HomeMy WebLinkAboutDSHW-2012-010506 - 0901a06880312bcbState of Utah
GARY HERBERT
Governor
GREG BELL
Lieutenant Governor
George Gooch
Department of
Environmental Quality
Amanda Smith
Executive Director
DIVISION OF SOLID AND
HAZARDOUS WASTE
Scott T. Anderson
Director
March 13, 2012
Acting Director, Environmental Services
, ATK Launch Systems-Promontory
P.O. Box 707
Brigham City, UT 84302-0707
RE: Monitor Well Installation Plan-Well P-10
ATK Launch Systems -Promontory Facility
UTD009081357
Dear Mr. Gooch:
Solid and Hazardous Waste Control Board
Kevin Murray, Chair
Kory Coleman, Vice-Chair
Brian E. Brower
Scott Bruce
Jeff Coombs, MPH, LEHS
R. Ryan Dupont, Ph.D.
Larry A. Ellertson
Brett Mickelson
Brad Mertz
Gary Mossor
Dennis Riding
Dwayne Woolley
Amanda Smith
Scott T. Anderson
Executive Secrewrv
The Division of Solid and Hazardous Waste has completed its review of the monitoring well
installation plan for well P-1 0. Well P-1 0 is being installed to acquire additional potentiometric
surface data in order to help determine the groundwater flow direction in the uppermost perched
aquifer that has been identified in the area of wells P-6 and P-7.
Post-Closure Permit Condition IV.D.2.b requires the Permittee to construct and maintain new
monitoring wells and piezometers in accordance with plans and specifications to be submitted for
approval. The monitoring well installation plan for the new well P-1 0 is hereby approved. If you
have any questions, please contact Jeff Van del at (80 1) 536-0257.
STA/JV/tjm
c: Paul Hancock, A TK Launch Systems
Lloyd Berentzen, Deputy Director, Bear River Health Department
Nancy Morlock, Region 8 EPA
195 North 1950 West o Salt Lake City, UT
Mailing Address: P.O. Box 144880 • Salt Lake City, UT 84114-4880
Telephone (801) 536-0200 o Fax (801) 536-0222 • T.D.D. (801) 536-4414
www.deq.utah.gov
TN201200475 Printed on 100% recycled paper