Loading...
HomeMy WebLinkAboutDSHW-2013-005473 - 0901a068803bbd7aATK 10 rb-oo 54-73 Launch Systems Group PO Box 707 Bngham City, UT 84302 Division of Solid and Hazardous Waste www atk com SEP 1 7 2013 September 12, 2013 8200-FY14-042 Mr. Scott T. Anderson, Director Utah Department of Environmental Quality Division of Solid and Hazardous Waste 195 North 1950 West P.O. Box 144880 Salt Lake City, Utah 84114-4880 Re: ATK Launch Systems Inc., EPA ID #UTD009081357, Semi-Annual RFI Progress Report for March 2013 to September 2013. Dear Mr. Anderson: Attached is the ATK Launch Systems Inc. Promontory Facility Semi-Annual RFI Progress Report for March 2013 to September 2013. If you have questions regarding this report, please contact Paul Hancock at (435) 863-3344 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Sincerely, George E. Gooch Manager, Environmental Services ATK Launch Systems cc: Walter L. Baker, Division Director, Utah Division of Water Quality SEMI-ANNUAL RFI PROGRESS REPORT 1 March 2013 -1 September 2013 ATK Launch Systems Promontory Facility 1. Description Of Work Completed SWMU Assessment Report Schedule As required by the Promontory Post-Closure Permit, ATK Launch Systems (ATK) provided a schedule for submitting SWMU assessment reports or RFI work plans for the SWMUs listed in Attachment 6 of the permit in to the Division in November 2007. After the Utah Division of Solid and Hazardous Waste (UDSHW) has approved the schedule, ATK will proceed with the assessment of the remaining SWMUs. UDSHW Evaluation of Three SWMU's for Potential Closure The UDSHW is currently evaluating three SWMUs for potential closure from the Promontory RCRA RFI report submitted in August 2000. These SWMUS are # 192 - Hydroflouric Acid Treatment Unit at building M-227, #444 - Dry Well at building M-19A, and #649 - Strand Burner Exhaust Discharge at building M-585. Through discussion with the UDSHW, it was determined that additional information on #649 was warranted in order to establish the valence state of chromium from the total chromium analysis of the soil. Based on process knowledge, the source of the chromium is the nickel chromium wire used in the ignition of the propellant strands. When the propellant burns HCL gas is generated this creates an acidic environment and a Cr (III) valence. Additional information supporting this process description will be provided to the UDSHW. U.S. Air Force Installation Restoration Program (IRP) Report The United States Air Force submitted an IRP report to the UDSHW in 1992 describing the results of their investigation of the SWMUs at the old Air Force Plant 78 facility. ATK purchased this facility in 1995. In a December 18, 2012 letter, the UDSHW recommended additional characterization of three sites. ATK and the Air Force have an agreement to share costs for additional environmental work at the facility and ATK would need to obtain concurrence from the Air Force prior to proceeding. However, upon further review of the IRP report, ATK has determined that the level of additional investigation and clarification does not warrant pursuing the cost sharing agreement. ATK will arrange a meeting with the UDSHW to discuss the evaluation of risks and characterization of these SWMUs. North Plant P Wells Investigation As part of the corrective action for SWMUs at the North Plant, the UDSHW submitted a letter on February 3,2012 requesting that an additional well be installed in the same area as wells P-2, P-6, and P-7. The intent of the new well, P-10, is to more accurately determine flow direction in the uppermost perched aquifer. ATK submitted a well completion report to the UDSHW in May 2012. As discussed in the completion report, during the well development process, the water level dropped to only 0.5 ft of water remaining in the well. Approximately five days later, the water level had not changed. There was sufficient water to collect a grab sample on March 27,2012 using a disposable bailer. Results of the sample are contained in the completion report and included a 1,1- DCE concentration at 6.8 ppb and a TCE concentration at 9.5 ppp. No perchlorate was detected. As of June 2013, the water level continues to remain at approximately three inches. It is believed that due to the tight formation, water does not recharge quickly or because it was completed in a perched aquifer, the producing zone may be limited. Well P-10 indicates that the perched zones have a limited northern extent. These are perched aquifers that appear to be separate, isolated, and laterally discontinuous. In a site visit on August 2,2012 from Helge Gabert and Jeff Vandel, the decision was made to wait until the spring of 2013 to see if water recharges back into Well P-10 and then collect another sample. Based on that result, it will be determined if soil gas sampling will be required at the site. Plant 3 Well 3 A Treatment Summary Reports The treatment system at the Promontory Plant 3 well 3 A has been monitored quarterly according to the Division approved plan. The plan includes a request that a summary of the previous year to date monitoring data be included in the September Semi-Annual report. This summary is found in Table 1. The treatment system continues to remove TCE to below the 5u7L health based limit with a carbon replacement interval of every 6 + months. Water usage at Plant 3 has diminished with lower production. Therefore, ATK is finding that TCE removal extends significantly beyond the standard 6 month carbon replacement interval. In addition, perchlorate removal in the two septic tanks, M-201 and M-205, continues to be effective with the all samples reported at non-detect. 2. Summaries of All Findings No corrective action work on SWMUs has been conducted during this reporting period. 3. Summaries of All Problems or Potential Problems Encountered During the Reporting Period There were no significant problems encountered during the reporting period. 4. Actions Taken to Rectify Problems No problems were identified. 5. Projected Work for the Next Reporting Period Monitoring the P wells and the Plant 3 Well 3 A treatment system will be ongoing through the next reporting period. ATK will pursue resolution of the Air Force cost sharing agreement for additional characterization of the three IRP SWMUs on the Air Force Plant 78. Table 1 Plant 3 Well 3A Treatment Summary Reports Fiscal 2013 Second Quarter Data Summary Well 3A - Post Carbon Sample Date TCE (ug/L) Perchlorate (ug/L) Flow (gal)1 i j ) 9/27/2012 ; U 84 __J 5380 javerage flowjrom: ^^29/2012! J/27/2012| __: Totalizer reading gallons ^23,627,5001 __i _ : ^ i... ........' iP_a.Y? i 90 Septic Tank Data (ug/L) _ j _ !_ • [ M-201 _ M-205 ±.,, ,. A . _]_ j[ _...!. j . Perchlorate Perchlorate ' ; ; ! 9/27/2012 U U Influent Data > TCE (ug/L) 1 Perchlorate (ug/L) | 9/27/2012 ' 13.4 88 Fiscal 2013 Third Quarter Data Summary Well 3A - Post Carbon Sample Date TCE (ug/L) 12/13/2012 ! U Septic Tank Data (ug/L) ; M-201 Perchlorate 12/13/2012 • U Perchloratejug/L) i Flow (ga|)! 91 5822 average flow from: M-205 Perchlorate U 9/27/2012 12/13/2012 Totalizer reading gallons '• Days 24,075,800j 77; Fiscal 2013 Fourth Quarter Data Summary Well 3A - Post Carbon Sampl e Date \ TCE (ug/L) 3/28/2013 ! 1.7 Septic Tank Data (ug/L) M-201 Perchjorate 3/28/2013 U Perchlorate (ug/L) Flow (gal), , j 86 17409 average flow from: • 12/13/2012 3/28/2013 •~ • • ....... .». T ^ ...... ._( ..... ... _j j _ Totalizer reading gallons j 25,903^700j Days j 105; M-205 PercN orate U Influent Data TCE (ug/L) Perchlorate (ug/L) 3/28/2013 22.1 83 [ Fiscal 2014 First Quarter Data Summary Well 3A - Post Carbon Sample Date ! TCE (ug/L) Perchlorate (ug/L) |F[ow (gal) 6/27/2013 1.1 i Se pti c Ta n k JJata (ug/L) ! M-201 : Perchlorate U 86 M:205 Perchlorate U 17252 average flow from: 3/28/2013! 6/27/2013: Totalizer reading gallons Days 27,473,600! 91;