HomeMy WebLinkAboutDSHW-2010-037166 - 0901a068801c296cLaunch Systems Group
P.O. Box 707 1^ IH L
Brigham City, UT 84302 ®
www.atk.com SEP 0 8 2010
UTAH DIVISION 01-
2 September 2010 SOLID & HAZARDOUS WASTt
8200-FYl 1-038 20iP. I
Scott T Anderson
Executive Secretary,
c/o UDEQ Division of Solid and Hazardous Waste
PO Box 144880
SALT LAKE CITY UT 84114-4880
Subject: ATK Launch Systems Promontory Facility, Semi-Annual RFl Progress Report for March
2010 - September 2010, Promontory EPA ID #UTD009081357
Dear Mr. Anderson
Attached, please find the ATK Launch Systems Promontory Facility Semi-Annual Progress Report
for March 2010 - September 2010. If you have questions regarding these comments, please contact
Paul Hancock at (435) 863-3344.
1 certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the information,
the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations.
Sincerely,
David P. Gosen, P.E.\E)irector
Environmental Services
Co : Walter L. Baker, Division Director, Utah Division of Water Quality
SEMI-ANNUAL RFI PROGRESS REPORT
1 March 2010 -1 September 2010
ATK Launch Systems Promontory Facility
1. Description Of Work Completed
SWMU Assessment Report Schedule
As required in the ATK Launch Systems, September 20, 2007 Promontory Post-Closure
Permit, ATK submitted a schedule for submitting SWMU Assessment Reports or RFI work
plans for the SWMUs listed in Attachment 6 of the permit. Upon Utah DSHW approval of
the schedule, ATK will proceed with the assessment of the remaining SWMUs.
Vegetable Oil Injection Pilot Testing
The DSHW gave approval for a pilot test of vegetable oil injection at the source areas in the
M-136 bum grounds. This injection was completed in September 2007. Summaries of the
interim testing results have been provided in previous progress reports. A final report was
submitted to the Division on June 7, 2010. The conclusion of the report was that using
vegetable oil as a substrate to stimulate biological degradation is a viable way to treat volatile
organic compounds and perchlorate at M-136 and that a broader application would be
successful. Samples will continue to be collected to assess the long term effects of the
treatment.
Plant 3 Well 3A Treatment Summary Reports
The treatment system at the Promontory Plant 3 well 3A has been monitored quarterly
according to the Division approved plan. The plan includes a request for a summary of the
previous year to date monitoring data be included in the Semi-Annual report. This summary
is included as an attachment to this report The treatment system continues to remove TCE
to below detection limits with a carbon replacement interval of every 6 months. In addition,
perchlorate removal in the two septic tanks, M-201 and M-205, continues to be effective.
2. Summaries of all findings
Summary tables of the Plant 3 well treatment are attached.
3. Summaries of all problems or potential problems encountered during the reporting
period
There were no significant problems encountered during the reporting period.
4. Actions taken to rectify problems
ATK continues to review all available information and pursue all avenues
to resolve any uncertainty associated with the solid waste management units.
5. Projected work for the next reporting period
Efforts for the next reporting period will focus on receiving approval for voluntary corrective
measures, investigating additional solid waste management units, and SWMU Assessment
report preparation. Monitoring at the vegetable oil injection wells, and the Plant 3 treatment
system monitoring will be ongoing through the next reporting period.
Attachment J
^romontorK Plant 3 Well 3AT
^en JA Treatments unimary
Quarterly Sampling Data Summary ATK Promontory Plant 3 Well 3A
Post Carbon
Sample Date TCE (ug/L) Perchlorate (ug/L) Flow (gal)
9/30/2009 U 76.3 19045 average flow from 8/10/2009 to 9/30/2009
12/17/2009 U 31.3 14788 average flow from 9/30/2009 to 12/17/2009
3/30/2010 U 76 17048 average flow from 12/17/2009 to 3/30/2010
6/28/2010 U 83 17649 average flow from 3/31/2010 to 6/28/2010
Septic Tank Data
M-201 M-205
Sample Date Perchlorate Perchlorate
9/30/2009 U U
12/17/2009 29.7 U
3/30/2010 U U
6/28/2010 U U
Influent Data TCE (ug/L) Perchlorate (ug/L)
Average 15.3 75