Provide equipment, barricading, and shoring as necessary per direction of Incident Commander. d. As Fire Brigade, assist when needed. e. Provide construction type materials and services for containment of hazardous material spills. f. Performs these duties per direction of Incident Commander. 10. ENVIRONMENTAL SERVICES PERSONNEL a. Report to the Incident Commander at the command post, when notified by Security Police Radio Dispatch. b. Perform duties as directed by the Incident Commander after material to be collected has been identified, any hazards associated with the material have been identified, and safe procedures to handle the material have been established. c. Perform these duties in accordance with HAZWOPER requirements. d. Advise the Incident Commander on potential environmental hazards, safe handling, and disposal options. 11. MEDICAL SERVICES PERSONNEL a. Remain at or report to the Dispensary to receive and treat patients. b. Report to the emergency area when requested by the Incident Commander. c. Coordinate with surrounding community hospitals and doctors for the receipt and treatment of injured. d. Requisition supplemental medical supplies, equipment, and personnel as needed. 11 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 May request helicopter transportation in life or death situations. e. Conduct and supervise treatment for injured personnel. f. Review MSDS and other relevant information, and transmit same to receiving hospital. 12 TRANSPORTATION PERSONNEL (IN-PLANT TAXI SERVICE) a. Coordinate with Incident Commander to ensure adequate transportation of plant personnel. 13. EMERGENCY COMMANDER a. Control and coordinate overall activities of the emergency situation. The Emergency Commander will work from the Emergency Command Center, and will assist and direct the On-Scene Incident Commander as needed. b. Evaluate situation and determine need to convene the Emergency Command Unit. c. Direct the Telephone Operators to open or close the switchboard according to the nature of the emergency. d. Open the Emergency Operations Center as necessary. e. Identify the disaster potential posed by the emergency. f. Make the disaster declaration when necessary (disaster responsibilities are listed in Section III). 14. PHOTOGRAPHER a. Report to the Incident Commander at the Command Post. b. Advise the Incident Commander on photo coverage. c. Photograph the scene as directed. d. Expedite printing and delivery of the photographs. e. Interpret the photographs as required. 15. HUMAN RESOURCES COORDINATOR a. Provide food and assistance with personal needs for emergency team members and those affected. b. Notify next of kin of injured persons when advised by Emergency Commander. (See Section IV, the Emergency and Disaster Response Plan for procedures). 16. ENVIRONMENTAL SPECIALIST a. Assess possible environmental hazards resulting from the incident including assessment of spills caused by the activation of a building deluge system which in turn caused the building sump to overflow. 12 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 b. Initiate reports required by the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) and Utah Solid and Hazardous Waste Regulations. c. Determine (along with the responding local emergency agency) whether the facility has had a discharge, fire, or explosion which could threaten the environment outside of the facility. Assure immediate implementation of emergency procedures. d. Notify the State and Federal environmental agencies as required. e. The Environmental Specialist contacts either the government official designated as the on-scene coordinator or the National Response Center, (800) 424-8802, and Utah Dept. of Environmental Response and Remediation (DERR) at (801) 536- 4123 to relaying the following information: i. Name and telephone number of reporter. ii. Name and address of facility. iii. Time and type of incident (such as discharge, fire, etc.). iv. Name and quantity of material(s) involved, to the extent known. v. The extent of injuries, if any. vi. The possible hazards to human health or to the environment outside the facility. f. Notify the Corporate Environmental Engineer if the spill is reportable. David Shead (952) 351-2663 g. Utah Hazardous Waste Management Rules require that the Environmental Specialist note in the operating record the time, date, and details of any incident that requires implementing the contingency plan. Within 15 days after the incident, he must submit a written report on the incident to the Director of the Division of Waste Management and Radiation Control .Executive Secretary of tho Solid and ----'{_Formatted: Highlight Hazardous Waoto Control Board. The report must include: i. Name, address, and telephone number of the owner or operator. ii. Name, address, and telephone number of the facility. iii. Date, time, and type of incident (such as fire, explosion, etc.). iv. Name and quantity of material(s) involved. v. The extent of injuries, if any. vi. An assessment of actual or potential hazards to human health or the environment where this is applicable. vii. Estimated quantity and disposition of material recovered from the incident. 13 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan femtarvJulv. 20145 UTDO09081357 h. Notify the community emergency coordinator for the local emergency planning committee in compliance with requirements outlined in 40 CFR 355.40, where applicable. i. Immediately after an emergency, the Environmental Specialist must provide direction for treating, storing, or disposing of recovered waste, contaminated soil or surface water, or any other material that results from a discharge, fire, or explosion at the facility. j. The Environmental Specialist and the Incident Commander must ensure that, in the affected area(s) of the facility: i. A determination is made who will do the spill remediation work (Building Personnel, ATK Spill Remediation Team, or Off-Site Contractor). ii. No waste that may be incompatible with the discharged material is stored or disposed of until cleanup procedures are completed; and iii. All emergency equipment listed in the contingency plan is cleaned and ready for its intended use before normal operations are resumed. 17. CORPORATE PUBLIC AFFAIRS a. Establish liaison with representatives of public information media. b. Prepare drafts of general/public information press releases relating to the emergency. c. Release information as directed by the Emergency Commander, according to ATK Policy. 18. RECORDER a. Record incoming and outgoing communications at the EOC. b. Record all significant events and actions. c. Initiate and maintain record information in a time line log. d. Assist in the preparation of interim and final reports. E. ALARM SYSTEMS 1. Alarm systems are available at ATK for fires or building evacuations if an emergency or disaster situation exists: Type People/Materials Sound Fire and Building People Fire Alarm Evacuation Hazardous Waste People Verbal Signal (or fire alarm, if available) Storage and 14 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 Thermal Treatment Materials Verbal Signal (fire alarm or air horn, if available) 2. The hazardous waste storage facilities at M-186 and E-501 are located outdoors in open areas, evacuation of personnel will be in any direction away from the problem. The assembly area for E-501 is directly across the street (to the north) from the entrance gate. The assembly point for M-186 is at the M-381 trailer. 3. The hazardous waste storage facility at the M-705 Consolidation Room is a single room equipped with two exits, a single door on the west and a double door on the east. Both sets of doors open directly to an open outdoor area where personnel are to evacuate to an area near the intersection of the main in-plant road and the M-705 access road. The room is equipped with a heat sensor alarm, a fire alarm and a carbon monoxide alarm on the supplied air system. /I. M-j\7 js ai storage buNding onjyL and is equippe tho building only. These exits are delineated in the evacuation plans in Appendix I. 4£. M-629,03 is a storage building with multiple exits as outlined in the evacuation plan in appendix I. 56. Tables and maps showing the function of the various hazardous waste sites and area evacuation plans are found in Appendix I, p. .3440. F. LOCAL LAW-ENFORCEMENT AGENCIES, FIRE DEPARTMENTS, AND HOSPITALS 1. Local law-enforcement agencies, fire departments, and hospitals have been contacted to respond to or treat any ATK emergency. The most recent copy of this Contingency Plan is sent to each agency in order to familiarize them with the layout, description of hazardous wastes handled, and evacuation plan for the plant. Copies of the letters sent to each agency are kept in the Operating Record. 2. All emergency response units from off-plant will be escorted from the gate to the fire/explosion/spill site by an ATK authorized agent. This will ensure the units reach the location as quickly and efficiently as possible. III. SPILL CONTAINMENT AND CLEANUP A. CONTROL PROCEDURES 1. Detailed emergency response procedures whenever there is a fire, explosion, or release (spill) are found in the current Emergency and Disaster Response Plan. 2. Specific directives for cleaning up spills are given in the Hazardous Waste Profile Data (HWPD). There are over 1,000 chemical entries in the HPWD. Approximately 800 of the chemicals in current use exhibit hazardous properties. The MHSI documents are generated in-house to provide a standard format for easy use. Each entry contains Material Safety Data Sheet (MSDS) information as well as other information. There are approximately 100 sets of MHSI distributed throughout the facility. In addition, a complete MHSI is accessible through over 1,000 computer terminals at the facility. 3. The Wastewater Treatment Facility (M-705) is designed to treat wastewater containing hazardous-waste constituents. The responsible building foreman or supervisor should report to the M-705 facility personnel any spill or accidental discharge to a sump 15 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JonuarvJulv. 20145 UTD009081357 suspected of containing chemicals at concentrations above the levels normally discharged. The report should include the incident location, name of person reporting, chemical involved, and approximate quantity. The treatment facility personnel will then be able to determine how best to handle the wastewater. 4. The propellant storage buildings will be inspected daily or weekly as required when in use. While the propellants stored in these buildings are solid, occasionally a small amount of nitro glycerin or similar material can ooze from the motor and drip to the floor. These drips will be checked for during the inspections, and cleaned up using rags and acetone within 24 hours of discovery or as soon as is practicable. B. SPILL CONTAINMENT AND CONTROL §265.56(e) of the Resource Conservation and Recovery Act (RCRA) states: "During an emergency, the Emergency Commander must take all reasonable measures to ensure that fires, explosions and releases do not occur, recur, or spread to other hazardous waste at the facility. These measures must include where applicable, stopping processes and operations, collecting and containing released waste and removing or isolating containers." Confine hazardous material spills to the affected area with dams, Quicksort), or other approved means. Hazardous material properties may be determined by consulting the Hazardous Waste Profile Data Sheet, MHSI, or the DOT Emergency Response Guidebook. No attempt will be made to contain a spill until the hazardous properties are known. Secondary containment is provided for most storage tanks. For those tanks without secondary containment, consult Appendix II for spill containment considerations. C. SPILL CLEANUP 1. Waste Management and Environmental Services will be responsible for the coordination of spill cleanup activities. Building personnel will clean up smaller sized spills, incidental to the work process, that are deemed within the skills and level of training possessed by available building personnel, where the spill occurred. All other spills will be cleaned up by the Spill Remediation Team or a company contracted by ATK. Proper procedures will be followed for every release of hazardous wastes. Because of the extensive inventory of hazardous materials managed at ATK Corporation, each release will require specific safety precautions, cleanup procedures, and/or disposal methods. See Table II p. for chemical compatibility information. WARNING Do not attempt to contain or clean up any spill until hazards associated with the material are known and proper safety precautions are taken. 2. Response procedures to be used during container spills or leaks are as outlined: a. Identify the material ! From the hazardous waste label ! From Waste Management and Environmental Services inventory records ! Through laboratory analysis ! From carrier manifest or placard DOT guide number b. Protect personnel through the use of personal protective equipment specific to the 16 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 identified material (refer to MHSI or Material Safety Data Sheet, available from Industrial Hygiene.) c. Stops the spill or leak d. Contain the material ! Eliminate the source ! Use Quicksorb, or other approved methods e. Clean up the material ! Re-drum ! Wipe up, use absorbent material, excavate soil f. Dispose of the material (refer to Haz Com Web and Disposal Instructions for Waste Materials, GM-3.1) g. Decontaminate the site and clean the equipment 1. When the spill has been properly contained and stopped, appropriate equipment will be used to remove the spilled material to a disposal site 2. Spills involving very large quantities of material caused by the failure of a large storage tank should be dealt with as quickly as possible to minimize exposure to the environment. The method of pickup generally will be pumping material into a tank truck, the original tank after repairs, or into another tank. An alternative may be to use the Environmental Waste Disposal sump truck to pump liquid hazardous wastes and transfer them to a 5,000 gallon storage tank trailer at M-705. Contact Waste Management and Environmental Services for use. 3. Proper steps will be taken to repair equipment and facilities and/or remove the cause of the spill. 4. Operating procedures will be changed, if necessary, to prevent recurrence of a spill. 5. Safety and Operational Training will be instigated, if required. 6. When possible, all reasonable effort will be made to salvage reusable material. E. INCOMPATIBLE WASTE The Environmental Coordinator and Incident Commander will ensure no waste is incompatible with any material during the cleanup of a discharge. Table II, p. lists the information and its available location to the Environmental Coordinator and Incident Commander to make decisions regarding compatibility. All of these materials are available for inspection at the plant site. F. CLEANUP MATERIAL AND EQUIPMENT The following is a partial list of safety equipment that may be used for cleanup as required per Chemical Safety Software EMS-E. All items can be obtained from Stores or from a call contract. D. FOLLOWUP PROCEDURES 17 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv, 20145 UTD009081357 Item Coveralls Smocks Tyvek Suit (m) Tyvek Suit (I) Tyvek Suit (xl) Tyvek Sack Suit Tyvek Hood Polyethylene- Tyvek Suit Saranex Tyvek Suit Booties (Yellow) Booties (Clear) Boots (Rubber) Glasses, Safety Monogoggles Ear Plugs Gloves, Rubber (s) Gloves, Rubber (m) Gloves, Rubber (I) Gloves, Leather Gloves, Cotton Gloves Gloves, NBR (s) Gloves, NBR (m) Gloves, NBR (I) Respirator, Half Mask Air Purifying Respirator, Full-face Cart Respirator, Fresh Air Respirator, No. 8710 Filter S (Gray) Filter H (Purple) Filter GMA (Black) Filter GMC (Yellow) Filter GMD (Green) Filter (Purple/Black) GMA-H Filter (Purple/ Yellow) GMC-H Filter (Black/Olive) GMP Acetone Rumple cloth Stock No. Use Live Operations Manufacturing Area Asbestos & Dust Asbestos & Dust Asbestos & Dust Asbestos & Chemical Spills Asbestos & Chemical Spills Asbestos & Chemical Spills Chemical Spills Asbestos & Chemical Spills Asbestos & Chemical Spills Chemical Spills Spills-Less than 1 quart Spills-Greater than 1 quart Noise-Greater than 90 B(A) Methyl Ethyl Ketone Methyl Ethyl Ketone Methyl Ethyl Ketone General Use General Use Solvent Resistant Methyl Chloroform Methyl Chloroform Methyl Chloroform In 02 Sufficient Areas Only In 02 Sufficient Areas Only In 02 Deficient Areas Only Dust, Single-use Only Dusts, Mists, Fumes, Radon Daughters, Asbestos Dusts, Mists, Fumes, Radio- nuclides, Asbestos Organic Vapors Organic Vapors, Acid Gases Ammonia & Methylamine Organic Vapors, Dusts, Mists, Fumes, Radionuclides, Asbestos Organic Vapors, Acid Gases, Dusts, Fumes, Mists, Radionuclides, Asbestos Pesticides Propellant solvent wipe 18 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 Chemliner bag Velostat bag Contain solvent rags Conductive bag to contain chemiliner In addition, the following materials are available if required: Item Lumber Sawdust Pipe Quicksorb (27-200002) Absorption Clay Hydrated Lime (54-426006) Chemical Spill Neutralizer Acids (General) Bases (General) Flammable Solvents Mercury Cleanup Kits NG Spill and Detector Kit Bulldozer (Space/DLV) Front-end Loader Portable Lights and Generator Sump Tank Portable Diaphragm Pumps General Trucks SCBA Respirators Water Ops. Equip Spill Response Truck Location M-90 M-90 M-90 M-3 (Stores) Landfill M-3 (Stores) J. T. Baker M-53 M-53 M-53 M-53 M-585 M-55/M-321 M-55/M-321 M-6 M-136 M-55/M-321 M-55/M-321 Fire Dept M-705 Fire Dept Ext 2680/2757 2680/2757 2680/2757 2757 2837 2757 2617 2617/7436 2617 2617 8446 2837/2455 2837/2455 3431 2520 2837/2455 2837/2455 2222 2222 2222 Description Plywood, Lumbers Bulk All dimensions 50 lb Bag Bulk 50 lb Bag 3.2 kg 1.2 kg (1.1 kg) (18 kg) 0.9 kg 5 liter bottle D-8 VA and 3 yd bucket 2 Mercury Lamps 3,000 gal 11/2-5Ton 30 Min. Tank Sump Trucks, Etc. Spill Response and Rescue DECONTAMINATION EQUIPMENT AND PROCEDURES 1. Equipment available for decontamination includes two disposable wading pools, a wood-framed plastic pool carried on the spill truck for tool and spill team decontamination, and fire trucks to supply wash down water. Decontamination procedures outlined on Figures 1 and 2 will be followed to ensure spill containment and to minimize the area of contamination. 2. The M-186 hazardous waste drum storage site is located near the burning grounds. This area is serviced by the E-522 Fire Station which is located 3-5 minutes away. The M-705 Hazardous Waste consolidation room and the E-501 drum storage yard are also serviced by the E-522 Fire Station which is located 1-2 minutes away. Both the E-522 and M-11 Fire Stations are outfitted with quick-response spill control equipment (See maps, Appendix I). In addition, spill response kits are available at the M-53 and M-585 Laboratories. EQUIPMENT DECONTAMINATION AND REPLENISHMENT 1. The Incident Commander, or his designee, will ensure all equipment has been properly decontaminated, cleaned, and replaced before normal operations are resumed. The following guidelines are to be used for decontamination of equipment after a discharge has occurred. These steps are also supplemented by the information found in the 19 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 sources listed in Paragraph F. 2. As much as possible, measures should be taken to prevent contamination of equipment. Any delicate instrument which cannot be decontaminated easily should be protected while it is being used. It should be bagged and the bag taped and secured around the instrument. Openings can be made in the bag for sample intake. a. Sampling Devices Sampling devices require special cleaning. The instruction and care manuals provide information on proper decontamination methods for each instrument used. b. Tools and Equipment Equipment and tools designated for spill response should be disposable; however, some tools and equipment require decontamination. Decontamination equipment, materials, and supplies are generally selected based on availability. Soft-bristle scrub brushes or long-handle brushes are used to remove contaminants. Water in buckets is used for rinsing. Large galvanized wash tanks or stock tanks can hold wash and rinse solutions; children's wading pools can also be used. Open top (55-gallon) drums or similar containers lined with plastic bags can be used to store contaminated clothing and equipment. Contaminated liquids can be stored temporarily in metal or plastic cans or drums. Other supplies include paper or cloth towels for drying protective clothing and equipment. Personal protective equipment, sampling tools, and other equipment are usually decontaminated by scrubbing with detergent-water using a soft-bristle brush followed by rinsing with copious amounts of water. While this process may not be fully effective in removing some contaminants, it is a relatively safe option compared with using a chemical decontaminating solution. Occasionally, a decontamination chemical is then needed to change the contaminant into a less harmful substance during decontamination. The Environmental Coordinator and Incident Commander, or his designee, may consult the information sources in Table I, p. 33, to determine the necessity of using a chemical decontamination solution. All materials and equipment used for decontamination must comply with proper disposal. Clothing, tools, buckets, brushes, and all other equipment that are contaminated must be secured in drums or other containers and labeled. Clothing not completely decontaminated onsite should be secured in plastic bags before being removed from the site. Contaminated wash and rinse solutions should be contained to hold spent solutions. The spent solutions are transferred to drums which are labeled and properly disposed of. The Environmental Specialist and Incident Commander, or his designee, will ensure the disposal of these materials is done in an appropriate manner. c. Respirators Certain parts of contaminated respirators, such as the harness assembly and leather or cloth components, are difficult to decontaminate. If grossly contaminated, they may have to be discarded with the other spill cleanup wastes. Rubber components can be soaked in soap and water and scrubbed with a brush. 20 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 Regulators must be maintained according to manufacturer's recommendations. Persons responsible for decontaminating respirators should be thoroughly trained in respirator maintenance. d. Heavy Equipment Bulldozers, trucks, back-hoes, bulking chambers, and other heavy equipment are difficult to decontaminate. The method generally used is to wash them with water under high pressure and/or to scrub accessible parts with detergent/water solution under pressure, if possible. Shovels, scoops, and lifts may be sandblasted or steam cleaned. Particular care must be given to those components in direct contact with contaminants such as tires and scoops. Wash water generated during the decontamination process must be contained and disposed of in a proper manner. IV. INSTALLATION RESPONSE TEAM TRAINING Building/area personnel responding to spills of hazardous materials incidental to the normal processes within their building/area will not need training beyond that required by ATK's Hazard Communication Program. Personnel responding to spills, who are not assigned to the building/area where the spill occurred, are to be members of the Spill Remediation Team with the proper OSHA training. A. TRAINING All personnel involved in cleanup operations will be trained. This training will include an awareness of the locations of cleanup materials and equipment and the procedures for the operation of such equipment. B. SIMULATION The Spill Contingency Plan will be simulated annually under the direction of the Emergency Commander. V. TRAINING PLAN One of the most important objectives of the Contingency Plan is to ensure that the emergency responders are properly trained. Training should include teaching, exercise and critique phases. Re- training and review should be completed at least annually. The following is an outline of training plan elements: A. SCOPE AND PURPOSE OF THE CONTINGENCY PLAN B. REVIEW OF LEGAL REQUIREMENTS NOTE Hazard Communication Plus Program is a combination of the HAZ-COM Program required by OSHA 29 CFR 1910.1200 and HAZWOPER first awareness level required by OSHA 29 CFR 1910.120. 1 2 3 4 Authority OSHA requirements State requirements EPA requirements 21 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTDO09081357 5. State Fire Marshall requirements 6. Law enforcement requirements 7. Medical Examiner/Coroner requirements C. LOCAL ATK REQUIREMENTS D. CUSTOMER REQUIREMENTS Contract review E. REVIEW AUTHORITY AND FUNCTION OF EACH RESPONSE TEAM MEMBER F. EMERGENCY COMMUNICATION SYSTEM 1. Initial notification and follow-up 2. Verification of information 3. Radio discipline 4. Communication intercept G. FIRE PLANS/FIRE DRILL 1. Use 2. Exercise 3. Evaluate 4. Evacuation 5. Assembly points H. BOMB SEARCH TECHNIQUES 1. Outside to Inside 2. Left to right 3. Bottom to Top 4. Evacuation 5. Suspect items (Isolate; don't touch or disturb) I. FIRE BARRICADE/CORDON AREAS 1. Function 2. Initiate/release J. EMERGENCY MEDICAL TREATMENT 1. EMT training, equipment 2. First response first aid K. SECURITY OF SITE 1. Purpose 2. Authority 3. Who authorizes access L. INVESTIGATION 1. OSHA 2. EPA 22 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 3. Local Law enforcement 4. Medical Examiner/Coroner 5. Customer 6. ATK M. PUBLIC RELEASE OF INFORMATION 1. Who authorizes 2. Importance of controlling 3. Who releases 4. Who reviews 5. Next of kin N. FACT-FINDING METHODS 1. Initial interview 2. Follow-up interview 3. Recordings 4. Photo Coverage 5. Mapping damage a. Who? b. How? c. Why? 6. Personnel security checks 7. Drug and alcohol tests 8. Weather conditions 9. Product status 10. Operational status 11. Equipment records and history 12. Facility, tooling, modification and history O. SAFING THE AREA 1. Electric Power 2. Water 3. Steam 4. Toxic chemicals 5. Falling hazards 6. Explosives P. CONTROL OF THE CURIOUS 1. Outsider 2. Employees 3. Press Q. HANDLING OF REMAINS 1. Notification 2. Photo 3. Movement (after authorization by Medical Examiner) 4. Release (after authorization by Medical Examiner) R. NOTIFICATION PROCEDURES 1. When? 23 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JamwvJulv, 20145 UTD009081357 2. Who? 3. How? 4. Verification S. RESCUE EFFORTS 1. When? 2. When not to 3. How to determine 24 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 TABLE I COMPATIBILITY INFORMATION Source of Compatibility Information Location 1. Hazardous Waste Compatibility Chart Table 9-2 of Attachment 9 Available at Environmental Services offices 2. Material Health and Safety Information (example of informa- tion found in plan) Available in hard copy form at approximately 100 locations through- the plant; also available on 1,000 computer terminals throughout the plant* 3. Material Safety and Data Sheets Located on the internal web Chemical Safety Software EMS-E 4. Work Experience Knowledge of each member of the Response Team when responding to a discharge 25 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 VI. EMERGENCY COORDINATOR The Emergency Coordinator is the ATK Fire Department's Emergency Manager. The alternate Emergency Coordinators are the ATK Fire Department Shift Supervisors. A primary or alternate Emergency Coordinator is on plant or on call at all times. In this plan, the Emergency Coordinator may be referred to as the Incident Commander (IC). The primary and alternate Emergency Coordinators or ICs are identified in the Operating Record, which is maintained onsite at the Promontory facility. ATK Promontory security headquarters/dispatch can be contacted 24/7 at 435-863-8545. ATK Promontory security headquarters/dispatch can contact the on plant Emergency Coordinator or IC. 26 I ATK Launch Systems - Promontory JanuarvJulv. 20145 Attachment 4 - Contingency Plan UTD009081357 P V J, FIGURE 1. DECONTAMINATION/SPILL SCENE Difficult Decontamination Situations Some situations, such as a solvent spilled on tiles or large spills on unprotected ground require the removal and disposal of the affected material. Other situations, such as contaminated equipment or fixtures, require steam cleaning and the use of a detergent. Frequently, the rinse from steam cleaning is best controlled with a wet/dry vacuum. Steam cleaners, detergents, and wet/dry vacuums can be obtained from local rental companies. The rinse should be tested for the contaminant and managed appropriately. 27 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 The Spill Scene While each spill is unique, every spill shares common features best referred to as the "Spill Scene." This allows a conceptual illustration of the work area which emphasizes the relationship of the various components. Complete decontamination of workers, tools, and the spill site must be performed before the spill response is completed. It is prudent to establish an area for worker decontamination through which all SPILL TEAM members must pass prior to leaving the site. In this TEAM DECONTAMINATION SITE (TDS) protective clothing can be thoroughly washed with detergent and rinsed with water, if necessary. The soles of ALL WORKERS SHOES MUST BE RINSED before they leave the area. Outer coveralls (Tyvek, etc.) must be removed in this area. These steps are necessary to prevent spreading the contamination or introducing toxic substances into workers homes. Tools can be rinsed with detergent and water prior to removal from the spill scene. All rinses from these decontamination procedures must be treated as hazardous waste. Dry decontamination may be used when appropriate. It is frequently necessary to test the site for completeness of decontamination prior to declaring the emergency resolved. Spills which contaminate soil, asphalt, concrete, or other absorbent materials will require that samples be obtained and analyzed. After all residual contamination is removed, asphalt and concrete areas must receive a thorough wash-down with fresh water. Cold Zone Warm Zone Dirty Area Hot Zone Secure Spi Area Decontamination Corri/or V Supplies FIGURE 2. DECONTAMINATION 28 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 IJTD009081357 APPENDIX I FACILITY FUNCTION TABLES, SITE MAPS, & EVACUATION PLANS NORTH PLANT SITE MAP 30 MANUFACTURING AREA SITE MAP 31 TEST AREA SITE MAP 32 PLANT 3 SITE MAP 33 M-136 BURNING GROUNDS FACILITY FUNCTION TABLE 34 M-186 HAZARDOUS WASTE AREA FACILITY FUNCTION TABLE 34 M-136 SITE MAP AND EVACUATION PLAN 35 M-186 SITE MAP AND EVACUATION PLAN 36 E-501 STORAGE YARD FACILITY FUNCTION TABLE 37 E-501 SITE MAP AND EVACUATION PLAN 38 M-225 BURNING GROUNDS FACILITY FUNCTION TABLE 39 M-225 SITE MAP AND EVACUATION PLAN 40 T-29B SATELLITE ACCUMULATION AREA FACILITY FUNCTION TABLE 41 T-29B SITE MAP AND EVACUATION PLAN 42 M-705 WASTEWATER TREATMENT FACILITY FUNCTION 43 M-705 HAZARDOUS WASTE CONSOLIDATION ROOM 43 M-705 SITE MAP AND EVACUATION PLAN 44 M-62947- PROPELLANT STORAGE FUNCTION TABLE 45 M-62947- SITE MAP AND EVACUATION PLAN 46 M-603 PROPELLANT STORAGE FUNCTION TABLE 47 M-603 SITE MAP AND EVACUATION PLAN 48 S-633 PROPELLANT STORAGE FUNCTION TABLE 419 ..—{ Formatted: Highlight S-633 SITE MAP AND EVACUATION PLAN 48j0 Formatted: Highlight Formatted: Highlight 29 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 2 9 i * J I i_i Ii SHE NORTH PLANT SITE MAP 30 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 5§a + T T f f • J-!—1 i - TEST AREA SITE MAP 32 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv, 20145 UTD009081357 * fa PLANT 3 SITE MAP 33 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 M-136 BURNING GROUNDS FACILITY FUNCTION: Propellant, explosives, unstable and pyrotechnic waste disposal Waste Products Into Area Class 1.1 and 1.3 propellant wastes, propellant con- taminated wastes, and unstable waste. Method of Disposal Burning Spill Cleanup/Handling Flashing in waste propellant disposal areas M-186 HAZARDOUS WASTE AREA FACILITY FUNCTION: Receive hazardous waste materials and store for shipment Waste Products Into Area Methyl Chloroform Methyl Ethyl Ketone Xylene Toluene Paint Thinners Oil Lab Chemicals Photographic Fixer Solution Rags & debris Method of Disposal Store for off-plant shipment Store for off-plant shipment Spill Cleanup/Handling Six UN Drums Quicksorb, 100 lb Two shovels One broom One fire extinguisher Emergency shower/eye wash Two overpack drums Saranex suit (level B) 34 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv, 20145 UTD009081357 EVACUATE AREA, THEN PROCEED TO ASSEMBLY POINT 200 FEET WEST ON APPROACH ROAD BURNING PIT 19 DETONATION PITS • D D • NO. 11 NO. 10 NO. 9 NO. 8 PIT 17 PIT 16 PIT 7 PIT 6 PIT 15 PIT 14 TANK 2D TANK 1 PIT 5 PIT 4 ULJ1 I o PIT 2 PROPELLANT BED N M-136 LEGEND: • FIRE EXTINGUISHER M-136 AND BURNING PITS 35 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 EVACUATE, THEN PROCEED TO ASSEMBLY POINT. SOUTHWEST AT M-381 GATE N M-186A M-186B n OFFICE M-186C TUF SHI • WASTE H-186D WASTE H-186E SAMPLE • • : M-186G M-186F FIXER SHED —- LEGEND: • FIRE EXTINGUISHER HAZARDOUS WASTE TREATMENT, STORAGE, DISPOSAL, AND FACILITIES M-186 36 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 BUILDING E-501 STORAGE YARD FACILITY FUNCTION: Hazardous Waste Storage Yard Waste Products Into Area Various Other assorted materials that may be recycled Method of Disposal Shipment off-plant for disposal N/A Spill Cleanup/Handling Two fire extinguishers Absorbent Two repack drums Electrical pump Telephone/radio Eyewash/shower Safety gates Safety flags Six UN 55-gal drums (empty) Saranex suit (level B) 37 ATK Launch Systems - Promontory JanuarvJulv. 20145 Attachment 4 - Contingency Plan UTD009081357 EVACUATE AREA, THEN PROCEED TO ASSEMBLY POINT ON 200 STREET, 200 FEET EAST N DRUM STORAGE LEGEND: • FIRE EXTINGUISHER E-501 and SALVAGE YARD 38 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 M-225 BURNING GROUNDS FACILITY FUNCTION: Disposal of waste products from High Performance Propellant Development Area and miscellaneous rocket motors, igniters, and related materials Waste Products Into Area Composite propellant, uncured from M-209 Composite propellant, cured Burn from M-221 NG propellant, uncured from M-208, M-241 NG propellant, cured from M-221 HMXfrom M-208, M-210 AP from M-210 (fine only) Binder premix (NG or other nitrate, etc.) PEP contaminated waste (rags, containers, etc.) Miscellaneous (motor, igniters) Method of Disposal Burn Burn Burn Burn with diesel Burn with propellant Spill Cleanup/Handling Dampened rags (wipes) Pick up, soft brush or wet rags (wipes) Solvent dampened rags followed by NG detector to verify cleanliness Pick up, soft brush and/or wet rags Soft brush and/or water-damp rags. If possible, wet HMX with water before handling Sweep with soft brush. Wipe with composite water-wet rag. Flush with water into sump Burn or Contain, absorb into sawdust or pulp, detonate pick up with wipes, wet rags. Apply NG depending detector to verify cleanliness on materials and/or condition Burn with respective propellant Burn or detonate depending on materials and/or con- dition Pick up, clean with method used for respective propellant or ingredient Each case must be dealt with on an individual basis 39 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 EVACUATE AREA TO M-22SA BUNKER M-22SA BUNKER MUUWB0U8 X IUWTRAY s V COftfTAMINATED TRA8H* BURKTRAY v - WHOLE <4> MOTOR BURN H-HS ENERGYa IN TRAY | N M-225 40 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 T-29B SATELLITE ACCUMULATION AREA BUILDING FUNCTION: Hydrazine Storage and Dilution Facility Waste Product Method of disposal From Building Disposal Spill Cleanup/Handling Pure hydrazine Hydrazine-citric acid solution 5-50% dilute hydrazine contaminated waste Dilute with water to 5-50% solution by volume. Waste hydrazine is shipped for disposal/Treatment. Contaminated waste is also shipped for disposal/treatment All areas where normal operations are performed have a drainage system which culminates in a common sump. Spills should be flushed thoroughly with large amounts of water. The wash water is then drummed and shipped for disposal 41 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTDOO9081357 N EVACUATE BUILDING, THEN PROCEED TO ASSEMBLY POINT 300 FEET NORTH OF BUILDING 1 T-29B 42 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJuty. 20145 UTD009081357 M-705 WASTEWATER TREATMENT FACILITY BUILDING FUNCTION: Removal of reactive wastes from sump water Waste Products From Area Lime Sludge (Heavy Metals) Potassium Perchlorate Classifier Decanter Solids Method of Disposal Shipment to off- plant disposal company Burning Burning Spill Cleanup/Handling Two shovels One broom Plastic gloves One bin Saranex suit (level B) M-705 HAZARDOUS WASTE CONSOLIDATION ROOM BUILDING FUNCTION: Consolidation and lab packing of hazardous wastes Waste Products From Area Consolidated hazardous wastes Lab packed hazardous wastes Method of Disposal Shipment to M-186 for eventual off-plant disposal Spill Cleanup/Handling Two shovels One broom Plastic Gloves One Fire Extinguisher Emergency shower/eyewash Quicksorb, 100 lb Two overpack drums Six UN drums Saranex suit (level B) 43 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv, 20145 UTD009081357 EVACUATE BUILDING 300 FEET, THEN PROCEED TO ASSEMBLY POINT ON R" AVENUE NEAR M-366 r^ 7b HMX •u ^M-7)5B C M-705A I I I i lllllllliurty -iiL^U-LU-^ N • FIRE EXTINGUISHER O MANUAL ALARM 0 ALARM PANEL Qj EVACUATION HORN © SMOKE DETECTOR M AUDIOVISUAL ALARM A. SYSTEM RISER • HEAT DETECTOR ? INSPECTORS TEST © GAS SHUTOFF MAIN PROCESS AREA J 1 ZD 10,000 Gallon Fuel Oil Tank Underground M-705 44 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuorvJulv. 20145 UTD009081357 | M-47629 PROPELLANT and Propellant Waste STORAGE FACILITY BUILDING FUNCTION: Storage of reactive hazardous waste propellant/propellant contaminated materials, motors. Non-waste propellant.tdonor propellant) and explosive initiation articles are also stored within the building. Storage of waste and non-waste propellant and motors Method of Waste and non-waste Products Disposal Spill Cleanup Materials 1,3C Propellant and Motors Burning/slurried Obtain clean up material as needed recovery/neutralization 1 .IC Propellant and Motors Burning/slurried explosives/AP Obtain clean up material as needed recovery/neutralization Solid Hazardous Waste Method of Disposal _ Spill Cleanup Materials 1,3C Propellant/propellant Thermal Treatment Obtain clean up material as needed contaminated materials 1.3C Rocket Motors Thermal Treatment Obtain clean up material as needed 1.1C Propellant/propellant Thermal Treatment Obtain clean up material as needed contaminated materials 1.1C Rocket Motors Thermal Treatment Obtain clean up material as needed 1.3C Flares and Flare Illuminate Thermal Treatment Obtain clean up material as needed contaminated materials 45 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan fefflHHvJulv. 20145 UTD009081357 EVACUATE BUILDING, THEN PROCEED TO ASSEMBLY POINT AT BUILDING M - 583 N ; —^ ft < r J LEGEND: • FIRE EXTINGUISHER 0 ALARM RESET A SYSTEM RISER M-629 46 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv, 20145 UTD009081357 EVACUATE BUILDING, THEN PROCEED TO ASSEMBLY POINT 500 FEET SOUTH ON 6TH AVENUE • FIRE EXTINGUISHER N M-47 47 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 M 603 PROPELLANT STORAGE FACILITY BUILDING FUNCTION: Storage and Disaooembly of waste and non-waste propellant and motors Method of Waste and non-waste Products Disposal Spill Cleanup Materials 1 3C Propellant and Motors Burning/slurriod explosives/AP Obtain clean up material as needed recovory/neutralization 1.1C Propellant and Motors Burning/slurriod explosivos/AP Obtain clean up material as needed recovery neutralization 48 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JaauafyJulv. 20145 UTD009081357 EVACUATE BUILDING 500 FEET, THEN PROCEED TO ASSEMBLY POINT AT BUILDING M-643 CALL HEADQUARTERS WPTH HEADCOUNT N • B B a B LEGEND: • FIRE EXTINGUISHER O M ANUAL ALARM • ALARM RESET QD EVACUATION HORN A SYSTEM RISER HO HEAT DETECTOR $ INSPECTORS TEST M-603 49 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 S-633 REACTIVE HAZARDOUS WASTE STORAGE PAD STORAGE PAD FUNCTION: Storage of reactive hazardous waste propellant/propellant contaminated materials and motors and non-waste propellant Waste and non-waste Products 1.3C Propellant/propellant contaminated materials 1.3C Rocket Motors Method of Disposal Spill Cleanup Materials Thermal Treatment Obtain clean up material as needed Thermal Treatment Obtain clean up material as needed 1.1C Propellant/propellant contaminated materials 1.1C Rocket Motors Thermal Treatment Obtain clean up material as needed Thermal Treatment Obtain clean up material as needed 1,3C Donor Burn Propellant 1.3C Flares and Flare Material Burn Enhancer Obtain clean up material as needed Thermal Treatment Obtain clean up material as needed 50 ATK Launch Systems - Promontory JanuarvJulv, 20145 Attachment 4 - Contingency Plan UTD009081357 51 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 APPENDIX II BULK STORAGE AREAS INFORMATION A. BULK FLAMMABLE LIQUID STORAGE AREAS 50 B. PRACTICAL CONSEQUENCES OF A CATASTROPHIC FAILURE 51 APPENDIX III | ARRANGEMENTS WITH LOCAL AUTHORITIES 527- 52 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 BULK FLAMMABLE LIQUID STORAGE AREAS Type of Location Flammable Liquid M-4 Butanol Ethanol Isopropanol Methanol Methyl Ethyl Ketone Paint Paint Thinner Capacity (Gallons) 40 60 530 500 400 500 120 Above/Below Ground Above Above Above Above Above Above Above M-53 M-55 M-66 1-10 M-585 Acetone Ethanol Heptane Methanol Methyl Ethyl Ketone Gasoline Assorted Methanol Methyl Ethyl Ketone Acetone Ethyl Acetate Methanol Toluene 60 10 10 50 60 17,000 80 15 50 50 15 10 30 Above Above Above Above Above Below Above Above Above Above Above Above Above M-711 E-510 Gasoline Ethanol Isopropanol Methanol 10,000 100 1,660 35 Below Above Above Above E-512 E-517 Acetone Isopropanol Paint Thinner Polyester Resin Toluene Xylene Isopropanol Kerosene Methyl Ethyl Ketone 100 50 50 160 50 160 170 50 450 Above Above Above Above Above Above Above Above T-29B Hydrazine 100 Above 53 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTDO09081357 B. PRACTICAL CONSEQUENCES OF A CATASTROPHIC FAILURE Building Number 1-10 M-4" M-8" M-43B M-53A M-66 M-504 M-585 M-605 E-512 E-517 Location Shed west of building Building north of M-3 system Two sheds west of building Shed south of building Shed south of building Shed southwest of building Shed south of building Shed east of building Waste dock north of building Shed west of building Shed north of building Direction of Flow* Has self-containment concrete berm Liquid would run west across asphalt into drain Spill would drain down west hill Self-contained storage building Self-contained storage building Spill would run into ditch (trench or grading needed to keep surface runoff from accumulating in containment area) Spill would flow into ditch Spill would drain into ditch Spill would drain into ditch Spill would drain into ditch Spill would drain into ditch All other storage areas have self-containment Fire flows and/or spilled material from these buildings will flow into a gated spill containment structure below M-2. The gates are hand operated. 54 I ATK Launch Systems - Promontory Attachment 4 - Contingency Plan JanuarvJulv. 20145 UTD009081357 APPENDIX III Arrangements with Local Authorities ATK has a well trained and full time Fire Department and Security Department onsite. ATK's roads and grounds and Water Operations departments maintains a fleet of trucks, tractors, vacuum trucks and other equipment that could be used during an emergency response. The facility also has a nursing staff during normal business hour, and a 24/7 ambulance service operated by ATK firemen with EMT certifications. Due to these capabilities, the need for outside assistance is greatly reduced. The most likely need for outside assistance would be that of hospital service. Arrangement will be made with both the Bear River Valley Hospital and the Brigham City Community Hospital to accept employees that may have been injured due to an explosion, chemical exposure or other accident. This arrangement will include information on the types of chemicals used at ATK Promontory as well as explosive hazards and other mechanical hazards associated with work performed at ATK. The most likely scenario that would require assistance from a police agency would be the need to control traffic on Highway 83. Arrangements for assistance in this area will be made with the Box Elder County Sheriffs Department and the Utah Highway Patrol. All on plant traffic control will be handled by ATK's security department. ATK has established contracts with three different emergency response/remediation contractors for use as needed. While we do not anticipate the need for emergency service assistance, these companies are on call to provide service if needed. All emergency response at the plant will be handled by the ATK Fire Department, who will act as the primary emergency authority. Arrangements will also be made with the Box Elder County Fire Department and the Tremonton Fire Department. We do not anticipate any need for assistance from the Utah Department of Environmental Response and Remediation, although notification of emergencies will be made to this department as required. In addition to those agencies listed above, ATK will also provide a copy of the contingency plan to the Box Elder County Emergency Planning Committee for review and comment. Below is a summary list of those agencies/service providers for which service arrangements will be sought: Bear River Valley Hospital Brigham City Community Hospital Box Elder County Sheriffs Department Utah Highway Patrol Box Elder County Fire Department Tremonton Fire Department The most recent copy of the Contingency Plan will be sent to each of these agencies in order to familiarize them with the layout, description of hazardous wastes handled, and evacuation plans for the plant. All correspondence with these agencies, in regard to the Contingency Plan and service arrangements will be kept in the Operating Record. 55 Attachment 5 CLOSURE PLAN AND FINANCIAL REQUIREMENTS I ATK Launch Systems Inc. - Promontory Attachment 5 - Closure Plan Modified FebruarvJulv. 2015 UTD009081357 CLOSURE PLAN AND FINANCIAL REQUIREMENTS This Closure Plan describes the steps that will be taken to close the hazardous waste management units (HWMUs) at the ATK Launch Systems Inc. - Promontory (ATK) facility. Closure Cost estimates are maintained in the Operating Record once approved by the Director. HWMUs included in this document are: M-186; M-705S; E-501; M-136; M-225; T-29B; M 47, M-6290^ and S-633. The Closure Plan was developed to comply with R315-8-7 and R315-8-9.9 of the Utah Administrative Code (UAC). UAC R315-8-7 incorporates by reference the requirements of 40 CFR 264 Subpart G. The closure cost estimates were made in accordance with UAC R315-8-8, which incorporates by reference the requirements of 40 CFR 264 Subpart H. All HWMUs in current operation are being managed in a manner that facilitates clean closure. Historical sites, such as the LTTAs do require post closure care, and are covered in our Post Closure Permit. 1.0 Closure Plans [40 CFR 270.14(b)(13), 270.23(a)(2), and 264.112(a)(1) & (2) and UAC R315-3, R315-8] This Closure Plan identifies the general steps needed to close storage and treatment facilities, as identified above, at the end of their operating life. Copies of this plan will be maintained at the Promontory Facility. The closure plans will be followed as written, unless modification to the original plans have been submitted and approved by the Utah Department of Environmental Quality, Division of Solid and Hazardous Waste (DSHW). Upon update/revision approval, revised pages or complete documents will be sent to all plan addressees. 1.1 Closure Performance Standards [40 CFR 264.111 and UAC R315-8-7] Closure standards specified under RCRA are designed to be protective of human health and the environment. These goals will be achieved by one of the following closure methods: • Clean closure - this method refers to residential risk based levels. Cleanup to residential risk based levels, as outlined in UAC R315-101, will be considered clean closure. Clean closure includes removal of all contaminants, or removal to the risk based level. • Site Management - closure where waste remains in place and specific post closure care is required. For the purposes of estimating closure costs, it is assumed that all of the HWMUs will be "clean closed". Clean closure can be achieved by cleaning the units to background conditions or by meeting the clean closure equivalency as defined in UAC R315-101-6(c)(l). All closures will assess real and reasonably likely impacts to human and ecological exposures. 1 I ATK Launch Systems Inc. - Promontory Attachment 5 - Closure Plan Modified FebruarvJulv. 2015 UTD009081357 Preliminary remediation goals can be established prior to implementing any of the closure plans. Screening levels published by USEPA or site-specific risk based levels based on UAC R315- 101-5.2 maybe used. If contamination from hazardous waste or constituents is discovered at a HWMU above risk based goals, further investigation will be performed to determine the extent of the contamination. Based on the results of this investigation, a Corrective Measure Study (CMS) may be prepared for review and approval by the DEQ, prior to implementation. If investigation suggests that clean closure is not a practicable approach, a Site Management Plan will be prepared. Upon approval, the unit will be closed by implementing appropriate site management or post closure requirements. If this approach is necessary, the Post Closure Permit may be modified to provide post closure care for the sites that are not clean closed. 1.2 Partial Closure and Final Closure Activities [40 CFR 264.112(b)(1) through (b)(7) and UAC R-315-8-7] This plan is designed to accommodate both partial and final closure. The plan includes separate steps to close storage, consolidation & disassembly areas, and open burning/open detonation areas. A detailed plan for closing each HWMU will be submitted in accordance with Permit Condition III.J.2. Soil monitoring has been conducted at the M-136 and M-225 burn grounds since 1991. Semi- annual groundwater monitoring is also conducted, in accordance with ATK's Post-Closure Permit. 1.3 Maximum Waste Inventory and Disposal Method [40 CFR 264.112(b)(3) and UAC R315-8-7] The maximum inventory of hazardous waste onsite at any one time during the life of the facilities is based on permit limitations for inert facilities, and Quantity/Distance(QD) limitations for live materials, based on Department of Defense Explosive Safety Standard 4145.26M or a lesser designated amount. If storage capacities change, the Permit will be modified. These quantity limitations are listed below: M-186 (inert) 400 ea. 55 gallon drum equivalent M-705S (inert) 32 ea. 55 gallon drum equivalent E-501 (inert) 160 ea. 55 gallon drum equivalent M-136 (live) 106,500 lbs 1.3 / 20,000 lbs 1.1 M-225 (live) 55,000 lbs 1.3 / 1,500 lbs 1.1 T-29B (inert) 1 ea. 55 gallon drum (pure) equivalent M M (live) 300,000 lbs 1.3 /21,000 lbs 1.1 M-6290^ (live) 1120,000 lbs 1.3 / 855,000 lbs 1.1 S-633 (live) 75,000 lbs 1.3/20,000 lbs 1.1 2 I ATK Launch Systems Inc. - Promontory Attachment 5 - Closure Plan Modified FobruarvJuly, 2015 UTD009081357 ATK treats reactive hazardous wastes on-site at the M-136 and M-225 open burning grounds. Wastewater is collected and treated on site and discharged through one of two UPDES permitted treatment facilities. All other hazardous wastes are transported by commercial carrier to fully permitted disposal or recycling facilities. 1.4 Schedule for Closure [40 CFR 264.112(b)(6) and UAC R315-8-7] Section 1.4.1 of this plan provides an estimated closure schedule for all activities associated with implementation of this Closure Plan. If sample results indicate the need for additional investigation or a CMS, the schedule will be modified to accommodate the changes. Final closure will be certified by an independent professional engineer licensed in Utah. 1.4.1 Time Allowance for Closure [40 CFR 264.113(a) and (b) and UAC R315-8-7] Final closure is expected to be initiated within 30 days following shipment of the final volume of hazardous waste. If more time is required, a request will be submitted to the Director. All hazardous wastes will be removed or treated within 90 days of (1) plan approval, or (2) after receiving the final volume of hazardous waste, whichever is later. Final closure activities will be completed within 180 days of (1) plan approval, or (2) after receiving the final volume of hazardous waste, whichever is later. 1.4.2 Extensions for Closure time [40 CFR 264.113(a) and (b) and UAC R315-8-7] If closure activities cannot be completed within the time designated in this Closure Plan, a permit modification and request for additional time will be submitted to the DSHW. The request will state the reason for needed additional time and the status of the closure underway. It will also address any added measures that must be followed to minimize any threats to human health or the environment during the extension period. 1.5 Closure Procedures [40 CFR 264.112 and 264.114 and UAC R315-8-7] All permitted treatment and storage facilities have been designed and managed to minimize possible contamination. This includes chemical resistant concrete coatings, blind containment sumps, regular inspections, regular maintenance, and prompt cleanup of any spilled materials. These practices should greatly reduce the need for significant remediation efforts upon closure. 1.5.1 Soil and Groundwater Sampling Groundwater sampling is not covered under this plan. A groundwater monitoring program is currently in place as discussed above. Soil sampling should not be required for any of the permitted facilities, except for the two burn ground areas (M-136 and M-225) and S-633. Detailed sampling plans will be submitted in accordance with Permit Condition III.J.2. Samples will first be collected at locations most likely to have been affected by waste management practices - as approved by DSHW personnel. Twenty soil samples will be collected at M-136, eight soil samples will be collected at M-225 and eight soil samples will be collected at S-633. 3 I ATK Launch Systems Inc. - Promontory Attachment 5 - Closure Plan Modified FebruaryJulv. 2015 UTD009081357 These samples will be sent to a State of Utah certified laboratory for analysis. Sample collection, preservation and handling methods will follow those outlined in the Waste Analysis Plan of this permit, and will be in compliance with all applicable SW-846 methods. All samples will be processed and analyzed by a Utah Certified Laboratory in accordance with R444-14-3(2) UAC. Analytical and extraction methods to be used are shown below. Analytical and Extraction Methods Parameter Analytical procedure Extraction Procedure Volatiles SW-846; 8260B SW-846; 5030B(W), 5035S Semi-Volatiles SW-846 8270C SW-846; 3510C(W), 3550(S) RCRA Metals SW-846 601 OB SW-846; 3005A(W),7471A(S) Mercury SW-846 7470A/7471A SW-846;7470A(W), 7471A(S) Explosives SW-846;8330 Modified SW-846; 8330 Modified Perchlorate EPA 314.0 EPA 314.0 1.5.1.1 Sampling Equipment Decontamination Procedures All field sampling equipment will arrive on site pre-cleaned, and will be decontaminated following standard protocol and the waste analysis plan in this permit. A mobile decontamination station will be used to clean all sampling equipment that could come in contact with soil samples. 1.5.1.2 Sampling Waste Management All waste generated from field sampling and decontamination operations will be managed in accordance with the current UAC R315 rules. Water used in the decontamination process will be containerized and sent offsite for treatment or disposal. Soils will be stored in UN containers pending lab results. Any soil determined to be hazardous waste will be managed appropriately. All non-aqueous hazardous waste generated by the sampling operation will be transported by a third party contractor off site to a fully permitted TSDF for disposal. Any waste determined not to be hazardous under EPA regulations will be sent via third party to a non-hazardous landfill for disposal. A field log will be maintained to track and identify all samples. This log will include sample numbers, dates, times, sample depth, samplers name, weather conditions, test methods and constituents for which to analyze. 1.5.1.3 Health and Safety Procedures Soil and water sampling will be performed by trained and qualified personnel. A determination of appropriate personal protective equipment (PPE) to be used for this effort will be determined at the time of closure. PPE selection will be based on potential hazards as determined at the time of closure, and in consultation with Industrial Hygiene professionals. 4 I ATK Launch Systems Inc. - Promontory Attachment 5 - Closure Plan Modified FebruaryJulv. 2015 UTD009081357 Soil sampling should only be required at the burn grounds, because of well maintained secondary containment and waste management practices during the entire life of all other permitted facilities. Protective clothing appropriate for the task will be used during removal of waste and during decontamination of containment areas for the permitted storage and treatment units. 1.5.2 Determining Cleanup Goals For the purposes of estimating closure costs, it is assumed that all of the HWMUs will be clean closed. Clean closure can be achieved by cleaning the units to background conditions or by meeting the clean closure equivalency as defined in UAC R315-101-6(c)(l). All closures will assess real and reasonably anticipated potential impacts to human and ecological exposures. It is anticipated that the HWMUs will be clean closed and will not require post-closure care. 1.5.3 Site Cleanup 1.5.3.1 Inventory Removal [40 CFR 264.112(b)(3) and UAC R315-8-7] The maximum inventory of hazardous waste on hand at any given permitted facility is based on the maximum allowed under this permit, or a quantity - distance limit for explosives, imposed by the Department of Defense and ATK. These limitations are specified in Section 1.3 of this Closure Plan. Transportation and disposal costs of all hazardous waste during closure of a facility will be based on hiring a third party. The transportation contractor will be licensed and insured, and the disposal facility will be a permitted facility. Reactive hazardous wastes may be open burned on site. Cost calculations for treatment, disposal and equipment decontamination will be based on maintaining an ATK staff sufficient to complete these efforts. 1.5.3.2 Disposal or Decontamination of Equipment and Structures [40 CFR 264.112(b)(4), 264,112(e), and 264.114 and UAC R315-8-7] Decontamination of equipment and structures at the Promontory facilities will follow one of two plans. These plans cover the open burning units, and all other facilities. The open burning facilities use burn trays, pipes, concrete vaults or rocket cases to contain the waste to be treated. Most of the material burned is hazardous by characteristic only. Any waste that may be contaminated with, or contains solvents or hazardous heavy metals is designated as a derived waste, and the ash collected for offsite disposal. Therefore, except for the derived trays, all ash in trays, vaults, cases, and on the ground around these units will be collected and disposed on-site. The burn trays will then be high pressure water washed and the rinsate collected for disposal. After the final rinse, a composite sample from the trays will be collected and analyzed at a Utah certified lab to verify proper tray decontamination. Each sample will include rinsate from 5 trays. Samples will be extracted and analyzed as described in 1.5.1. 5 I ATK Launch Systems Inc. - Promontory Attachment 5 - Closure Plan Modified FebruaryJulv. 2015 UTD009081357 | All facilities except for M-136, M-225, M-629 and S-633 are designed with secondary containment. The secondary containment includes a concrete pad with curbing and blind sump to simplify cleaning. The containment pads and sumps are coated with a chemical resistant epoxy to prevent liquid migration through the concrete. Secondary containments are inspected daily, when in use, and maintained as needed. After removal of all containerized waste, the liquid chemical containment pads of facilities E-501, M-186, M-705S, and T-29B will be high pressure water washed, and the rinsate will be collected for disposal. After the final wash, rinse water samples will be collected from each sump and characterized for disposal. Samples will be sent to a State certified laboratory for analysis. 1.5.3.3 Closure Containers [40 CFR 264.178, 264.112(b)(3), and 270.14(b)(13) and UAC R315-8-9.9, R315-807, and R315-3-5(b)(13)[ Non-reactive hazardous waste requiring off-site disposal will be placed in a UN or a bulk USDOT authorized containers for offsite shipment to permitted disposal facilities. Empty containers will be cleaned in compliance with 49 CFR, and sent for disposal. 2.0 Closure Certification [40 CFR 264.115 and UAC R315-8-7] Within 60 days of completion of closure of each facility, ATK will submit a certification to the DSHW by registered mail, that the hazardous waste management facility was closed in compliance with this Closure Plan. This certification will be signed by ATK and an independent registered professional engineer licensed in Utah. Documentation supporting the engineer's registration will be provided upon request. 3.0 Closure Cost Estimate [40 CFR 264.142] Closure cost estimates are maintained in the operating record once approved by the Director. Closure cost estimates are based on using a third party except for the thermal treatment and disposal of reactive waste which will be conducted on site. 4.0 Financial Assurance Mechanism for Closure [40 CFR 264.143 and R315-309] ATK will maintain current financial assurance meeting the requirements outlined in the above referenced Federal and State regulations. ATK will provide documentation to DSHW supporting compliance with financial mechanism requirements. 5.0 Post Closure Plan If it is determined that a HWMU can't be clean closed, contaminants may be left in place, and a post closure or site management plan will be developed. Any proposal for post closure care or site management will be developed in accordance with UAC R315-8-7, UAC R315-8-8 and 40 CFR 264 Subparts G and H, and will be submitted to the Director for approval. If this approach is necessary, the Post Closure Plan may be modified to provide post closure care for the sites that are not clean closed. 6 Attachment 6 - Figures E-501 M-705S r M-629 M-186 S-633 M-136 T-29B X M m ATK Promontory Facility - Figure 6A I 0 1 I S# - ! 1 i EL 100'-6" TOP OF WALL EL 100-3" 35-11 EL lOO'-O" oo 3 SLOPE COLUMN, OTHERS NOT SHOWN CONCRETE FLOOR -> WITH CONTAINMENT CURB k EPOXT COATING THRU PIPE WITH LOCK VALVE EL 99-2 7/8" TOP OF WALL E-501 PLAN VIEW SCALE 1" = 20'-0"± EL lOO'-O" 8" 3-5 7/8" SECTION SCALE: 3/8' 3N (T\ f-4 r s~ ROOF COLUMN ^ TS4x4 L EPOXY COATING SECTION B SCALE: 3/8" « V-O* E-501 PAD LAYOUT FIGURE B-1 N u Ln O 3 I 16'-0" 5 EPOXY COATED - FLOOR I # L If J /- BUND SUMP M-705S PLAN VIEW SCALE 1/8" = T-O" 2*-0 SO. -TRENCH COVER SUMP 1- r Eli Hi C4 +1 to SECTION A SCALE: 1/4" = I'-O" TRENCH COVER CMU 8". 12* 5 W.S. (TYP.) 8 SECTON SCALE: 1/4" - 1'-0" X=SL W.S. (TYP.) 12 (3 E3 CSJ ' I * L-—DOUBLE TEE ,=L—T i WALL PANEL SECTION SCALE 1/4' 3N /T\ M-705S BUILDING LAYOUT FIGURE C-1 i m Figure 6D 8 I 7 I 6 I 5 I 4 I 3 I ~ I 3 LA] M-629 FLOOR PLAN t lj^-WUJW IMWT J M-186 Figure 6E SECTION SCALE 1/4*= 1-0" 8"tl V, SECTION SCALE 1/4*-1-0" B SECTION SCALE: 1/4*= 1-0" CM CNI "-6" 1-6" SO ^2- SECTON SCALE 1/4"-1'-0' CHEMICAL RESISTANT CONCRETE FLOOR W/ CONTAINMENT CURBS TYP. in • CB • • to > > • r-. CO • 23-8 25-0 M-186A BUILDING LAYOUT FIGURE E-1 N 1 M-136 m • 3£ • 1 l1. Figure 6F \ L \ < \ r? i \ \ i \ ' f ? / OA / Ml ! I I \ ! v.' r r -A to 5t 3 X / A X c GO -A \ M 136 J Jo oa"1—> M-186 0 1 S-633 M-136 BURN GROUND FACILITY LAYOUT FIGURE F-1 N SCALE: 1' = SOU*-0"± Figure 6H 12" SQ. ORAM PLATE WITH 2" PPE UNDER FLOOR TO EXTERIOR SUMP B El —yz WALLS 14-8 b*j £5Z**j{»: 4 2x4 FRAMED WALL WITH CORRUGATED ALUM. ON EXT.. 1/2" PLYWOOD WfTH 16GA SST INT. 1 SECTION SCALE: 1/4" - 1'-0" PERMITTED BAY M CO 3 T-29B PLAN VIEW SECTION SCALE 1" - 10'-O" SCALE 1/4* - V-tT T-29B BUILDING LAYOUT FIGURE H-1 n Figure 61 // // 0 0 // 0 9 / 7 / r /; V C r? \ > x5 25 M ft M-225 BURN GROUND FACILITY LAYOUT FIGURE 1-1 SCALE 1"»20ff-Cfi 10 D DJO Figure 6J FEKCIK 5-ttS MUBME 1W I 10tf j en i . © M22SG4XK 4m S-633 STORAGE PAD Tmrssr 3cez— NONE ~m— FIGURE J-1 WIT ATTACHMENT 7 SECURITY PLAN ATK Launch Systems Inc. - Promontory Attachment 7 - Security 07 07.01.1 SECURITY PROCEDURES 07.01.1 Purpose and Scope September 30July, 20150 UTD009081357 HAZARDOUS WASTE MANAGEMENT The work performed at the ATK Launch Systems, Promontory facility primarily involves Department of Defense and NASA contracts; therefore, comprehensive security agreement measures have been instituted. These security measures meet the requirements of the Division of Solid and Hazardous Waste Administrative Rules R315-8-2.5. No waiver from these requirements is being sought as the facility has both a twenty-four hour surveillance system and an artificial barrier around the facilities to minimize the possibility of unknown entry of livestock or personnel. 07.01.2 Surveillance System Security is maintained by a trained security force which controls entry and exit from the facility and provides patrol, escort, and other activities within the plant. The mainAtt plant entrances are manned by a minimum of one security officer during normal working twenty four hours per day, every day. All other gates are locked and only used when authorized by attending Security. All employees entering the facility must show identification badges at the gate and wear them in plain sight throughout the day. All visitors and vendors are required to wear special identification badges. 07.01.3 Artificial Barrier There are artificial or natural barriers around the entire plant. The primary barrier consists of a chain link and barbed wire fence with controlled access at the main entrances to the plant. The chain link fence runs along the highway from building A until it runs into the gully formed by Blue Creek just west of M-46. A natural barrier is provided by the Blue Creek gully which is approximately 15 feet deep with near vertical sides. This barrier extends for approximately 8,000 feet to a five-foot, four-strand barbed wire fence. This fence extends to the north, changes to chain link, and runs around the north end of the Plant. The chain link fences are seven feet high and topped with barbed wire. This fence is continued by a five-foot, four-strand barbed wire fence, which completes the primary barrier by encircling North Plant, Test, and South Plant. Plant III is encircled by a five-foot, four-strand barbed wire fence and also has controlled access at the main entrance. Each hazardous waste management area also has an artificial barrier. I ATK Launch Systems Inc. - Promontory September 30July. 20150 Attachment 7 - Security UTD009081357 E-501: The Container Storage Area is surrounded by a seven-foot chain link fence and has controlled access. The gate is locked when no one is present. M-136: A five-foot, four-strand barbed wire fence surrounds the Burning Grounds area. It has a gate, which is locked when no one is present. S-633 The storage area is located inside the secured M-136 perimeter fence. S-633 is also surrounded by a five foot four strand barbed wire fence in addition to the M-136 fence. M-186: A five-foot, four-strand barbed wire fence surrounds the Container Storage Area. It has a gate, which is locked when no one is present. M-225: The Burning Grounds are surrounded by an eight-foot, chain link fence. It has a gate, which is locked when no one is present. A five- foot, four-strand barbed wire fence surrounds the runoff dispersion area. M-705 S: The hazardous waste management area is inside a building with lockable doors to provide access control. In addition, the facility uses the plant's artificial barrier. M-47629: The solid reactive waste propellant, propellant contaminated, and / motor storage area is inside the building and remains locked except when occupied by personnel for placement of material into storage or removal from storage. M 603: The propellant/motor storage and disassembly building is restricted and requires check in at building M 192 before entry is permitted. T29B: Building T29B remains locked at all times and is controlled by authorized Test Service personnel. 07.01.4 Signs All hazardous waste management areas (i.e., E-501, M-136, S-633, M-186, M-225, M-705S, M-47629, M 603 and T29B) have warning signs placed at the access approaches. All signs are legible from a distance of at least 25 feet. All signs have a legend which reads "Danger - Unauthorized Personnel Keep Out." ATTACHMENT 8 PREPAREDNESS AND PREVENTION PLAN I ATK Launch Systems Inc. - Promontory Attachment 8 - Preparedness and Prevention SeptemberJulv 201508 UTD009081357 8-1 PROCEDURES, STRUCTURES, AND EQUIPMENT 8-1-1 Purpose and Scope Precautions have been taken to minimize the accidental or sudden release of hazardous waste or waste constituents into the environment. The precautions comply with the requirements of R315-8-3.2. Several precautions have been taken to minimize hazards during the loading and unloading of hazardous waste. These precautions are divided into three classes of Waste Management: Open Burning, Drum Storage and Propellant/Explosives Storage. Open Burning of hazardous waste explosives and propellants requires special precautions. Precautions taken during loading and unloading operations are described in M-136 Burning Grounds Operating procedures and in M-225 Burning Grounds Operating procedures. Safe loading and unloading of explosive waste helps to minimize waste release into the environment and reduce the possibility of unplanned ignition of waste material. Waste energetic material received from off-site for storage prior to open burning, will be handled under the same precautions as all other wastes accepted for disposal at the burn grounds. Loading/off-loading areas will be inspected each day waste is received, and at a minimum of once per week. Several precautions are also taken at the Drum Storage areas. Spill control equipment is located at each area and can be used in loading and unloading operations. All drums are on pallets and are loaded and unloaded by a forklift. The design of the Drum Storage facilities allows adequate aisle space for movement of drums with a forklift to minimize the actual handling of the drums. Permit conditions n.JK.6. and IJJ.E.4. state that, at a minimum, the Permittee shall maintain 30 inches of aisle space between containers or pallets of containers at storage areas M-186 and E-501. All forklift truck operators must have a license to operate the forklift truck. The operator receives this license by attending a training program which includes an actual driving test that must be passed. The hazardous waste operators must also participate in the Hazardous Waste Training Program discussed in Attachment 3. Waste propellant, explosives and rocket motors are carefully offloaded from trucks using fork lifts, building cranes or a trailer mounted knuckle 8-1-2 Loading and Unloading Operations 1 ATK Launch Systems Inc. - Promontory Attachment 8 - Preparedness and Prevention SeptemberJulv 20.15QS UTD009081357 boom. Small containers, less than 50 lbs, may be off loaded by hand. All operators of the equipment listed above, under go extensive training in the proper use of the equipment they operate. This training includes class room as well as hands on training. All ATK propellant moving, grounding and bonding procedures will apply. Many precautions are taken during the transfer of waste hydrazine during the dilution process that is used to prepare this waste for off-plant disposal. These precautions include medical certification, operator knowledge of chemical properties, special safety equipment, and specific operating instructions. Run-on and run-off are controlled at the drum storage pads M-186 and E-501 by a concrete berm around the facility. The M-705 storage and consolidation room is totally enclosed preventing run-on from entering the facility and eliminating any possibility for run-off. Details of these structures and how they control run-off are found in Attachment 6 of this Permit. Run-on and run-off at the Burning Grounds, M-225, attd M-136, and storage pad S-633 are controlled by diversion, collection ditches, and trenches. A diversion ditch directs run-on around the Burning Grounds. The run-off at M-136 is collected in a ditch and dispersed in a dispersion area. The run-off at M-225 is dispersed in an area directly in front of the burning area. Both areas will be included in the zone of Engineering Control. Waste material at the S-633 storage pad is stored in closed or covered containers/articles. Drawings showing the control systems for M-136 and M-225 are included in Attachment 6. Run-on and run-off at buildings M-47629 and M 603 areis controlled since the facilityies [safe awfully enclosed buildings which isare elevated above the surrounding grade to prevent rain intrusion. Drawings of thisese buildings isare found in Attachment 6 of this permit. The drum storage areas, M-186, E-501, and M-705S each have a containment system which is designed to prevent releases of contaminants to the environment. Each system is constructed to be leak-proof and divert run-on. These containment systems are shown in the facility drawings contained in Attachment 6. 8-1-3 Prevention of Run-on and Run-off 8-1-4 Prevention of Water Supply Contamination 2 I ATK Launch Systems Inc. - Promontory Attachment 8 - Preparedness and Prevention September July 20L5O8 UTD009081357 The propellant/motor storage buildings areas store only solid materials, and do not require secondary containment. The nature of this solid waste, combined with fully enclosed storage buildings, greatly reduces the potential for contaminating water supplies. The materials in the trays at the burning grounds are normally destroyed on a biweekly basis, except those materials too sensitive to store which are burned the same day. The burn trays are inspected weekly and prior to loading to look for cracks or holes. Minimizing free liquids and controlling run-on and run-off prevents water supply contamination. It is not anticipated that groundwater or surface water will become contaminated from the storage operations. Historical management of hazardous waste has resulted in groundwater contamination at ATK. Semiannual groundwater monitoring is conducted in the area of the M-136 Burning Grounds, and down-gradient, in accordance with ATK's Post-Closure Permit. Groundwater flow and transport models have been developed to help predict the migration of contaminant plumes. The Division of Solid and Hazardous Waste has approved the ATK Promontory groundwater modeling report. The Rjisk ( Formatted: Not Highlight assessments and potential corrective measures, are being conducted, will be i .-{Formatted: Not Highlight conducted once the Division of Solid and Hazardous Waste approves the groundwater models. 8-1-5 Mitigating Effects of Equipment Failures and Power Outages A power outage or equipment failure will have little effect on the hazardous waste storage and treatment areas. Any equipment failures, such as truck breakdowns, pump repairs, etc.; can be managed by on-plant maintenance. Power outages can occur, but all critical operations have backup generators so hazardous waste can be controlled. ATK maintains an electrical lineman crew that has the necessary equipment and experience to repair on plant power outages. In the event of a very large power outage or repair, Rocky Mountain Power will be contacted and necessary measures taken to restore power. 8-1-6 Prevention of Undue Exposure to Personnel Exposure to personnel handling hazardous waste is minimized by containing and safely packaging waste and supplying personnel with proper protection and safety equipment. Section in F of the Contingency Plan (Attachment 4) lists the equipment available to all plant personnel. Specific procedures and requirements for personnel protection during the handling of hazardous waste are specified in area standard operating procedures. 3 ATK Launch Systems Inc. - Promontory Attachment 8 - Preparedness and Prevention SeptemberJulv 20L50S UTD009081357 8-1-7 Emergency Equipment This equipment is inspected on a monthly basis. The emergency equipment is intended to help respond to small emergencies such as leaks or spills. It is not intended to respond to major incidents, fires, nor explosions. It is limited to equipment that is manually operated and is easily portable. Monthly inspections assure there are adequate supplies of material on hand and mechanical items are operable so that immediate response to small emergencies can be safely handled. ATK maintains a spill response trailer which is used to respond to spills that are medium to large. The trailer contains safety and spill response equipment. This trailer is maintained by the fire department and is inspected weekly or after use to ensure that an adequate supply of material is on hand. 8-1-8 General Areas The general area of each hazardous waste storage site is inspected on a daily basis when in use. These inspections consist of observing the area for possible spills or mismanagement of hazardous waste. These areas need daily inspections when in use to minimize potential for mismanagement of hazardous wastes during loading, unloading, or handling. 8-1-9 Safety Equipment Safety equipment is inspected monthly. Monthly inspections include testing equipment to make sure it is in working order and ensuring that all equipment is complete and in place. These inspections help to maintain a safe work environment and minimize human health incidents. 8-1-10 Storage and Containment System The storage and containment system shall be inspected as directed in Attachment 2. In some cases, inspections are required, as stated in the attachment, after each storm event. A storm event is defined as more than one inch of precipitation in a one-hour period. This is not only a regulatory requirement, but these inspections help to operate the container storage area in a safe manner and minimize environmental incidents. Inclement weather and mismanagement are the primary sources of deterioration of the containment system and containers. Standing liquids in the containment system and/or sumps must be 4 I ATK Launch Systems Inc. - Promontory SeptemberJulv 201508 Attachment 8 - Preparedness and Prevention UTD009081357 managed according to Section 9-4.3 of Attachment 9 - Container Management Procedures. Inspections are conducted in order to effectively manage standing liquid. These inspections minimize environmental impacts from the actual storage of hazardous wastes in the storage areas. If a leaking or deteriorating drum is identified during the inspection, the contents or the entire container must be immediately transferred into a new container. The new container must be numbered and labeled with exactly the same number and label as the old container. The date and time of any transfer action must be noted in the inspection log. The transfer of the leaking or deteriorating drum can be handled in two ways: the contents of the container can be transferred by pump to a new drum,or the drum can be placed in an 85-gallon over-pack drum with the space between the two drums filled with an absorbent to control any possible leaks. 8-1-11 Burning Ground Area Burning of explosives and reactive wastes occurs normally on a biweekly basis, but can occur more often if conditions necessitate the increased frequency. Inspections of the area, equipment, and burn trays, are conducted weekly or as specified in Attachment 2. Items inspected under this category are subject to general wear or weathering. In addition, containers stored in burn trays at M-136 are inspected to ensure that they are in good condition, closed and labeled. Burn trays are inspected for cracks and gaps and accumulation of leaked liquids or precipitation. Inspections conducted as described above, provide the time necessary to correct maintenance and erosion or wear problems. They also minimize the environmental impact at the Burning Grounds. 8-1-12 General Facility Equipment and PPE required to properly manage hazardous waste and for spill clean up is kept at the permitted facilities and regularly inspected. New materials are purchased as needed to assure an adequate supply. 8-1-13 Fire Department Equipment The Fire department inspects their equipment on a routine basis and after each use. This equipment is especially important to aid in minimizing the effects from fires, explosions, and spills. The inspections are performed and records are kept by the Fire Department personnel. 8-1-14 Heavy Equipment 5 I ATK Launch Systems Inc. - Promontory SeptemberJujy 201508 Attachment 8 - Preparedness and Prevention UTD009081357 Most of the heavy equipment is used on a regular basis for construction services and for the management of solid wastes. It is also available for use in emergencies. This equipment is handled at the heavy equipment garage and is inspected on an hour-usage basis rate of 100-150 hours depending on the equipment type and working conditions. A detailed checklist is covered by Maintenance that is checked thoroughly by trained personnel. All inspection records on heavy equipment are kept on file at Maintenance Control and are available for inspection. 8-1-15 Inspection Log All inspections are recorded. These forms are put into one of three inspection logs. Each log contains the most recent three years of records and is available for review. Environmental Services keeps the inspection logs of the results of all inspections on the security equipment, emergency equipment, general area, safety equipment, storage and containment system, burning grounds, and general facility categories. The Fire department keeps a log of the Fire department categories and Maintenance Control keeps a log for the heavy equipment category. 8-2 CONTINGENCY PLAN 8-2-1 Purpose and Scope ATK has developed and supplied a contingency plan as required by R315- 3-2.5(b)(7) and R315-8-4. This plan has been devised as a separate document so that it can be used independently of this permit. A copy of the contingency plan is in Attachment 4. The plan has been designed to minimize hazards to human health and the environment from fires, explosives, or any unplanned or sudden release of hazardous wastes. 8-3 PREPAREDNESS AND PREVENTION 8-3-1 Purpose and Scope The hazardous waste treatment and storage facilities have been designed, constructed, maintained, and operated to minimize the possibility of unplanned fires, explosions, or discharges of hazardous wastes. In the event of an emergency, the responsibilities of responders, organizational structure, and procedures required to ensure effective warning, response, and control to minimize hazards to human health or the environment are addressed in detail in the Contingency Plan (Attachment 4). 6 ATK Launch Systems Inc. - Promontory Attachment 8 - Preparedness and Prevention SeptemberJu]y 20L5O8 UTD009081357 8-3-2 Required Equipment All hazardous waste facilities are equipped to respond effectively to an emergency situation. Should an emergency situation arise, such as a discharge of hazardous waste, a fire, or an explosion, employees who are in hazardous waste management areas should be able to respond according to the procedures outlined in the Contingency Plan. All hazardous waste facilities are equipped with internal and external communication systems. Internal communications are provided by voice signals and commands specified in the Contingency Plan in Section E. All hazardous waste facilities are in open-space areas and there are no loud, industrial noises that could muffle voice commands or signals. These voice commands provide immediate onsite emergency instructions to employees in the hazardous waste management areas. An external communication system using telephones is provided for employees at each area. These telephones can be used to contact Internal Emergency Response or initiate the Contingency Plan. Storage buildings not equipped with alarms or hard wired phones, will utilize cellular phones to contact ATK's emergency responders if needed. To prevent encouraging personnel tefrom fighting fires in the waste rocket motor/propellant storage buildings and adjacent waste docks, fire extinguishers are not provided. All other hazardous waste storage areas are equipped with fire extinguishers. The buildings that have separate electrical rooms, have extinguishers that are to be used in the electrical rooms only. Spill clean up material will be provided in each of these buildings as outlined in section IH.F of the Contingency Plan. The location of the fire extinguisher is shown on the evacutation plan in Appendix 1 of the Contingency Plan. Along with these portable extinguishers, ATK maintains a Fire department to respond to fires or explosions. Descriptions of fire equipment, available water, and the Fire department are described in Section IG of the Contingency Plan. Buildings MM does not have water immediately available, but rely on ATK's full time, fully equipped and trained Fire Department for any emergency response action. Building M-60^29 is equipped with a fire sprinkler system, which is checked at least annually. ATK's full time, fully equipped and trained Fire Department are immediately available for any emergency response action. All emergency and safety equipment is inspected on a routine basis to 8-3-3 Testing and Maintenance of Equipment 7 ATK Launch Systems Inc. - Promontory Septemberjulv 20L5Q8 Attachment 8 - Preparedness and Prevention UTD009081357 ensure it is in working order and in good repair. These inspections are documented and are available for inspection. 8-3-4 Access to Communications or Alarm Systems All employees who manage hazardous waste have immediate access to both internal and external communication systems. All employees have access to telephones or cellular phones and are trained on how to summon external emergency assistance if required. 8-3-5 Required Aisle Space Aisle space has been designed into each drum storage pad. This type of drum storage allows easy access to thoroughly inspect the area around each drum and allows adequate room to transfer hazardous waste into a new drum if a drum is found to be leaking or in poor condition. There is enough aisle space and clearance around each storage pad to allow free movement of fire protection equipment, spill control equipment, and any needed decontamination equipment. Detailed drawings of the drum storage areas are found in Attachment 6 of this Permit. An aisle space of 30 inches minimum between containers or pallets of containers will be maintained at storage areas M-186 and E-501. Hazardous waste stored in containers at M-705S, M-62947-, MS-6033 and M-136 will be stored so that they may be readily inspected and hazardous waste labels are visible. 8-4 PRECAUTIONS TO PREVENT IGNITION AND REACTION 8-4-1 Purpose and Scope Precautions to prevent accidental ignition or reaction are essential to the safety of all personnel. The precautions taken ensure compliance with R315-8-2.8. The precautions are a part of everyday manufacturing and production activities at ATK. 8-4-2 Precautions for Open Burning of Explosives and Propellants Many precautions are taken to prevent accidental ignition or reaction of hazardous waste materials at the Burning Grounds at M-136 and M-225. Because of the extremely sensitive nature of these wastes, special precautions are taken for each source of ignition. Safety procedures for handling energetic and sensitive materials are found in ATK's Hazardous Operations Standard Manual (AHOPS) and the internal handling procedures or protocols.Reactive Waste Disposal Instructions (RWDI) which are available at the facility for inspection. 8 I ATK Launch Systems Inc. - Promontory Attachment 8 - Preparedness and Prevention SeptemborJulv 20L5O8 UTD009081357 8-4-3 Precautions for Drum Storage of Hazardous Waste The drum storage buildings have been designed to hold flammable liquids. The front of M 186 and all sides of E-501 are open to ensure that proper ventilation is maintained in each storage area. Doors are opened as needed at M-186 and M-705S to provide adequate ventilation. Unauthorized personnel are kept out of the storage areas. The areas are inspected on a weekly or daily basis and all leaking or damaged containers are replaced as addressed above and in Attachment 9. In the event of a spill of hazardous waste or material which, when spilled, becomes hazardous waste, the person responsible for the material at the time of the spill shall immediately take appropriate action to minimize the threat to human health and the environment and comply with UAC R315-9 and implement the Contingency Plan if necessary. All propellants/motors will be safely handled in accordance with AHOPS. These procedures include, but are not limited to, proper grounding and bonding protocol. All permitted hazardous waste storage and treatment facilities are located more than 50 feet from any property line to help minimize the fire potential of adjoining property. General site maps which show these buildings, as well as the property lines, are found in Attachment 6. 8-4-4 Precautions for Propellant/Motor Storage I ATK Launch Systems Inc. - Promontory Attachment 8 - Preparedness and Prevention September July 201508 UTDO09081357 TABLE 8A Precautions Against Accidental Ignition and Reaction of Hazardous Waste Explosives and Propellants IGNITION SOURCE Smoking Open Flames Static Electricity Incompatible Materials Friction and Sparks PRECAUTIONS Burning grounds are designated as areas where smoking is a fire hazard and as such must meet the requirements of company procedures. Requirements for smoking are strictly enforced by the Safety department. The use of a flame, heat, or spark-emitting device in any area requires a permit. Requirements for uses and restrictions of these permits are found in company procedures. These permits are issued prior to starting work. Static electricity can be an ignition source. To avoid static charges, all explosive or propellant waste is packed in a container with either a conductive or static dissipative liner. During storage and prior to and/or during transportation of wastes to the burning grounds, all conductive waste containers are grounded to prevent static spark. Upon placement in the metal burn tray, grounding is no longer required. Rocket motors for disposal will not be packaged in these liners, but will be grounded to the case prior to being placed into position for open burning. Incompatible materials are not placed in the same containers and incompatible wastes are segregated at each waste pickup dock. Vehicles hauling waste propellant must have spark arresters in the exhaust line. Non- sparking rakes are used in preparing the trenches for burning or re-burning. A porous, non-sparking truck bed is also used. 10 ATK Launch Systems Inc. - Promontory Attachment 8 - Preparedness and Prevention SeptcmberJulv 2015OS UTD009081357 Electrical Equipment No electrical work is allowed in areas where explosives or propellant are present. TABLE 8B Precautions Against Accidental Ignition and Reaction of Hazardous Waste in Drum Storage IGNITION SOURCE PRECAUTIONS Smoking The drum storage areas are designed as areas where smoking is a fire hazard and as such must meet the requirements of company procedures. Requirements for smoking are strictly enforced Open Flames The use of a flame, heat, or spark-emitting device in any area of the plant requires a permit. Requirements for uses and restrictions of these permits are found in company procedures. These permits are issued prior to starting work. 11 ATTACHMENT 9 CONTAINER MANAGEMENT PROCEDURES I ATK Launch Systems Inc. - Promontory Modified SeptemberJuly L30,20185 Attachment 9 - Container Management UTD009081357 CONTENTS 9 USE AND MANAGEMENT OF CONTAINERS 3 9-1 PURPOSE AND SCOPE 3 9-1.1 Facility Description 3 9-2 MANAGEMENT OF CONTAINERS 4 9-2-1 Types of Containers for Storage 4 9-2-2 Waste Compatibility 5 9-2-3 Storage of Containers 6 9-2-4 Inspections 8 9-2-5 Operating Record 8 9-3 LAB PACKS AND WASTE CONSOLIDATION 8 9-3-1 Lab Pack Preparation 8 9-3-2 Lab Pack Labeling 9 9-3-3 Containment Sealer 9 9-3-4 Lab Pack Compatibility 9 9-4 CONTAINMENT 9 9-4-1 Capacity of Containment 9 9-4-2 Containment Sealer 10 9-4-3 Removal of Free Liquids From Containment Area 10 9-5 RUN-ON AND RUN-OFF CONTROL 11 9-6 REQUIREMENTS FOR IGNITABLE AND REACTIVE WASTES 12 2 ATK Launch Systems Inc. - Promontory Attachment 9 - Container Management Modified SeptemberJuly J30, 20105 UTD009081357 9 USE AND MANAGEMENT OF CONTAINERS 9-1 PURPOSE AND SCOPE ATK Launch Systems - Promontory (ATK) currently manages the drum storage areas at M-186, E-501, M-705S, the solid propellant storage buildings-at M-47629 and M 603. storage pad S-633 and solid propellant storage in burn trays and at Burn Station 14 at M-136 in accordance with the Division of Solid and Hazardous Waste Administrative Rules R315-8- 9. These waste storage areas are owned and operated by ATK. All containers are being temporarily stored waiting thermal treatment on-site, or shipment off-site for recycling, treatment and/or disposal. The drum storage site at M-186 is designed to hold 400, 55-gallon drums of various types of waste intended for treatment or disposal. The drum storage site at E-501 is designed to hold 160, 55-gallon drums of various types of waste intended for treatment or disposal. The M-705S storage and consolidation room is designed to store a maximum of 32, 55-gallon drums, both rooms include palletainers of various types of waste intended for consolidation or lab packing. For solid propellant storage capacities, see Module in section E. 9-1.1 Facility Description The M-186 storage pad is permitted for the storage of the hazardous wastes identified in Permit Condition HI.B.l. The storage pad is divided into five storage bays to keep incompatible materials separated. The pad is a coated concrete floor with secondary containment. The M-l 86 storage facility is shown in Figure E-l of Attachment 6. The E-501 storage pad is permitted for the storage of the hazardous wastes identified in Permit Condition ELB. 1. The pad is a coated concrete floor with secondary containment. The E-501 storage facility is shown in Figure B-l of Attachment 6. The M-705S Storage and Consolidation Room is a single room with a coated concrete floor and secondary containment. It is permitted for the storage of the hazardous wastes identified in Permit Condition HI.B.l. The room is equipped with plastic containers to keep incompatible materials separated. Poly-spill pallets are used to provide separate containment for each consolidation drum and lab pack drum as needed. The M-705S storage facility is shown in Figure C-l of Attachment 6. 3 Fjuly 130, 20105 UTD009081357 M-62947 is designed for storage of solid propellant/explosives. This building is sited for the maximum quantity of propellant/explosives based on Quantity/Distance, DOD siting criteria found in the contractor safety manual, 4145.26m. Each building is set up to permit proper grounding and cross bonding as appropriate. The M-43629 storage facility is shown in Figure 6-DG-4 of Attachment 6. Building M 603 follows the same maximum quantity criteria as storage building M 47. This building is also permitted for treatment of the waste, in accordance with Module TV, through disassembly of motors or other procedures needed to prepare the waste for disposal through open burning or other similar techniques. The M 603 storage and treatment facility is shown in Figure D 1 of Attachment 6. Storage Pad S-633 is designed for storage of solid propellant/ explosives. It is secured by a perimeter fence, a vehicle access gate that can be locked, and has the appropriate warning signs for a storage area. It has a road base surface, and has lighting protection. Precipitation run-on or run-off is prevented by a combination of diversion ditches, collection ditches and trenches. The S-633 storage pad is shown in Figure J-l of Attachment 6. The storage of solid propellant wastes received from off-site at M-136 is only permitted for a maximum of 14 days. This includes waste stored in containers placed in burn trays and waste rocket motors that contain solid propellant placed on the ground at Burn Station 14. The storage of waste materials received from off-site at M-136 is permitted in order to facilitate more efficient and safer waste handling practices, and to accommodate delays in waste treatment due to weather or other uncontrollable delays. Storage of this waste will be in compliance with this permit and R315-8-9. 9-2 MANAGEMENT OF CONTAINERS 9-2.1 Types of Containers for Storage The containers to be used for storage, lab packing, or consolidation at M-186, E-501, and M-705S will meet the UN or USDOT criteria or will be a sturdy liquid tight alternative container. No more than 400 drums will be stored at M-186; 160 drums at E-501; and 32 drums at M-705S. Substitute containers will reduce the number of drums that can be stored based on the volume of the container chosen. The containers that will be used for storing solid, reactive wastes at M-62947. M 603 and S-633 include rocket motor cases, covered drums, boxes, plastic bags, woven bags,^lids. and US Department of ,..-{ Formatted: Not Highlight ATK Launch Systems Inc. - Promontory Attachment 9 - Container Management 4 I ATK Launch Systems Inc. - Promontory Attachment 9 - Container Management Modified SeptemberJuly 130,20105 UTD009081357 Transportation (DOT) approved shipping containers. The standard containers used at the Facility are or containerized as described in Attachment 11. Section 11.4. All solid reactive waste received from off-site and stored at M-136 will be stored in containers as described in Attachment 11.4. Storage of these containers is permitted in liquid tight burn trays or on the ground at Burn Station 14 for intact rocket motors. All containers will be kept closed during storage. Lab pack and consolidation drums used for different compatibility groups will be separated using a portable secondary containment system (PSCS) such as a Poly-spill pallet. The PSCS will have the capacity to hold a minimum of 55 gallons. Most PSCSs are unsatisfactory for storing most organic waste; therefore, flammable/combustible waste lab packs or consolidation drums will be placed on a pallet and stored on the floor using the room's containment system. Lab pack and containment drums with non-hazardous waste will be stored on the floor. Non-hazardous waste found to be incompatible with solvents would be placed on a PSCS for which it was found to be compatible. All full consolidation or lab pack drums will be transferred from M-705S to a permitted storage facility to stay within M-705S's storage capacity. TABLE 9-2 HAZARDOUS WASTE COMPATIBILITY FOR STORAGE AT M-186, E-501, M-705S, M-62947, M 603, and S-633 General Compatibility Groups DOT Hazard Class in Group 1. Flammable/combustible liquids and non-flammable solvents a. Flammable Liquids b. Combustible Liquids 2. Corrosives (acids) a. Corrosive Liquids (acids only) 3. Corrosives (bases) a. Corrosive Liquids (bases only) 4. Reactive Chemicals a. Organic Peroxides b. Oxidizes 5. Toxic Chemicals a. Toxic b. Infectious 6. Explosives a. 1.1 5 ATK Launch Systems Inc. - Promontory Attachment 9 - Container Management Modified SeptemberJuly 130, 20105 UTD009081357 b. 1.3 9-2.3 Storage of Containers M-186. E-501 andM-705S Before any waste container is accepted at M-705S, E-501, and M-186, it shall be inspected to determine whether the waste matches the identity of the waste specified on the accompanying manifest or shipping paper. In addition, the containers shall be inspected to ensure that they are in good condition, are closed, and labeled in accordance with 40 CFR 262.34 (incorporated by reference in R315-5-3.34) and R315-5-3.31. If the drum is found to be unacceptable, it must be immediately repacked and relabeled or the waste transferred to a new drum. Each drum or container must be entered into the operator's log (see Section 9-2.5) when the drum or the container is accepted in to the drum storage area. A forklift and/or pallet jack is used to move the pallet into the storage area. Drums or containers in the holding bays at M-186 and at E-501 will be sampled according to Attachment 1 of this permit. The wastes are accumulated until enough containers exist to complete a load. The containers are then loaded into a truck and shipped to the disposal facility for proper treatment and/or disposal. All drums stored at the M-705S, E-501, and M-186 storage areas will be stored with either both plugs closed or with the top of the drum sealed. No waste containers will be open unless waste is being added or removed. Adding or removing waste will only occur at these storage facilities if a container is damaged, leaking, for sampling, for waste consolidation, and/or for lab packing. A container may be filled if spilled material is found in a sump during the transfer of waste containers. A container being filled or replaced will be located in the containment area. This will provide containment if any spillage results from an incident during transferring procedures. Precautions to be taken during the transfer of the waste include: insuring all transfer equipment (i.e., hoses, pumps, funnels) is located inside the containment area; ensuring a proper drum is used when transferring waste material. An aisle space of 30 inches minimum between containers or pallets of containers will be maintained at storage areas M-186 and E-501. Hazardous waste stored in containers at M-705S, M-62947, M 603. S-633 and M-136 will be stored so that they may be readily inspected and 6 ATK Launch Systems Inc. - Promontory Modified SeptemberJuly J30,20105 Attachment 9 - Container Management UTD009081357 hazardous waste labels are visible. 55-gallon drums may be stacked at a maximum of two high at storage areas M-186 and E-501 only. Containers stored at M-629 and S-633 that can be safely stacked, such as flare or munition boxes, may be stacked to a maximum height of 6 feet. All storage containers shall have hazardous waste labels attached that meet the requirements of 40 CFR 262.34 (incorporated by reference in R315-5- 3.34). All personnel required to complete RCRA labeling shall receive training as appropriate. M-62947 ,M 603 and S-633 All waste propellant/explosives stored at M-62947, M 603 and S-633 must be entered into the operating record. Building and storage pad inspections must begin upon first receipt of material and end when all hazardous waste has been removed from the building or storage pad. All containers must be kept closed except when adding or removing waste. Adequate aisle space must be provided to permit proper container inspection. Total quantity limitations are as outlined in module HI section E. All containers shall have hazardous waste labels attached that meet the requirements of 40 CFR 262.34 (incorporated by reference in R315-5- 3.34). M-136 Burn Trays and Burn Station 14 All solid reactive wastes received from off-site shall be inspected prior to placement into burn trays or Burn Station 14 at M-136 to determine whether the waste matches the identity of the waste specified on the accompanying manifest or shipping paper. In addition, the containers shall be inspected to ensure that they are in good condition, are closed, and labeled in accordance with 40 CFR 262.34 (incorporated by reference in R315-5-3.34) and R315-5-3.31. If a container holding hazardous waste is not in good condition, e.g., apparent structural defects, or if it has begun to leak, ATK personnel shall take steps as appropriate to prevent a release from the container to the environment. Prior to placement of hazardous wastes into burn trays, the tray shall be inspected as outlined in Attachment 2. Once the container or waste rocket motor received from off-site is placed in a burn tray or Burn Station 14, the date of the placement shall be added to the hazardous waste label, beginning the 14 day maximum period which the waste may be stored. 7 { Formatted: Indent: Left: 1" 9-2.4 Inspections All container storage areas are inspected on at least a weekly basis. Details of inspection requirements for the storage areas are outlined in Attachment 2. If a container is found with severe corrosion, structural defects, rusty bungs, or leaking, the contents or the entire container must be immediately transferred into a new container. The new container must be numbered and labeled with exactly the same number and label as the old container. The date and time of any transfer action must be noted in the inspection log and the Environmental Waste Disposal technical staff must be notified. 9-2.5 Operating Record All waste brought into the M-186, E-501, M-705S, M-62947. M 603, S- 633 and M-136 storage areas are entered into a hazardous waste log compliant with R315-8-5.3. This log is kept for all wastes. If a waste material is consolidated, the consolidation drum is recorded in the hazardous waste log in such a way as to allow the consolidated material to continue to be tracked. Waste materials to be lab packed are placed in a lab pack drum and recorded in a hazardous waste log in such a way as to allow the material and the drum to also be tracked. The operating record is kept for all hazardous wastes. These records are used to track wastes as they come in from on and off-plant generators and satellite generator facilities. 9-3 LAB PACKS AND WASTE CONSOLIDATION 9-3.1 Lab Pack Preparation ATK disposes of several hazardous wastes in lab packs. Completed lab packs are stored in the drum storage bays. Before a lab pack is accepted at the drum storage bay, it must be prepared, labeled, and documented in accordance with 40 CFR 262 Subpart C (incorporated by reference in R315-5-3.34) and R315-5-3.31. ATK Launch Systems Inc. - Promontory Modified SeptemberJuly 130,20105 Attachment 9 - Container Management UTD009081357 Containers stored in burn trays at M-136 shall remain closed during storage, except when it is necessary to add or remove waste. A container holding hazardous waste shall not be handled or stored in a manner which may rupture the container or cause it to leak. Containers shall be stored such that the hazardous waste labels may be readily inspected. 8 ATK Launch Systems Inc. - Promontory Modified SeptemberJuly 130,201Q5 Attachment 9 - Container Management UTD009081357 Materials in small containers may be stored at the lab packing and consolidation room at M-705S or at M-186 for lab packing or waste consolidation. The materials are separated into compatibility groups based on DOT hazard classification. The materials are generally in small containers ranging from one or two ounces to 5-gallon cans. The small containers are then stored in palletainers or on a shelf until ready to lab pack or consolidate. Incompatible materials are not allowed to be stored in the same palletainer, or containment bay. 9-3.2 Lab Pack Labeling Each waste container must be labeled with a complete hazardous waste label. 9-3.3 Containment Sealer The concrete containment area where consolidation and lab packing occur at M-186 and M-705S, is sealed with a high build polyamide epoxy coating system or equivalent. The Material Safety Data Sheet and compatibility chart for this material can be found on the manufacturer's web site. 9-3.4 Lab Pack Compatibility Under no circumstances will a lab pack contain wastes that are incompatible. Compatibility of wastes will be determined by using the MSDS or other reference sources. If a waste is not found in the reference material, then the material will be assumed incompatible with all wastes and lab packed separately unless research by Environmental Waste Disposal's technical staff documents compatibility. Reactive wastes will be lab packed or thermally treated at the M 136 burn grounds. Lab packing will be done in accordance with USDOT regulations and the requirements of the disposal company. 9-4 CONTAINMENT 9-4.1 Capacity of Containment All the container storage areas and consolidation/lab packing areas at M-186, E-501, and M-705S are designed to hold a minimum of ten percent of the volume of waste stored in the area or the volume of the largest container, which ever is greater. Table 9-5A summarizes the calculations. 9 ATK Launch Systems Inc. - Promontory Modified SeptemberJuly 130,20105 Attachment 9 - Container Management UTD009081357 TABLE 9-5A Containment Capacity of Drum Storage Areas Storage Container Number of Drums to be Stored Needed Containment Containment Available M-186 Storage Bay 80 Drums 440 Gal 980 Gal E-501 Storage Pad 160 Drums 880 Gal 895 Gal M-705S Room 16 Drums* 88 Gal 830 Gal M-705S Poly-spill pallet 4 Drums 55 Gal 85 Gal * Includes Palletainers 9-4.2 Storage buildings M-62947. M 603 and storage pad S-633 are not permitted to store liquids. Each container will be inspected to assure no liquids are present upon arrival at the storage facility. Storage buildings M-62947 and M 603 areis fully enclosed to prevent contact of the-waste with rain water, and does not require secondary containment. Roof leaks must be repaired as soon as is practicable. Storage pad S-633 is located within the M-136 Thermal Treatment Area. Any rain water falling on the pad is collected in the M-136 stormwater run-on/run-off control system. Containment Sealer 9-4.3 The containment area at the M-186 and M-705S storage facilities are coated with an epoxy resin to resist liquid penetration. No leakage or spillage is anticipated during waste storage; however, in the event spills or leaks do occur, the epoxy will prevent the material form penetrating the concrete. The containment system at E-501 is coated with an epoxy sealer that is a high-build chemical resistant coating. The chemical compatibility and properties of this epoxy are available from the manufacturer. Removal of Free Liquids From Containment Area 10 I ATK Launch Systems Inc. - Promontory Attachment 9 - Container Management Modified SeptemberJuly 13©, 20195 UTD009081357 Removal of free liquids at M-186, E-501, and M-705S must be done with a pump or vacuum truck. When free liquids are found in the sump, a portable drum pump, either electric or hand operated, is used to transfer the liquid to a UN 55 gallon dram. A vacuum truck can also be used to pump out collection of rain water and snow melt. Water pumped with the vacuum truck will be taken to a UPDES permitted waste water treatment facility (M-705) for processing. All free liquids taken from the sumps will be managed as hazardous wastes until waste analysis or inspection dictates otherwise. Precautions will be taken to avoid spills. All spills are cleaned immediately, unless the size demands spill response. After the liquids are transferred into drums, a sample will be taken form each dram according to the sampling procedure in the Waste Analysis Plan, contained in Attachment 1. The drums will be managed as hazardous waste until a determination has been made classifying the contents. If the analysis indicates the liquid is a hazardous waste as defined by the Division of Solid and Hazardous Waste Administrative Rules R315-2, then the drams will continue to be managed as a hazardous waste. If the liquid is a wastewater, the liquid will be taken to M-705 Wastewater Treatment Facility. Occasionally, small amounts of liquid such as nitroglycerine can drip from rocket motors onto the concrete floor. These drips are typically less than 1-inch in diameter and may drip as much as once per week. Any sign of out-of-place waste will be checked during the regular inspections outlined in Attachment 2. Clean up of dripped materials will be completed as soon as is practicable using rags and acetone or other appropriate cleaners. M-136 Burn Trays Although the burn trays at M-136 are ewly-permitted for the storage of off- site solid reactive wastes in containers for no more than 14 days, some of these containers contain small amounts of desensitizing fluid (e.g. diesel, shingle oil, etc.). Therefore, the containment requirements of R315-8-9.6, as discussed below, apply to the storage of wastes in the burn trays. The burn trays shall be free of cracks or gaps and be sufficiently impervious to contain leaks, spills, and accumulated precipitation until the collected material is detected and removed. Spilled or leaked waste and accumulated precipitation shall be removed from the burn trays in as timely a manner as is necessary to prevent overflow of the tray. Inspection requirements for burn trays and the accumulation of liquids are outlined in Attachment 2. 11 ATK Launch Systems Inc. - Promontory Attachment 9 - Container Management Modified SeptemberJuly 130, 20195 UTD009081357 If the collected material is a hazardous waste under R315-2, it shall be managed as a hazardous waste in accordance with all applicable requirements of the State of Utah Hazardous Waste Management Rules. If the collected material is discharged through a point source to waters of the United States, it is subject to the requirements of section 402 of the Clean Water Act, as amended. 9-5 RUN-ON AND RUN-OFF CONTROL Run-on and run-off water is prevented form entering the M-186 and E-501 drum storage pads. Three sides of each pad contain a curb that is six inches in height and a sloped grade in the front that is three inches above the ground surface. Each pad has sufficient height to prevent run-on from entering the drum storage containment system. Detailed drawings of these facilities are contained in Attachment 6. The storage facility at M-705S is totally enclosed to prevent any run-on water from entering the building. Calculations have been performed for the M-186 storage pad and these indicate that no run-on or run-off should enter the storage building and affect the capacity of the containment area. The calculations were based on a 24-hour, 25-year storm event and were submitted with the Part B Permit Application. The terrain around the burn grounds and storage pad S-633 has been graded and drainage ditches surround the area in order to minimize run- on/run-off. The topography and drainage ditches at M-136, M-225, and S-633 are shown in Attachment 11 Figures 11-1 and 11-2, and Attachment 6 Figure J-l. In addition, all waste will be in water tight burn trays to prevent run-on and run-off. Waste Rocket motors will be covered to eliminate contact with rain water, and will sit on chalks or pallets to avoid direct contact with flowing storm water. 9-6 REQUIREMENTS FOR IGNITABLE AND REACTIVE WASTES All container storage areas are located more then 50 feet from facility property lines. The aerial photograph contained in Attachment 6 (Figure 6A) shows the property boundaries and facility location. 12 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 JawwrvJulv. 20154 ATTACHMENT 11 M-136 and M-225 Thermal Treatment Operations n-i I UTD 009081357 ATK Launch Systems Promontory Facility Part B Operational Plan Process Information January-July, 20154 11.0 PROCESS INFORMATION All reactive waste management operations at the facility are conducted and are under the management of ATK. The reactive waste management process is described in the following text. 11.1 Facility Description The ATK Promontory facility is located in a remote area of west Box Elder County, Utah, approximately 30 miles northwest of Brigham City, and approximately 11 miles north of the Great Salt Lake. The facility was purchased by Thiokol in 1956, with the exception of a 1,500-acre tract that was sold to the U.S. Air Force in 1958 and then repurchased in 1995. The facility has been held in its entirety since purchase. ATK Launch Systems conducts thermal treatment of reactive hazardous wastes at two treatment units: (1) the main facility, M-136, located centrally to the two main manufacturing sites; and (2) M-225 located in a remote development location called Plant III. M-136 is the primary treatment area for conducting open burning at the Promontory facility. Open detonation is also conducted at M-136 which is a secured fenced facility within the main facility fence. The M-225 treatment area receives small amounts of the reactive hazardous waste materials from the Plant III propellant development area. The M-225 treatment unit is surrounded with an 8-foot high chain link fence. The waste materials are treated via open burning or open detonation. The M-136 and M-225 treatment areas are fenced and are located within a controlled and fenced facility that is patrolled and maintained by a security department. The treatment areas have warning signs posted around the perimeter. The vegetation is controlled within the treatment areas through application of herbicide and putting in place loads of gravel and road base. Surrounding both treatment areas are a large system of fire breaks that are constructed using large equipment to till and cultivate a large strip of land removing any vegetation. The system of fire breaks are designed to contain a fire within its boundaries. Contained within the boundaries of the M-136 treatment area are twelve former surface impoundments called Liquid Thermal Treatment Areas (LTTAs). These impoundments were used for the disposal of hazardous waste and wastewater and then capped and closed. The units are currently under post closure care and managed through a Post Closure Permit which includes requirements for groundwater monitoring and corrective action. The Post- Closure groundwater monitoring program includes all wells around the M-136 and M-225 treatment areas as part of the groundwater monitoring system. These wells are routinely monitored thorough the permit requirements which includes the Sampling and Analysis and Quality Assurance Plans. The Promontory facility is located in the Blue Spring Valley which is bounded on the east by the Blue Spring Hills and on the west by Engineer Mountain and the Promontory Mountain ranges. Within the Blue Spring Valley, the terrain is characterized by topography that slopes down from the mountain crest at an elevation of approximately 6,050 feet above mean sea level (AMSL) toward the center of the 11-2 ATK Launch Systems Promontory Facility Part B Operational Plan Process Information JanuarvJulv. 20154 | UTD 009081357 Blue Creek Valley at an elevation of 4,250 feet AMSL. As a result, the surrounding environment extending out to 6.2 miles (10 kilometers) from both treatment units can be characterized as complex terrain. .GEOLOGY The ATK facility is located in the Southern Blue Creek Valley, northwest of the Salt Lake Valley, which is the eastern most structural valley of the Basin and Range physiographic province, which includes parts of Utah, Idaho, Nevada, Arizona, and New Mexico. The Basin and Range province consists of a number of north-south aligned mountain ranges and valleys bounded by high-angle normal faults. The Blue Creek Valley, in which ATK is located, is bounded on the east and west by the Blue Springs Hills and the Engineer and Promontory Mountain ranges, respectively. Movement along the faults has displaced the mountains upward relative to the adjacent valley. Likewise, the mountains immediately west of ATK are bounded on their eastern margin by one or more faults which are partly buried by recent deposits. Bedrock, composed of Middle Paleozoic shale, sandstone, and limestone, is exposed in the ranges adjacent to the site. The bedrock is highly fractured with some folding. During the Mississippian and Permian Periods, marine sediments consisting of sand, clay, and calcareous detritus were deposited in shallow marine environments. In the late Cretaceous Period, compressional forces from the west resulted in folding and thrust faulting in conjunction with uplift of the region into mountain ranges. Extensive jointing and fracturing of the bedrock were caused by this folding and faulting episode. Tensional stresses in the early to middle Tertiary Period resulted in north south trending normal faults that formed a series of high linear mountain ranges with intervening basins which received sediment from adjacent highlands. This activity was associated with volcanism and ancient lake deposition. In the late Tertiary Period, a series of geologic units tentatively identified as the Salt Lake Group were formed from deposition of sediments in large lakes which developed within the valleys. These lake deposits are composed primarily of silts and clays with minor amounts of sand and gravel and are characterized by low to moderate permeabilities; extensive deposits of volcanic ash are also present in the Salt Lake Group. The alluvial fan deposits were overlapped by more recent lake sediments of Pleistocene Lake Bonneville, the predecessor to the present Great Salt Lake. Lake Bonneville covered much of western Utah and parts of Idaho and Nevada between about 23,000 and 12,000 years ago. Deposits associated with the lake consist of lakebed and alluvial materials reworked by lake bottom and shoreline processes. Lake Bonneville sediments thicken southward. The most recent sedimentary deposits consist of stream alluvium and mud and debris flows. The stream alluvium consists primarily of silty and clayey sand and gravel. The mud and debris flow deposits are characterized by a broad gradation of sediments from clay-size fines to boulders as large as 3 feet in diameter. JHYDROGEOLOGY Ground water in Blue Creek Valley occurs under unconfined and confined conditions. These two conditions exist in fractured and faulted bedrock, lake clays and gravels, unconsolidated alluvium, gravel, and sandy deposits. Precipitation, surface water infiltration, and plant discharges that infiltrate into sediments may migrate slowly, I Field Code Changed { Field Code Changed I f Field Code Changed ) 11-3 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information | UTD 009081357 JanuarvJulv. 20154 vertically, and horizontally to form perched water tables above the 50- 150-foot depth of the regional water zone. The perched ground water may eventually migrate to the deeper regional system. The regional system ranges from 50- 600 feet in depth depending on the topographical location. Blue Creek may recharge shallow aquifers in the center of the Blue Creek Valley. The direction of movement within the faulted and fractured bedrock will be controlled by the connection of faults and fractures. Regionally, the ground water flow trend is from north to south. Depth to groundwater at the M-136 treatment units is an average 300 feet. Depth to groundwater at the M-225 treatment unit is 600 feet. The ground water quality in Blue Creek Valley is generally poor due to naturally occurring chlorides and total dissolved solids. Levels of dissolved solids range from 400 to over 12,000 mg/1. The .quality of ground water depends upon the sediments, which it has contacted. Quality is quite good in local, up gradient areas of water recharge, but degrades rapidly as it moves from mountain to the valley axis. High levels of total dissolved solids in lowland areas are probably due to slow migration through Tertiary sediments. Down gradient from the ATK sites, quality deteriorates rapidly as it enters the mudflats of the Great Salt Lake. - { Field Code Changed Field Code Changed .CLIMATE ATK has a 10-meter meteorological tower and instruments to measure and record air temperature, barometric pressure, relative humidity, solar radiation, precipitation, vertical and horizontal wind speed, and direction. -{ Field Code Changed The ATK plant site is classified as semiarid, with an average annual total precipitation of 14.88 inches at the ATK meteorology station. During the winter months, the average total snowfall amounts to 24 inches. Precipitation typically occurs on 95 days out of the year (includes trace precipitation). During the year, it would be expected that 35 percent of the days would be clear, 30 percent of the days would be partly cloudy, 34 percent would be cloudy, and fog would be expected to occur about 1 percent of the time. According to interpreted weather data for the ATK facility, the 25-year storm with 24-hour duration would result in 2.4 inches of precipitation. Evaporation rates are high throughout the year, with the Great Salt Lake averaging 66 in. a year. The average area evapotranspiration rate is 46.6 inches. The consistently low precipitation and high evaporation allow little if any percolation into subsurface soils. The average annual temperature in the ATK Promontory area is in the 45 to 50 degree range, with generally hot, dry summers. Relative humidity averages between 20 and 30 percent during summer afternoons. Nights are usually cool, but daytime maximums occasionally exceed 100 degrees F. On clear nights, cold air usually drains from the slopes of the adjacent ranges and accumulates on the valley floor, while the foothills and bench areas, such as at Thiokol, remain relatively warm. The average daily temperature ranges from about 11 to 32 degrees F in January and from about 54 to 91 degrees F in July. On an annual basis, the winds for the valley tend to prevail from the north during the earlier morning hours and south to southeast, averaging about 10 mph, during the afternoon. 11-4 I UTD 009081357 ATK Launch Systems Promontory Facility Part B Operational Plan Process Information JanuarvJulv. 20154 Blue Creek is the only perennial stream in the valley drainage basin and is the closest water body to the M-136 treatment unit. Blue Creek originates some 15 miles north of the Promontory facility from a warm saline spring, which flows along the western boundary of the facility. The Promontory area is characterized as a very sparsely populated rural region, with primarily dry farms and ranching activities. Low growing perennial grasses and shrubs characterize the vegetation in the area. The ecological habitat found at the Promontory facility includes many head of mule deer and large populations of various birds, rabbit, and predator species. 11.2 WASTE CHARACTERIZATION Wastes will be characterized to identify hazardous properties to ensure they are properly managed. The Waste Analysis Plan (see Attachment 1) will be used to characterize and classify reactive wastes. 11.3 REACTIVE WASTE DESCRIPTION The primary products produced at the facility include solid rocket motors, military and aviation flares, and high explosive/high energy compounds. Solid rocket motors are typically cast with composite propellants. Composite propellants are classified as a DOT 1.3 material, and typically contain a non-explosive liquid binder mixed with aluminum powder and ammonium perchlorate. Flares are generally classified as a DOT 1.3 material, and typically contain an inert binder, a metal powder, and an oxidizer. High explosive compounds are generally classified as DOT 1.1 material and are generally nitramine compounds developed for specific military requirements. Reactive wastes are produced from the manufacturing process include, but are not limited to the following: cured and uncured propellants; rocket motors; small initiating devices; explosives articles, propellant scrap; and explosive ingredients such as HMX, RDX, CL-20, explosive contaminated metal powders such as aluminum and magnesium and oxidizers such as ammonium perchlorate and potassium perchlorate. The facility also contains both quality assurance and research and development laboratories. The quality assurance laboratories generate wastes similar to manufacturing wastes. The Research and Development laboratories generate a small quantity, but a wide variety of both explosive compounds and precursors to explosive compounds. Reactive wastes are characteristic hazardous wastes for reactivity (D003). Nearly all of the reactive wastes are reactive due to the presence of propellants and explosives. Some reactive wastes, such as those from laboratory operations, may contain solvents which would also be a listed waste defined by R315-2 of the UAC. Wastewater treatment sludge generated from the processing of explosives is a K044 listed hazardous waste. Reactive wastes also include materials such as rags, gloves, other personal protective equipment, plastics, rubber and paper contaminated with explosive materials during the manufacturing process. Reactive wastes may also be received from off-site sources. With one exception, off- site wastes are rocket motors, propellants or explosives with similar formulations and ingredients to those generated on site. The exception is wastes received from Autoliv Automotive Safety Products Inc. (Autoliv) which are generally DOT Class 1.3 11-5 ATK Launch Systems Promontory Facility UTD 009081357 Part B Operational Plan Process Information JanuarvJulv. 20154 materials containing compounds similar in nature to flare products. Ingredients include oxidizers (e.g. ammonium nitrate, copper nitrate, potassium nitrate, strontium nitrate and potassium perchlorate), reactive metal powders (e.g. boron, zirconium, aluminum and magnesium), nitrogen rich fuels (e.g. tetrazole or triazole compounds) and polyacrylimide binders. Many of the Autoliv products were initially developed at Promontory when Thiokol Chemical Corporation operated the site. Autoliv and ATK are co-located, and a working relationship continues between the two companies, which includes open burning reactive wastes generated by Autoliv that can't be commercially disposed. 11.4 REACTIVE WASTE GENERATION AND COLLECTION ATK uses a variety of containers to store reactive wastes at the Facility. The standard containers used at the Facility are described in this section. However, due to the nature of our business, new types of containers may be required in the future, and can't be described in this application. To ensure that all containers are safe to use, containers will be selected using the DOD Contractor's Safety Manual for Ammunition and Explosives (DOD 4145.26-M). All containers for reactive waste that are currently used, or will be used in the future, will meet the DOD 4145.26-M requirements. Operating buildings generating reactive wastes use a variety of collection containers as described below: • Conductive Containers -Electrically conductive containers are typically bags made of opaque, volume-conductive carbon-impregnated polyolefin or polypropylene. They can be grounded to prevent he build up of static electricity. The bags are available in a variety of sizes from small containers to large than one cubic yard. They are typically used to line other containers, but can be used without an outside container. Typical conductive containers include Velostat® bags, Velostat® sheet material, and conductive sling bag and Super Sack® containers. • Static Dissipative Containers -Static dissipative containers are typically bags made of a polyethylene material. The material prevents the build-up of static electricity by continually dissipating the charge. These bags are typically used to line other containers, but may be used without an outside container. Typical static dissipative containers include pink poly bags, pink poly sheet material and static dissipative Cromhmiq™ sack containers. • Fiberboard drums - Wastes may be collected directly into commercially available 30-gallon fiberboard drums. These drums have a removable lid that can be sealed in place with a locking chime after the drum is filled. Fiberboard drums selected for this application are approved by DOT for highway transportation of hazardous materials and can be used to ship these wastes off-site for treatment and disposal. • Sumps- Explosive contaminated wastewater is collected in sumps at the point of generation. When appropriate, propellant "chips" and other suspended solids are filtered out before the wastewater reaches the tank, and when the wastewater is pumped out of the tanks. The wastewater is pumped into tanker trucks where it is treated at M-705 and discharged under a UPDES permit. Filters containing "chips 11-6 I UTD 009081357 ATK Launch Systems Promontory Facility Part B Operational Plan Process Information JanuarvJulv. 20154 and other suspended solids are accumulated , and treated and disposed of in accordance with the applicable hazardous waste management rules. • Other Containers - Large blocks of cured propellant are containerized by wrapping the waste in plastic and placing it on wood pallets. Ammunition cans are used to hold initiating and ordnance items. Waste rocket motors are generally large enough to be their own container. Plastic buckets are used to hold conductive and static dissipative bags. The buckets are reused and become contaminated with reactive material. The buckets are cleaned by removing the contaminated material using a rag. The contaminated rag is then collected for disposal and managed as directed in UAC 315-5. If a bucket cannot be cleaned, it is managed as a hazardous waste and treated by open burning. Laboratory waste may come in a variety of sizes and types of containers such as plastic, metal or glass. DOT containers for Class 1.1 and 1.3 reactive materials may also be used. A plastic cover secured to a tray may be used as a container for unburned residue or containers of off-site waste stored in a tray for up to 14 days from its receipt to thermal treatment. Operating personnel accumulate reactive waste in these containers as it is generated. When a reactive waste container is full or at the end of an operating shift, it is closed or sealed as applicable for the container. A hazardous waste label is filled out and attached to the container. Operators at the buildings that generated the waste enter pertinent information into the electronic waste tracking system described in Section Most operating buildings that generate reactive waste have an explosive waste collection area located approximately 50 feet from the operating building. Except as described below, waste containers are placed in the collection area to facilitate removal of waste propellant, explosive and reactive wastes from the operating buildings. The collection sheds are constructed of wood or corrugated metal and are secured to a concrete floor. When managing reactive wastes, ATK building operators use the temporary collection sheds as 90-day or satellite accumulation stations. Reactive wastes are placed in the collection area either as they are generated or at the end of each operating shift. Waste containers that are not full at the end of a shift are sealed, a hazardous waste label is attached to the container and they are moved to the temporary collection area. Containerized explosive wastes are picked up from the collection location using a vehicle approved for the transport of explosive wastes. Extreme care is used when handling all explosive wastes. Wastes are transported directly to either the M-136 or M-225 burning ground. Reactive wastes generated at Plant 3 are transported to M-225. All other reactive wastes are transported directly to M-136. Propellant and explosive operating buildings at the facility, including explosive waste 90-day storage and satellite accumulation areas, are designed and constructed in accordance with strict federal standards. These standards identify the criteria that must be used to construct buildings where reactive material will be used and/or stored. These standards also require that explosive buildings to be separated by sufficient distance, or a quantity-distance relationship, to prevent an explosive event in one building from propagating to another building. Quantity-distance rules also control the location of propellant and explosive operating buildings with regard to public property 11.5. 11-7 ATK Launch Systems Promontory Facility Part B Operational Plan Process Information JanuarvJulv. 20154 | UTD 009081357 (highways, parks, etc,) and private property. All buildings used for temporary storage of waste explosives, including the temporary storage sheds, are correctly sited with respect to the applicable quantity-distance rules. 11.5 QUANTITY DISTANCE DETERMINATION The facility uses the Department of Defense (DOD) guidance to calculate quantity distance relationships. The evaluation was conducted according to NAVSEA OP5, Volume 1, Revision 4, Paragraph 11-3.2. The method used to determine safe quantity distance relationships for both Class 1.1 and 1.3 propellants is provided below. The quantity distance relationship for Class 1.3 propellant is determined by the following formula: D = 5W"3. Where W is the weight of Class 1.3 propellant and D is the safe distance. The formula applies to Class 1.3 propellant and Class 1.3 propellant ingredients. The safe distance is defined as the interline protection for mass fire for Class 1.3 propellant. The quantity distance relationship for Class 1.1 propellant is determined by the following formula: D = 18W1'3. Where W is the weight of a Class 1.1 explosive and D is the safe distance. The formula applies to Class 1.1 propellant and Class 1.1 propellant ingredients. The safe distance is defined as the unbarricaded interline protection for Class 1.1 propellant. 11.6 WASTE TRACKING ATK maintains an electronic waste tracking record to collect and manage information about Teactive wastes generated at the facility. This tracking system uses a combination of paper records and an electronic database. Wastes being accumulated in containers at operating areas within the facility are labeled and managed in accordance with R315-5 of the UAC for either a satellite accumulation or less than 90-day hazardous waste storage area. The electronic tracking system maintains the following information to monitor cradle to grave waste handling practices: • ID# container identification number • Date - accumulation date • Building # - identifies where the waste was generated; • RWDI# - identifies the reactive waste disposal instruction • Profile # - identifies the profile • Quantity of PEP - quantity of propellant, explosive or pyrotechnic material; • Quantity of Contaminated waste - Explosive and total weight of the container; • Material Description - description of the material • Propellant name - describes the propellant by type, program other identifier • Log Date - date logged into the system The electronic tracking system maintains information on all containers of reactive waste in 90- day storage at M-136 and M-225. It also tracks the total weight of waste placed on each burn tray, and the total weight of waste burned on any given day. 11-8 ATK Launch Systems Promontory Facility | UTD 009081357 Part B Operational Plan Process Information JanaarvJulv. 20154 In the event reactive waste is shipped off-site for treatment, the system maintains the following information: the manifest number, transporters, manifest ship date, and manifest return date. In the event the electronic tracking system is not operable, the information will be tracked using paper copies until the electronic system is operable. In the event this occurs, ATK will transfer all information to the electronic system within 72 hours of the system becoming operational again. 11.7 REACTIVE WASTE STORAGE ATK may store hazardous wastes prior to disposal. Solid R-reactive wastes are stored in designated facilities as described in this section, and are segregated according to compatibility requirements. •—M 47—This building can be used to store any of the explosive wastes listed in Section 11.3. All containers of waste in storage will be closed except when waste is being added to or removed from the container. Adequate aisle space must be provided to pormit proper container inspection; all containers will be labeled and managed in accordance with R315 5 of the UAC. This building does not have water immediately available, and relies on the Fire Department for any emergency action. Employees are not permitted to fight fires inside an explosive storage building. This building is totally enclosed, so there are no precipitation run on or run off concerns. • M-62903 - This building can be used to store any of the explosive wastes listed in Section 11.3. All containers of waste in storage will be closed except when waste is being added to or removed from the container. Adequate aisle space must be provided to permit proper container inspection. All containers will be labeled and managed in accordance with R315-5 of the UAC. This building is equipped with a fire sprinkler system, which is checked annually. Employees are not permitted to fight fires inside an explosive storage building. This building is totally enclosed, so there are no precipitation run-on or run-off concerns. • M136- trays at M-136 can be used to store waste received from off-site for up to 14 days. All containers of waste must be closed, labeled and managed in accordance withR315-5 of the UAC. • S-633- This storage pad can be used to store any of the explosive wastes listed in Section 11.3. All containers of waste in storage will be closed except when waste is being added to or removed from the container. Adequate aisle space must be provided to permit proper container inspection. S-633 is approximately 100' x 100' in size. It is secured by a perimeter fence, a vehicle access gate that can be locked, and has the appropriate warning signs for a storage area. It has a road base surface, and has lighting protection. All waste containers will be labeled, and managed in accordance with R315-5 of the UAC. This area does not have water immediately available, and relies on the Fire Department for any emergency action. Employees are not permitted to fight fires inside a reactive waste storage area. Precipitation run- on or run-off is prevented by a combination of diversion ditches, collection ditches and trenches. 11-9 ATK Launch Systems Promontory Facility UTD 009081357 Part B Operational Plan Process Information January July, 20154 11.8 TREATMENT OF REACTIVE WASTE The facility utilizes thermal treatment methods to safely dispose reactive hazardous wastes. Thermal treatment methods include both open burning and open detonation. Reactive hazard wastes may also be shipped off-site and treated at other permitted treatment storage and disposal facilities. 11.8.1 OFF-SITE TREATMENT OF REACTIVE WASTE All hazardous reactive wastes treated off-site will comply with all applicable local, State and Federal regulations. 11.8.2 ON-SITE TREATMENT The M-136 and M-225 facilities are thermal treatment units designed to treat reactive hazardous wastes using open burning or open detonation. Treatment by open burning at M-136 is limited to a maximum of 106,500 pounds per day. Each burn station 1-12 and 14 may treat all or a portion of the 106,500 pounds. Burn station 13 can treat a maximum of 50,000 pounds per day. Treatment by open detonation will be conducted at burn stations 13 and 14 only, and is limited to 600 pounds per event. Figure 11-2 shows the security fence, control bunker, and vehicle access points for M-136. Treatment by open burning at M-225 is limited to a maximum of4,500 pounds per day. Each burn station 1 -4 may burn all or a portion of the 4,500 pound limit. Treatment by open detonation is limited to the 600 pounds per day in the M-225 open detonation area. Figure 11 -2 shows the security fence and vehicle access points for M-225. The process flow for open burning at both treatment areas is identified below: 1. Pre-planned Activities 2. Placement of Waste in Treatment Units, Wiring and Ignition 3. Post-burn Inspection and Cleanup The following precautions are used to ensure operator safety while working at the M- 136 and M-225 burn grounds: 1. Emergency egress routes are always maintained while employees are working in the treatment areas. 2. The firing systems are disabled using an interlock to prevent accidental ignition. 3. Weather conditions are monitored to assure operators are not exposed to risks from lightning strikes. 11.8.2.1 PRE- PLACEMENT ACTIVITIES OBOD operations at the facility are a continuous process. Wastes are transported from the generation areas and brought into the treatment areas on a daily basis. Wastes are off-loaded and placed in trays and managed under 90-day rules until treatment occurs. When treatment is completed, the trays are cleaned, inspected and the loading process begins again. Pre-placement inspections occur during the post-burn inspection and clean-up phase of the treatment process. 11-10 ATK Launch Systems Promontory Facility UTD 009081357 Part B Operational Plan Process Information JanuarvJulv. 20154 Prior to placing reactive waste for treatment at the OBOD facilities, operators visually verify the following tasks were completed during post-burn inspection and cleanup activity: 1. Any untreated waste and/or unburned residue has been identified, collected and is being properly managed; 2. Storm water accumulated in the trays has been removed. 3. Trays which do not meet the inspection criteria have been removed from service. 11.8.2.2 PLACEMENT OF WASTE IN TREATMENT UNITS Reactive hazardous waste is transported to the OBOD facilities using a vehicle which meets explosive safety requirements. Reactive hazardous waste may be offloaded by hand or mechanical means including a knuckle boom, forklift, crane, or other appropriate equipment. Reactive hazardous waste is not collected, transported, or unloaded during a lighting warning, which is defined as lightning within 30 miles of the facility. If collection, transportation, or unloading operation has started, the operation is brought to a safe halt. Treatment units used to treat and contain waste are listed below but are not limited to, the following: • Burn Trays - Metal trays constructed in several different sizes including, 4'X10', 5'X16', 8'X8', and 8'X20'. Typical construction is out of steel plate A36 grade steel ranging thicknesses of 3/8", W, Va \ and 1 inch. • Clamshell Disposal Trays- Used for the disposal of items that have the potential to be propulsive. Typical construction is a square welded box 1-inch thick, A36 steel plate with a vented lid that enables treatment of potentially propulsive items, while safely containing the propulsive energy. • Restraining Trays are typically constructed of 1 -inch thick A36 steel plate welded into a square box that is filled with sand. There are several different designs for restraining trays which include: (1) steel tubes sitting on end in the sand are used to hold potentially propulsive items which are secured to the tube allowing the exhaust to vent out of the open end of the steel tubes, and (2) used without steel tubes where propulsive items are secured at the base for items where the exhaust will vent from the side of the item. • Small Motor Disposal Vaults- Constructed from a concrete 1 Ox 10 foot sump filled with sand. Small rocket motors such are placed into the sand with the aft end exposed perpendicular to the ground. Motors are treated with the propulsive force directed into the concrete sump and the sand. The vehicle containing hazardous waste is to be parked near the receiving tray with any side rails lowered to facilitate offloading of the waste. Containers are transferred directly from the truck and carefully placed into the burn tray. Items to be open detonated are offloaded from the vehicle by hand, knuckle boom, or by forklift and then placed on the ground for treatment 11-11 ATK Launch Systems Promontory Facility Part B Operational Plan Process Information JanuarvJulv. 20154 UTD 009081357 Items that have the potential to be propulsive are off-loaded into the clamshell, sandbox, or small motor disposal vault by hand, knuckle boom, or by forklift. After offloading, items are restrained using engineered restraints allowing for safe treatment. Potentially propulsive items (e.g. rocket motors) may also be off-loaded into station 14 using the knuckle boom, forklift, or crane. The case may be placed on the ground, sand/dirt mounds, chocks, or other support media for treatment. PEP waste which generates ash or residue which is listed or characteristic is segregated from PEP waste which generates non-regulated ash. Ash and residue is managed as described in 11.8.2.5. 11.8.2.3 WIRING AND IGNITION After waste has been placed on a tray, the next step is to complete a resistance check on the ignition system. As a safety precaution, a physical interlock (e.g. key) is used to prevent the firing panel from being accidently engaged during the resistance check. The key remains in under the control of the operators during the resistance check and all subsequent operations until the operators return to the control bunker to complete treatment. Each firing stanchion must have 10 ohms or less. A firing stanchion that has a resistance of 10 ohms or greater must be tagged out until repairs are made. Once the resistance check is completed igniter installation is performed. The igniter is attached to the firing system by connecting the lead wire from the initiating device to the firing stanchion. Igniter installation operations are performed by a minimum of two operators. The types of igniters commonly used are listed below: 1. Burn Grounds Igniter -Propellant with a hot wire 2. Bag Igniters - Propellant, explosive, pyrotechnic with electric match or other electric initiation device. 3. Blasting Caps - Small amount of primary explosive 4. Electric Matches - wire attached to small explosive device 5. Fuse - a tube, cord, or the like, filled or saturated with combustible matter 6. EBW - Exploding Bridge Wire, a wire that contacts explosives fired by a high voltage electricity source 7. TBI - Through Bulkhead Initiator, shock initiation of an energetic material provided through an integral barrier Linear shaped charge may also be used to facilitate thermal treatment of potentially propulsive wastes and items contaminated with reactive hazardous wastes. Reactive hazardous wastes may be desensitized by adding one of the liquids listed below. The addition of these liquids modifies the reactive nature of the waste making it safer to store, handle and transport. It also slows the burning rate of the material during treatment. 1. Oils 2. Water 3. Alcohol 4. Triacetin 5. Physical Media (e.g. Conductive and static dissipative packaging) 11-12 ATK Launch Systems Promontory Facility UTD 009081357 Part B Operational Plan Process Information January July, 20154 When necessary, additional burn enhancers may be used to promote a more complete burn. Additives include, but are not limited to, the following: 1. Diesel Fuel 2. Wood (e.g. Pallets) 3. Propellant The burning ground operators verify the treatment area has been evacuated of all personnel before proceeding with ignition. The burning ground operators retreat to the control bunker and close the door. The lockout key is inserted into the control system which allows power to the firing panel. Circuit continuity is checked at the firing panel which verifies that igniters were properly installed. A flashing red light is activated once the firing system is operational to alert personnel inside the area that a treatment operation is about to begin. The appropriate stanchion is chosen and the igniter fired by pressing the ignition buttons. Two operators are required for this operation. In the event of a misfire, operators must wait a minimum period before reentering the treatment area to correct the problem. If a misfire occurs on the first tray, being burned the process stops, and personnel are required to stay in the bunker for at least 30 minutes. After 30 minutes, the igniter which failed is uninstalled. This process requires two employees and is done by: (1) the two employees performing the task remove the physical interlock and keep it in their possession, (2) the igniter wires are removed from the stanchion where the misfire occurred then twisted together to short the circuit. The igniter is not physically removed from its position. A new igniter is installed, and the operators return to the control bunker and repeat the process. If a misfire occurs and it is not the first tray in the burn sequence, the operators return after 16 hours and repeat the process described above. The Box Elder County Dispatch is notified prior to each treatment. This notification can be made by telephone, fax or email, and may be made immediately prior to ignition or an undefined number of hours prior to igniting the waste. Notification must be made the same day as the waste is treated. 11.8.2.4 POST-BURN INSPECTION AND CLEANUP Following an open burning treatment event, the area where the burn or detonation occurred cannot be re-entered for at least 16 hours after completion of the eventbwn without specific approval from ATK management. A preliminary inspection is performed before the cleanup begins. This inspection includes checking for hot spots and checking for unburned reactive hazardous waste. Hot spots include visual indications of hot material (flame, smoke, high temperature). If these conditions exist, post-burn clean is postponed until the hot spots are gone. All residues remaining on the burn trays are visually inspected to determine if there is any unburned reactive material. Unburned reactive material will be reburned. Depending on the nature of the material that did not burn, donor material or burn enhancers such as diesel or wood may be used to ensure the material will completely burn. Unburned waste ejected from the tray will be collected and placed on a burn tray, and treated in the same manner. 11-13 UTD 009081357 ATK Launch Systems Promontory Facility Part B Operational Plan Process Information JanuarvJulv. 20154 Small amounts of untreated residue will be considered as newly generated waste and will be tracked as such in the tracking system. A small amount is defined as less than or equal to 5% of the total volume placed on the tray or treatment area. The primary option for managing this waste is to burn it by 6pm the following calendar day. If untreated residue cannot be treated by 6pm the following calendar day then it will be managed in accordance with R315-5 of the UAC. Unburned waste that results from a misfire or an interrupted ignition can remain on a burn tray. An interrupted ignition occurs when anything greater than 5% of the waste on the tray fails to ignite. In this situation, the waste is considered unreacted waste instead of newly generated residue. ATK will attempt to reburn the waste by 6 pm of the following calendar day. If unforeseen circumstances prevent the burn from occurring by 6pm of the following day, the waste will be covered and the burn tray will be labeled and managed as a 90-day storage area in accordance with the requirements of R315-5 of the UAC. The cumulative storage time for the waste both in storage prior to burning and on the burn tray may not exceed 90-days. If it is necessary to storage this waste for greater than 90-days, an emergency permit would be requested. Typically, the post-burn and cleanup activities described in this section will be conducted the next calendar day following treatment. The clean process begins after the preliminary inspection is completed. Cleaning is accomplished using a variety of tools and equipment such as rakes, shovels, a forklift and a tractor. Ash is classified for disposal as described in 11.8.2.5. The majority of the waste treated is classified as EPA waste number D003 reactive only. The ash resulting from treating D003 reactive waste is collected, and transported to the on-site landfill where it is disposed. Ash classified as hazardous is collected and managed in accordance with the requirements of R315-5 of the UAC. Ash resulting from the treatment of K044 is collected and disposed in the on-site landfill. After the tray is cleaned, it is inspected for holes, weld cracks, and 6 inches of wall height. If a tray fails the inspection criteria, it is removed from service. These inspections are maintained onsite in the operating record. In the event a tray is not going to be used for an extended period, it is stored in a manner to prevent stormwater accumulation (e.g. stored upside down or with a lid). If accumulated liquid is present in a burn tray it is removed and delivered for treatment at a UPDES permitted facility. 11.8.2.5 Ash Classification A waste assessment is conducted prior to receiving waste for treatment. The waste assessment is made using generator knowledge of the production process, the raw materials used to produce the material, and the chemical composition of the materials. If the assessment identifies that, at the point of generation, the waste meets any of the following three criteria, all ash from the initial treatment is collected, and the ash is sampled and analyzed using the protocol described in Attachment 1. 1. 2. 3. It could potentially contain 40 CFR 261.31 listed constituents. It could potentially contain toxicity characteristic constituents above the 40 CFR 261.24 regulatory level. It could potentially contain underlying hazardous constituents above the 40 CFR 268.48 treatment standards. 11-14 I UTD 009081357 ATK Launch Systems Promontory Facility Part B Operational Plan Process Information JanuarvJulv. 20154 Based on the analytical results, the ash is managed using the logic in Attachment 1 Figure 3-2. All ash classified as hazardous based on the above criteria is managed in accordance with the requirements of R315-5 of the UAC. 11.9 RECEIVING HAZARDOUS WASTE FROM OFF-SITE ATK periodically receives reactive hazardous waste from off-site sources. All hazardous waste received from an off-site source will be managed at one of the permitted storage units. All off-site generated hazardous waste will be reviewed and approved prior to being accepted using the following criteria: • EPA hazardous waste number(s); • Physical description; • Chemical description; • Source of the waste; • Sampling frequency; • Parameter for analysis; • Handling code; • Tracking system number; • DOT shipping description; and • Safe handling instructions Upon receipt, all off-site generated hazardous waste will be visually inspected to ensure that it meets the acceptance criteria, the manifest is correct, and the containers are labeled, closed, in good condition and compatible with the waste. All deficiencies will be resolved with the generator before the waste is received. After the waste has been accepted, it will be managed using the tracking systems described in Sections 11.6. 11.10 ENVIRONMENTAL PERFORMANCE STANDARDS 40 CFR 264.600 contains requirements for treatment, storage and disposal facilities to meet environmental performance standards to ensure operations are conducted in a manner that ensures protection of human health and the environment. The follow areas of concern have been or are in the process of being addressed to ensure compliance with the performance standard requirements. Prevention of Releases Due to Migration of Waste Constituents in the Ground Water or the Subsurface Environment - this standard requires actions to prevent releases that may have adverse effects on human health or the environment due to migration of waste constituents in the ground water or subsurface environment. Topics that must be considered are: • The volume and physical and chemical characteristics of the waste in the unit, including its potential for migration through soil, liners, or other containing structures; • The hydrologic and geologic characteristics of the unit and the surrounding area; • The existing quality of ground water, including other sources of contamination and their cumulative impact on the ground water; • The quantity and direction of ground-water flow; • The proximity to and withdrawal rates of current and potential ground-water users; 11-15 ATK Launch Systems Promontory Facility UTD 009081357 Part B Operational Plan Process Information JanuarvJulv, 20154 • The patterns of land use in the region; • The potential for deposition or migration of waste constituents into subsurface physical structures, and into the root zone of food-chain crops and other vegetation; • The potential for health risks caused by human exposure to waste constituents; and • The potential for damage to domestic animals, wildlife, crops, vegetation, and physical structures caused by exposure to waste constituents; Prevention of Releases Due to Migration of Waste Constituents in Surface Water, Wetlands or on the Soil Surface -This standard requires actions to prevent releases that may have adverse effects on human health or the environment due to migration of waste constituents in surface water, or wetlands or on the soil surface. Topics that must be considered are: • The volume and physical and chemical characteristics of the waste in the unit; • The effectiveness and reliability of containing, confining, and collecting systems and structures in preventing migration; • The hydrologic characteristics of the unit and the surrounding area, including the topography of the land around the unit; • The patterns of precipitation in the region; • The quantity, quality, and direction of ground-water flow; • The proximity of the unit to surface waters; • The current and potential uses of nearby surface waters and any water quality standards established for those surface waters; • The existing quality of surface waters and surface soils, including other sources of contamination and their cumulative impact on surface waters and surface soils; • The patterns of land use in the region; • The potential for health risks caused by human exposure to waste constituents; and • The potential for damage to domestic animals, wildlife, crops, vegetation, and physical structures caused by exposure to waste constituents. Prevention of Releases Due to Migration of Waste Constituents in the Air - this standard requires actions to prevent releases that may have adverse effects on human health or the environment due to migration of waste constituents in the air. Topics that must be considered are: • The volume and physical and chemical characteristics of the waste in the unit, including its potential for the emission and dispersal of gases, aerosols and particulates; • The effectiveness and reliability of systems and structures to reduce or prevent emissions of hazardous constituents to the air; • The operating characteristics of the unit; • The atmospheric, meteorologic, and topographic characteristics of the unit and the surrounding area; • The existing quality of the air, including other sources of contamination and their cumulative impact on the air; • The potential for health risks caused by human exposure to waste constituents; and 11-16 ATK Launch Systems Promontory Facility UTD 009081357 Part B Operational Plan Process Information JanuarvJulv. 20154 • The potential for damage to domestic animals, wildlife, crops, vegetation, and physical structures caused by exposure to waste constituents. 11.10.1 Compliance With Environmental Performance Standard Requirements All of these factors have been and will continue to be evaluated until closure of the facility to ensure waste treatment methods are conservative and will not adversely affect human health or the environment. Control measures include, but are not limited to the following: Human Health Risk Assessment - a Human Health Risk Assessment (HHRA) is being conducted to evaluate the risk to the public from open burning and open detonation operations at the facility. Tasks associated with the HHRA include developing an air dispersion model, evaluating sources, source parameters, and waste materials, and characterizing emissions. The HHRA will address the following environmental performance related concerns: • The volume and physical and chemical characteristics of the waste in the unit, including its potential for the emission and dispersal of gases, aerosols and particulates; • The effectiveness and reliability of systems and structures to reduce or prevent emissions of hazardous constituents to the air; • The operating characteristics of the unit; • The atmospheric, meterologic, and topographic characteristics of the unit and the surrounding area; and • The potential for health risks caused by human exposure to waste constituents. The methods used in the HHRA are based on United States Environmental Protection Agency (U.S. EPA) risk assessment guidance documents, and to the extent possible, the dispersion modeling methodology within the Human Health Risk Assessment Protocol (HHRAP) for Hazardous Waste Combustion Facilities (U.S. EPA, September 2005). The completed HHRA Protocol and Report will be reviewed by the Utah Division of Solid and Hazardous Waste. Limits on OBOD operations will be based on this assessment, as appropriate, once approval of the HHRA Report is given by the Director of the Utah Solid and Hazardous Waste Control Board. Ecological Risk assessment - an Ecological Risk Assessment (ERA) will be conducted to determine potential risks to ecological receptors that may be affected by OBOD operations. It will evaluate the potential for damage to domestic animals, wildlife, crops, vegetation, and physical structures. The completed ERA will be submitted to the Utah Division of Solid and Hazardous Waste for review. Limits on the OBOD operations will be based on this assessment, as appropriate, once approval of the ERA Report is given by the Director of the Utah Solid and Hazardous Waste Control Board. Soil Monitoring Plan - a Soil Monitoring Plan (SMP) will be developed to verify the air dispersion and deposition models that were developed for the HHRA. The SMP will be used to evaluate the existing quality of surface waters and surface soils, and to determine what impact continued operations at the thermal treatment areas has on surface soil and surface water quality. Risks to human health and the environment will be evaluated using the data collected during implementation of the SMP. 11-17 ATK Launch Systems Promontory Facility Part B Operational Plan Process Information JanuarvJulv. 20154 UTD 009081357 Groundwater Monitoring Plan - a groundwater monitoring program has been in place at the facility since 1986 to monitor contaminants that were released from past disposal practices. The sampling methods, constituents of concern, sampling frequency, sampling results and analytical methods are closely reviewed and monitored by the DSHW. The groundwater monitoring program addresses the following concerns: • The hydrologic and geologic characteristics of the unit and the surrounding area • The existing quality of groundwater, including other sources of contamination and their cumulative impact on the groundwater; • The quantity and direction of groundwater flow; and • The proximity to and withdrawal rates of current and potential groundwater users. A Groundwater Monitoring Plan will be developed to evaluate the impact of thermal treatment operations on groundwater down gradient of the M-136 and M-225 Thermal Treatment Areas. The plan will identify analytes, sampling protocols and data quality objectives. In addition, the plan will propose a statistical method for determining if existing groundwater contamination concentrations increase due to ongoing thermal treatment operations. Annual Review of Limits - the operating permit requires ATK to conduct an annual review of emission factors established by the HHRA, the reference doses for selected health effects, and to review the potential health risk scenarios to assure that the scenarios have not changed. An annual accounting of the types and quantities of reactive waste treated is also required. Stormwater Management - Stormwater run-on and run-off is controlled by a combination of soil grading and drainage ditches. The terrain around M-136 and M-225 has been graded and drainage ditches surround the areas in order to minimize stormwater run-on and run-off. The topography is shown in Attachment 6, Figures F-l and 1-1. Stormwater collection and drainage is shown in Attach 11 Figure 11-1 and Figure 11-2. The combination of controlling run-on and run-off, containing waste in water-tight burn trays, lack of precipitation, high evaporation rate and depth to groundwater prevents waste constituents from being released to the groundwater and or subsurface environment. Ongoing soil and groundwater monitoring are used to verify these controls are effective in preventing adverse effects to human health and the environment. Actions to Prevent Releases to the Environment - all spills of hazardous materials are promptly cleaned up. Internal procedures require that chemicals be properly containerized, labeled, stored, used and disposed. The workplace is routinely audited to ensure compliance with procedures. When spills do occur, the released material is promptly cleaned up and R315 reporting requirements are followed. Open Burning is Conducted in Steel Containers - Open burning is conducted in containers which minimizes the potential for waste constituents to migrate to the ground water, surface water or related environments. The Operating Permit requires routine inspections to ensure the containers are properly maintained. Containers requiring repair are removed from service until repairs are completed. 11-18 I UTD 009081357 ATK Launch Systems Promontory Facility Part B Operational Plan Process Information JanuarvJulv. 20154 Ash Management - ash and residue from OBOD operations are promptly collected and disposed. Ash is managed and classified as described in sections 8.2.4, and 8.2.5 of this attachment. Storage and Inspections - All PEP and residues from OBOD treatment are stored in accordance with Section 4 of this attachment and R315-5 Hazardous Waste Generator Requirements. Storage and treatment areas are inspected as required by Attachment 2, and operated in accordance with Attachment 9 of this permit. Regulatory Oversight- the facility is subject to strict regulatory oversight by the Utah Division of Solid and Hazardous Waste. All aspects of hazardous waste management described in this Attachment are subject to their review. When necessary, deficiencies are identified and corrective action is taken by the permittee. 11-19 EarthFax Engineering Group, LLC Cost Estimate Project: ATK - Promontory M-629 closure cost estimate Project #: UC-1023-18 Estimator: RB White Date: 27-Jul-15 Costs: Means 2005 Environmental Remediation Cost Data, adjusted for inflation, except as otherwise noted Assume Level C PPE Item No. Description Means No./Source Units Est. Quan. Unit Price Total Price 1 2 3 4 5 6 9 10 11 12 13 14 15 16 17 18 Materials prep (CIH) Materials prep (technician) Load waste motor (crane) Haul motor to burning ground Off-load motor Handling evaluation/planning Motor handling Disposal at burning ground Sweep building floor area Steam clean floor Load rinsate/sweepings Load drums Haul drums to Clean Harbors State disposal fee Sample collection Sample analyses, metals/exp 33-22-0111 x 2 33-22-0112 x 2 Crew SIWSM Crew COET2 Crew SIWSM Site personnel Site personnel ATK 33-22-0112 x 2 33-17-0812 33-19-0103 33-19-0103 33-19-0243 Utah DEQ 33-22-0112 x 2 Chemtech-Ford hr hr hr hr hr hr hr lb hr sf drum ea truck-mi ton hr ea 8 12 4 8 4 40 20 110,000 8 2,638 4 4 350 1 4 2 83.44 31.58 393.57 93.31 393.57 65.00 65.00 0.25 31.58 0.39 4.87 3.05 2.26 28.00 31.58 210.00 668 379 1,574 746 1,574 2,600 1,300 27,500 253 1,029 19 12 791 28 126 420 SUBTOTAL Inflation adjustment (see Means 2014 Heavy Construction Cost Data) 1.363 39,020 53,184 Misc. costs as a percent of the inflation-adjusted subtotal: Mob/demob Engineering/permitting DSHW oversight Contingency 5 % 10 % 10 % 10 % 2,659 5,318 5,318 5,318 TOTAL ESTIMATED COST 71,799 ATK Launch Systems Inc. - Promontory 20145 Module III - Storage in Containers Modified Julyamtafy, UTD009081357 .MODULE III - STORAGE IN CONTAINERS Field Code Changed III.A. APPLICABILITY III. A. 1. The requirements of this permit Module pertain to the operation of hazardous waste container storage areas at the facility. The Permittee shall comply with R315-8-9 and all conditions of this Module. III. A.2. The designated hazardous waste storage areas are the bays of Buildings M-705 S, E-501, M-62947, M 603. M-186, the burn trays at M-136, Burn Station 14 at M-136, and Storage Pad S-633. Drawings of these storage areas are presented in Attachment 6. III.B. WASTE IDENTIFICATION III.B. 1. The Permittee shall, subject to the terms of this Permit, store only the following hazardous wastes, as listed by EPA hazardous waste code, in containers at storage areas M-186, M-705Sand E-501: D001, D002, D003, D004, D005, D006, D007, D008, D009, D010 D011, D016, D018, D019, D021, D022, D023, D024, D026, D027,D028, D029, D035, D036, D038, D039, D040, D042, D043, F001, F002, F003, F004, F005, F006, F007, F008, F009, K044, P003, P012, P022, P028, P029, P030, P047, P048, P064, P067, P077, P087, P092, P093, P095, P098, P102, P105, P106, PI 12, PI 16, PI 19, U001, U002, U004,U006, U008, U009, U019, U025, U028, U029, U031, U037, U041, U044, U048, U053, U056, U057, U069, U070, U072, U077, U079, U080, U085, U088, U092, U093, U095, U098, U101, U102, U103,U105, U108, Ul 12, Ul 13, Ul 17, Ul 18, U120, U121, U122, U123, U131, U133, U134, U140, U147, U148, U149, U151, U154, U156, U159, U160, U161, U162, U165, U168, U169, U170, U171, U185, U186, U188, U190, U196, U201, U209, U210, U211, U218, U219, U220, U221, U223, U224, U225, U226, U228, U238, U239, U240, U243, U244, U246, U253, U328, U353, U359, U404. III.B.2. The Permittee may store solid reactive hazardous waste, EPA hazardous waste code D003, in storage Buildings M-47629 and M-603 subject to the terms of this Permit. III.B.3. The Permittee may store solid reactive hazardous waste, EPA hazardous waste code D003, received from off-site in burn trays at M-136 for up to 14 days prior to thermal treatment. Waste stored in burn trays shall be containerized only in covered drums, boxes, plastic bags, woven bags, US Department of Transportation (DOT) approved shipping containers or containerized as described in Attachment 11. Containers shall be labeled and managed as specified in Attachment 9. III.B.4. The Permittee may store waste rocket motors, EPA hazardous waste code D003, received from off-site that contain solid propellant, one at a time on the ground at M-136, Burn Station 14 for up to 14 days prior to thermal treatment. The waste rocket motors shall be labeled and managed as specified in Attachment 9. III.B.5. The Permittee may store solid reactive hazardous waste, EPA hazardous waste code D003, on Storage Pad S-633 subject to the terms of this Permit. i ATK Launch Systems Inc. - Promontory Modified Julvanuarv. 20145 Module III - Storage in Containers UTD009081357 III.B.6. The Permittee is prohibited from storing hazardous waste that is not identified in Section III.B. of this Module. Any addition of hazardous waste codes to Condition III.B. 1. requires modification of the permit in accordance with Condition I.D.3. III.C. CONDITION OF CONTAINERS III.C. 1. If a container holding hazardous waste is not in good condition (e.g., severe rusting, bulging, apparent structural defects) or it has begun to leak, the Permittee shall transfer the hazardous waste, or the container itself, to a UN approved container in accordance with Section 8-1-10 of Attachment 8. The transfer shall be completed as soon as possible but not later than 24 hours from the time the problem was first discovered. III.D. COMPATIBILITY OF WASTE WITH CONTAINERS III.D. 1. The Permittee shall assure that the waste is compatible with the containers as required by R315-8-9.3. The Permittee shall follow the compatibility plan as indicated in Section 9-2.1 and Table 9-2 of Attachment 9. III.E. MANAGEMENT OF CONTAINERS III.E. 1. The Permittee shall manage containers in accordance with this module of the Permit, UAC R315-8-9.4 and the procedures identified in Attachment 9. A container holding hazardous waste shall always be closed during storage except when the Permittee is adding or removing waste from the container. The Permittee shall not open, handle, or store containers in a manner which may cause the containers to leak. III.E.2. The Permittee shall store liquid hazardous wastes in containers only at storage areas M-186, E-501 and M-705 S. Drawings of the container storage areas are shown in Attachment 6. At capacity, the Permittee may store the following volumes of wastes: III.E.2.a. E-501 - 8,800 gallons, which is 160 55-gallon containers or the equivalent; III.E.2.b. M-186 - 22,000 gallons, which is 400 55-gallon containers or the equivalent; and III.E.2.C. M-705S - 1,760 gallons, which is 32 55-gallon containers or the equivalent. III.E.3. The Permittee shall store solid reactive hazardous waste in containers at storage areas M-62947. M 603, M-136 and S-633. Drawings of the storage areas are shown in Attachment 6. At capacity, the Permittee may store the following amounts of wastes: III.E.3.a. M 47 300,000 lbs 1.3 or21,000 lbs 1.1 solid propellant; III.E.3.ba. M-62903 - 1120,000 lbs 1.3 or 855,000 lbs 1.1 solid reactive hazardous waste; III.E.3.eb. M-136 - 106,500 lbs of 1.3 or 20,000 lbs of 1.1 solid reactive hazardous waste, as described in Condition III.B.3. or III.B.4., in burn trays or in a rocket case placed on the ground; and III.E.3.dc S-633 - 75,000 lbs of 1.3 or 20,000 lbs of 1.1 solid reactive hazardous waste. 2 ATK Launch Systems Inc. - Promontory Modified Julvanuarv. 20145 Module III - Storage in Containers UTD009081357 III.E.4. The Permittee shall maintain an aisle space of 30 inches minimum between containers or pallets of containers at storage areas M-l 86 and E-501. III.E.5. The Permittee shall store hazardous wastes at M-705S, M-62947. M 603. S-633 and M- 136 so that the container or waste rocket motor may be readily inspected and hazardous waste labels are visible. III.E.6. The Permittee may stack 55-gallon drums at a maximum of two high at storage areas M-186 and E-501. III.E.7. Hazardous waste containers shall not be stacked at storage areas M-705S, M 47, M-62963, S-633 and M-136 except as described in Attachment 9-2.3. III.E.8. The Permittee shall unload any transport vehicle hauling containers of hazardous waste for storage within 10 days following arrival at the site. Arrival for purposes of this permit shall be the day the vehicle arrives at the facility. III.E.9. The Permittee shall provide storage for and maintain on-site, 85 gallon over-pack drums at areas where liquid hazardous waste is stored. HI.F. CONTAINMENT SYSTEMS III.F. 1. The Permittee shall maintain the containment systems in accordance with the attached plans and specifications contained in Attachment 9 and as specified in UAC R315-8- 9.6. III.F.2. Container management areas shall be inspected for the presence of free liquids in accordance with Attachment 2. If free liquids are discovered in the sumps or other containment areas, the Permittee shall identify the location in the inspection log. Any liquids discovered shall be removed immediately, but in no case later than twenty-four hours after the liquid is discovered and managed according to the spill contingency plan specified in Section 9-4.3 of Attachment 9. III.F.3. For purposes of inspections, all containers stored in the liquid hazardous waste storage area shall be considered full to their respective capacities with liquid hazardous waste. Gondolas/roll-offs that are used only for the storage of solid hazardous waste need not be considered in the calculations for containment. The area for storing solid waste shall be identified. III.F.4. The burn trays at M-l 36 are only permitted for the storage of solid reactive wastes in containers received from off-site for no more than 14 days. However since some of the containers contain small amounts of desensitizing fluid (e.g. diesel, shingle oil, etc.), the containment requirements, as specified in Attachment 9, apply to the storage of wastes in the burn trays. Inspection of the burn trays shall be conducted in accordance with Attachment 2. 3 ATK Launch Systems Inc. - Promontory Modified Julvanaarv. 20145 Module III - Storage in Containers UTD009081357 III.G. SPECIAL REQUIREMENTS FOR IGNITABLE OR REACTIVE WASTE III.G. 1. The Permittee shall not locate containers holding ignitable or reactive waste within 15 meters (50 feet) of the facility boundary. III.G.2. The Permittee shall take precautions to prevent accidental ignition or reaction of ignitable or reactive waste and follow the procedures specified in Attachment 8, UAC R315-8-2.8 and UAC R315-8-9.7. IILH. SPECIAL REQUIREMENTS FOR INCOMPATIBLE WASTE III.H. 1. The Permittee shall not place incompatible wastes, or incompatible wastes and materials, in the same container, in accordance with UAC R315-8-2.8 and UAC R315- 8-9.8(a). III.H.2. The Permittee shall not place hazardous waste or materials in an unwashed container that previously held an incompatible waste or material in accordance with UAC R315- 8-2.8 and UAC R315-8-9.8(b). III.H.3. A storage container holding a hazardous waste that is incompatible with any waste or other materials stored nearby shall be separated from the other materials or protected from them by means of a dike, berm, wall, or other device. 1SLL INSPECTION SCHEDULES AND PROCEDURES 111.1.1. The Permittee shall inspect the hazardous waste storage and treatment facilities identified in Condition III.B. of this Permit as specified in the Inspection Schedules contained in Attachment 2. The purpose of this inspection shall be to detect leaking containers, standing liquids, deterioration of containers, and to detect deterioration of, or liquids in, the secondary containment system caused by corrosion and other factors as specified in R315-8-9.5. 111.1.2. If problems are observed during the inspections, the Permittee shall correct the problem in accordance with Module II, Section F. III.J. CLOSURE/POST-CLOSURE III.J, 1. The Permittee shall close the storage areas in accordance with UAC R315-8-7, UAC R315-8-9.9, Condition II.O. and Attachment 5 of this Permit. III.J.2. Closure plans for each individual hazardous waste management area shall be submitted to the Director for approval no less than 180 days prior to the commencement of closure activities. No closure activities shall take place that have not received prior approval from the Director. 4