Loading...
HomeMy WebLinkAboutDSHW-2014-012929 - 0901a06880499618Division of Solid and Hazardous Waste September 29, 2014 SEP 2 9 2014 Mr. Scott T. Anderson, Director Utah Division of Solid and Hazardous Waste P.O. Box 144880 Salt Lake City, UT 84114-4880 Re: Five-Year Permit Anniversary Closure Cost Estimate; Closure Notice for Buildings M-47 and M- 603; ATK Launch Systems Inc., Promontory; UTD009081357 Dear Mr. Anderson: Promontory permit module II.P.3 requires that ATK Launch Systems Inc. (ATK) conduct a detailed evaluation of the closure cost estimates for the regulated unit, and determine if the annual adjustments for inflation have been adequate to update the closure cost estimates. A detailed cost estimate has been completed, and is attached. The closure cost is currently estimated at $692,109 compared to $670,383 reported in our May 2014 annual update. Permit Module II.0.4 requires that ATK notify the Director prior to closing a facility. This correspondence also serves notice of ATK's intent to close buildings M-47 and M-603. We are unable to use these facilities for storage, and ATK will work with the Division to close them and replace them with a single building which will be identified at a later date. ATK will work with the Division to update Attachment 5, Closure Plan and Financial Requirements, to reflect the updated cost estimate along with finalizing the closure plans for the storage facilities and updating our insurance policies for closure costs. Please refer questions on this correspondence to Blah- Palmer at (435)863-2430. / certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility offine and imprisonment for knowing violations. Manager, Environmental Services cc: Brad Maulding, DSHW JeffVandel DSHW David McCleary DSHW Blair Palmer, ATK Sincerely, EarthFax Engineering Group, LLC Cost Estimate Project: ATK - Promontory E-501 closure cost estimate Project*: UC-1023-18 Estimator: RB White Date: 16-Sep-14 Costs: Means 2005 Environmental Remediation Cost Data, adjusted for inflation, except as otherwise noted Assume Level C PPE Item No. Description Means No./Source Units Est. Quan. Unit Price Total Price 1 2 3 4 5 6 7 8 9 10 11 Site prep (CIH) Site prep (technician) Load drums Haul drums to Clean Harbors Landfill disposal State disposal fee Truck washout/decon Steam clean pad Rinsate sample collection Sample analyses, metals Sample analyses, explosives 33-22-0111 x 2 33-22-0112x2 33-19-0103 33-19-0243 33-19-7214 Utah DEQ 33-19-0311 33-17-0812 Site crew Chemtech-Ford Chemtech-Ford hr hr ea truck-mi drum ton ea sf hr ea ea 4 8 160 700 160 40 1 1,760 4 1 1 83.44 31.58 3.05 2.26 145.00 28.00 158.00 0.39 65.00 210.00 210.00 SUBTOTAL Inflation adjustment (see Means 2014 Heavy Construction Cost Data) 1.337 28,501 38,106 Misc. costs as a percent of the inflation-adjusted subtotal: Mob/demob 5% 1,905 Engineering/permitting 10% 3,811 DSHW oversight 10% 3,811 Contingency 10 % 3,811 TOTAL ESTIMATED COST 51,443 EarthFax Engineering Group, LLC Cost Estimate Project: ATK - Promontory M-47 closure cost estimate Project*: UC-1023-18 Estimator: RB White Date: 16-Sep-14 Costs: Means 2005 Environmental Remediation Cost Data, adjusted for inflation, except as otherwise noted Assume Level C PPE Item No. Description Means No./Source Units Est. Quan. Unit Price Total Price 1 2 3 4 5 6 9 10 11 12 13 14 15 16 17 18 Materials prep (CIH) Materials prep (technician) Load waste motor (crane) Haul motor to burning ground Off-load motor Handling evaluation/planning Motor handling Disposal at burning ground Sweep area Steam clean floor Load rinsate/sweepings Load drums Haul to Clean Harbors State disposal fee Sample collection Sample analyses, metals/exp 33-22-0111 x2 33-22-0112x2 Crew SIWSM Crew COET2 Crew SIWSM Site personnel Site personnel ATK 33-22-0112x2 33-17-0812 33-19-0103 33-19-0103 33-19-0243 Utah DEQ 33-22-0112x2 Chemtech-Ford hr hr hr hr hr hr hr Ib hr sf drum ea truck-mi ton hr ea 12 20 8 16 8 80 40 300,000 8 5,680 10 10 350 1 4 2 83.44 31.58 393.57 93.31 393.57 65.00 65.00 0.25 31.58 0.39 4.87 3.05 2.26 28.00 31.58 210.00 1,001 632 3,149 1,493 3,149 5,200 2,600 75,000 253 2,215 49 31 791 28 126 420 SUBTOTAL Inflation adjustment (see Means 2014 Heavy Construction Cost Data) 1.337 96,135 128,533 Misc. costs as a percent of the inflation-adjusted subtotal: Mob/demob Engineering/permitting DSHW oversight Contingency 10 6,427 12,853 12,853 12,853 TOTAL ESTIMATED COST 173,519 EarthFax Engineering Group, LLC Cost Estimate Project: ATK - Promontory M-136 closure cost estimate Project* UC-1022-01 Estimator: RB White Date: 16-Sep-14 Costs: Means 2005 Environmental Remediation Cost Data, adjusted for inflation, except as otherwise noted Assume Level C PPE Item No. Description Means No./Source Units Est. Quan. Unit Price Total Price 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Site prep (CIH) Site prep (technican) Treat remaining waste Excavate contaminated soil Load soil and burned waste Haul waste and soil to Clean Harbors Landfill disposal, waste and soil State disposal fee, waste and soil Steam clean burn pans Load rinsate Haul rinsate to Clean Harbors Landfill disposal, rinsate State disposal fee, rinsate Demolish pans Load pan debris Haul pan debris to Clean Harbors Landfill disposal, pan debris State disposal fee, pan debris Sample collection Sample analyses, metals Sample analyses, explosives Sample analyses, volatiles 33-22-0111 x2 33-22-0112x2 ATK 17-03-0231 17-03-0222 33-19-0221 33-19-7214 Utah DEQ 33-17-0812 33-19-0103 33-19-0243 33-19-7214 Utah DEQ 17-02-0105 17-03-0222 33-19-0221 33-19-7263 Utah DEQ Site crew Chemtech-Ford Chemtech-Ford Chemtech-Ford hr hr Ib hr hr truck-mi ton ton sf drum truck-mi drum ton cf hr truck-mi ton ton hr ea ea ea 20 40 106,000 20 8 1,050 50 50 1,000 5 350 5 1 2,000 4 350 50 50 40 20 20 20 83.44 50.96 0.25 105.63 68.13 2.50 169.45 32.50 0.39 4.87 2.26 145.00 28.00 0.14 68.13 2.50 169.45 32.50 65.00 210.00 210.00 250.00 1,669 2,038 26,500 2,113 545 2,625 8,473 1,625 390 24 791 725 28 280 273 875 8,473 1,625 2,600 4,200 4,200 5,000 75,071 SUBTOTAL Inflation adjustment (see Means 2014 Heavy Construction Cost Data) 1.337 100,370 Misc. costs as a percent of the inflation-adjusted subtotal: Mob/demob Engineering/permitting DSHW oversight Contingency 5 % 10 % 10 % 10 % 5,018 10,037 10,037 10,037 TOTAL ESTIMATED COST 135,499 EarthFax Engineering Group, LLC Cost Estimate Project: ATK - Promontory M-186 closure cost estimate Project*: UC-1023-18 Estimator: RB White Date: 16-Sep-14 Costs: Means 2005 Environmental Remediation Cost Data, adjusted for inflation, except as otherwise noted Assume Level C PPE Item No. Description Means No./Source Units Est. Quan. Unit Price Total Price 1 2 3 4 5 6 7 8 9 10 11 Site prep (CIH) Site prep (technician) Load drums Haul drums to Clean Harbors Landfill disposal State disposal fee Truck washout/decon Steam clean floor Rinsate sample collection Sample analyses, metals Sample analyses, explosives 33-22-0111 x2 33-22-0112x2 33-19-0103 33-19-0243 33-19-7214 Utah DEQ 33-19-0311 33-17-0812 Site crew Chemtech-Ford Chemtech-Ford hr hr ea truck-mi drum ton ea sf hr ea ea 8 24 400 1,750 400 100 1 1,930 4 1 1 83.44 31.58 3.05 2.26 145.00 28.00 158.00 0.39 65.00 210.00 210.00 668 758 1,220 3,955 58,000 2,800 158 753 260 210 210 SUBTOTAL Inflation adjustment (see Means 2014 Heavy Construction Cost Data) 1.337 68,991 92,241 Misc. costs as a percent of the inflation-adjusted subtotal: Mob/demob Engineering/permitting DSHW oversight Contingency 10 4,612 9,224 9,224 9,224 TOTAL ESTIMATED COST 124,526 EarthFax Engineering Group, LLC Cost Estimate Project: ATK - Promontory M-225 closure cost estimate Project*: UC-1022-01 Estimator: RB White Date: 16-Sep-14 Costs: Means 2005 Environmental Remediation Cost Data, adjusted for inflation, except as otherwise noted Assume Level C PPE Item No. Description Means No./Source Units Est. Quan. Unit Price Total Price 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Site prep (CIH) Site prep (technican) Treat remaining waste Excavate contaminated soil Load soil and burned waste Haul waste and soil to Clean Harbors Landfill disposal, waste and soil State disposal fee, waste and soil Steam clean burn pans Load rinsate Haul rinsate to Clean Harbors Landfill disposal, rinsate State disposal fee, rinsate Demolish pans Load pan debris Haul pan debris to Clean Harbors Landfill disposal, pan debris State disposal fee, pan debris Sample collection Sample analyses, metals Sample analyses, explosives Sample analyses, volatiles 33-22-0111 x2 33-22-0112x2 ATK 17-03-0231 17-03-0222 33-19-0221 33-19-7214 Utah DEQ 33-17-0812 33-19-0103 33-19-0243 33-19-7214 Utah DEQ 17-02-0105 17-03-0222 33-19-0221 33-19-7263 Utah DEQ Site crew Chemtech-Ford Chemtech-Ford Chemtech-Ford hr hr Ib hr hr truck-mi ton ton sf drum truck-mi drum ton cf hr truck-mi ton ton hr ea ea ea 8 20 55,000 12 4 350 25 25 400 3 350 3 1 800 4 350 20 20 20 5 5 5 83.44 50.96 0.25 105.63 68.13 2.50 169.45 32.50 0.39 4.87 2.26 145.00 28.00 0.14 68.13 2.50 169.45 32.50 65.00 210.00 210.00 250.00 668 1,019 13,750 1,268 273 875 4,236 813 156 15 791 435 28 112 273 875 3,389 650 1,300 1,050 1,050 1,250 SUBTOTAL Inflation adjustment (see Means 2014 Heavy Construction Cost Data) 1.337 34,274 45,824 Misc. costs as a percent of the inflation-adjusted subtotal: Mob/demob Engineering/permitting DSHW oversight Contingency 5 % 10 % 10 % 10 % 2,291 4,582 4,582 4,582 TOTAL ESTIMATED COST 61,862 EarthFax Engineering Group, LLC Cost Estimate Project: ATK - Promontory M-603 closure cost estimate Project*: UC-1023-18 Estimator: RB White Date: 16-Sep-14 Costs: Means 2005 Environmental Remediation Cost Data, adjusted for inflation, except as otherwise noted Assume Level C PPE Item No. Description Means No./Source Units Est. Quan. Unit Price Total Price 1 2 3 4 5 6 9 10 11 12 13 14 15 16 17 18 Materials prep (CIH) Materials prep (technician) Load waste motor (crane) Haul motor to burning ground Off-load motor Handling evaluation/planning Motor handling Disposal at burning ground Sweep area Steam clean floor Load rinsate/sweepings Load drums Haul to Clean Harbors State disposal fee Sample collection Sample analyses, metals/exp 33-22-0111 x2 33-22-0112x2 Crew SIWSM Crew COET2 Crew SIWSM Site personnel Site personnel ATK 33-22-0112x2 33-17-0812 33-19-0103 33-19-0103 33-19-0243 Utah DEQ 33-22-0112x2 Chemtech-Ford hr hr hr hr hr hr hr Ib hr sf drum ea truck-mi ton hr ea 8 12 8 12 8 40 20 120,000 8 1,830 4 4 350 1 4 2 83.44 31.58 393.57 93.31 393.57 65.00 65.00 0.25 31.58 0.39 4.87 3.05 2.26 28.00 31.58 210.00 668 379 3,149 1,120 3,149 2,600 1,300 30,000 253 714 19 12 791 28 126 420 SUBTOTAL Inflation adjustment (see Means 2014 Heavy Construction Cost Data) 1.337 44,727 59,800 Misc. costs as a percent of the inflation-adjusted subtotal: Mob/demob Engineering/permitting DSHW oversight Contingency 10 2,990 5,980 5,980 5,980 TOTAL ESTIMATED COST 80,729 EarthFax Engineering Group, LLC Cost Estimate Project: ATK - Promontory M-705S closure cost estimate Project*: UC-1023-18 Estimator: RB White Date: 16-Sep-14 Costs: Means 2005 Environmental Remediation Cost Data, adjusted for inflation, except as otherwise noted Assume Level C PPE Item No. Description Means No./Source Units Est. Quan. Unit Price Total Price 1 2 3 4 5 6 7 8 9 10 11 Site prep (CIH) Site prep (technician) Load drums Haul drums to Clean Harbors Landfill disposal State disposal fee Truck washout/decon Steam clean floor Rinsate sample collection Sample analyses, metals Sample analyses, explosives 33-22-0111 x2 33-22-0112x2 33-19-0103 33-19-0243 33-19-7214 Utah DEQ 33-19-0311 33-17-0812 Site crew Chemtech-Ford Chemtech-Ford hr hr ea truck-mi drum ton ea sf hr ea ea 4 8 32 350 32 8 1 1,850 4 1 1 83.44 31.58 3.05 2.26 145.00 28.00 158.00 0.39 65.00 210.00 210.00 334 253 98 791 4,640 224 158 722 260 210 210 SUBTOTAL Inflation adjustment (see Means 2014 Heavy Construction Cost Data) 1.337 7,899 10,560 Misc. costs as a percent of the inflation-adjusted subtotal: Mob/demob Engineering/permitting DSHW oversight Contingency 10 528 1,056 1,056 1,056 TOTAL ESTIMATED COST 14,256 EarthFax Engineering Group, LLC Cost Estimate Project: ATK - Promontory S-633 closure cost estimate Project*: UC-1023-18 Estimator: RB White Date: 17-Sep-14 Costs: Means 2005 Environmental Remediation Cost Data, adjusted for inflation, except as otherwise noted Assume Level C PPE Item No. Description Means No./Source Units Est. Quan. Unit Price Total Price 1 2 3 4 5 6 7 Materials prep (CIH) Materials prep (technician) Disposal at burning ground Sample collection Sample analyses, metals 33-22-0111 x2 33-22-0112x2 ATK Site crew Chemtech-Ford hr hr Ib hr ea 4 8 75,000 8 8 83.44 31.58 0.25 65.00 210.00 334 253 18,750 520 1,680 Sample analyses, explosives Chemtech-Ford ea 8 210.00 1,680 Sample analyses, volatiles Chemtech-Ford ea 8 210.00 1,680 SUBTOTAL Inflation adjustment (see Means 2014 Heavy Construction Cost Data) 1.337 24,896 33,286 Misc. costs as a percent of the inflation-adjusted subtotal: Mob/demob Engineering/permitting DSHW oversight Contingency 10 1,664 3,329 3,329 3,329 TOTAL ESTIMATED COST 44,937 EarthFax Engineering Group, LLC Cost Estimate Project: ATK - Promontory T-29B closure cost estimate Project*: UC-1023-18 Estimator: RB White Date: 16-Sep-14 Costs: Means 2005 Environmental Remediation Cost Data, adjusted for inflation, except as otherwise noted Assume Level C PPE Item No. Description Means No./Source Units Est. Quan. Unit Price Total Price 1 2 3 4 5 6 7 8 9 10 11 12 13 Site prep (CIH) Site prep (technician) Extra drum for dilution Transfer and dilute hydrazine Load drums Haul drums to Clean Harbors Landfill disposal State disposal fee Truck washout/decon Steam clean floor Rinsate sample collection Sample analyses, metals Sample analyses, explosives 33-22-0111 x2 33-22-0112x2 33-19-0402 Site crew 33-19-0103 33-19-0243 33-19-7214 Utah DEQ 33-19-0311 33-17-0812 Site crew Chemtech-Ford Chemtech-Ford hr hr ea hr ea truck-mi drum ton ea sf hr ea ea 4 8 1 4 2 350 2 1 1 200 4 1 1 83.44 31.58 80.00 65.00 3.05 2.26 145.00 28.00 158.00 0.39 65.00 210.00 210.00 334 253 80 260 6 791 290 28 158 78 260 210 210 SUBTOTAL Inflation adjustment (see Means 2014 Heavy Construction Cost Data) 1.337 2,958 3,954 Misc. costs as a percent of the inflation-adjusted subtotal: Mob/demob Engineering/permitting DSHW oversight Contingency 198 395 395 395 TOTAL ESTIMATED COST 5,338