Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DSHW-2010-033717 - 0901a06880188bbb
May 3, 2010 82dO-FYll-005 HAND DELIVERED MAY 0 3 2010 UTAH DIVISION OF SOLID & HAZARDOUS WASTE Scott T Anderson Division of Solici and Hazardous Waste Department of Environmental Quality P O Box 144880 Salt Lake City, UT 84114-4880 RE ATK Launch Systems-Promontory, EPA ID number UTD009081357 Request for Class 3 Permit Modification to Implement 40 CFR 264 600 Requirements and Other Items as Specified Dear Mr Anderson, In accordance with R315-3-4 3 (incorporated by reference 40 CFR 270 42), ATK Launch Systems - Promontory (ATK) requests a Class 3 permit modification to implement the foUow^ing changes • Delete Module IV dated September 30, 2008 which regulates an obsolete operation, and replace it with the attached Module IV containing proposed operatmg conditions to comply with 40 CFR 264 600 requirements • Attachment 11 is bemg provided to describe process and facility information for open buming and open detonation (OBOD) treatment activities • Revise Attachment 5 (Closure Plan) dated September 30, 2008 to add S-633 as a permitted storage area, reduce the storage capacity in M-603, and adjust the operatmg capacities for M-136 and M-225 to be consistent with the values used in the OBOD risk assessment • Revise Attachment 4 (Hazardous Waste Contingency Plan) dated September 30, 2008 to provide required information for S-633 and to update emergency contact information Revise Attacliment 2 (Inspection Schedules and Procedure) dated September 30, 2008 to provide an inspection schedule for S-633 Modify conditions in Module I, Module II and Module III dated September 30, 2008 to reflect changes resulting from revising Module IV and Attachment 5. Modify Module III.B.4 to include the use of plastic tray covers as approved containers for off-site waste. Similar covers are approved for use as containers for unburned waste and residue at the NIROP facility. Refer to Attachment 4.6.4, Hazardous Waste Storage and Subpart X treatment Permit, September 2009, UT3170027277. As specified in R315-3-4.3, ATK as the permittee will send a notice of this modification request to the latest facility mailing list, maintained by your department. We will also publish this notice in the Herald Joumal, Standard Examiner and the Box Elder News Joumal. This notice will announce a 60 day public comment period and a public meeting to be held at the Brigham City Library. All requirements as outlined in R315-3-4.3 will be followed. If you have any question or need additional clarification, please contact Blair Palmer of my staff at (435) 863-2430. Thank you for your attention to this matter. Sincerely, David P. Gosen, P.E/ Director, Environmental Services c: Jeff Vandel, DSHW George Gooch, ATK Paul Hancock, ATK Blair Palmer, ATK ATK Launch Systems Inc - Promontory May 2010 Module 1 - Standard Permit Conditions UTD009081357 MODULE I - STANDARD PERMIT CONDITIONS I A EFFECT OF PERMIT I A 1 The Permittee is allowed to store hazardous waste in containers and to treat hydrazine, by dilution, m contamers at the ATK Launch Systems-Promontory (ATK) Facihty, Box Elder County, Utah in accordance with the conditions of this Permit In addition, the Permittee is allowed to store and disassemble waste rocket motors at the facility in accordance with the conditions of this Permit Any treatment, storage, or disposal of hazardous waste not authorized in this Permit, is prohibited IA 2 Compliance with this Permit, during its term, constitutes compliance for purposes of enforcement with applicable sections of Utah Administrative Code (UAC) R315 only for those management practices specifically authorized by this Permit I A 3 Issuance of this Permit does not convey property rights of any sort or any exclusive privilege, nor does it authorize any injury to persons or property, any invasion of other private rights, or any infringement of State or local law or regulations I A 4 This Permit has been developed in accordance with the applicable requirements of UAC R315-1 through 101 ofthe Utah Hazardous Waste Management Rules All conditions within this Permit will supercede conflicting statements, requirements, or procedures found within UAC R3I5-I through 101 or attachments to this Permit IB ENFORCEABILITY I B 1 Violations documented through the enforcement process pursuant to Utah Code Annotated (UCA) 19-6-112 may result in penalties assessed in accordance with UAC R315-102, the Penalty Policy IC OTHER AUTHORITY ICI The Executive Secretary expressly reserves any right of entry provided by law and any authority to order or perform emergency or other response activities as authorized by law ID PERMIT ACTIONS I D 1 This Permit may be modified, revoked and reissued, or terminated for cause, as specified in UAC R315-3-4 If the Executive Secretary determines that cause exists to modify, revoke, and reissue, or terminate this Permit, the action will proceed in accordance with UAC R315-4-1 5 The filing of a request for a permit modification, revocation, reissuance, termination, or the notification of planned changes or anticipated noncompliance on the part of the Permittee does not stay the applicability or enforceability of any permit condition I D 2 The Executive Secretary may modify this Permit, in accordance with UAC R315-3-4 2, when the standards or regulations on which the Permit was based have been changed by ATK Launch Systems Inc - Promontory May 2010 Module I - Standard Permit Conditions UTD009081357 statute, through promulgation of new or amended standards or regulations, or by judicial decision after the effective date of this Permit I D 3 The Permit may be modified at the request of the Permittee according to the procedures of UAC R315-3-4 3 I D 4 All Permit conditions supersede conflicting statements, requirements or procedures found in the Attachments to the Permit I D 5 If a conflict exists between conditions in this Permit, the most stringent condition, as determined by the Executive Secretary, shall be met 1 D 6 In accordance with the Utah Solid and Hazardous Waste Act, UCA, 19-6-108(13), this Permit shall be reviewed no later than five (5) years from the date of issuance or renewal and subsequently modified, if necessary IE SEVERABILITY I E 1 The provisions ofthis Permit are severable and if any provision of this Permit, or the application of any provision of this Permit to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this Permit shall not be affected thereby Invalidation of any State or federal statutory or regulatory provision which forms the basis for any condition of this Permit does not affect the validity of any other state or federal statutory or regulatory basis for said condition IF DUTIES TO COMPLY I F I The Permittee shall comply with all conditions of this Permit, except to the extent and for the duration such noncompliance is authorized by an Emergency Permit issued in accordance with UAC R315-3-6 2 Any permit noncompliance, other than noncompliance authorized by an Emergency Permit, constitutes a violation of the Utah Solid and Hazardous Waste Act, and is grounds for enforcement action, for Permit termination, revocation and reissuance, or modification, or for denial of a Permit renewal application, or a combination of enforcement action and any of the other listed remedies I F 2 Compliance with the terms of this Permit does not constitute a defense to any order issued or any action brought under Sections 3007, 3008, 3013, or 7003 of RCRA (42 USC Sections 6927, 6928, 6934 and 6973), Section 106(a), 104, or 107 ofthe Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (42 USC 9606(a), 9604, and 9607, commonly known as CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), or any other State or federal law providing for protection of human health or the environment from any imminent and substantial endangerment IG DUTY TO REAPPLY I G 1 If the Permittee wishes, or is required by the Executive Secretarty, to continue an activity allowed by this Permit after the expiration date of this Permit, the Permittee shall submit a complete application for a new permit, in accordance with UAC R315-3- 2 lg and UAC R315-3-3 1(b), at least 180 days before this Permit expires ATK Launch Systems Inc - Promontory May 2010 Module I - Standard Permit Conditions UTD009081357 IH PERMIT EXPIRATION I H 1 This Permit shall be effective for ten years from the date it is issued II CONTINUATION OF EXPIRING PERMIT 11 1 This Permit and all conditions herein shall continue in force until the effective date of a new permit, if the Permittee has submitted a timely and complete application, in accordance with applicable requirements of UAC R315-3 and R315-4, and through no fault of the Permittee, the Executive Secretary has neither issued nor denied a new permit under UAC R315-3-5 2 on or before the expiration date of this permit IJ NEED TO HALT OR REDUCE ACTIVITY NOT A DEFENSE IJI It shall not be a defense for the Permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this Permit IK DUTY TO MITIGATE IKI In the event of noncompliance with the Permit, the Permittee shall take all reasonable steps to minimize releases of hazardous waste, hazardous waste constituents, and perchlorate salts to the envirormient resulting from the noncompliance, and shall carry out such measures as are reasonable to prevent significant adverse impacts on human health or the envirormient IL PROPER OPERATION AND MAINTENANCE ILI The Permittee shall, at all times, properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the Permittee to achieve compliance with the conditions of this Permit Proper operation and maintenance includes effective performance, adequate funding, adequate operator staffing and training, and adequate laboratory and process controls, including appropriate quality assurance procedures This provision requires the operation of back-up or auxiliary equipment or similar systems only when necessary to achieve compliance with the conditions of this Permit IM DUTY TO PROVIDE INFORMATION IMI The Permittee shall fumish to the Executive Secretary, within a reasonable time, any relevant information which the Executive Secretary may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this Permit, or to determine compliance with this Permit The Permittee shall also fumish to the Executive Secretary upon request, copies of records required to be kept by this Permit IN INSPECTION AND ENTRY IN 1 Pursuant to the UCA 19-6-109, the Permittee shall allow the Executive Secretary, or an authonzed representative, upon the presentation of credentials and other documents, as may be required by law, to ATK Launch Systems Inc - Promontory May 2010 Module 1 - Standard Permit Conditions UTD009081357 IN 1 a Enter, at reasonable times, upon the Permittee's premises where a regulated facility or activity is located or conducted, or where records are kept as required by the conditions of this Permit, IN 1 b Have access to and copy, at reasonable times, any records that are kept as required by the conditions of this Permit, IN I c Inspect at reasonable times any portion of the Facility, equipment (including monitoring and control equipment), practices, or operations regulated or required under this Permit, IN 1 d Sample or monitor, at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by the Utah Solid and Hazardous Waste Act, any substances or parameters at any location, and IN I e Make record of inspection by photographic, electronic, videotape, or any other reasonable medium No audio recording devices shall be used without notice to all individuals in recording range prior to activation of the recording device Photographic and video recording shall comply with the safety and security requirements of the Permittee lO MONITORING AND RECORDS I O 1 The Permittee shall retain records of all monitoring information, including all calibration and maintenance records and, where applicable, all original strip chart recordings (or equivalent recordings) for continuous monitoring instrumentation, copies of all reports and records required by this Permit, the waste minimization certification required by UAC R315-8-5 3 (40 CFR § 264 73(b)(9) incorporated by reference), and records of all data used to comply with the conditions of this Permit, including any and all data to support human health and ecological nsk assessments for cleanup and closure activities All of the above referenced material shall be retained for a period of at least three years from the date of the sample, measurement, report, certification, or recording unless a longer retention period for certain information is required by other conditions of this Permit The three-year period may be extended by the Executive Secretary at any time by written notification to the Permittee The retention times are automatically extended during the course of any unresolved enforcement action regarding the facility to three years beyond the conclusion of the enforcement action Recordkeeping may be accomplished usmg original documents, xerographic copies, document replicas, electronic facsimiles, electronic disk, CD ROM computer drive files, microfilm, microfiche, photograph, magnetic tape or any other reasonable medium or similar recordkeeping technique Any recordkeeping system shall be capable of reproducing complete, accurate and legible records 10 2 Pursuant to UAC R315-3-3 10)(3), records of monitoring information shall specify at a minimum I O 2 a The date(s), exact place, and times of sampling or measurements, I O 2 b The name(s), title(s), and affiliation of individual(s) who performed the sampling or measurements, I O 2 c The date(s) analyses were performed, 4 ATK Launch Systems Inc - Promontory May 2010 Module I - Standard Permit Conditions UTD009081357 I O 2 d The individual(s) who performed the analyses, I O 2 e The analytical techniques or methods used, and I O 2 f The results of such analyses 10 3 Samples and measurements taken for the purpose of monitoring shall be representative of the monitored activity The method used to obtain a representative sample of the waste to be analyzed shall be the appropriate method from UAC R315-50-6 or as specified or modified by this Permit Laboratory methods shall be those specified in "Test Methods for Evaluating Solid Waste, Physical/Chemical Methods SW-846 (Thtrd Edition November 1986)" or most currently promulgated edition, "Standard Methods for Examination of Water and Wastewater (17th Edition, 1989) or most curtently promulgated edition, or an equivalent method as approved by the Executive Secretary The analysis of all samples shall be conducted by laboratories certified by the State of Utah 10 4 When requesting substitute or additional analytical methods, the Permittee shall submit to the Executive Secretary a request for substitution of analytical methods which are equivalent to the methods specifically approved for use in this permit, in accordance with UAC R315-3-4 3 The request shall provide information demonstrating that the proposed methods are equivalent or superior in terms of sensitivity, accuracy, and precision (i e reproducibility) IP REPORTING PLANNED CHANGES IPI The Permittee shall give vmtten notice to the Executive Secretary 60 days prior to any planned physical alterations or additions to any Hazardous Waste Management Unit (HWMU) or system being permitted or previously permitted in accordance v^th UAC R315-3-3 I(1) and R315-3-4 3 Planned physical alterations or additions shall include all changes in any hazardous and solid waste activities, and to any non-waste underground storage tanks regulated under UAC R315-202 (40 CFR 280) Construction or operation of new or modified HWMUs shall not begin imless the provisions of UAC R315-4-1 5 are met IQ REPORTING ANTICIPATED NONCOMPLIANCE I Q 1 The Permittee shall give written notice to the Executive Secretary 30 days prior to any planned changes in the permitted Facility or activity which may result in noncompliance with requirements of this Permit Advance notice shall not constitute a defense for any noncompliance IR CERTIFICATION OF CONSTRUCTION OR MODIFICATION IRI The Permittee shall not commence storage, treatment, or disposal of hazardous waste in a new hazardous waste management unit or in a modified portion of an existing permitted hazardous waste management unit, except as provided in UAC R315-3-4 3, until I R I a The Permittee has submitted to the Executive Secretary by certified mail, express mail or hand delivery ATK Launch Systems Inc - Promontory May 2010 Module I - standard Permit Conditions UTD009081357 I R 1 a 1 A letter signed by the Permittee and an independent, Utah registered professional engineer qualified by experience and education in the appropriate engineering field certifying that the unit has been constructed or modified in accordance with the approved modification request and this Permit, and I R 1 a 11 As-built engineering drawings and specifications as appropriate I R 1 b The Executive Secretary or designated representative has reviewed and inspected the modified or newly constructed unit and has notified the Permittee in writing that the unit was found in compliance with the conditions of this Permit I R 2 If within fifteen (15) calendar days of the date of receipt of the letter required by Permit Condition I R 1 a i, the Permittee has not received notice from the Executive Secretary, of the intent to inspect, prior inspection is waived and the Permittee may commence treatment, storage, or disposal of hazardous waste in the permitted unit, if certified in accordance with Condition I R 1 a i IS TRANSFER OF PERMIT I S 1 This Permit may be transferred to a new owner or operator only if it is modified or revoked and reissued pursuant to UAC R315-3-4 1 and R315-3-4 2(b)(2) Prior to transferring ownership or operation of the Facility during its operating life, the Permittee shall notify the new ovraer or operator, in writing, of the applicable requirements of UAC R315-1 through R315-101, and this Permit Failure by the Permittee to notify the new owner or operator of these requirements and this Permit in no way relieves the new owner or operator of his obligation to comply with all applicable requirements of the Rules and this Permit IT TWENTY-FOUR HOUR REPORTING ITI In accordance with UAC R315-3-3 l(l)(6)(i), the Permittee shall orally report to the Executive Secretary any noncompliance with this Permit which may endanger human health or the environment Any such information shall be reported as soon as possible, but not later than twenty-four (24) hours from the time the Permittee becomes aware of the noncompliance I T 2 In accordance with UAC R315-9-1(b), the Permittee shall immediately report to the Executive Secretary any spill of any hazardous waste or material which, when spilled becomes a hazardous waste, if the spilled quantity exceeds 100 kilograms or a lesser amount if there is a potential for endangerment to human health or the environment, or exceeds 1 kilogram if the material is an acute hazardous waste as defined by UAC R315-9-I(b)(2) I T 3 The Permittee shall immediately report to the Executive Secretary any spill that contains perchlorate, if the spilled quantity exceeds 100 kilograms and the perchlorate concentration of the spilled material is greater than 26 ug/L Any such information shall be reported as soon as possible, but not later than 24 hours from the spill occurrence I T 4 The non-compliance and spill reports shall include, but not be limited to, the following ATK Launch Systems hic - Promontory May 2010 Module I - Standard Permit Conditions UTD009081357 I T 4 a Information conceming the release of any hazardous waste which may endanger public drinking water supplies, and I T 4 b Any information of a release or discharge of hazardous waste, or of a fire, or explosion at the Facility, which could threaten human health or the environment I T 4 c A description of the occurrence and its cause, I T 4 d The name, title, and telephone number of the individual reporting, I T 4 e The name, address, and telephone number of the ovmer or operator, I T 4 f The name, address, and telephone number of the Facility, I T 4 g The date, time, and type of the incident, I T 4 h The location and cause of the incident, I T 4 1 The name and quantity of materials involved, I T 4 J The extent of injuries, if any, I T 4 k An assessment of actual or potential hazard to the environment and human health, where this is applicable, I T 4 1 A description of any emergency action taken to minimize threat to human health and the environment, I T 4 m An estimated quantity and disposition of the recovered material that resulted from the incident, and I T 4 n Any other information necessary to fully evaluate the situation and to develop an appropriate course of action I T 5 Within 15 days of the time the Permittee is required to provide the reports specified in Conditions ITI through IT 4 , the Permittee shall submit to the Executive Secretary a written report I T 6 The wntten report shall include, but not be limited to the following I T 6 a The name, title, address, and telephone number of the individual reporting, I T 6 b A description including the date, time, location and nature of the reported incident, I T 6 c The extent of injuries, if any, I T 6 c The name and quantity of material(s) involved in the spill, I T 6 d An estimated quantity and disposition of the recovered material, I T 6 e An assessment of actual or potential hazards to human health and the environment, where this is applicable The report shall also include whether or not the results of the ATK Launch Systems Inc - Promontory May 20)0 Module I - Standard Permit Conditions UTD009081357 incident remain a threat to human health and the environment (whether the noncompliance has been corrected and the release has been adequately cleaned up), and I T 6 f If the release or noncompliance has not been adequately corrected or cleaned up, the anticipated time that the noncompliance or remediation is expected to continue, the steps taken or planned to reduce, eliminate, and prevent recurrence of the noncompliance, and/or the steps taken or plarmed to adequately remediate the release IU MONITORING REPORTS I U 1 Monitoring information shall be recorded and maintained as specified in Condition I O I V COMPLIANCE SCHEDULES IVI Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this Permit shall be submitted no later than 14 days following each scheduled date IW MANIFEST DISCREPANCY REPORT I W 1 Manifest discrepancies shall be defined as differences between the quantity or type of hazardous waste designated on the manifest or shipping paper, and the quantity or type of hazardous waste the permittee actually receives Significant discrepancies in quantity are (1) for batch waste, any variation in piece count, such as a discrepancy of one drum in a tmckload, and (2) for bulk waste, variations greater than 10 percent in weight Significant discrepancies in type are obvious differences which can be discovered by inspection or waste analysis, such as waste solvent substituted for waste acid, or toxic constituents not reported on the manifest or shipping paper If a significant discrepancy is discovered in a manifest, the Permittee shall attempt to reconcile the discrepancy If not resolved within 15 days, the Permittee shall submit a written report, including a copy ofthe manifest and efforts to reconcile the discrepancy, to the Executive Secretary in accordance vsath UAC R315-8-5 4 IX UNMANIFESTED WASTE REPORT I X 1 The Permittee shall submit to the Executive Secretary an Unmanifested Waste Report within 15 days of receipt of unmanifested waste in accordance with UAC R315-8-5 7 I Y BIENNIAL REPORT IYI The Permittee shall submit to the Executive Secretary a Biennial Report covering facility activities during odd numbered calendar years This report shall be submitted by March 1 of the following even numbered year in accordance with UAC R315-8-5 6 IZ OTHER NONCOMPLIANCE I Z 1 The Permittee shall report all other instances of noncompliance with this Permit not otherwise required to be reported in accordance with Condition I T , within seven days of discovering the noncompliance The reports shall contain the information listed in Condition I T of this Permit Reporting shall not constitute a defense for any noncompliance ATK Launch Systems Inc - Promontory May 2010 Module I - Standard Permit Conditions UTD00908I357 I AA OTHER INFORMATION I AA 1 Whenever the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit modification, or in any report submitted to the Executive Secretary, the Permittee shall submit such facts or corrected information within seven working days IBB SIGNATORY REQUIREMENT I BB 1 All reports, notifications, submissions or other mformation required by this Permit, requested by or submitted to the Executive Secretary, shall be signed and certified in accordance with UAC R315-3-2 2 ICC CONFIDENTIAL INFORMATION I CC 1 The Permittee may claim confidential any information required to be submitted by this Permit in accordance with Utah Code Annotated 63-2-101 et seq and Utah Code Annotated 19-1-306 IDD REPORTS. NOTIFICATIONS. AND SUBMISSIONS I DD 1 All reports, notifications, or other submissions which are required by this Permit to be transmitted to the Executive Secretary should be sent by certified mail or other means of proof of delivery to Executive Secretary Utah Solid and Hazardous Waste Control Board Division of Solid and Hazardous Waste P O Box 144880 Salt Lake City, Utah 84114-4880 Phone (801)-538-6170 Normal business hours are 7 am to 6 pm, Monday through Thursday, except Utah State holidays Required oral notifications shall be given only to the Executive Secretary or an authorized representative of the Executive Secretary Notifications made at other times shall be made to the 24-hour answering service at (801) 538-4123 Notifications made to the 24-hour answering service shall include all applicable information required by this Permit The Permittee shall give oral notification to the Executive Secretary or an authorized representative of the Executive Secretary on the first business day followmg notification to the 24-hour answering service I EE DOCUMENTS TQ BE MAINTAINED AT THE FACILITY SITE I EE 1 The Permittee shall maintain at the facility, for the periods specified, current copies of the following documents and amendments, revisions and modifications to these documents I EE 1 a A copy of the Permit imtil closure is certified in accordance with Condition IIN , I EE 1 b Waste Analysis Plans (Attachment 1), and all associated analytical data, as required by UAC R315-8-2 4 and this Permit until closure is certified m accordance with Condition IIO, ATK Launch Systems Inc - Promontory May 2010 Module 1 - Standard Permit Conditions UTD009081357 I EE 1 c Inspection schedules and logs (Attachment 2), as required by UAC R315-8-2 6(b) and this Permit for a period of three years in accordance with UAC R315-8 2 6(d), I EE 1 d Personnel training documents (Attachment 3), and records, as required by UAC R315- 8-2 7(d) and this Permit until closure for current employees, or for a period of three years for former employees in accordance with UAC R315-8 2 7(e), I EE 1 e Contingency Plan (Attachment 4), as required by UAC R315-8-4 and this Permit until closure is certified in accordance with Condition IIN, I EE 1 f Operating record, as required by UAC R315-8-5 3, and this permit until closure is certified in accordance with Condition IIN, I EE 1 g Closure Plans (Attachment 5), as required by UAC R315-8-7 and this permit, imtil closure is certified in accordance with Condition IIN, I EE 1 h Cost estimates (Attachment 5) for the closure and post-closure ofthe Hazardous Waste Management Units covered by this Permit, in accordance with UAC R315-8-8 and Condition II P of this Permit, I EE I 1 Manifest copies, as required by UAC R315-8-5 and this Permit for at least three years from the date the waste shipment was accepted at the facility or shipped off-site to an approved hazardous waste management facility, and I EE 1 j A copy of the Permittee's waste minimization statement until closure is certified in accordance with Condition IIN IFF PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT I FF 1 Pursuant to Section 3005(C)(3) of RCRA (Section 212 of HSWA) and UAC R315-3- 3 3(b)(2) [40 CFR 270 32(b)(2)], this Permit contains those terms and conditions determined necessary to protect human health and the environment 10 ATK Launch Systems Inc - Promontory May 2010 Module 11 - General Facility Conditions UTD00908I357 MODULE II - GENERAL FACILITY CONDITIONS HA APPLICABILITY II A 1 The requirements of this permit module pertain to all Hazardous Waste Management Units (HWMUs) identified within Modules I, II and III IIB DESIGN AND OPERATION OF FACILITY II B 1 The Permittee shall design, constmct, maintain and operate all of the HWMUs and surrounding areas to minimize the possibility of a fire, explosion, or any sudden or non- sudden release of hazardous waste or hazardous waste constituents to the air, soil, groundwater or surface water which could threaten human health or the environment II B 2 Any constmction changes associated with a permitted HWMU at the facility shall be documented by as-built drawings and certified by a registered professional engineer in accordance with Condition IRI and UAC R315-3-3 I(l)(2)(i) II B 3 After review of the as-built drawings and field verification of the facility's HWMUs, the Executive Secretary will notify the Permittee in writing of any change which he concludes does not satisfy the operating requirements specified m this permit IIC REQUIRED NOTICE II C 1 As required by UAC R315-8-2 3(a)( 1), the Permittee shall notify the Executive Secretary in wnting at least four weeks in advance of the date the Permittee expects to receive hazardous waste from a foreign source Notice of subsequent shipments of the same waste from the same foreign source in the same calendar year is not required II C 2 When the Permittee arranges to receive hazardous waste from an off-site source (except where the Permittee is also the generator), the Permittee shall inform the generator in writing that he has the appropriate permit(s) for, and will accept, the waste the generator is shipping The Permittee shall keep a copy of this written notice as part of the operating record as required by UAC R315-8-2 3(b) IID WASTE ANALYSIS PLAN II D 1 The Permittee shall follow the procedures of the Waste Analysis Plan included as Attachment 1 of this Permit In addition, the Permittee shall comply with any other conditions involving waste analysis in Modules I, II, III and IV IID 2 The Permittee shall use the test methods described in the Waste Analysis Plan (Attachment I) or an equivalent procedure that satisfies Condition 10 3 Changes in a test method described in the Waste Analysis Plan, as a result of an improvement or refinement of that method, may be adopted by the Permittee and incorporated into this Permit, m accordance with UAC R315-4-1 5 and Condition I D II D 3 The Permittee shall characterize, using analytical techniques if necessary, all waste streams generated on or off-site in accordance with UAC R315-8-2 4 and Attachment 1 ATK Launch Systems Inc - Promontory May 2010 Module II - General Facility Conditions UTD009081357 The waste characterization profiles shall be kept in the operating record II D 4 An annual evaluation of each waste stream shall be performed, as outlined in the waste analysis plan, to verify that the waste characterization is still accurate These evaluations shall be kept in the operating record until the next annual evaluations are completed Characterization of waste streams shall also be done each time the process generating the waste changes II D 5 Any waste analysis used to evaluate off-site waste for acceptance by the Permittee shall be accomplished using a laboratory that has been certified by the Utah State Division of Laboratories II D 6 At a minimum, the Permittee shall II D 6 a Maintain properly functioning sampling and analytical equipment, II D 6 b Use approved sampling and analytical methods, and II D 6 c Submit an updated list of parameters, analytical methods, and sample preparation methods on an annual basis The updated list shall be submitted to the Executive Secretary on or before January 15'^ of each calendar year II D 7 Whenever the Executive Secretary determines that the Permittee needs to update the analytical methodologies or the version(s) of SW-846 that are bemg used by the Permittee's analytical laboratory, the Executive Secretary will submit wTitten notification to the Permittee The Permittee shall notify the Utah Department of Health, Bureau of Laboratory Improvement of the requested update within 30 days of receipt of the Executive Secretary's determination The Permittee shall have 180 days from the receipt of the Executive Secretary's written notification to complete the requested update If it is not possible to complete the update within the prescribed time, the Permittee shall submit a written request for extension to the Executive Secretary for approval II D 8 If the Permittee uses a contract laboratory to perform analyses, the laboratory must be certified by the State of Utah to perform the contracted analyses For parameters for which certification is unavailable, the Permittee shall ensure that quality control/quality assurance data provided by the laboratory is sufficient to assess the validity of the data The Permittee shall inform the laboratory in writing that it must operate under the Waste Analysis Plan conditions set forth in this Permit HE SECURITY II E 1 The Permittee shall comply with the security conditions and procedures contained in Attachment 7 of this Permit IIF GENERAL INSPECTION REQUIREMENTS II F 1 The Permittee shall conduct inspections in accordance with UAC R315-8-2 6 and shall follow the inspection schedule found in Attachment 2 II F 2 The Permittee shall remedy any deterioration or malfiinction as required by UAC R315- ATK Launch Systems hic - Promontory May 2010 Module II - General Facility Conditions UTD009081357 8-2 6(c) If the remedy requires more than 72 hours to implement from the time that the problem is detected, the Permittee shall submit to the Executive Secretary, before the expiration of the 72 hour period, a proposed time schedule for correcting the problem II F 3 Any problem which could endanger human health or the environment shall be corrected as soon as possible after the problem is discovered The Permittee shall make every effort to eliminate the threat to human health or the environment within 24 hours II F 4 If, upon determination by the Executive Secretary or the Permittee, contmued operation of the waste management unit involved in the inspection could endanger human health or the environment, the Permittee shall cease operation of the unit until the problem has been corrected The Permittee shall be allowed to undertake those operations which are part of corrective activities II F 5 Records of inspections shall be kept as required by UAC R315-8-2 6(d) II G RISK THRESHOLDS II G 1 The thermal treatment operations at both of the ATK Promontory thermal treatment areas shall be conducted to minimize the risk to human health and the environment The risk thresholds identified in Condition II G and the operating conditions in Module IV for the NIROP Buming Grounds are based on the mformation provided m Attachments to this Permit and the following site specific documents available for review in the Department of Environmental Quality, Division of Solid and Hazardous Waste files IIG 1 The thermal treatment operations at both of the ATK Promontory thermal treatment areas shall be conducted to minimize the risk to human health and the environment The risk thresholds identified in Condition II G and the operating conditions in Module IV for the treatment areas are based on the information provided or referenced in Attachments to this Permit and the following site specific documents available for review in the Department of Environmental Quality, Division of Solid and Hazardous Waste files IIG 1 a The Waste Characterization and Air Dispersion Modeling Protocol for use in the Human Health and Ecological Risk Assessments - ATK Launch Systems - Promontory, November 2009, IIG 1 b The response to the Division of Solid and Hazardous Waste comments on the Waste Characterization and Air Dispersion Modeling Protocol for use in the Human Health and Ecological Risk Assessments, II G 1 c ODOBI Test Results, Emission Factors IIG 1 d The Human Heahh Risk Assessment Protocol for OB/OD Operations at the ATK Promontory Facility, February 2010 Note The human health risk assessment is currently being conducted Specific restrictions on bum ground operations are pending and will be included in the second draft ofthe permit modification document There will be an additional public comment period for this document Additional site specific documents on the HHRA will be available for review at that time ATK Launch Systems Inc - Promontory May 2010 Module II - General Facility Conditions UTD009081357 II G 2 The Permittee shall submit to the Executive Secretary by March T' of each calendar year, an annual report on the operation of the Promontory Thermal Treatment areas This report shall at a minimum include the following II G 2 a An accounting of the quantities and types of reactive hazardous waste treated at the M-136 and M-225 thermal treatment areas, including all donor material and ignition compounds, II G 2 b The estimated quantity of tetrachlorodibenzo(p)dioxin toxic equivalents (TCDD TEQs) released annually The quantity shall be calculated by assuming a TCDD TEQ emission rate to be determined through approval ofthe air dispersion model Based on the Human Health Risk Assessment identified in Condition II G 1 d, or II G 1 e , the Permittee shall not emit more than a quantity to be determined of the TCDD TEQs in a calendar year, II G 2 c An evaluation of the emission factors, identified in Condition II G 1 c , used in the human health risk assessment to determine whether these factors need to be updated, and II G 2 d A review of the of the human health risk assessment, identified in Condition II G 1 d or IIG 1 e , to evaluate whether the slope factors and reference doses for carcinogenic and non- carcinogenic health effects related to the chlorinated dioxin, chlorinated furan and semi-volatile compounds have changed, and a review of the potential human health risk scenarios, identified in Condition IIG 1 a and b, used in the risk assessment to assure that these scenarios have not changed II G 3 If the Executive Secretary determines after reviewing this annual report that any component of the risk assessment needs to be updated, he will inform the Permittee in writing which components of the human health risk assessment to update IIG 4 If the Permittee is required to update the human health risk assessment for the M-136 or M-225 Thermal Treatment areas, the Permit shall be modified in accordance with Condition I D of this Permit II H PERSONNEL TRAINING II H 1 The Permittee shall conduct personnel traimng as required by UAC R315-8-2 7 This training program shall follow the outline found in Attachment 3 New personnel working with or around hazardous waste shall complete the required personnel training withm six (6) months of their hire date, assignment to the facility or assignment to a new position at the facility II H 2 Facility personnel shall take part in an annual review of their initial training for contingency and hazardous waste management procedures relevant to the positions in which they are employed II H 3 The Permittee shall maintam training documents and records as required by UAC R315- 8-2 7(d) and R315-8-2 7(e) [40 CFR 264 16(d) and 264 16(e)], in accordance with the ATK Launch Systems Inc - Promontory May 2010 Module 11 - General Facility Conditions UTD009081357 Training Plan m Attachment 3 These records shall indicate the type and amount of training received II H 4 The Permittee shall maintain a copy of the Training Plan at the Facility until it is fully closed and closure is certified II H 5 Employees working at the rocket motor disassembly and storage building (M-603) shall receive task specific on-the-job-trainmg in addition to the training outlined in Attachment 3 This training shall be documented and maintained in the operatmg record until the specific program is completed III GENERAL REQUIREMENTS FOR IGNITABLE. REACTIVE. OR INCOMPATIBLE WASTE II11 The Permittee shall comply with the requirements of UAC R315-8-2 8 III 2 In addition to the requirements of UAC R315-8-2 8 , the Permittee shall comply with the Conditions III G and III H pertaining to ignitable, reactive, or incompatible waste IIJ LOCATION STANDARDS IIJ 1 The Permittee shall comply with the location standards specified by UAC R315-8-2 9 II K PREPAREDNESS AND PREVENTION II K 1 The Permittee shall follow the Preparedness and Prevention Plan, Attachment 8 II K 2 At a minimum, the Permittee shall equip and maintain in good operating condition at the facility the equipment set forth in Attachment 8, as required by UAC R315-8-3 3 II K 3 The Permittee shall test and maintain the equipment specified in Condition II J 2 as necessary to assure its proper operation in time of emergency II K 4 The Permittee shall maintain records of the preventative maintenance and repair activities specified in Condition II J 3 and shall keep schedules, reflecting minimum and planned frequency for the performance of preventative maintenance activities in the Operating Record at the facility II K 5 The Permittee shall maintain access to the communications or alarm system as required by UAC R315-8-3 5 II K 6 At a minimum, the Permittee shall maintain 30 inches of aisle space between containers or pallets of containers at storage areas M-186 and E-501 II K 7 The Permittee shall attempt to make arrangements (Coordination Agreements) with State and local authorities as required by UAC R315-8-3 7 Copies of the Coordination Agreements shall be kept m the Operating Record The attempts to make such agreements, any refusals and all final agreements shall be documented in the Operating Record ATK Launch Systems Inc - Promontory May 2010 Module II - General Facility Conditions UTD009081357 IIL CONTINGENCY PLAN II L 1 The Permittee shall immediately carry out the provisions of Attachment 4, and follow the emergency procedures described by UAC R315-8-4 7 whenever there is a fire, explosion, or release of hazardous waste or hazardous waste constituents which threatens or could threaten human health or the environment The Permittee shall comply with Condition I T in reporting releases to the Executive Secretary II L 2 The Permittee shall provide copies of the Contingency Plan to emergency agencies who may be called in an emergency, shall maintain a copy of the Plan at the facility, and shall provide a copy upon request in accordance with UAC R315-8-4 4 II L 3 The Permittee shall review the Contingency Plan, in accordance with UAC R315-8-4 5 and shall modify it in accordance with Condition I D , if necessary II L 4 A trained emergency coordinator shall be available at all times m case of an emergency, in accordance with UAC R315-8-4 6 and identified in Attachment 4 IIM MANIFEST SYSTEM II M I The Permittee shall comply with the manifest requirements of UAC R315-5-2 and UAC R315-8-5 The manifest tracking number shall be recorded m the Operatmg Record with each waste load that arrives or leaves the Permittee's facility IIN RECORDKEEPING AND REPORTING II N I The permittee shall maintam an accurate written Operatmg Record at the facility in accordance with UAC R315-8-5 3 (40 CFR 264 73 incorporated by reference) and R315-50-2 (Appendix I to Part 264 incorporated by reference) IIN 2 The Permittee shall, by March I of each year, submit to the Executive Secretary a certificafion pursuant to UAC R315-8-5 3 [40 CFR 264 73(b)(9) incorporated by reference], signed in accordance with UAC R315-3-2 2, that the Permittee has a program in place to reduce the volume and toxicity of hazardous waste that he generates to the degree determined by the Permittee to be economically practicable, and that the proposed method of treatment, storage, or disposal is the most practicable method currently available to the Permittee which minimizes the present and future threat to human health or the environment II N 3 The Permittee shall comply with the biermial report requirements of UAC R315-8-5 6, by March 1 of each even-numbered reporting year The report shall include wastes generated, treated or stored at the Permittee's facility during the previous odd-numbered year II N 4 The Permittee shall submit additional reports to the Executive Secretary in accordance with UAC R315-8-5 8 IIN 5 All reports, notifications, applications, or other materials required to be submitted to the ATK Launch Systems Inc - Promontory May 2010 Module II - General Facility Conditions UTD009081357 Executive Secretary shall be submitted in accordance with Condition I DD IIO CLOSURE/POST-CLOSURE II O 1 The Permittee shall close the facility as required by UAC R315-8-7, UAC R315-101 and Attachment 5 II O 2 For all HWMUs, minor deviations from the approved closure plan procedures, necessary to accommodate proper closure, shall be described in narrative form with the closure certification statements The Permittee shall describe the rationale for implementing minor changes as part of this narrative report Within 60 days after completion of closure of each HWMU, the Permittee shall submit the certification statements and narrative reports to the Executive Secretary II O 3 The Permittee shall amend the closure/post-closure plan in accordance with UAC R315- 8-7 and Condition ID whenever necessary, or when required to do so by the Executive Secretary II O 4 The Permittee shall notify the Executive Secretary in writing of the partial closure of any portion of the facility in accordance with UAC R315-8-7 The Permittee shall notify the Executive Secretary at least 180 days prior to the commencement of final facility closure The closure plan contained in Attachment 5 will be reviewed before commencing partial or final facility closure If the closure plan requires modification, the plan shall be modified and submitted to the Executive Secretary for approval m accordance with Condition I D II O 5 After receiving the final volume of hazardous waste, the Permittee shall treat or remove from the site all hazardous waste and complete closure activities in accordance with the schedule specified in Attachment 5 II O 6 The Permittee shall decontaminate or dispose of all facility equipment, stmctures, soil and rinsate as required by UAC R315-8-7, R315-8-9 and Attachinent 5 Facility equipment, stmctures and soil which have not been decontaminated shall be disposed of only at a permitted hazardous waste treatment, storage or disposal facility II O 7 The Permittee shall certify that the facility has been closed in accordance with the specifications in Attachment 5 as required by UAC R315-8-7, and shall provide a certification by an independent, Utah registered professional engineer qualified by experience and education in the appropriate engineenng field II O 8 In the event that any of the hazardous waste management units covered by this permit carmot be clean closed by decontaminating or removing contaminated stmctures or soil, or releases have occurred which have impacted soil or groimdwater, the Permittee shall modify the Closure/Post-Closure Plan for that hazardous waste management unit in accordance with Condition I D Within 30 days of the date that the Executive Secretary approves the modification, the Permittee shall close the unit in accordance with the applicable provision of UAC R315-8-7 and R315-101 II O 9 If a HWMU can not be clean closed, the Permittee shall submit a survey plat and property description for the HWMU with the submission of the certification of closure for the HWMU, in accordance with UAC R315-8-7 and R315-101 ATK Launch Systems Inc - Promontory May 2010 Module II - General Facility Conditions UTD009081357 IIP COST ESTIMATES FOR HWMU CLOSURE II P 1 The Permittee's closure cost estimate for each HWMU shall be prepared and maintained at the facility in accordance with UAC R315-8-8 (40 CFR 264 142 incorporated by reference) and Attachment 5 II P 2 On the one year anniversary date of Permit issuance, the Permittee shall submit to the Executive Secretary for approval updated closure plans and detailed closure cost estimates for each HWMU at the ATK facility The closure cost estimates shall identify the costs, in current dollars, of the steps necessary to perform final closure for each HWMU in accordance with UAC R315-8-9 9 and UAC R315-8-8 (40 CFR 264 142 incorporated by reference) II P 3 On the five year anniversary date of the submittal of the closure cost estimates required by Condition II O 2 above, the Permittee shall conduct a detailed evaluation of the closure cost estimates for each HWMU and determine whether the annual adjustments for inflation have been adequate to update the closure cost estimates The Permittee shall submit a report on this assessment and if necessary, a modification of the Permit in accordance with Condition I D to the Executive Secretary 90 days after the report is submitted II P 4 The Permittee shall revise the closure cost estimate within 30 days after the Executive Secretary has approved the request to modify the affected closure plan(s) II P 5 For each new HWMU placed mto operation, an updated closure cost estimate to the facility must be prepared which includes the new unit, 60 days prior to waste being placed on or into the new unit IIQ FINANCIAL ASSURANCE FOR FACILITY CLOSURE II Q 1 The Permittee shall demonstrate continuous financial assurance compliance by providing a third party financial assurance certification of at least the amount of the closure/post-closure cost estimates established in Condition II O The Permittee may substitute other instmments of financial assurance provided the method, funding and wording requirements of UAC R315-8-8 are followed and approved by the Executive Secretary II Q 2 The financial assurance document shall be updated within 60 days of the annual adjustment for inflation or withm 60 days of the approval of a revised closure/post- closure cost estimate in accordance with UAC R315-8-8 IIR LIABILITY REQUIREMENTS II R 1 The Permittee shall demonstrate continuous compliance with the liability requirements of UAC R315-8-8 (40 CFR 264 147 incorporated by reference) The Permittee shall have and maintain hazardous waste liability coverage for sudden accidental occurrences in the amount of at least one $1 million U S dollars per occurrence with an annual aggregate of at least $2 million U S dollars, exclusive of legal defense costs The Permittee shall submit an approved certificate of hazardous waste liability insurance worded as required by UAC R315-8-8 ATK Launch Systems Inc - Promontory May 2010 Module 11 - General Facility Conditions UTD009081357 II R 2 Changes in liability coverage mechanisms shall be approved by the Executive Secretary 60 days prior to such a change IIS INCAPACITY OF OWNER OR OPERATORS. GUARANTORS. OR FINANCIAL INSTITUTIONS II S 1 The Permittee shall comply with the notification and financial requirements of UAC R315-8-8 (40 CFR 264 148 incorporated by reference) ATK Launch Systems Inc - Promontory September 2008 Module 111 - Storage in Containers UTD009081357 Modified June 16 2009 MODULE III - STORAGE IN CONTAINERS III A APPLICABILITY III A 1 The requirements of this permit Module pertain to the operation of hazardous waste container storage areas at the facility The Permittee shall comply with R315-8-9 and all conditions of this Module III A 2 The designated hazardous waste storage areas are the bays of Buildings M-705S, E-501, M-47, M-603, M-186, the bum trays at M-136, Bum Station 14 at M-136, and S-633 Drawings of these storage areas are presented in Attachment 6 IIIB WASTE IDENTIFICATION III B 1 The Permittee shall, subject to the terms of this Permit, store only the following hazardous wastes, as listed by EPA hazardous waste code, in containers at storage areas M-186, M-705S and E-501 DOOl, D002, D003, D004, D005, D006, D007, D008, D009, DOlO DOl 1, D016, D018, D019, D021, D022, D023, D024, D026, D027,D028, D029, D035, D036, D038, D039, D040, D042, D043, FOOl, F002, F003, F004, F005, F006, F007, F008, F009, K044, P003, P012, P022, P028, P029, P030, P047, P048, P064, P067, P077, P087, P092, P093, P095, P098, P102, P105, P106, Pl 12, Pl 16, Pl 19, UOOl, U002, U004,U006, U008, U009, U019, U025, U028, U029, U031, U037, U041, U044, U048, U053, U056, U057, U069, U070, U072, U077, U079, U080, U085, U088, U092, U093, U095, U098, UlOl, U102, U103,U105, U108, Ul 12, Ul 13, Ul 17, Ul 18, U120, U121, U122, U123, U131, U133, U134, U140, U147, U148, U149, U151, U154, U156, U159, U160, U161, U162, U165, U168, U169, U170, U171, UI85, U186, U188, U190, U196, U201, U209, U2I0, U2II, U218, U2I9, U220, U221, U223. U224, U225, U226, U228, U238, U239, U240, U243, U244, U246, U253, U328, U353, U359, U404 III B 2 The Permittee may store solid reactive hazardous waste , EPA hazardous waste code D003, in storage Building M-47 subject to the terms of this Permit III B 3 The Permittee may store tsolid reactive hazardous waste , EPA hazardous waste code D003, in Building M-603 in accordance with Module IV of this Permit III B 4 The Permittee may store solid reactive hazardous waste, EPA hazardous waste code D003, received from off-site in bum trays at M-136 for up to 14 days prior to thermal treatment Waste stored in bum trays shall be containerized only in covered drums, boxes, plastic bags, woven bags, US Department of Transportation (DOT) pproved shipping contamers or containerize as describe m Attachemnt 11 Containers shall be labeled and managed as specified in Attachment 9 III B 5 The Permittee may store waste rocket motors, EPA hazardous waste code D003, received from off-site that contam solid propellant, one at a time on the ground at M- 136, Bum Station 14 for up to 14 days prior to thermal treatment The waste rocket motors shall be labeled and managed as specified in Attachment 9 ATK Launch Systems Inc - Promontory September 2008 Module 111 - Storage in Containers UTD009081357 Modified June 16 2009 III B 6 The Permittee may store solid reactive hazardous waste , EPA hazardous waste code D003, in Building M-633 subject to the terms of this Permit III B 7 The Permittee is prohibited from storing hazardous waste that is not identified in Section III B of this Module Any addition of hazardous waste codes to Condition III B 1 requires modification of the permit in accordance with Condition I D 3 IIIC CONDITION OF CONTAINERS III C 1 If a container holding hazardous waste is not in good condition (e g , severe msting, bulging, apparent structural defects) or it has begun to leak, the Permittee shall transfer the hazardous waste, or the container itself, to a UN approved container in accordance with Section 8-1-10 of Attachment 8 The transfer shall be completed as soon as possible but not later than 24 hours from the time the problem was first discovered HID COMPATIBILITY OF WASTE WITH CONTAINERS III D 1 The Permittee shall assure that the waste is compatible with the containers as required by R315-8-9 3 The Permittee shall follow the compatibility plan as indicated in Section 9-2 1 and Table 9-2 of Attachment 9 HIE MANAGEMENT OF CONTAINERS III E 1 The Permittee shall manage containers in accordance with this module ofthe Permit, UAC R315-8-9 4 and the procedures identified in Attachment 9 A container holding hazardous waste shall always be closed during storage except when the Permittee is adding or removing waste from the container The Permittee shall not open, handle, or store containers in a manner which may cause the containers to leak III E 2 The Permittee shall store liquid hazardous wastes in containers only at storage areas M-186, E-501 and M-705S Drawings of the container storage areas are shovm in Attachment 6 At capacity, the Permittee may store the following volumes of wastes III E 2 a E-501 - 8,800 gallons, which is 160 55-gallon containers or the equivalent, III E 2 b M-186 - 22,000 gallons, which is 400 55-gallon containers or the equivalent, and III E 2 c M-705S - 1,760 gallons, which is 32 55-gallon contamers or the equivalent III E 3 The Permittee shall store solid reactive hazardous waste in containers at storage areas M-47, M-603, M-136 and S-633 Drawings of the storage areas are shovm m Attachment 6 At capacity, the Permittee may store the followmg amounts of wastes III E 3 a M-47 - 300,000 lbs I 3 or 21,000 lbs 1 1 solid propellant, III E 3 b M-603 - 120,000 lbs 1 3 r 8,000 lbs 1 1 solid reacttve hazardous waste, III E 3 c M-136 - 106,500 lbs of 1 3 or 20,000 lbs of 1 1 solid reactive hazardous waste in bum trays or in a rocket case placed on the ground, and ATK Launch Systems Inc - Promontory September 2008 Module III - Storage in Containers UTD009081357 Modified June 16 2009 III E 3 d S-633 - 75,000 lbs of 1 3 or 20,000 lbs of 1 1 solid reactive hazardous waste III E 4 The Permittee shall maintain an aisle space of 30 inches minimum between containers or pallets of containers at storage areas M-186 and E-501 111 E 5 The Permittee shall store hazardous wastes at M-705S, M-47, M-603 and M-136 so that the container or waste rocket motor may be readily inspected and hazardous waste labels are visible III E 6 The Permittee may stack 55-gallon drums at a maximum of two high at storage areas M-I86 and E-501 III E 7 Hazardous waste containers shall not be stacked at storage areas M-705S, M-47, M-603 and M-136 III E 8 The Permittee shall unload any transport vehicle hauling containers of hazardous waste for storage within 10 days followmg arrival at the site Arrival for purposes of this permit shall be the day the vehicle arrives at the facility III E 9 The Permittee shall provide storage for and maintain on-site, 85 gallon overpack dmms at areas where liquid hazardous waste is stored IHF CONTAINMENT SYSTEMS III F 1 The Permittee shall maintain the containment systems in accordance with the attached plans and specifications contained in Attachment 9 and as specified in UAC R315-8- 96 III F 2 Container management areas shall be inspected for the presence of free liquids in accordance with Attachment 2 If free liquids are discovered in the sumps or other containment areas, the Permittee shall identify the location in the inspection log Any liquids discovered shall be removed immediately, but in no case later than twenty-four hours after the liquid is discovered and managed according to the spill contingency plan specified in Section 9-4 3 of Attachment 9 III F 3 For purposes of inspections, all containers stored in the liquid hazardous waste storage area shall be considered full to their respective capacities with liquid hazardous waste Gondolas/roll-offs that are used only for the storage of solid hazardous waste need not be considered in the calculations for containment The area for stonng solid waste shall be identified III F 4 The bum trays at M-136 are only permitted for the storage of solid reactive wastes in containers received from off-site for no more than 14 days However since some of the containers contain small amounts of desensitizing fluid (e g diesel, shingle oil, etc ), the containment requirements, as specified in Attachment 9, apply to the storage of wastes in the bum trays Inspection of the bum trays shall be conducted m accordance with Attachment 2 ATK Launch Systems Inc - Promontory Module III - Storage in Containers September 2008 UTD009081357 Modified June 16 2009 IIIG IIIG 1 IIIG 2 IIIH IIIH 1 IIIH 2 IIIH 3 IIII IIII 1 III I 2 IIIJ III J 1 III J2 SPECIAL REQUIREMENTS FOR IGNITABLE OR REACTIVE WASTE The Permittee shall not locate containers holding ignitable or reactive waste within 15 meters (50 feet) of the facility boundary The Permittee shall take precautions to prevent accidental ignition or reaction of ignitable or reactive waste and follow the procedures specified in Attachment 8, UAC R315-8-2 8 and UAC R315-8-9 7 SPECIAL REQUIREMENTS FOR INCOMPATIBLE WASTE The Permittee shall not place incompatible wastes, or incompatible wastes and materials, in the same container, m accordance with UAC R315-8-2 8 and UAC R315- 8-9 8(a) The Permittee shall not place hazardous waste or materials in an unwashed container that previously held an incompatible waste or material m accordance with UAC R315- 8-2 8 and UAC R315-8-9 8(b) A storage container holding a hazardous waste that is incompatible with any waste or other materials stored nearby shall be separated from the other materials or protected from them by means of a dike, berm, wall, or other device INSPECTION SCHEDULES AND PROCEDURES The Permittee shall inspect the hazardous waste storage and treatment facilities identified in Condition III B of this Permit as specified in the Inspection Schedules contained in Attachment 2 The purpose of this inspection shall be to detect leaking containers, standing liquids, deterioration of containers, and to detect deterioration of, or liquids in, the secondary contamment system caused by corrosion and other factors as specified in R315-8-9 5 If problems are observed durmg the inspections, the Permittee shall correct the problem in accordance with Module II, Section F CLOSURE/POST-CLOSURE The Permittee shall close the storage areas in accordance with UAC R315-8-7, UAC R315-8-9 9, Condition II O and Attachment 5 of this Permit Closure plans for each individual hazardous waste management area shall be submitted to the Executive Secretary for approval no less than 180 days prior to the commencement of closure activities No closure activities shall take place that have not received prior approval from the Executive Secretary ATK Launch Systems Inc Promontory May 2010 Module IV - Thermal Treatment of Energetic Wastes UTD009081357 MODULE rv - THERMAL TREATMENT OF ENERGETIC WASTES IVA APPLICABILITY rv A 1 The requirements of this permit module apply to the thermal treatment of energetic or reactive hazardous waste at the ATK Launch Systems - Promontory facility. Box Elder County, Utah The Permittee shall comply with UAC R315-8 and all conditions of this module and Permit rv A 2 The permit conditions of this module allow thermal treatment at the two Hazardous Waste Management Units, designated as the M-136 and M-225 Thermal Treatment Areas, as designed and described in the drawings and specifications in Attachments 6 and 11 The M-136 Thermal Treatment Area consists of 14 bum stations and 2 open detonation areas The M-225 Thermal Treatment Area consists of 4 bum stations and 1 open detonation area rv A 3 Thermal treatment at both of the Promontory Thermal Treatment Areas shall only be accomplished by properly trained ATK personnel in accordance with ATK's Standard Operating Procedures, the conditions of this Permit and its attachments rv A 4 This Permit has been developed in accordance with the applicable requirements of UAC R315-1 through 101 All conditions in this Permit shall supercede conflicting statements, requirements, or procedures found in UAC R315-1 through 101 or attachments to this Permit IVB PERMITTED AND PROHIBITED WASTE IDENTIFICATION rv B 1 The Permittee may treat energetic or reactive hazardous waste at the two Promontory Thermal Treatment Areas by open buming and detonation These energetic and reactive hazardous wastes are generated from the following sources rv B 1 a Class 1 1 and 1 3 propellants and explosives manufactured at the Promontory, Bacchus, and other ATK facilities as well as Autoliv ASP, DOD, NASA or other govemment and private facilities (e g cured and uncured propellants, excess propellants and propellant scraps) including the following, IV B 1 b Production materials contaminated with class 1 1 and 1 3 propellants and explosives and reactive residues (e g , rags, gloves, other personal protective equipment, plastics, mbber and paper that were contaminated with explosive materials during the manufacturing process), IV B 1 c Large and small class 1 1 and 1 3 rocket motors and initiating devices, IV B I d Class 1 3 Pyrotechnic, Illuminants, Metal Powders, or Autoliv ASP Products rv B 1 e Production materials contaminated with class 1 3 Pyrotechnic, Illuminants, Metal Powders, or Autoliv ASP Products and other reactive residues (e g, rags, gloves, other personal protective equipment, plastics, mbber and paper that were contaminated with explosive materials during the manufacturing process), IV B 1 f Reactive laboratory wastes which may contain solvents. Page 1 ATK Launch Systems Inc Promontory May 2010 Module IV - Thermal Treatment of Energetic Wastes UTD009081357 rv B 1 g Wastewater treatment sludge generated from the processing of explosive ingredients and propellants defined in UAC R315-2 as a K044 listed hazardous waste, rv B 1 h Reactive bag house dust generated from the processing of explosive ingredients and propellants, rv B 1 1 Waste developmental propellants, explosives and associated contaminated production materials rvrv B 2 Only reactive hazardous waste as defined by UAC R315-2 may be treated at the Promontory Thermal Treatment Areas Reactive hazardous waste thermally treated at the Promontory Thermal Treatment Areas may contain the follow EPA waste codes DOOl, DOOS, D005, D007, D008„ D030, D038, FOOl, F002, F003, F004, F005 and K044 rv B 3 The Permittee is prohibited from thermally treating reactive hazardous waste classes and compositions not included in Condition IV B 2 including wholly inert items and improvised explosive devices (e g homemade bombs), chemical and energetic reactive hazardous wastes that will detonate under open buming conditions rv B 4 The Permittee shall only thermally treat reactive hazardous wastes at the Promontory Thermal Treatment Areas that are identified in Conditions rV B 1 and rV B 2 rv B 5 The addition of hazardous waste codes to Condition fV B 2 requires modification of the permit as specified in UAC R315-4-1 5 and Condition I D rv B 6 The Permittee shall comply with the waste compatibility requirements of Condition II H rVC GENERAL OPERATING CONDITIONS rv C 1 The Permittee shall comply with the following treatment limits for the M-136 Thermal Treatment Area rv C 1 a The Permittee shall not treat more than 106,500 pounds of reactive hazardous waste in a calendar day, rv C 1 b The Permittee shall not treat more than 106,500 pounds of reactive hazardous waste in a calendar day at bum stations 1,2,3,4,5,6,7,8,9,10,11,12, The Permittee shall not treat more than 50,000 pounds of reactive hazardous waste in a calendar day at bum station 13, The Permittee shall not treat more than 106,500 pounds of reactive hazardous waste in a calendar day at bum station 14, rv C 1 c The Permittee shall not treat more than 600 pounds of reactive hazardous waste by open detonation per event, rv C 1 d reserve rv C 1 e The Permittee shall operate the M-136 Thermal Treatment Area in accordance with the quantity-distance requirements identified in Attachment 11 section 5 Page 2 ATK Launch Systems Inc Promontory May 2010 Module IV -Thermal Treatment of Energetic Wastes UTD009081357 rv C 1 f The Permittee shall not treat more than 10,000,000 pounds of reactive hazardous waste at the M-136 Thermal Treatment Area in a calendar year This 10,000,000 pound limit shall be established by adding the Net Explosive Weight (NEW) and all donor and initiator materials Donors shall include all pallets, cardboard, packaging material, absorbents and diesel fuel rv C 2 The Permittee shall comply with the following treatment limits for the M-225 Thermal Treatment Area rv C 2 a The Permittee shall not treat more than 4,500 pounds of reactive hazardous waste per calendar day, rv C 2 b The Permittee shall not open burn more than 4,500 pounds of reactive hazardous waste at any bum station or combination of stations per calendar day, rv C 2 c The Permittee shall not treat more than 600 pounds of reactive hazardous waste by open detonation per event, rvrv C 2 d The Permittee shall operate the M-225 Thermal Treatment Area in accordance with the quantity-distance requirements identified in Attachment 11 section 5 rv C 2 e The Permittee shall not treat more than 55,000 pounds of reactive hazardous waste at the M-225 Thermal Treatment Area in a calendar year This limit shall be established by adding the Net Explosive Weight (NEW) and all donor and initiator materials Donors shall include all pallets, cardboard, packaging material, absorbents and diesel fuel rv C 3 The Permittee shall maintain the integrity of the Promontory Thermal Treatment Areas to ensure that they meet the performance standards of UAC R315-8-16 and minimize the potential impacts to human health and the environment The Permittee shall adhere to applicable provisions of Attachments 2 and 11 and the following conditions rv C 3 a The Permittee shall conduct all open bum operations within the secure areas designated as the M-136 or M-225 Thermal Treatment Areas with controlled access as identified in Attachment 11, rv C 3 b The Permittee shall post waming signs around both of the Thermal Treatment Areas to keep unauthorized personnel out, rv C 3 c The Permittee shall maintain the egress paths for both of the Thermal Treatment Areas identified in Attachment 4, rv C 3 d The Permittee shall disable the firing system whenever operators are in the QD for this treatment unit The firing system shall only be active or armed when operators are conducting a pre-bum continuity check, as specified in Attachment 11, Section 8 2 3, or when the firing system is being maintained and no waste is present in the treatment area, or after all operators have exited the tteatment unit and retreated to the firing controi room in preparation of initiating an ignition as specified in Condition fV F 2 i, rv C 3 e The Permittee shall assess and monitor meteorological conditions to ensure operators are not exposed to risks from lightning strikes or other adverse weather conditions that would preclude the s rv C 3 f The Permittee shall comply with all requirements for pre-placement of waste, placement of waste in treatment units, wiring and ignition and the post-bum inspection and clean up actifVties identified in Condition rV D, E, F, G, H and 1 Page 3 ATK Launch Systems Inc Promontory May 2010 Module IV - Thermal Treatment of Energetic Wastes UTD009081357 rv C 3 g The Permittee shall provide operators with access to a telephone that can be used to contact support personnel, including security, safety and fire fighting units, whenever the operators are inside the M-136 or M-225 Thermal Treatment Areas, rv C 3 h The Permittee shall maintain the integrity of the two Promontory Thermal Treatment Areas and support equipment through regular inspections and in accordance with the mspection plan in Attachment 2 Inspection records shall be maintained at the facility, rv C 3 I The Permittee shall train all operators of the Promontory Thermal Treatment Areas in accordance with Condition II G and Attachment 3 of this Permit, rv C 3 J The Permittee shall not operate either of the Promontory Thermal Treatment Areas without containment measures (e g firebreaks) to assure the confinement and control of any fire resultmg from the open bum and open detonation operations at the Promontory Thermal Treatment Areas, and rv C 3 k The Permittee shall not treat propulsive items at the Promontory Thermal Treatment Areas, unless the item has been rendered non-propulsive or is contained in accordance with Attachment 11 FV C 4 The Permittee shall operate the Promontory Thermal Treatment Areas to prevent unacceptable risk of cancer and non-cancer effects to on-site workers and off-site residents and to minimize significant effects to the ecosystem surrounding the Promontory Thermal Treatment Areas The Permittee shall maintain compliance with the environmental performance standards listed in UAC R315-8-16 and comply with Permit Condition II G 2 rv C 5 The Permittee shall adhere to the following conditions to prevent unacceptable risk of cancer and non-cancer effects due to exposure to emissions from the open buming operations rv C 5 a The cumulative carcinogenic risk to on-site workers shall not exceed an occurrence rate of 10X10"^ (one in ten thousand) for the closest potential receptors which are Promontory facility workers The risk shall be calculated according to the methodology in Condition IIG 2 a and II G 2 d The maximum NEW, including donors and initiators, to be treated at the Promontory Thermal Treatment Areas shall not exceed 106,500 pounds per bum at the M-136 Thermal Treatment Area and 4,500 pounds per bum at the M-225 Thermal Treatment Area, and Note The human health risk assessment is currently being conducted Specific restrictions on bum ground operations are pending and will be included in the second draft of the permit modification document There will be an additional public comment period for this document rvrv C 5 b The cumulative carcinogenic risk to actual or potential off-site receptors shall not exceed 1 OX 10 * (one in a million) The cumulative non-carcinogenic hazard to actual or potential off-site receptors shall not exceed a hazard index of 1 0 for any 24-hour period followmg initiation of a bum rv C 6 Based on the air dispersion and deposition modeling and the human health risk assessment for the Promontory Thermal Treatment Areas, the Permittee shall adhere to the following conditions Page 4 ATK Launch Systems Inc Promontory May 2010 Module IV - Thermal Treatment of Energetic Wastes UTD009081357 Note The human health risk assessment is currently being conducted Specific restrictions on bum ground operations are pending and will be included in the second draft of the permit modification document There will be an additional public comment period for this document rv C 6 a ATK shall nottfy Box Elder County Dispatch before each treatment operation involving reactive material, rv C 6 b The Permittee shall only conduct bums when the surface wind speed is not greater than 15 miles per hour, rv C 6 c The Permittee may conduct bums and open detonations between the hours of 10 00 am and 6 00 pm IVD WASTE TRACKING rv D 1 The Permittee shall track all reactive hazardous waste in accordance with Attachment 11 and maintain this information in the operating record for both of the Promontory Thermal Treatment Areas rVE PRE-BURN ACTIIVTIES rv E 1 Prior to bringing any reactive hazardous waste into either of the Promontory Thermal Treatment Areas for thermal treatment. The Permittee shall conduct pre-bum activities in accordance with the requirements identified in Attachment 11, and the pre-bum inspection requirements in accordance with the inspection schedule included in Attachment 2 The Permittee shall also comply with the following conditions rv E 1 a If the treatment units have not been inspected the same day the unit is loaded, the treatment unit shall be inspected prior to placing reactive waste in the treatment unit, rv E 1 b Any tteatment unit that fails one or more of the inspection cnteria shall be removed from service until the problem is corrected, rv E 1 c No treatment is permitted unless either radio or telephone communication with emergency services is available, rv E 1 d No treatment is permitted if the emergency equipment listed in Attachment 2, Table II-B, "Inspection Schedule for Thermal Treatment Area at M-136" or Table II-C, "Inspection Schedule for Thermal Treatment Areas at M-225" is not available for use at each respective location, rv E 1 e All leaks or spills of diesel fuel shall be cleaned up before the Promontory thermal treatment areas can be operated, and rv E 1 f The loss of the flashing light will require that the unit be shut down until the problem is corrected If the Permittee must use the treatment unit when the flashing light is not working, the supervisor shall visually inspect the area within the QD of the treatment unit and assure that no unauthorized employees are present in the area If any unauthorized employees are found within this area, they will be escorted from the area Treatment operations can commence once the supervisor verifies in the operating record that the area is clear Page 5 ATK Launch Systems Inc Promontory May 2010 Module IV - Thermal Treatment of Energetic Wastes UTD009081357 rVF PREPARING WASTE FOR THERMAL TREATMENT BURN rv F 1 Prior to placing any reactive hazardous waste in a treatment unit, the Permittee shall comply with all provisions Conditions rV C, D and E of this Permit The Permittee shall also comply with the following conditions rv F 1 a There shall be at least two operators present when a treatment unit is in the process of being loaded with reactive hazardous wastes as defined in Condition IV B 1, IV rv rv F 1 b The tteatment unit shall be loaded in accordance with internal safety procedures and the ATK Hazardous Operation Standard 1-3 Handling & Disposal of Explosives & Other Hazardous Wastes, an intemal and confidential document which is part of the operating record, and the provisions identified in Attachment 118, rvrv F 1 c All cardboard, wood and diesel used as donor material to assure a complete bum shall be counted towards the daily tteatment limits, and recorded in the operating record, rv F 1 d All reusable propellant buckets used as accumulation containers for reactive waste shall be inspected after use If there is any contamination in the containers they shall be cleaned or decontaminated in accordance with the procedures identified in Attachment 11 before being reused, rv F 1 e The Permittee shall document in the operating record the bum station for each container of reactive hazardous waste treated rv F 2 Prior to beginning the final preparations for an open bum, the Permittee shall comply with the following conditions rv F 2 a Reactive waste shall not be prepared for ignition, as described in Attachment 11 8 2 3, until all non-essential personnel leave the tteatment area, rv rv F 2 b All wiring and ignition operations, described in Attachment 11 8 2 3, shall be conducted by at least two employees, rv rv F 2 c The Permittee may reactivate the firing system treatment areas only after all operators have exited the QD for the treatment unit, rv F 2 d As the operators leave the tteatment area following operations described in Attachment 11, Section 8 2 3, they shall close the gate to the treatment area. rv F 2 e After all operators have exited the treatment area and retreated to the firing conttol room, the operators may replace the firing system interlock in the firing system conttol console and activate the firing system, rv F 2 f After activating the firing system, the operators shall confirm that the flashing red light was activated to alert all personnel that a treatment event is about to start and that they should vacate the QD area for the treatment area If the flashing light is not operational, the Permittee shall comply with Condition fV E 1 f before initiating the thermal treatment. Page 6 ATK Launch Systems Inc Promontory May 2010 Module IV -- Thermal Treatment of Energetic Wastes UTD009081357 rv F 2 g After the waming identified m Condition IV F 2 f has been completed, the Permittee shall conduct a pre-ignition continuity check of the firing system to assure that the igniters have been installed correctly into the hard-wired portion of the firing system If any firing circuit fails this test, the Permittee shall perform the following tasks rv F 2 g I Remove the interlock for the firing control system, deactivating the firing control system, rv F 2 g u At least two operators shall reenter the treatment area, and correct the problem, rv F 2 g HI If the resistance problem cannot be immediately corrected, the operators may connect a separate igniter wire to an adjacent stanchion, and rv F 2 g IV After the problem with the firing circuit has been corrected the operators shall repeat the steps described in Conditions rV F 2 g rv F 2 h The freatment units shall be fired in accordance with the provision of Attachment 11, Section 8 2 3 of this Permit, rv F 2 1 All thermal treatment events shall be observed with a video camera from the firing confrol room or immediately outside the firing confrol room, rv F 2 j In the event that none of the treatment units ignite, the operators shall wait 30 minutes before removing the firing system interlock and reentering the treatment area to correct the problem After correcting the problem, the operators shall repeat the steps described in Conditions fV F 2 c, d, e, f and g, and proceed with activating the firing system, rv F 2 k If at least one treatment unit ignites, then the operators shall wait at least 16- hours before reentermg the freatment area, and correctmg the problem After the problem has been corrected, the operators shall repeat the steps described in Conditions IV F 2 c, d, e, f and g, and proceed with activating the firing system, rv F 2 I Prior to ignition, the area supervisor or designee, shall review the placement of the waste on the treatment units, and rv F 2 m All freatment data shall be maintained in accordance with the requirements of UAC R315- 8-5 3 and shall be entered into the operating record for the Promontory facility in accordance with attachment 11 6 IV G POST-BURN ACTIIVTIES rv G 1 Following treatment, the Permittee shall conduct the post-bum inspection activities identified in Attachment 2, and clean up activities identified in Attachment 1 lof this Permit, and shall comply with Conditions fV C 1, 2 and 3, and shall have completed and complied with all provisions of Conditions, fV E and F rv G 2 The post-bum inspection shall be conducted within 24 hours of completing a treatment event, and perform the following unless one of the exceptions identified in fV G 2 j or k applies Page 7 ATK Launch Systems Inc Promontory May 2010 Module IV - Thermal Treatment of Energetic Wastes UTD009081357 rv G 2 a Prior to entering the treatment area, the operators shall deactivate the firing control system and remove the interlock, rv G 2 b Document any treatment unit with an open flame, hot spot or smoldering residue, rv G 2 c Document any treatment unit with unburned residue, rv G 2 d Document any treatment unit with unbumed reactive hazardous waste and identify if possible in the operating record why the waste did not bum, rv G 2 e Inspect for any unbumed waste that was ejected from a treatment unit during the last treatment event Such waste shall be picked up and placed in a tteatment unit, rv G 2 f Record on the inspection form the date that the treatment units were cleaned, or the reason why the units were not cleaned within 24 hours after completing the treatment event, rvrv G 2 g Identify the treatment unit where unbumed waste is being stored, rv G 2 h Evaluate the condition of the safety equipment identified m Attachment 2, Table II-B and Table II-C, rv G 2 I The Permittee may postpone post-bum activities if lightning sfrikes or adverse weather conditions prohibit the safe operation of the treatment areas Lightning strikes closer than 30 miles restrict attended operations at the Promontory Facility The Permittee shall document the reasons for the delay in the facility's operating record, and rv G 2 J The Permittee may delay the post-bum inspection for bums involving bulk propellant and bulk explosives that occurred on a Friday The post-bum inspection shall be conducted on the following Monday, unless the meteorological conditions identified in Condition rv G 2 J prohibit re-entry into the treatment area The Permittee shall document the reasons for the delay in the facility's operating record rv G 3 Within 24 hours of completing an open bum that generates a characteristic or listed ash or residue, the Permittee shall remove all characteristic or listed residues from the treatment area and mange the waste m accordance with R315-5 of the UAC If the Permittee can not remove these treated residues from the freatment area within 24 hours due to weather conditions, such as, snow or ice covering the treatment area, the Permittee shall document the followmg information in the operating record rv G 3 a The reason for the delay in doing the post-bum clean up, rvrv G 3 b The date when the freatment unit was cleaned, and rv G 3 c Except as delayed by the conditions described in Condition IV G 2 j, the area supervisor, or designee, shall review the Promontory Thermal Treatment Areas log and post-bum inspection forms within 24 hours of completing a thermal treatment event The review shall assure that all of the recorded information is correct and identify any items that may require corrective action including any treatment unit that failed to ignite, had an ignition problem or misfired, had an unplanned detonation, where the bum did not propagate as expected or any other unexpected event Page 8 ATK Launch Systems Inc Promontory May 2010 Module IV - Thermal Treatment of Energetic Wastes UTD009081357 rv G 4 Open bum operations at the Promontory Thermal Treatment Areas may result in the generation of untreated residue and unbumed wastes The Permittee shall manage these residues and wastes in accordance with the following provisions rv G 4 a Small amounts of unfreated residue shall be considered newly generated waste and shall be logged and tracked as such in the explosive waste tracking system This small amount is defined as less than 5% of the total volume placed treatment unit The primary option for managing this waste is to burn it by 6 00 pm of the following calendar day If the untreated residue cannot be treated by 6 00 pm of the following calendar day then it shall be managed in accordance with UAC R315-5, rv G 4 b Unbumed waste resulting from a misfire or an interrupted ignition shall be treated by 6 00 pm of the calendar day following the date of the first attempt to freat this waste For the purposes of this Permit, an intermpted ignition occurs when anything greater than 5% of the waste placed on in a freatment unit or in a station fails to ignite This unreacted waste shall not be considered a newly generated residue If the Permittee is unable treat the unbumed waste by 6 00 pm of the following calendar day, the Permitttee shall cover the waste and manage the treatment unit or station in accordance with UAC R315-5 If the cumulative storage time for the unbumed waste both while in storage prior to treatment and while on the treatment unit or in the bum station is greater than 90 days, the Permittee shall request an emergency storage permit in accordance with UAC R315-3-6 2, rv G 4 c For reactive hazardous wastes that have been in storage for greater than 90 days when they are placed on in a freatment unit or in a bum station and which do not completely bum, the Permittee shall freat all unbumed or unreacted waste by 6 00 pm of the calendar day following the date of the initial attempt to freat the waste If the Permittee is unable to treat the unbumed or unreacted waste by 6 00 pm of the following calendar day, then the Permittee shall request an emergency storage permit in accordance with UAC R315-3-6 2, and rv rvrv G 5 The Permittee shall manage all freatment residues generated from the freatment of listed and/or characteristic wastes during post-bum activities in accordance with this Permit and UAC R315-5 IV H STORMWATER MANAGEMENT AND RUN-ON AND RUN-OFF CONTROLS rv H 1 The Permittee shall manage all stormwater collected from treatment units in accordance with this Permit, Attachment 11, Sectton 11 and UAC R315-5 rv H 2 The Permittee shall maintain run-on diversion sfructures in accordance with this Permit and UAC R315-8-16 which incorporates by reference 40 CFR 264 601 The Permittee shall inspect the condition of those stmctures annually to assure that they are in good repair The annual inspection shall be documented in the operating record for Promontory Thermal Treatment Areas rv H 3 Run-off from precipitation that falls within the operating area of the Promontory Thermal Treatment Areas shall be managed in accordance with UAC R315-8-16, which incorporates by reference 40 CFR 264 601, using berms, and ground slope rv H 4 The Permitee will submit a proposal for managing run-off precipitation within 180 days from the issue date of this permit Page 9 ATK Launch Systems Inc Promontory May 2010 Module IV - Thermal Treatment of Energetic Wastes UTD009081357 IVI TREATMENT RESIDUE AND ASH MANAGEMENT rv n AU treatment residue and ash generated from the Promontory Thennal Treatment operations shall be managed in accordance with Condition fV G 5 and the procedures identified in Attachment 11 rv I 2 Sampling and analysis of treatment residues and ash generated during operations at the thermal treatment areas shall be performed in accordance with Attachment 1 and 11 IVJ INSPECTION SCHEDULES AND PROCEDURES rv J 1 The Permittee shall conduct inspections of the Promontory Thermal Treatment areas in accordance with Attachment 2 and 11 IV K ENIVRONMENTAL MONITORING REGUIREMENTS rv K 1 Withm 180 days of issuance of this Permit or completion of the Human Health Risk Assessment, whichever occurs later, the Permittee shall submit a Soil Monitoring Plan to the Executtve Secretary for approval The Soil Monitoring Plan shall, at a minimum, address the following rv K 1 a The impact of thermal treatment operations on soils within the tteatment zone as identified by the air dispersion and deposition model contained in the human health risk assessment identified in Condition ir G 1 , rv K 1 b Risks to human health from exposure to media impacted by emissions from the Promontory Thermal Treatment Areas operations shall be assessed Acceptable risks are specified m Conditions fV C 5 a and IV C 5 b rV The receptors to be evaluated are listed m the Human Health Risk Assessment identified in Condition II G 1 The risk assessment methodology shall be consistent with UAC R315-101, and rv K 1 c The plan shall identify analytes, sampling protocols and data quality objecttves for the soil monitoring program rv K 2 If the Executive Secretary does not approve the Soil Monitoring Plan, he shall provide written comments to the Permittee identifying the deficiencies in Soil Monitoring Plan The Permittee shall address the comments and submit a revised Soil Monitoring Plan to the Executive Secretary for approval within 60 days of receipt of written comments rv K 3 Within 30 days of receipt of the Executive Secretary's approval of the Soil Monitoring Plan, the Permittee shall submit a request to modify the Permit in accordance with Condition 1 D to incorporate the requirements of the Soil Monitoring Plan into this Permit rv K 4 Within 180 days of the issuance of this Permit, the Permittee shall submit a Groundwater Monitoring Plan to the Executive Secretary for approval The Groundwater Monitoring Plan shall, at a minimum, address the following rv K 4 a The impact of thermal treatment operations on groundwater up and down gradient of the M-136 and M-225 Thermal Treatment Areas, and Page 10 ATK Launch Systems Inc Promontory May 2010 Module IV - Thermal Treatment of Energetic Wastes UTD009081357 rv K 4 b The plan shall identify analytes, sampling protocols and data quality objectives for the groundwater monitoring program In addition, the plan shall propose a statistical method for determining if existing groundwater contamination concenfrations increase due to ongoing thermal freatment operations Page 11 ATK Launch Systems Inc Promontory May 2010 Module IV-Thermal Treatment of Energetic Wastes UTD009081357 IVL ECOLOGICAL RISK rv L 1 Within 180 days of issuance of this Permit or completion of the human health risk assessment, which ever occurs later, the Permittee shall submit an Ecological Risk Assessment Protocol document for evaluating thermal treatment operations to the Executive Secretary for approval If the Executive Secretary is unable to approve the Ecological Risk Assessment Protocol document, he shall provide written comments to the Permittee identifying the deficiencies in Ecological Risk Assessment Protocol document The Pennittee shall address the comments and submit a revised Ecological Risk Assessment Protocol document to the Executive Secretary for approval within 60 days of receipt of written comments rv L 2 Within one year of receiving approval of the Ecological Risk Assessment Protocol document, the Permittee shall submit an Ecological Risk Assessment for evaluating thermal treatment operations to the Executive Secretary for approval If the Executive Secretary is unable to approve the Ecological Risk Assessment, he shall provide written comments to the Permittee identifying the deficiencies in Ecological Risk Assessment The Permittee shall address the comments and submit a revised Ecological Risk Assessment to the Executive Secretary for approval within 60 days of receipt of wntten comments rv L 3 Withm 30 days of receiving approval of the Ecological Risk Assessment, the Permittee shall submit a request to modify Condition IIG of this Permit in accordance with Condition 1 D to add performance standards for the acceptable ecological risk associated with the operation of both of the Promontory Thermal Treatment areas rVM ACUTE HUMAN HEALTH RISK Note The human health risk assessment is currently being conducted The acute human health risk will be evaluated Specific restrictions on bum ground operations are pending and will be included in the second draft of the permit modification document There will be an additional public comment period for this document IV N FACILITY MODIFICATION/EXPANSION rv N 1 Modification of the design plans and specifications in Attachment 6 or construction of additional treatment units shall be allowed only in accordance with UAC R315-4-1 5 FVO CLOSURE AND POST CLOSURE rv O 1 The Permittee shall close the Promontory Thermal Treatment Areas m accordance with the Closure Plan in Attachment 5 IV P PROMONTORY THERMAL TREATMENT AREAS OPERATING RECORD rv P 1 The Permittee shall maintain an operating record at the Promontory facility that describes the operation of the Thermal Treatment areas The operating records for the M-136 and M-225 Thermal Treatment Areas shall, at a minimum, include the following mformation rv P 1 a All information required by UAC R315-8-5 3, rv P 1 b Copies of all mspections required by this module, rv P 1 c All waste tracking information maintained in the electronic Waste Tracking Record identified in Attachment 11 Page 12 ATK Launch Systems Inc Promontory May 2010 Module IV - Thermal Treatment of Energetic Wastes UTD009081357 rvrv P 1 d A description of the meteorological conditions described in Condition IV C 3 e during each bum, rv P 1 e Copies of all reports identified in Condition II G 1 and required by Condition 11 G 2 and rv K and rv L, and rv P 1 f A running total of the type and quantity of reactive hazardous waste that has been treated at both of the Promontory Thermal Treatment areas during the calendar year Page 13 ATK Launch Systems Inc - Promontory May 2010 Attachment 2 - Inspection Schedules and Procedures UTD009081357 ATTACHMENT 2 INSPECTION SCHEDULES AND PROCEDURE ATK Launch Systems Inc - Promontory May 2010 Attachment 2 - Inspection Schedules and Procedures UTD009081357 INSPECTION SCHEDULES AND PRQCEDURES IIA Purpose and Scope The inspection schedule used by ATK for the hazardous waste management areas has been designed to meet the requirements of R315-8 2 6 The design ofthe schedule promotes the detection of malfunctions, deterioration, discharges, and other Situations which may be causing or leading to a release of hazardous waste constituents into the environment or pose a threat to human health Inspections are conducted by personnel trained to identify potential problem areas and to use the inspection schedule and the inspection log Eight areas are designated for inspection the container storage area at E-501, M-705S, M-186, the Thermal Treatment Areas at M-136 (mcluding the LTTAs, bum trays and Bum Station 14), M-225, T-29B hydrazine dilution and the solid propellant/motor storage buildings, M-47, M-603 and storage pad S-633 Waste solid propellant and rocket motors are stored at buildings M-47, M-603, and storage pad S-633 only occasionally and waste hydrazine is treated (by dilution) at building T-29B periodically Therefore inspections of these facilities, m accordance with their inspection schedules, are only required when hazardous waste is bemg stored or treated at the facility A facility must be inspected, however, prior to receiving hazardous waste for storage or treatment if inspections were discontinued during the period of inactivity If any problems are identified with the areas of concem that are listed in the inspection schedules (contained in this attachment), they must be corrected before the facility is put back into use II B Remedial Action or Mamtenance Repairs or corrective action for any deterioration or malfunction discovered by an inspection shall be conducted as outlined in Module II, Section F Repairs to security equipment shall be completed as soon as practicable, but not later than 72 hours after the problem is discovered As stated in R315-8-2 6(c), where a hazard is imminent or has already occurred, remedial action shall be taken immediately II C Inspection Records All records of inspections and remedial actions shall be retained in the Operating Record, for a period of at least three years At a minimum, inspection records shall include the date and time of the inspection, the name of the inspector, a notation of the observations made, and the date and nature of any repairs or maintenance taken ATK Launch Systems Inc - Promontory Attachment 2 - Inspection Schedules and Procedures IID May 2010 UTD009081357 Inspection Schedules The inspection schedules appear in detail in Tables II-A through II-F Each inspection schedule is designed so that the items appearing on the schedule are inspected frequently enough to avoid any deterioration of equipment and thus reduce the probability of an environmental or human health incident between inspection times Each mspection schedule is divided into individual categories and each category contains a specific list of items to be inspected Inspections are also required within 24 hours after a storm event as outlined in the schedules below A storm event is defined as precipitation in excess of 1 0 mch in a one- hour period It shall be documented in the inspection log that the mspection was conducted in response to a storm event TABLE II-A ^ INSPECTION SCHEDULE FOR DRUM STORAGE AT JVl-186 EOUIPMENT MINIMUM FREOUENCY AREAS OF CONCERN I Security Equipment Fences Weekly Visually inspect all fence lines and look for broken or downed fence lines, loose wires Signs Gates Weekly Weekly Readable signs, signs in place Able to properly close gate, safety flags in place Lock Weekly In working order, able to lock 2 Area Roadway Daily' Inspect road for spills, soil discoloration Loading/ Daily Unloading Areas Periphery Daily' Inspect loading areas for spills, soil discoloration Inspect groimds for any spills, soil discoloration or stressed vegetation ATK Launch Systems Inc - Promontory Attachment 2 - Inspection Schedules and Procedures 3 Safety Equipment Eyewash/Shower Monthly May 2010 UTD00908I357 Ensure in working order by testing, check water supply Telephone/Radio Monthly 4 Storage Containment Containers Weekly Pads Weekly^ Sumps/Pads Daily' Drainage Area Weekly^ Roof Weekly 5 Emergency Equipment Fire Monthly Extinguisher Absorbent Monthly Repack Dmms Monthly 55-Gallon dmms Monthly Generator Monthly Pump Monthly Working condition Number of contamers, severe corrosion (i e , flaking, large rust buildup, msty bungs), dented drums, hazardous waste labels in place, properly marked, readable, open bungs, no standing liquid on dmms, adequate aisle space (2 5 feet) Chips, cracks,or irregularities in concrete, general condition Standing liquid on pad or in sumps Spills, discolored soil General condition including holes or defects Fire extinguisher full, in working order Adequate supply (minimum 25 lbs) Two repack dmms with seals Six empty 55-gallon drums with btmgs in good condition, no dents, etc Routme oil check, fill with gas, test startup Good working order, hoses intact, test startup and pump ATK Launch Systems Inc - Promontory Attachment 2 - Inspection Schedules and Procedures ' When m use May 2010 UTD009081357 And after each storm event A storm event is defined as more than one inch of precipitation in a one-hour period TABLE II-B INSPECTION SCHEDULE FOR BURNING GROUNDS AT lVI-136 EQUIPMENT 1 Security Equipment Fences Signs Gates Lock 2 Area Roadway Loading/ Unloading Areas Periphery 3 Safety Equipment MINIMUM FREOUENCY Weekly Weekly Weekfy Weekly Daily' Daily' Daily' AREAS OF CONCERN Visually inspect all fence lines, look for loose wires or broken lines Readable signs, signs in place Able to properly close gate In working order, able to lock Spills, discolored soil Spills, discolored soil Spills, discolored soil, stressed vegetation Telephone/Radio Monthly 4 Bum Ground Area Erosion Weekly^ Check operating condition of equipment Survey area and note severe erosion on grounds ATK Launch Systems Inc - Promontory Attachment 2 - Inspection Schedules and Procedures 5 Storage/Containment May 2010 UTD009081357 Burn tray Fire Extinguisher Weekly .2 3 Container Weekly^ 6 Emergency Equipment Monthly Tray is intact and liquid tight, accumulation of liquids Closed, labeled, signs of leaks or spills Fire extinguisher full and in working order 1 When in use 2 Inspect upon arrival, then each calendar week 3 And after each storm event A storm event is defined as more than one mch of precipitation in a one-hour period TABLE II-C INSPECTION SCHEDULE FOR BURNING GROUNDS AT lVI-225 EOUIPMENT 1 Security Equipment Fences Signs Gates Lock 2 Area Roadway MINIMUM FREOUENCY Weekly Weekly Weekly Weekly Daily' Loading/Unloading Daily Areas AREAS OF CONCERN Visually inspect all fence lines, look for loose wires or broken lines Readable signs, signs in place Able to properly close gate In working order, able to lock Spills, discolored soil Spills, discolored soil ATK Launch Systems Inc - Promontory Attachment 2 - Inspection Schedules and Procedures Periphery Daily' 3 Safety Equipment Telephone/Radio Monthly May 2010 UTD009081357 Spills, discolored soil, stressed vegetation Check operating condition of equipment 4 Bum Ground Area Erosion Weekly^ Bum Tray Weekly^ 5 Emergency Equipment Fire Extinguisher Monthly Survey area and note severe erosion on grounds Tray is intact and liquid tight, accumulation of liquids Fire extinguisher fiill and in working order When in use ^ And after each storm event A storm event is defined as more than one inch of precipitation in a one-hour period TABLE II-D INSPECTION SCHEDULE FOR STORAGE AND CONSOLIDATION ROOIM AT 1VI-705S EOUIPMENT 1 Security Equipment Signs ME^IMUM FREOUENCY Weekly AREAS OF CONCERN Readable signs, signs in place 2 Area Roadway Daify' Spills, discolored soil ATK Launch Systems Inc - Promontory Attachment 2 - Inspection Schedules and Procedures Loading/Unloading Daily' Areas May 2010 UTD009081357 Periphery Daily' 3 Safety Equipment Eyewash/Shower Monthly Telephone/Radio Monthly 4 Storage contamment Containers Weekly Pads, Sumps Weekly Portable Secondary Daily Roof Weekly Sump, pads Daily' 5 Emergency Equipment Fire Extinguisher Monthly Absorbents Monthly Repack Dmms Monthly Spills, discolored soil Spills, discolored soil, stressed vegetation Ensure in working order by testing, check water supply Check operating condition of equipment Number of containers, severe corrosion (i e flaking, large mst buildup, msty bungs), dented drums, hazardous waste labels in place, properly marked, readable, no open bungs, no standing liquid on the drums Chips, cracks, or irregularities in the concrete, general conditions Cracks, liquid, containment integrity General condition including holes or defects Check for standing liquids in the sump and containment system Fire extinguisher fiill and in working order Adequate supply (minimum 25 lbs ) Two repack drums with seals 55-Gallon Dmms Monthly Six empty 55-gallon drums with bimgs in good condition, no dents, etc ATK Launch Systems Inc - Promontory Attachment 2 - Inspection Schedules and Procedures ' When m use May 2010 UTD009081357 TABLE II-E INSPECTION SCHEDULE FOR lVI-47, lVI-603 (Note As stated in section II A of this Attachment, inspections of these storage buildings are not required during periods when hazardous waste is not being stored at the facility) EQUIPMENT 1 Security Equipment Signs Bay Doors Lock 2 Area Roadway MINIMUM FREOUENCY Weekly Weekly Weekly Daify' Loading/Unloading Areas Daily Periphery Daily' 3 Communications Equipment Telephone Monthly 4 Storage Containers Motors/bags, etc Weekly AREAS OF CONCERN Readable signs, signs in place Function properly Function properly Inspect road for spills, soil discoloration Inspect loading areas for spills, soil discoloration Inspect grounds for any spills, soil discoloration or stressed vegetation Working condition, place call to verify operation Verify condition of motors/bags, properly marked and labeled, out of place matenal and check for leakage, or liquid discharge from waste solid rocket motors and propellant ATK Launch Systems Inc - Promontory Attachment 2 - Inspection Schedules and Procedures Building Weekly May 2010 UTD009081357 Verify no damage done to exterior of facility Roof 5 Emergency Equipment Fire Extinguisher Weekly Monthly General condition including holes or defects In working order and full ' When hazardous waste is transported to and from the building TABLE H-F INSPECTION SCHEDULE FOR DRUM STORAGE PAD AT E-501 EOUIPMENT 1 Security Equipment Fences Signs Gates Lock 2 Area Roadway MINIMUM FREOUENCY Weekly Weekly Weekly Weekly Daify' AREAS OF CONCERN Visually inspect all fence lines and look for broken or downed fence lines, loose wires Readable signs, signs in place Able to properly close gate, safety flags in place In working order, able to lock Inspect road for spills, soil discoloration Loading/ Daily Unloading Areas Periphery Daily' Inspect loading areas for spills, soil discoloration Inspect grounds for any spills, soil discoloration or stressed vegetation ATK Launch Systems Inc - Promontory Attachment 2 - Inspection Schedules and Procedures May 2010 UTD00908I357 3 Safety Equipment Eyewash/Shower Monthly Ensure m working order by testing, check water supply Telephone/Radio Monthly 4 Storage Containment Containers Weekly Pads Weekly Sumps/Pads Daily' Drainage Area Weekly^ Roof Weekly 5 Emergency Equipment Fire Monthly Extinguisher Absorbent Monthly Repack Dmms Monthly Working condition Number of containers, severe corrosion (i e , flaking, large mst buildup, msty bungs), dented drums, hazardous waste labels in place, properly marked, readable, open bungs, no standing liquid on drums, adequate aisle space (2 5 feet) Chips, cracks,or irregularities in concrete, general condition Standing liquid on pad or in sumps Spills, discolored soil General condition including holes or defects Fire extinguisher fiill, in working order Adequate supply (minimum 25 lbs) One repack drum with seals 55-Gallon dmms Monthly Three empty 55-gallon dmms with bungs in good condition, no dents, etc When in use ATK Launch Systems Inc - Promontory May 2010 Attachment 2 - Inspection Schedules and Procedures UTD00908I357 ^ And after each storm event A storm event is defined as more than one inch of precipitation in a one-hour period TABLE II-G INSPECTION SCHEDULE FOR T-29B Hydrazine Dilution Bay (Note As stated in section II A of this Attachment, inspections of building T-29B are not required during periods when hazardous waste is not being treated at the facility) EOUIPMENT 1 Security Equipment Signs Door Locked 2 Area Roadway Loading/ Unloading Areas Periphery 3 Safety Equipment Eyewash/Shower Telephone(cell) 4 Storage Containment Containers MINIMUM FREOUENCY AREAS OF CONCERN Pnor to treatment Readable signs, signs in place Prior to treatment In working order, locked Daily' Daily' Daily' Prior to treatment Inspect road for spills, soil discoloration Inspect loading areas for spills, soil discoloration Inspect grounds for any spills, soil discoloration or stressed vegetation Ensure in working order by testing, check water supply Prior to treatment Working condition Prior to treatment Number of containers, severe corrosion (i e , flaking, large mst buildup, msty bungs), dented drums, hazardous waste labels in place, properly marked, readable, open bimgs, no standing liquid on dmms ATK Launch Systems hic - Promontory Attachment 2 - hispection Schedules and Procedures May 2010 UTD009081357 Floor Prior to treatment Chips, cracks,or irregularities in concrete, general condition Roof Prior to treatment 5 Emergency Equipment Prior to treatment General condition includmg holes or defects Fire Extinguisher Absorbent Fire extinguisher full, m working order Prior to treatment Adequate supply (minimum 25 lbs) ' When hazardous waste is ttansported from the building TABLE II-H INSPECTION SCHEDULE FOR STORAGE PAD S-633 (Note As stated in section IIA of this Attachment, inspections of this storage pad IS not required during periods when hazardous waste is not being stored on the pad) EOUIPMENT 1 Security Equipment MINIMUM FREOUENCY AREAS OF CONCERN Fences Weekly Visually inspect all fence lines, look for loose wires or broken lines Signs Weekly Readable signs, signs in place Gate Weekly Able to properly close gate Lock Weekly In working order, able to lock 2 Area ATK Launch Systems Inc - Promontory Attachment 2 - Inspection Schedules and Procedures Roadway Daily' Loading/Unloading Daily' Areas May 2010 UTD009081357 Periphery Erosion Daily' Weekly^ 3 Storage Containers Motors/containers, etc Weekly^ Spills, discolored soil Spills, discolored soil Spills, discolored soil, stressed vegetation Survey area and note severe erosion on or around storage pad Verify condition of motors/containers, properly marked and labeled, out of place matenal and check for leakage, or liquid discharge from waste solid rocket motors and propellant When hazardous waste is transported to and from the storage pad ^ And after each storm event A storm event is defined as more than one inch of precipitation in a one-hour period ^Inspect upon arrival, then each calendar week HAZARDOUS WASTE MANAGEMENT Contingency Plan and Emergency Procedures For Spills of Hazardous Materials May 2010 ATK Launch Systems Promontory Plant P.O. Box 689 Brigham City UT 84302-0689 (435) 863-8545 ATK Launch Systems - Promontory May 2010Attachment 4 - Contingency Plan PREFACE This document, HAZARDOUS WASTE MANAGEMENT CONTINGENCY PLAN AND EMERGENCY PROCEDURES FOR SPILLS OF HAZARDOUS MATERIALS, (herein referred to as Contingency Plan), provides written instructions on how to take care of spills of hazardous substances It is mtended to meet the requirements of the Utah Hazardous Waste Rules and Subpart D of the EPA Resource Conservation and Recovery Act This CONTINGENCY PLAN does not replace, nor is it to be used mstead of, the ATK Launch Systems - Promontory EMERGENCY AND DISASTER RESPONSE PLAN, or any other plan which outlines procedures to be followed durmg general emergencies, disasters, civil disturbances, nots bomb threats, etc Most spills mvolving hazardous substances will not require use of the EMERGENCY AND DISASTER RESPONSE PLAN Spills that create an emergency situation mvolving possible mjury to personnel or damage to property will require use ofthe EMERGENCY AND DISASTER RESPONSE PLAN to take care ofthe emergency This CONXrNGENCY PLAN applies to containment and cleanup of a hazardous waste spill Defmitions m the HAZARDOUS WASTE MANAGEMENT CONTINGENCY PLAN AND EMERGENCY PROCEDURES reflect EPA and State of Utah environmental language while those m the EMERGENCY AND DISASTER RESPONSE PLAN reflect OSHA, UOSH, FEMA, and ATK Launch Systems language The user must be careful not to be confused by differences m language between these documents and must evaluate the applicability of each document to the particular situation ATK Launch Systems - Promontory May 2010Attachment 4 - Contingency Plan TABLE OF CONTENTS INTRODUCTION A PURPOSE B SCOPE C NOTIFICATION D POSTING E REVISIONS AND UPDATING F DEFINITIONS G PLANT LOCATIONS AND SITE INFORMATION H PREVENTION OF RECURRENCE OR SPREAD OF FIRES, EXPLOSIONS, OR RELEASES II REPORTING PROCEDURES AND rNCIDENT IDENTIFICATION A EVACUATION CRITERIA B IDENTIFICATION OF A HAZARDOUS WASTE IN A SPILL C REPORTING OF EMERGENCY INCIDENTS D PERSONNEL RESPONSIBILITIES E ALARM SYSTEMS F LOCAL LAW-ENFORCEMENT AGENCIES, FIRE DEPARTMENTS, AND HOSPITALS 7 7 7 8 8 19 15 III SPILL CONTAINMENT AND CLEANUP 16 A CONTROL PROCEDURES 16 B SPILL CONTAINMENT AND CONTROL 16 C SPILL CLEANUP 16 D FOLLOWUP PROCEDURES 17 E INCOMPATIBLE WASTE 18 F CLEANUP MATERLVL AND EQUIPMENT 18 G DECONTAMINATION EQUIPMENT AND PROCEDURES 20 H EQUIPMENT DECONTAMINATION AND REPLENISHMENT 20 IV INSTALLATION RESPONSE TEAM TRAINING A TRAINING B SIMULATION 21 21 22 TRAINING PLAN 22 A SCOPE AND PURPOSE OF THE CONTINGENCY PLAN 22 B REVIEW OF LEGAL REQUIREMENTS 22 C LOCAL ATK CORPORATION REQUIREMENTS 22 D CUSTOMER REQUIREMENTS 22 E REVIEW AUTHORITY AND FUNCTION OF EACH RESPONSE TEAM MEMBER 22 F EMERGENCY COMMUNICATION SYSTEM 22 G FIRE PLANS/FIRE DRJLL 22 H BOMB SEARCH TECHNIQUES 22 I FIRE BARRICADE/CORDON AREAS 23 J EMERGENCY IVIEDICAL TREATMENT 23 K SECURITY OF SITE 23 L INVESTIGATION 23 M PUBLIC RELEASE OF INFORMATION 23 N FACT-FINDING METHODS 23 O SAFING THE AREA 24 P CONTROL OF THE CURIOUS 24 ATK Launch Systems - Promontory May 2010Attachment 4 - Contmgency Plan Q R S HANDLING OF REMAINS NOTIFICATION PROCEDURES RESCUE EFFORTS 24 24 24 TABLES TABLE I COMPATIBILITY INFORMATION TABLE II EMERGENCY COORDINATOR CALL LIST 25 26 FIGURES FIGURE 1 DECONTAMINATION/SPILL SCENE FIGURE 2 DECONTAMINATION 27 28 APPENDIX I NORTH PLANT SITE MAP 30 SOUTH PLANT SITE MAP 31 TEST AREA SITE MAP 32 PLANT 3 SITE MAP 33 M 136 BURNING GROUNDS FACILITY FUNCTION TABLE 34 M 186 HAZARDOUS WASTE AREA FACILITY FUNCTION TABLE M-136 SITE MAP AND EVACUATION PLAN M-186 SITE MAP AND EVACUATION PLAN E-501 STORAGE YARD FACILITY FUNCTION TABLE E 501 SITE MAP AND EVACUATION PLAN M-225 BURNING GROUNDS FACILITY FUNCTION TABLE M-225 SITE MAP AND EVACUATION PLAN 34 35 36 37 38 39 40 T 29B SATELLITE ACCUMULATION AREA FUNCTION TABLE T-29B SITE MAP AND EVACUATION PLAN 41 42 M-705 WASTEWATER TREATMENT FACILITY FUNCTION TABLE M 705 HAZARDOUS WASTE CONSOLIDATION ROOM M-705 SITE MAP AND EVACUATION PLAN 43 43 44 M-47 PROPELLANT STORAGE FUNCTION TABLE M-47 SITE MAP AND EVACUATION PLAN 45 46 M-603 PROPELLANT STORAGE FUNCTION TABLE M-603 SITE MAP AND EVACUATION PLAN 47 48 ATK Launch Systems - Promontory May 2010Attachment 4 - Contmgency Plan APPENDIX II A BULK FLAMMABLE LIQUID STORAGE AREAS 50 B PRACTICAL CONSEQUENCES OF A CATASTROPHIC FAILURE 51 APPENDIX III ARRANGEMENTS WITH LOCAL AUTHORITIES 52 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contmgency Plan I INTRODUCTION A PURPOSE This plan may be activated by requestmg emergency response on phone number 2222 or 911 The purpose of this Contmgency Plan and Emergency Procedures is to set forth responsibilities, establish organizational structure, and outlme the procedures requu-ed to ensure effective wammg, response, and control to mmmuze hazards to human health or the environment from fires explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to au-, soil, or surface water B SCOPE This organizational plan is mtended to meet requirements of the Utah Hazardous Waste Management Rules and Subpart D of the Resource Conservation and Recovery Act The provisions of this plan will be carried out immediately whenever there is a fire, explosion, or release of hazardous waste or hazardous waste constituents at one of the permitted facility that could threaten human health or the environment This plan specifically addresses company actions to be mitiated m the event of a spill or release of hazardous materials C NOTIFICATION Incidents covered by this contmgency plan and which meet applicable State of Utah and U S EPA reportmg requirements will be reported to the appropriate agencies by Envu-onmental Specialists The Envu-onmental Specialist should confer with the Director or Manager of Environmental Services pnor to notification D POSTING Copies of the Contmgency Plan and all revisions must be 1 Mamtamed at the facility and the Fire Department's Spill Response vehicle 2 Submitted to all local police departments, fire departments, hospitals, and State and local emergency response teams that may be called upon to provide emergency services (Arrangements have been made between ATK Launch Systems - Promontory and the hospitals located at Brigham City and Tremonton regardmg emergency services that would be provided as requu-ed Letters of agreement are kept m the Environmental Services Central Files ) E REVISIONS AND UPDATING This contmgency plan will be reviewed and amended whenever 1 Applicable regulations are revised 2 The plan fails m an emergency 3 The facility changes its design, construction, operations, mamtenance or other circumstances m a way that materially mcreases the potential for fires, explosions, or release of hazardous waste or hazardous waste constituents, or changes the response necessary m an emergency ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan 4 The list of emergency coordinators change 5 The list of emergency equipment changes F DEFINITIONS 1 Disaster An event m which loss of life, senous and/or multiple mjuries, major property or environmental damage, or major disruption of normal operations has occurred This mcludes serious fu-es or major hazardous material spills, explosions, mjuries to multiple people, and acts of nature such as floods, violent storms, or earthquakes 2 Discharge - The accidental or mtentional spillmg (see Spill), leakmg, pumpmg pourmg, emittmg, emptymg, or dumpmg of hazardous waste on or mto the air, land, or water 3 Emergency - A simanon which, if not quickly controlled, can lead to death, serious and/or multiple mjuries, major loss or damage to property, significant damage to the environment or disruption of normal operations 4 Emergency Command Unit The group of personnel selected by the emergency commander to assist m the full scope admmistration of the emergency 5 Emergency Commander - The General Manager or his designee, as head of the Command Unit, is responsible for the overall direction, coordmation, and function of all units charged with providmg countermeasures to cope with conditions and/or events withm the scope of this plan The Command Unit will consist of any and all persons selected by the Emergency Commander NOTE The Emergency Commander -will be the head of the Command Unit for all civil disturbances bomb threats national emergencies and natural disasters The Command Unrt will operate from a pre-designated Emergency Operations Center specified by the Emergency Disaster Response Plan or the Emergency Commander 6 Emergency Operations Center (EOC) The location of senior management where decisions and mcident specific policies are made 7 Environmental Specialist - The Envu-onmental Specialist is the Spill Team Leader from Environmental Services He or his designated alternate will assist the Incident Commander m the evaluation of the impact on the environment resultmg from any emergency, disaster, or hazardous substance discharge NOTE When required notification of Federal State and/or local environmental agencies shall be through the Environmental Specialist Company policy requires that the event be discussed •with the Vice President of the applicable division and A TK Corporate Environmental 8 Fire Brigade - A group of employees, generally from mamtenance, who have received HAZWOPER trammg and are called on as needed to assist the full-time fu-e department m emergency response ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan 9 Fire Warden A designated mdividual assigned in advance to assist the fire department m evacuation procedures and give mformation on the buildmg and surroundmg area 10 Hazardous Waste - Identified m 40 CFR 261 and m Utah Hazardous Waste Management Rules, Section 2 1 on the basis of specific listed material and general characteristics Specific listed wastes are found m these documents The EPA regulations provide detailed technical specifications of four characteristics Ignitable (DOOl)- Corrosive (D002) • Reactive (D003) An ignitable compressed gas, an oxidizer a liquid havmg a flashpomt < 140^F or a non-1 iquid capable of causmg fire, under standard temperature and pressure through friction, absorption moisture, or spontaneous chemical changes A solid waste that (1) is aqueous and has a pH < 2 or > 12 5, or (2) is a liquid and has a corrosion rate > 0 25 mches/year on steel A solid waste that a Is unstable and readily undergoes violent change without detonatmg b Reacts violently with water c Forms potentially explosive mixtures with water d Generates toxic gases, vapors or fumes in a quantity sufficient to present a danger to human health or the environment when mixed with water e Is a cyanide or sulfide bearmg waste which can generate toxic gases, vapors, or fiimes in a quantity sufficient to present a danger to human health or the environment when exposed to pH conditions between 2 and 125 TCLP Toxicity (as determmed by Toxicity Characteristic Leachate Procedures) - Presence of certam listed toxic matenals at levels greater than those specified in the regulation 11 Hazardous Communication Web (Haz Com Web) - a computer based system which contams a scanned unage of the MSDS, plus additional safety and disposal information 12 Hazardous Waste Profile Data (HWPD) Sheet An ATK document that lists all EPA, DOT, and chemical mformation needed for markmg, labelmg, and identifymg waste streams on plant 13 Hazardous Waste Operations and Emergency Response (HAZWOPER) Refers to specific trammg requirement for handling hazardous materials and for emergency operations These requirements are foimd m 29 CFR 1910 120 14 Human Resource Coordination - An intermediate between management and personnel who deals with employee concems and mterests 15 Incident Commander/Emergency Coordinator - The Incident Commander will be the on duty Assistant Fire Chieflncident Commander The Incident Commander will direct the activities of all Field Units from a designated control 3 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan pomt at the scene of the emergency disaster, or other event The Security Manager will be the Incident Commander for countermeasures m situations caused by hostile persons The Fire Prevention Captam will act as Incident Commander until relieved by an Assistant Fire Chief The followmg items are identified as prmciples for the Emergency Commander and Incident Commander to apply to the unique circumstances of the emergency or disaster a Assist the mjured b Stabilize situation and site c Assure evidence is not destroyed, lost, or moved d Record situation through text photographs, videos, and/or mappmg e Notify State and local officials f Secure and admit only qualified essential personnel to the site g Debrief participants 16 Matenal Safety Data Sheet (MSDS) - Provides mformation on safe handlmg, proper PPE, and disposal mformation for each chemical This document is prepared by the chemical manufacture For additional mformation contact your local Indusfrial Hygiene representative 17 Non-sudden Release - The accidental dischargmg (see Discharge), spillmg leakmg, pumpmg, pourmg, emittmg, empfymg, or dumpmg of hazardous wastes or materials which, when spilled become hazardous wastes, mto or on any land or water over an extended penod of time This also mcludes spills onto asphalt or concrete pads 18 Reportable Spill (Discharge) - A hazardous waste spill which must be reported to the Utah Department of Envu-onmental Response and Remediation, National Response Center and/or other applicable Federal, State or local authorrties The Utah Hazardous Waste Management Rules list reportable spill quantities as a One kilogram (2 2 lb) of material m accordance with R315-9-1 (b)( 1) A spill of a lesser quantity must be reported if there is a potential threat to human health or the envu-onment b One-hundred kilograms (220 lb) of hazardous waste or material which when spilled, becomes hazardous waste, m accordance with R315-9-1 (b)(2) A spill of a lesser quantity must be reported if there is a potential threat to human health or the envu-onment c Subpart J of 40 CFR Part 265 of the Resource Conservation and Recovery Act stipulates that a spill of 1 lb from a leakmg hazardous waste sump is a reportable quantity NOTE For complete descriptions and listings contact Environmental Services or refer to R315-9 of the Utah Hazardous Waste Management Rules ATK Launch Systems - Promontory May 201 OAttachment 4 - Conttngency Plan The followmg is a partial list of matenals used at ATK and the quantities which, if spilled, would require State or Federal notification EPA Utah Material Quantity Quantitv Acetone 5000 lbs 220 lbs Methanol 5000 lbs 220 lbs Methylchloroform 1000 lbs 220 lbs Methylene Chlonde 1000 lbs 220 lbs Methyl Ethyl Ketone 5000 lbs 220 lbs Methyl Isobutyl Ketone 5000 lbs 220 lbs Nitt-oglycerm 10 lbs 2 2 lbs Propellants, reactive materials (HMX) oxidizers (AP) 100 lbs 220 lbs Sodium Azide 1000 lbs 2 2 lbs Toluene 1000 lbs 220 lbs Xylene 100 lbs 220 lbs A more complete list of reportable quantities is found m GM 3 1, Table IX 19 Solid Waste - Any discarded matenal that is a solid, liquid, semi solid or contamed gaseous material resultmg from industrial, commercial, mmmg, or agricultural operations and is not excluded under 40 CFR 261 4(a), 260 30, or 260 31 20 Spill - The accidental discharging (see Discharge), spillmg, leakmg, pumpmg, pourmg, emittmg emptymg, or dumpmg of hazardous wastes or matenals which, when spilled become hazardous wastes, mto or on any land or water This also mcludes spills onto asphalt or concrete pads 21 Environmental Services - A department with expertise m the areas of hazardous waste, au- and water management, includmg environmental regulations m these areas PLANT LOCATIONS AND SITE INFORMATION 1 The ATK Launch Systems - Promontory (ATK) plant is located in Box Elder County approximately 30 miles northwest of Bngham City The 30-square mile plant site is remote from any major population centers and is reasonably isolated from ranches located at varying distances from the area boundanes The plant site is composed of four major areas in which manufactunng and testing activities take place South Plant North Plant Test Area and Plant 3 There are approximately 675 buildings located on the plant site (See Appendix I for facility site maps) ATK owns and operates these 4 areas All of these areas are contiguous and waste disposal IS managed by one organization From the beginning of operations in 1956 to the present time plant activities have encompassed a wide range of programs requinng the production of solid rocket propellants rocket motor testing and industnal support necessary to achieve each program's objectives Solid rocket motors manufactured during this penod vary from motors containing 7-9 lb of propellant to 1,100 000 lb Programs have included Space Shuttle SRM Peacekeeper Trident SRAM HARM Standard Genie Minuteman Poseidon and a variety of ground and air launched flares ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan 2 The plant site has eight hazardous waste treatment and storage facilities Burning Grounds at M-136 and M-225 Drum Storage areas at E-501 and M-186 the T-29B Hydrazine Dilution Facility the M-705 Wastewater Treatment Plant the M-705S Hazardous Waste Consolidation Room the solid propellant waste storage facilities at M-47and building M-603 which will be used for storage and treatment of solid propellant rocket motors and non-hazardous liquids The site maps and evacuation plans for these facilities are shown in Appendix I These nine facilities serve as waste management units for the entire facility Reactive wastes treated at the burning grounds include waste propellants waste explosives oxidizers or solid waste contaminated with propellants explosives or oxidizers No propellants or explosives are ever stored in the drum storage areas hazardous wastes that are flammable, toxic, or corrosive are stored in these units The Hydrazine Dilution Facility at T-29B dilutes waste hydrazine to between 5 to 50 percent by volume for shipment to an off-plant disposal site The M-705 Wastewater Treatment Facility treats hazardous and industnal waters from building sumps Hazardous wastes are consolidated and lab packed at the M-705S Hazardous Waste Consolidation Room 3 Approved hazardous waste accumulation areas are descnbed in Table I 4 Fire hydrants are located as follows 101 hydrants in the Administrative and Manufactunng area 95 at North Plant 47 in the Test Area and 9 in Plant 3 Static and dynamic pressure heads have been measured for each hydrant and the Fire Department maintains this information The fire protection system at the plant site meets the NFPA codes for fire protection ATK owns and operates two pumper fire engines and two brush trucks which are used for emergency response The following water tanks are interconnected Location Capacity (gal) X-1 200 000 X-2 20 000 M-131 50 000 M-132 50 000 M-133 100 000 M-587 (North Plant) 1,000 000 M-696 20,000 T-59 (Test) 1 000 000 The M-203 (Propellant Development Area) water tank with a 100 000 gallon capacity is not interconnected to the other tanks Fire hydrants throughout the plant are color coded according to capacity Color Code Flow Capacity (gpm) Green Fire Hydrant 1 000 or more Orange Fire Hydrant 500 -1 000 Red Fire Hydrant 500 or less 5 Information depicting the capacity location and practical consequences of a catastrophic failure of large hazardous material storage areas is found in Appendix II C p67 6 All buildings with 10 or more regular occupants have an evacuation plan posted at all 6 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan major exits of the building (See Appendix I for the site maps and evacuation routes of the hazardous waste treatment and storage facilities) H PREVENTION OF RECURRENCE OR SPREAD OF FIRES, EXPLOSIONS, OR RELEASES 1 There are many steps that can be taken to prevent the recurrence and spread of fires explosions or releases at the drum storage areas burning grounds and operating buildings These include limiting propellant quantities placed in the burning trays following safe handling procedures personnel training segregating incompatible and reactive matenals in the burning trays and in the drum storage areas practicing good housekeeping procedures proper labeling regular inspections and separating the burning trays by safe distances These procedures are outlined in company operating manuals 2 Each fire explosion or release into the environment is unique The Incident Commander must be an expenenced individual who will take all possible steps to prevent a recurrence to limit the extent of the damage and to stop the discharge These steps may include a Stopping processes and operations b Collecting and containing released wastes c Removing and isolating containers d Preventing additional harm to the environment through knowledge of the potential hazards associated with storage areas (found in Appendix II A and B pp 65 and 66 their locations capacities and identification 3 User organizations conduct regular inspections on items such as bulk storage containers that store hazardous wastes or materials which if released to the environment would become hazardous wastes Audits are taken on volumes of stored materials versus consumption to ensure that non-sudden releases are not occurnng If a non-sudden release of matenals is discovered steps are taken immediately to minimize the impact on the environment II REPORTING PROCEDURES AND INCIDENT IDENTIFICATION A EVACUATION CRITERIA 1 A fire that is a threat to human safety 2 A spill that IS a threat to human safety B IDENTIFICATION OF A HAZARDOUS WASTE IN A SPILL 1 The building personnel working the operation identify the matenal 2 The Matenal Safety Data Sheet(MSDS) is referred to for chemical constituents health hazards and protective clothing 3 The Hazardous Waste Profile Data sheet Haz Com Web GM 3 1 or MSDS is referred 7 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan to for proper disposal of the waste C REPORTING OF EMERGENCY INCIDENTS 1 Spilled matenal is reported to Security 2 Security contacts the Environmental Service s Spill Advisory Team and Safety for technical support and advice 3 Environmental Services contacts the State and EPA to report the incident (if required) 4 Environmental Services obtains the log from Security to prepare the written report to the State 5 Within 15 days Environmental Services submits the written report to the State and maintains a permanent copy in the Environmental Services' Central File as required D PERSONNEL RESPONSIBILITIES 1 EMERGENCY MANAGER a At all times there shall be at least one employee either present on the facility premises or on call with the responsibility for coordinating all emergency response measures b The facility emergency coordinator is thoroughly familiar with all aspects of the facility's contingency plan all operations and activities at the facility the location and characteristics of waste handled the location of manifests and all other records within the facility, and the facility layout or has immediate access to persons with this information c This person shall have the authonty to commit the resources needed to carry out the contingency plan d Arranges for and directs a spill contingency plan simulation 2 EMPLOYEES FIRST LINE SUPERVISORS AND FIRE WARDENS a Report all fires or emergencies by activating the fire alarm or calling the emergency number b Report from a safe telephone location Your name and phone number Type of incident (fire explosion injury spill etc) Location of incident c Stay on the line when possible until released by the emergency operator d Do not attempt to fight fires involving live or possibly toxic hazardous materials e Do not attempt to contain spills that are beyond capability or training 3 FIRST LINE SUPERVISORS a Ensure personnel evacuate buildings or areas to the assembly point indicated on 8 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan the Emergency/Evacuation Plan located in each building NOTE Handicapped personnel must be provided priority and assistance dunng evacuation and assembly b Advise the Fire Captain and the Incident Commander of conditions at the scene c Account for all employees that were in or assigned to the affected building or area d Report any injured or missing personnel to the Incident Commander e Remain at the assembly point until released by the Incident Commander f Notify appropnate Safety Department and fill out a Mishap Report INCIDENT COMMANDER a Initiate the first response actions b Contact line supervision at the assembly point to determine the details of the situation I Nature of incident II Number of personnel injured or not accounted for and the location of their last known assignment III Location and type of hazardous matenals that may be exposed to fire or explosion (Quantity Distance Critena) c Applicable Quantity Distance Cntena d Assume control of emergency area e Declare severity of event such as an emergency or disaster as appropnate f Establish emergency scene coordinate road blocks cordon the site and control entry/exit from the area g Make an initial assessment of situation h Notify the Security Radio Dispatcher as appropnate close the switchboard if absolutely necessary The Environmental Specialists must be included if a building deluge system has been activated and the building sump has overflowed or another known spill of hazardous matenal has taken place I Identify safe response routes for follow-on units j Coordmate activities with other emergency units k Commit rescue and first aid crews as necessary I Obtain emergency rescue and ambulance as required m Keep the Emergency Commander informed of the emergency situation 9 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan n Request outside assistance from the EOC as needed p Check with building s supervision to identify propellant ingredients and hazardous constituents in any building or building sump which must be pumped by Water Operations personnel Evaluate what hazards if any exist which may hinder safe access to the building q Perform actions in accordance with 29 CFR 1910 120 (HAZWOPER) SECURITY a Set up road blocks as directed by the Incident Commander to preclude unauthonzed entry of personnel and provide clear traffic flow for emergency vehicles b Coordinate with Incident Commander to ensure orderly evacuation of personnel c Provide protection for classified information valuable records and special equipment d Ensure protection of Company and Government property from theft or sabotage e Provide proper disposition storage and protection of classified material in accordance with the Department of Defense Industnal Secunty Manual f Establish penmeter boundary for emergency scene set up road blocks cordons etc g Above actions must be consistent with HAZWOPER requirements SECURITY RADIO DISPATCHER a When directed by the Incident Commander, notify appropriate personnel in accordance with the Emergency and Disaster Response Plan b Monitor and record all emergency radio communications and establish required communications between radio units c Upon direction of the Incident Commander notifies appropnate ATK management TELEPHONE OPERATORS a When directed by the Incident Commander refuse incoming and outgoing calls unless directed otherwise by the Emergency Commander INDUSTRIAL HYGIENIST a Report to the Incident Commander at the assembly point or Field Command Post b Advise the Incident Commander on emergencies involving toxic chemical or radiation hazards c Perform the following activities as necessary I Sample air at the scene including any sumps which have to be pumped (if 10 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan determined to be necessary by the Industnal Hygienist (IH) on the scene) II Monitor radioactivity at the scene (if determined to be necessary by the IH on the scene) III Advise Emergency Response Team concerning proper decontamination controls IV Notify Medical Services of personnel exposure to toxic chemicals or radioactive matenals V Advise the Incident Commander to notify public health authonties d Performs these duties in accordance with HAZWOPER requirements 9 MAINTENANCE CRAFTS PERSONNEL a Respond to all alarms when notified by the Security Police Radio Dispatcher and report to the Incident Commander at the command post b Control distribution of air water steam and electrical power as directed by the Incident Commander c Provide equipment barncading and shonng as necessary per direction of Incident Commander d As Fire Bngade assist when needed e Provide construction type matenals and services for containment of hazardous matenal spills f Performs these duties per direction of Incident Commander 10 ENVIRONMENTAL SERVICES PERSONNEL a Report to the Incident Commander at the command post when notified by Secunty Police Radio Dispatch b Perform duties as directed by the Incident Commander after matenal to be collected has been identified any hazards associated with the material have been identified and safe procedures to handle the material have been established c Perform these duties in accordance with HAZWOPER requirements d Advise the Incident Commander on potential environmental hazards safe handling and disposal options 11 MEDICAL SERVICES PERSONNEL a Remain at or report to the Dispensary to receive and treat patients b Report to the emergency area when requested by the Incident Commander c Coordinate with surrounding community hospitals and doctors for the receipt and treatment of injured 11 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contmgency Plan d Requisition supplemental medical supplies equipment and personnel as needed May request helicopter transportation in life or death situations e Conduct and supervise treatment for injured personnel f Review MSDS and other relevant information and transmit same to receiving hospital 12 TRANSPORTATION PERSONNEL (IN-PLANT TAXI SERVICE) a Coordinate with Incident Commander to ensure adequate transportation of plant personnel 13 EMERGENCY COMMANDER a Control and coordinate overall activities of the emergency situation The Emergency Commander will work from the Emergency Command Center and will assist and direct the On-Scene Incident Commander as needed b Evaluate situation and determine need to convene the Emergency Command Unit c Direct the Telephone Operators to open or close the switchboard according to the nature of the emergency d Open the Emergency Operations Center as necessary e Identify the disaster potential posed by the emergency f Make the disaster declaration when necessary (disaster responsibilities are listed in Section III) 14 PHOTOGRAPHER a Report to the Incident Commander at the Command Post b Advise the Incident Commander on photo coverage c Photograph the scene as directed d Expedite printing and delivery of the photographs e Interpret the photographs as required 15 HUMAN RESOURCES COORDINATOR a Provide food and assistance with personal needs for emergency team members and those affected b Notify next of km of injured persons when advised by Emergency Commander (See Section IV the Emergency and Disaster Response Plan for procedures) 16 ENVIRONMENTAL SPECIALIST a Assess possible environmental hazards resulting from the incident including assessment of spills caused by the activation of a building deluge system which in turn caused the building sump to overflow 12 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contmgency Plan b Initiate reports required by the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) and Utah Solid and Hazardous Waste Regulations c Determine (along with the responding local emergency agency) whether the facility has had a discharge fire or explosion which could threaten the environment outside of the facility Assure immediate implementation of emergency procedures d Notify the State and Federal environmental agencies as required e The Environmental Specialist contacts either the government official designated as the on-scene coordinator or the National Response Center (800) 424-8802 and Utah Dept of Environmental Response and Remediation (DERR) at (801) 536- 4123 to relaying the following information I Name and telephone number of reporter II Name and address of facility III Time and type of incident (such as discharge fire etc) IV Name and quantity of matenal(s) involved to the extent known V The extent of injunes if any VI The possible hazards to human health or to the environment outside the facility f Notify the Corporate Environmental Engineer if the spill is reportable David Shead (952) 351-2663 g Utah Hazardous Waste Management Rules require that the Environmental Specialist note in the operating record the time date and details of any incident that requires implementing the contingency plan Within 15 days after the incident he must submit a wntten report on the incident to the Executive Secretary of the Solid and Hazardous Waste Control Board The report must include I Name address and telephone number of the owner or operator II Name address and telephone number of the facility III Date time and type of incident (such as fire explosion etc) IV Name and quantity of matenal(s) involved v The extent of injuries if any VI An assessment of actual or potential hazards to human health or the environment where this is applicable VII Estimated quantity and disposition of material recovered from the incident 13 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan h Notify the community emergency coordinator for the local emergency planning committee in compliance with requirements outlined in 40 CFR 355 40 where applicable I Immediately after an emergency the Environmental Specialist must provide direction for treating stonng or disposing of recovered waste contaminated soil or surface water, or any other matenal that results from a discharge fire, or explosion at the facility J The Environmental Specialist and the Incident Commander must ensure that in the affected area(s) of the facility I A determination is made who will do the spill remediation work (Building Personnel ATK Spill Remediation Team or Off-Site Contractor) II No waste that may be incompatible with the discharged matenal is stored or disposed of until cleanup procedures are completed and III All emergency equipment listed in the contingency plan is cleaned and ready for Its intended use before normal operations are resumed 17 CORPORATE PUBLIC AFFAIRS a Establish liaison with representatives of public information media b Prepare drafts of general/public information press releases relating to the emergency c Release information as directed by the Emergency Commander according to ATK Policy 18 RECORDER a Record incoming and outgoing communications at the EOC b Record all significant events and actions c Initiate and maintain record information in a time line log d Assist in the preparation of intenm and final reports ALARM SYSTEMS 1 Alarm systems are available at ATK for fires or building evacuations if an emergency or disaster situation exists Type People/Matenals Sound Fire and Building People Fire Alarm Evacuation Hazardous Waste People Verbal Signal (or fire alarm if available) Storage and 14 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan Thermal Treatment Matenals Verbal Signal (fire alarm or air horn if available) 2 The hazardous waste storage facilities at M-186 and E-501 are located outdoors in open areas evacuation of personnel will be in any direction away from the problem The assembly area for E-501 is directly across the street (to the north) from the entrance gate The assembly point for M-186 is at the M-381 trailer 3 The hazardous waste storage facility at the M-705 Consolidation Room is a single room equipped with two exits a single door on the west and a double door on the east Both sets of doors open directly to an open outdoor area where personnel are to evacuate to an area near the intersection of the mam in-plant road and the M-705 access road The room is equipped with a heat sensor alarm a fire alarm and a carbon monoxide alarm on the supplied air system 4 M-47 IS a storage building only and is equipped with evacuation doors on the west side of the building only These exits are delineated in the evacuation plans in Appendix I 5 M-603 IS a storage and disassembly building with multiple exits as outlined in the evacuation plan in appendix I 6 Tables and maps showing the function of the vanous hazardous waste sites and area evacuation plans are found in Appendix I p 40 F LOCAL LAW-ENFORCEMENT AGENCIES, FIRE DEPARTMENTS, AND HOSPITALS 1 Local law-enforcement agencies fire departments and hospitals have been contacted to respond to or treat any ATK emergency The most recent copy of this Contingency Plan IS sent to each agency in order to familianze them with the layout descnption of hazardous wastes handled and evacuation plan for the plant Copies of the letters sent to each agency are kept in the Operating Record 2 All emergency response units from off-plant will be escorted from the gate to the fire/explosion/spill site by an ATK authonzed agent This will ensure the units reach the location as quickly and efficiently as possible III SPILL CONTAINMENT AND CLEANUP A CONTROL PROCEDURES 1 Detailed emergency response procedures whenever there is a fire explosion or release (spill) are found in the current Emergency and Disaster Response Plan 2 Specific directives for cleaning up spills are given in the Hazardous Waste Profile Data (HWPD) There are over 1 000 chemical entnes in the HPWD Approximately 800 of the chemicals in current use exhibit hazardous properties The MHSI documents are generated in-house to provide a standard format for easy use Each entry contams Matenal Safety Data Sheet (MSDS) information as well as other information There are approximately 100 sets of MHSI distnbuted throughout the facility In addition a complete MHSI is accessible through over 1 000 computer terminals at the facility 3 The Wastewater Treatment Facility (M-705) is designed to treat wastewater containing hazardous waste constituents The responsible building foreman or supervisor should report to the M-705 facility personnel any spill or accidental discharge to a sump 15 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan suspected of containing chemicals at concentrations above the levels normally discharged The report should mclude the incident location name of person reporting chemical involved and approximate quantity The treatment facility personnel will then be able to determine how best to handle the wastewater 4 The propellant storage buildings will be inspected daily or weekly as required when in use While the propellants stored in these buildings are solid occasionally a small amount of nitro glycerin or similar material can ooze from the motor and dnp to the floor These dnps will be checked for dunng the inspections and cleaned up using rags and acetone within 24 hours of discovery or as soon as is practicable B SPILL CONTAINMENT AND CONTROL §265 56(e) of the Resource Conservation and Recovery Act (RCRA) states "Dunng an emergency the Emergency Commander must take all reasonable measures to ensure that fires explosions and releases do not occur recur or spread to other hazardous waste at the facility These measures must include where applicable stopping processes and operations, collecting and containing released waste and removing or isolating containers" Confine hazardous matenal spills to the affected area with dams Quicksorb or other approved means Hazardous material properties may be determined by consulting the Hazardous Waste Profile Data Sheet MHSI or the DOT Emergency Response Guidebook No attempt will be made to contain a spill until the hazardous properties are known Secondary containment is provided for most storage tanks For those tanks without secondary containment, consult Appendix II for spill containment considerations C SPILL CLEANUP 1 Waste Management and Environmental Services will be responsible for the coordination of spill cleanup activities Building personnel will clean up smaller sized spills incidental to the work process that are deemed within the skills and level of training possessed by available building personnel where the spill occurred All other spills will be cleaned up by the Spill Remediation Team or a company contracted by ATK Proper procedures will be followed for every release of hazardous wastes Because of the extensive inventory of hazardous materials managed at ATK Corporation, each release will require specific safety precautions cleanup procedures and/or disposal methods See Table II p for chemical compatibility information WARNING Do not attempt to contain or clean up any spill until hazards associated with the material are known and proper safety precautions are taken 2 Response procedures to be used dunng container spills or leaks are as outlined a Identify the matenal I From the hazardous waste label I From Waste Management and Environmental Services inventory records I Through laboratory analysis I From earner manifest or placard DOT guide number 16 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan b Protect personnel through the use of personal protective equipment specific to the identified matenal (refer to MHSI or Material Safety Data Sheet available from Industnal Hygiene) c Stops the spill or leak d Contain the matenal ' Eliminate the source I Use Quicksorb or other approved methods e Clean up the matenal I Re-drum I Wipe up use absorbent matenal excavate soil f Dispose of the matenal (refer to Haz Com Web and Disposal Instructions for Waste Materials GM-3 1) g Decontaminate the site and clean the equipment FOLLOWUP PROCEDURES 1 When the spill has been properly contained and stopped appropnate equipment will be used to remove the spilled matenal to a disposal site 2 Spills involving very large quantities of matenal caused by the failure of a large storage tank should be dealt with as quickly as possible to minimize exposure to the environment The method of pickup generally will be pumping matenal into a tank truck the onginal tank after repairs or into another tank An alternative may be to use the Environmental Waste Disposal sump truck to pump liquid hazardous wastes and transfer them to a 5 000 gallon storage tank trailer at M-705 Contact Waste Management and Environmental Services for use 3 Proper steps will be taken to repair equipment and facilities and/or remove the cause of the spill 4 Operating procedures will be changed if necessary to prevent recurrence of a spill 5 Safety and Operational Training will be instigated if required 6 When possible all reasonable effort will be made to salvage reusable material INCOMPATIBLE WASTE The Environmental Coordinator and Incident Commander will ensure no waste is incompatible with any matenal dunng the cleanup of a discharge Table II p lists the information and its available location to the Environmental Coordinator and Incident Commander to make decisions regarding compatibility All of these matenals are available for inspection at the plant site CLEANUP MATERIAL AND EQUIPMENT The following is a partial list of safety equipment that may be used for cleanup as required 17 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan per Haz Com Web All items can be obtained from Stores or from a call contract Item Stock No Use Coveralls Smocks Tyvek Suit (m) Tyvek Suit (1) Tyvek Suit (xl) Tyvek Sack Suit Tyvek Hood Polyethylene- Tyvek Suit Saranex Tyvek Suit Booties (Yellow) Booties (Clear) Boots (Rubber) Glasses Safety Monogoggles Ear Plugs Gloves Rubber (s) Gloves Rubber (m) Gloves Rubber (1) Gloves Leather Gloves Cotton Gloves Gloves NBR(s) Gloves NBR(m) Gloves NBR (I) Respirator Half Mask Air Purifying Respirator Full-face Cart Respirator Fresh Air Respirator No 8710 Fliter S (Gray) Filter H (Purple) Filter GMA (Black) Filter GMC (Yellow) Filter GMD (Green) Filter (Purple/Black) GMA-H Fliter (Purple/ Yellow) GMC-H Filter (Black/Ohve) GMP Acetone Rumple cloth Live Operations Manufacturing Area Asbestos & Dust Asbestos & Dust Asbestos & Dust Asbestos & Chemical Spills Asbestos & Chemical Spills Asbestos & Chemical Spills Chemical Spills Asbestos & Chemical Spills Asbestos & Chemical Spills Chemical Spills Spills-Less than 1 quart Spills-Greater than 1 quart Noise-Greater than 90 B(A) Methyl Ethyl Ketone Methyl Ethyl Ketone Methyl Ethyl Ketone General Use General Use Solvent Resistant Methyl Chloroform Methyl Chloroform Methyl Chloroform In O2 Sufficient Areas Only In O2 Sufficient Areas Only In O2 Deficient Areas Only Dust Single-use Only Dusts Mists Fumes Radon Daughters Asbestos Dusts Mists Fumes Radio- nuclides Asbestos Organic Vapors Organic Vapors Acid Gases Ammonia & Methylamine Organic Vapors Dusts Mists Fumes Radionuclides Asbestos Organic Vapors Acid Gases, Dusts, Fumes Mists Radionuclides Asbestos Pesticides Propellant solvent wipe 18 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan Chemliner bag Contain solvent rags H Velostat bag Conductive bag to contain chemiliner In addition the following materials are available if required item Location Bet Description Lumber M-90 2680/2757 Plywood Lumbers Sawdust M-90 2680/2757 Bulk Pipe M-90 2680/2757 All dimensions Quicksorb (27-200002) M-3 (Stores) 2757 50 Ib Bag Absorption Clay Landfill 2837 Bulk Hydrated Lime (54-426006) M-3 (Stores) 2757 50 Ib Bag Chemical Spill J T Baker Neutralizer Acids (General) M-53 2617 3 2 kg Bases (General) M-53 2617/7436 1 2 kg Flammable Solvents M-53 2617 (1 1 kg) (18 kg) Mercury Cleanup Kits M-53 2617 0 9 kg NG Spill and M-585 8446 5 liter bottle Detector Kit Bulldozer (Space/DLV) M-55/M-321 2837/2455 D-8 Front-end Loader M-55/M-321 2837/2455 1/4 and 3 yd bucket Portable Lights and M-6 3431 2 Mercury Lamps Generator Sump Tank M-136 2520 3 000 gal Portable Diaphragm Pumps M-55/M-321 2837/2455 General Trucks M-55/M-321 2837/2455 172-5 Ton SCBA Respirators Fire Dept 2222 30 Mm Tank Water Ops Equip M-705 2222 Sump Trucks Etc Spill Response Truck Fire Dept 2222 Spill Response and Rescue DECONTAMINATION EQUIPMENT AND PROCEDURES 1 Equipment available for decontamination includes two disposable wading pools a wood-framed plastic pool carried on the spill truck for tool and spill team decontamination and fire trucks to supply wash down water Decontamination procedures outlined on Figures 1 and 2 will be followed to ensure spill containment and to minimize the area of contamination 2 The M-186 hazardous waste drum storage site is located near the burning pits This area is serviced by the E-522 Fire Station which is located 3-5 minutes away The M- 705 Hazardous Waste consolidation room and the E-501 drum storage yard are also serviced by the E-522 Fire Station which is located 1-2 minutes away Both the E-522 and M-11 Fire Stations are outfitted with quick-response spill control equipment (See maps Appendix I) In addition spill response kits are available at the M-53 and M-585 Laboratones EQUIPMENT DECONTAMINATION AND REPLENISHMENT 1 The Incident Commander or his designee will ensure all equipment has been properly decontaminated cleaned and replaced before normal operations are resumed The following guidelines are to be used for decontamination of equipment after a discharge has occurred These steps are also supplemented by the information found in the 19 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan sources listed in Paragraph F As much as possible measures should be taken to prevent contamination of equipment Any delicate instrument which cannot be decontaminated easily should be protected while it is being used It should be bagged and the bag taped and secured around the instrument Openings can be made in the bag for sample intake a Sampling Devices Sampling devices require special cleaning The instruction and care manuals provide information on proper decontamination methods for each instrument used b Tools and Equipment Equipment and tools designated for spill response should be disposable however some tools and equipment require decontamination Decontamination equipment matenals and supplies are generally selected based on availability Soft-bnstle scrub brushes or long-handle brushes are used to remove contaminants Water in buckets is used for rinsing Large galvanized wash tanks or stock tanks can hold wash and nnse solutions children's wading pools can also be used Open top (55-gallon) drums or similar containers lined with plastic bags can be used to store contaminated clothing and equipment Contaminated liquids can be stored temporanly in metal or plastic cans or drums Other supplies include paper or cloth towels for drying protective clothing and equipment Personal protective equipment sampling tools and other equipment are usually decontaminated by scrubbing with detergent-water using a soft-bnstle brush followed by nnsing with copious amounts of water While this process may not be fully effective in removing some contaminants it is a relatively safe option compared with using a chemical decontaminating solution Occasionally a decontamination chemical is then needed to change the contaminant into a less harmful substance dunng decontamination The Environmental Coordinator and Incident Commander or his designee may consult the information sources in Table I p 33 to determine the necessity of using a chemical decontamination solution All matenals and equipment used for decontamination must comply with proper disposal Clothing tools buckets brushes and all other equipment that are contaminated must be secured in drums or other containers and labeled Clothing not completely decontaminated onsite should be secured in plastic bags before being removed from the site Contaminated wash and nnse solutions should be contained to hold spent solutions The spent solutions are transferred to drums which are labeled and properly disposed of The Environmental Specialist and Incident Commander or his designee will ensure the disposal of these matenals is done in an appropnate manner c Respirators Certain parts of contaminated respirators such as the harness assembly and leather or cloth components, are difficult to decontaminate If grossly contaminated they may have to be discarded with the other spill cleanup wastes Rubber components can be soaked in soap and water and scrubbed with a brush 20 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan Regulators must be maintained according to manufacturers recommendations Persons responsible for decontaminating respirators should be thoroughly trained in respirator maintenance d Heavy Equipment Bulldozers trucks back-hoes bulking chambers and other heavy equipment are difficult to decontaminate The method generally used is to wash them with water under high pressure and/or to scrub accessible parts with detergent/water solution under pressure if possible Shovels scoops and lifts may be sandblasted or steam cleaned Particular care must be given to those components in direct contact wrth contaminants such as tires and scoops Wash water generated during the decontamination process must be contained and disposed of m a proper manner IV INSTALLATION RESPONSE TEAM TRAINING Building/area personnel responding to spills of hazardous matenals incidental to the normal processes within their building/area will not need training beyond that required by ATK s Hazard Communication Program Personnel responding to spills who are not assigned to the building/area where the spill occurred are to be members of the Spill Remediation Team with the proper OSHA training NOTE Hazard Communication Plus Program is a combination of the HAZ-COM Program required by OSHA 29 CFR 1910 1200 and HAZWOPER first awareness level required by OSHA 29 CFR 1910 120 A TRAINING All personnel involved in cleanup operations will be trained This training will include an awareness of the locations of cleanup matenals and equipment and the procedures for the operation of such equipment B SIMULATION The Spill Contingency Plan will be simulated annually under the direction of the Emergency Commander V TRAINING PLAN One of the most important objectives of the Contingency Plan is to ensure that the emergency responders are properly trained Training should include teaching exercise and cntique phases Re- training and review should be completed at least annually The following is an outline of trainmg plan elements A SCOPE AND PURPOSE OF THE CONTINGENCY PLAN B REVIEW OF LEGAL REQUIREMENTS 1 Authonty 2 OSHA requirements 3 State requirements 4 EPA requirements 21 ATK Launch Systems - Promontory May 2010Attachment 4 - Contmgency Plan 5 State Fire Marshall requirements 6 Law enforcement requirements 7 Medical Examiner/Coroner requirements C LOCAL ATK REQUIREMENTS D CUSTOMER REQUIREMENTS Contract review E REVIEW AUTHORITY AND FUNCTION OF EACH RESPONSE TEAM MEMBER F EMERGENCY COMMUNICATION SYSTEM 1 Initial notification and follow-up 2 Verification of information 3 Radio discipline 4 Communication intercept G FIRE PLANS/FIRE DRILL 1 Use 2 Exercise 3 Evaluate 4 Evacuation 5 Assembly points H BOMB SEARCH TECHNIQUES 1 Outside to Inside 2 Left to right 3 Bottom to Top 4 Evacuation 5 Suspect Items (Isolate don t touch or disturb) I FIRE BARRICADE/CORDON AREAS 1 Function 2 Initiate/release J EMERGENCY MEDICAL TREATMENT 1 EMT training equipment 2 First response first aid K SECURITY OF SITE 1 Purpose 2 Authonty 3 Who authorizes access L INVESTIGATION 1 OSHA 2 EPA 22 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan 3 Local Law enforcement 4 Medical Examiner/Coroner 5 Customer 6 ATK M PUBLIC RELEASE OF INFORMATION 1 Who authorizes 2 Importance of controlling 3 Who releases 4 Who reviews 5 Next of km N FACT-FINDING METHODS 1 Initial interview 2 Follow-up interview 3 Recordings 4 Photo Coverage 5 Mapping damage a Who? b How? c Why? 6 Personnel security checks 7 Drug and alcohol tests 8 Weather conditions 9 Product status 10 Operational status 11 Equipment records and history 12 Facility tooling modification and history SAFING THE AREA 1 Electric Power 2 Water 3 Steam 4 Toxic chemicals 5 Falling hazards 6 Explosives CONTROL OF THE CURIOUS 1 Outsider 2 Employees 3 Press HANDLING OF REMAINS 1 Notification 2 Photo 3 Movement (after authorization by Medical Examiner) 4 Release (after authorization by Medical Examiner) NOTIFICATION PROCEDURES 23 ATK Launch Systems - Promontory May 201 OAttachment 4 - Conttngency Plan 1 When? 2 Who? 3 How? 4 Venfication RESCUE EFFORTS 1 When? 2 When not to 3 How to determine 24 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan TABLE I COMPATIBILITY INFORMATION Source of Compatibility Information Location 1 Hazardous Waste Compatibility Chart Table 9-2 of Attachment 9 Available at Environmental Services offices 2 Material Health and Safety Information (example of informa- tion found in plan) Available in hard copy form at approximately 100 locations through- the plant also available on 1 000 computer terminals throughout the plant* 3 Material Safety and Data Sheets 4 Work Expenence Located on the Haz Com Web Knowledge of each member of the Response Team when responding to a discharge 25 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contmgency Plan TABLE II EMERGENCY COORDINATOR CALL LIST Pnmary Coordinator Steve Winn Alternate Coordinators Dee Madsen Work No 801-699-2473 435-279-6191 Tony Auger 435-279-6191 Wayne Jewkes 435-279-6191 26 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan FIGURE 1 DECONTAMINATION/SPILL SCENE Difficult Decontamination Situations Some situations such as a solvent spilled on tiles or large spills on unprotected ground require the removal and disposal of the affected matenal Other situations such as contaminated equipment or fixtures require steam cleaning and the use of a detergent Frequently the nnse from steam cleaning is best controlled with a wet/dry vacuum Steam cleaners detergents and wet/dry vacuums can be obtained from local rental companies The nnse should be tested for the contaminant and managed appropnately 27 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan TheSplllScene • '-/t;''. While each spill is unique, every spill shares common features best referred to as the "Spill Scene." This allows a conceptual illustration of the work area which emphasizes the relationship of the various components. Complete decontamination of workers, tools, and the spill site must be performed before the spill response is completed. It is prudent to establish an area for worker decontamination through which all SPILL TEAM members must pass prior to leaving the site. In this TEAM DECONTAMINATION SITE (TDS) protective clothing can be thoroughly washed with detergent and rinsed with water, if necessary. The soles of ALL WORKERS SHOES MUST BE RINSED before they leave the area. Outer coveralls (Tyvek, etc.) must be removed in this area. These steps are necessary to prevent spreading the contamination or introducing toxic substances into workers homes. Tools can be rinsed with detergent and water prior to removal from the spill scene. All rinses from these decontamination procedures must be treated as hazardous waste. Dry decontamination may be used when appropriate. It is frequently necessary to test the site for completeness of decontamination prior to declaring the emergency resolved. Spills which contaminate soil, asphalt, concrete, or other absorbent materials will require that samples be obtained and analyzed. After all residual contamination is removed, asphalt and concrete areas must receive a thorough wash-down with fresh water. FIGURE 2. DECONTAMINATION 28 ATK Launch Systems - Promontory May 201 OAttachment 4 - Conttngency Plan APPENDIX I FACILITY FUNCTION TABLES SITE MAPS & EVACUATION PLANS NORTH PLANT SITE MAP MANUFACTURING AREA SITE MAP TEST AREA SITE MAP PLANT 3 SITE MAP M-136 BURNING GROUNDS FACILITY FUNCTION TABLE M-186 HAZARDOUS WASTE AREA FACILITY FUNCTION TABLE M-136 SITE MAP AND EVACUATION PLAN M-186 SITE MAP AND EVACUATION PLAN E-501 STORAGE YARD FACILITY FUNCTION TABLE E-501 SITE MAP AND EVACUATION PLAN M-225 BURNING GROUNDS FACILITY FUNCTION TABLE M-225 SITE MAP AND EVACUATION PLAN T-29B SATELLITE ACCUMULATION AREA FACILITY FUNCTION TABLE T-29B SITE MAP AND EVACUATION PLAN M-705 WASTEWATER TREATMENT FACILITY FUNCTION M-705 HAZARDOUS WASTE CONSOLIDATION ROOM M-705 SITE MAP AND EVACUATION PLAN M-47 PROPELLANT STORAGE FUNCTION TABLE M-47 SITE MAP AND EVACUATION PLAN M-603 PROPELLANT STORAGE FUNCTION TABLE M-603 SITE MAP AND EVACUATION PLAN 30 31 32 33 34 34 35 36 37 38 39 40 41 42 43 43 44 45 46 47 48 29 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan NORTH PLANT SITE MAP 30 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan MANUFACTURING AREA SITE MAP (South Plant) 31 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan vmr— TEST AREA SITE MAP 32 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan PLANT 3 SITE MAP 33 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan M-136 BURNING GROUNDS FACILITY FUNCTION Propellant, explosives, unstable and pyrotechnic waste disposal Waste Products Into Area Class 1 1 and 1 3 propellant wastes propellant con- taminated wastes and unstable waste Method of Disposal Burning Spill Cleanup/Handling Flashing in waste propellant disposal areas M-186 HAZARDOUS WASTE AREA FACILITY FUNCTION Receive hazardous waste materials and store for shipment Waste Products Into Area Method of Disposal Methyl Chloroform Store for Methyl Ethyl Ketone off-plant Xylene shipment Toluene Paint Thinners Oil Store for Lab Chemicals off-plant Photographic Fixer Solution shipment Rags & debns Spill Cleanup/Handling SIX UN Drums Quicksorb 1001b Two shovels One broom One fire extinguisher Emergency shower/eye wash Two overpack drums Saranex suit (level B) 34 ATK Launch Systems - Promontory May 201 OAttachment 4 - Conttngency Plan EVACUATE AREA THEN PROCEED TO ASSEMBLY POINT 200 FEET WEST ON APPROACH ROAD NEW POND TANK2 • TANK1 BURNINQ PIT It PIT 17 Pine PIT 15 PIT14 N M-136 DETONATION PITS D D D D NO 11 NO 10 NO 9 NO S PITT PITS PITS PIT 4 '— PIT 3 • • PIT1 PIT 2 PROPELLANT BED J LEGEND • FIRE EXTINGUISHER M-136 AND BURNING PITS 35 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contmgency Plan EVACUATE THEN PROCEED TO ASSEMBLY POINT SOUTHWEST AT M-381 LEGEND • FIRE EXTINGUISHER HAZARDOUS WASTE TREATMENT, STORAGE, DISPOSAL, AND FACILITIES M-186 36 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contmgency Plan BUILDING E-501 STORAGE YARD FACILITY FUNCTION Hazardous Waste Storage Yard Waste Products Into Area Various Other assorted matenals that may be recycled Method of Disposal Shipment off-plant for disposal N/A Spill Cleanup/Handling Two fire extinguishers Absorbent Two repack drums Electncal pump Telephone/radio Eyewash/shower Safety gates Safety flags SIX UN 55-gal drums (empty) Saranex suit (level B) 37 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan EVACUATE AREA, THEN PROCEED TO ASSEMBLY POINT ON 200 STREET, 200 FEET EAST LEGEND: • FIRE EXTINGUISHER E-501 and SALVAGE YARD 38 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan M-225 BURNING GROUNDS FACILITY FUNCTION Disposal of waste products from High Performance Propellant Development Area and miscellaneous rocket motors, igniters, and related materials Waste Products Into Area Composite propellant uncured from M-209 Composite propellant cured Burn from M-221 NG propellant uncured from M-208 M-241 NG propellant cured from M-221 HMX from M-208 M-210 AP from M-210 (fine only) Binder premix (NG or other nitrate etc) PEP contaminated waste (rags contamers etc) Miscellaneous (motor igniters) Method of Disposal Burn Burn Burn Burn with diesel Burn with propellant Spill Cleanup/Handling Dampened rags (wipes) Pick up soft brush or wet rags (wipes) Solvent dampened rags followed by NG detector to verify cleanliness Pick up soft brush and/or wet rags Soft brush and/or water-damp rags If possible wet HMX wrth water before handling Sweep with soft brush Wipe with composite water-wet rag Flush with water into sump Burn or Contain absorb into sawdust or pulp detonate pick up with wipes wet rags Apply NG depending detector to verify cleanliness on matenals and/or condition Burn wrth respective propellant Burn or detonate depending on matenals and/or con- dition Pick up clean with method used for respective propellant or ingredient Each case must be dealt wrth on an individual basis 39 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contmgency Plan EVACUATE AREA TO lim228A BUNKER M-225 40 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan T-29B SATELLITE ACCUMULATION AREA BUILDING FUNCTION Hydrazine Storage and Dilution Facility Waste Product Method of disposal From Building Pure hydrazine Hydrazine-citnc acid solution 5-50% dilute hydrazine contaminated waste Disposal Dilute with water to 5-50% solution by volume Waste hydrazine is shipped for disposal/Treatment Contaminated waste IS also shipped for disposal/treatment Spill Cleanup/Handling All areas where normal operations are performed have a drainage system which culminates in a common sump Spills should be flushed thoroughly with large amounts of water The wash water is then drummed and shipped for disposal 41 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan N EVACUATE BUILDING, THEN PROCEED TO ASSEMBLY POINT 300 FEET NORTH OF BUILDING [ © T-29B 42 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan M-705 WASTEWATER TREATMENT FACILITY BUILDING FUNCTION Removal of reactive wastes from sump water Method of Waste Products From Area Disposal Spill Cleanup/Handling Lime Sludge (Heavy Metals) Shipment Two shovels to off-One broom plant Plastic gloves disposal One bin company Saranex surt (level B) Potassium Perchlorate Burning Classifier Decanter Solids Burning M-705 HAZARDOUS WASTE CONSOLIDATION ROOM BUILDING FUNCTION Consolidation and lab packing of hazardous wastes Waste Products From Area Consolidated hazardous wastes Lab packed hazardous wastes Method of Disposal Shipment to M-186 for eventual off-plant disposal Spill Cleanup/Handling Two shovels One broom Plastic Gloves One Fire Extinguisher Emergency shower/eyewash Quicksorb 1001b Two overpack drums Six UN drums Saranex surt (level B) 43 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan EVACUATE BUILDING 300 FEET, THEN PROCEED TO ASSEMBLY POINT ON R" AVENUE NEAR M-366 M-705 44 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan M-47 PROPELLANT STORAGE FACILITY BUILDING FUNCTION Storage of waste and non-waste propellant and motors Waste and non-waste Products 1 3C Propellant and Motors Method of Disposal Burnmg/slurned recovery/neutralization Spill Cleanup Matenals Obtain clean up matenal as needed 1 IC Propellant and Motors Burnmg/slurned explosives/AP recovery/neutralization Obtain clean up material as needed 45 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan EVACUATE BUILDING THEN PROCEED TO ASSEMBLY POINT 500 FEET SOUTH ON 6TH AVENUE N M-47 46 ATK Launch Systems - Promontory May 201 OAttachment 4 - Conttngency Plan M-603 PROPELLANT STORAGE FACILITY BUILDING FUNCTION Storage and Disassembly of waste and non-waste propellant and motors Waste and non-waste Products 1 3C Propellant and Motors 1 IC Propellant and Motors Method of Disposal Burning/slurried explosives/AP recovery/neutralization Burnmg/slurned explosives/AP recovery neutralization Spill Cleanup Materials Obtain clean up matenal as needed Obtain clean up matenal as needed 47 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan EVACUATE BUILDING 500 FEET THEN PROCEED TO ASSEMBLY POINT AT BUILDING M-e43 CALL HEADQUARTERS WITH HEADCOUNT N TRUCK BAY OD m • LEGEND • FIRE EXTINGUISHER O MANUAL ALARM B ALARM RESET mi EVACUATION HORN A SYSTEM RISER • HEAT DETECTOR 9 INSPECTORS TEST M-603 48 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan S-633 REACTIVE HAZARDOUS WASTE STORAGE PAD STORAGE PAD FUNCTION Storage of reactive hazardous waste propellant/propellant contaminated materials and motors and non-waste propellant Waste and non-waste Products 1 3C Propellant/propellant contaminated materials 1 3C Rocket Motors 1 1C Propellant/propellant contaminated matenals 1 IC Rocket Motors 1 3C Donor Burn Propellant Method of Disposal Thermal Treatment Thermal Treatment Thermal Treatment Thermal Treatment Burn Enhancer Spill Cleanup Materials Obtain clean up matenal as needed Obtain clean up matenal as needed Obtain clean up matenal as needed Obtain clean up matenal as needed Obtain clean up matenal as needed 49 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan EVACUATE PAD, THEN PROCEED TO ASSEMBLY POINT AT M 381 S-633 50 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan APPENDIX II BULK STORAGE AREAS INFORMATION A BULK FLAMMABLE LIQUID STORAGE AREAS 50 B PRACTICAL CONSEQUENCES OF A CATASTROPHIC FAILURE 51 APPENDIX III ARRANGEMENTS WITH LOCAL AUTHORITIES 57 51 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan BULK FLAMMABLE LIQUID STORAGE AREAS Type of Capacity Above/Below Location Flammable Liguid (Gallons) Ground M-4 Butanol 40 Above Ethanol 60 Above Isopropanol 530 Above Methanol 500 Above Methyl Ethyl Ketone 400 Above Paint 500 Above Paint Thinner 120 Above M-53 Acetone 60 Above Ethanol 10 Above Heptane 10 Above Methanol 50 Above Methyl Ethyl Ketone 60 Above M-55 Gasoline 17 000 Below M-66 Assorted 80 Above 1-10 Methanol 15 Above Methyl Ethyl Ketone 50 Above M-585 Acetone 50 Above Ethyl Acetate 15 Above Methanol 10 Above Toluene 30 Above M-711 Gasoline 10 000 Below E-510 Ethanol 100 Above Isopropanol 1 660 Above Methanol 35 Above E-512 Acetone 100 Above Isopropanol 50 Above Paint Thinner 50 Above Polyester Resin 160 Above Toluene 50 Above Xylene 160 Above E-517 Isopropanol 170 Above Kerosene 50 Above Methyl Ethyl Ketone 450 T-29B Hydrazine 100 Above 52 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan B PRACTICAL CONSEQUENCES OF A CATASTROPHIC FAILURE Building Number Location 1-10 Shed west of building M-4 Building north of M-3 system M-8 Two sheds west of building M-43B Shed south of building M-53A Shed south of building M-66 Shed southwest of building M-504 Shed south of building M-585 Shed east of building M-605 Waste dock north of building E-512 Shed west of building E-517 Shed north of building Direction of Flow* Has self-containment concrete berm Liquid would run west across asphart into dram Spill would dram down west hill Self-contained storage building Self-contained storage building Spill would run into ditch (trench or grading needed to keep surface runoff from accumulating in containment area) Spill would flow into ditch Spill would dram into ditch Spill would dram into ditch Spill would drain into ditch Spill would dram into ditch All other storage areas have self-containment Fire flows and/or spilled matenal from these buildings will flow into a gated spill containment structure below M-2 The gates are hand operated 53 ATK Launch Systems - Promontory May 201 OAttachment 4 - Contingency Plan APPENDIX III Arrangements with Local Authorities ATK has a well trained and full time Fire Department and Security Department onsite ATK's roads and grounds and Water Operations departments maintains a fleet of trucks, tractors, vacuum trucks and other equipment that could be used during an emergency response The facility also has a nursing staff durmg normal busmess hour, and a 24/7 ambulance service operated by ATK firemen with EMT certifications Due to these capabilities, the need for outside assistance is greatly reduced The most likely need for outside assistance would be that of hospital service Arrangement will be made with both the Bear River Valley Hospital and the Brigham City Community Hospital to accept employees that may have been injured due to an explosion, chemical exposure or other accident This arrangement will include mformation on the types of chemicals used at ATK Promontory as well as explosive hazards and other mechanical hazards associated with work performed at ATK The most likely scenario that would require assistance from a police agency would be the need to control traffic on Highway 83 Arrangements for assistance in this area will be made with the Box Elder County SherifPs Department and the Utah Highway Patrol All on plant traffic control will be handled by ATK's security department ATK has established contracts with three different emergency response/remediation contractors for use as needed While we do not anticipate the need for emergency service assistance, these companies are on call to provide service if needed All emergency response at the plant will be handled by the ATK Fire Department, who will act as the primary emergency authority Arrangements will also be made with the Box Elder County Fire Department and the Tremonton Fire Department We do not anticipate any need for assistance from the Utah Department of Environmental Response and Remediation, although notification of emergencies will be made to this department as required In addition to those agencies listed above, ATK will also provide a copy of the contingency plan to the Box Elder County Emergency Planning Committee for review and comment Below is a summary list of those agencies/service providers for which service arrangements will be sought Bear River Valley Hospital Bngham City Community Hospital Box Elder County Sheriffs Department Utah Highway Patrol Box Elder County Fire Department Tremonton Fire Department The most recent copy of the Contingency Plan will be sent to each of these agencies in order to familiarize them with the layout, description of hazardous wastes handled, and evacuation plans for the plant All correspondence with these agencies, in regard to the Contingency Plan and service arrangements will be kept in the Operating Record 54 ATK Launch Systems Inc - Promontory May 2010 Attachment 5 - Closure Plan UTD009081357 CLOSURE PLAN AND FINANCIAL REQUIREMENTS This Closure Plan describes the steps that will be taken to close the hazardous waste management imits (HWMUs) at the ATK Launch Systems Inc - Promontory (ATK) facility Estimates of the closure costs associated with these steps are also detailed in this Plan HWMUs mcluded in this document are M-186, M-705S, E-501, M-136, M-225, T-29B, M-47, M-603 and S-633 The Closure Plan was developed to comply with R315-8-7 and R315-8-9 9 of the Utah Administrative Code (UAC) UAC R315-8-7 incorporates by reference the requirements of 40 CFR 264 Subpart G The closure cost estimates were made in accordance with UAC R315-8-8, which incorporates by reference the requirements of 40 CFR 264 Subpart H All HWMUs in current operation are being managed in a maimer that facilitates clean closure Historical sites, such as the LTTAs do require post closure care, and are covered in owe Post Closure Permit 1 0 Closure Plans [40 CFR 270 14(b)(13), 270 23(a)(2), and 264 112(a)(1) & (2) and UAC R315-3, R315-8] This Closure Plan identifies all of the steps needed to close storage and treatment facilities, as identified above, at the end of their operating life Copies of this plan will be maintained at the Promontory Facility The closure plans will be followed as written, imless modification to the original plans have been submitted and approved by the Utah Department of Environmental Quality, Division of Solid and Hazardous Waste (DSHW) Upon update/revision approval, revised pages or complete documents will be sent to all plan addressees 1 1 Closure Performance Standards [40 CFR 264 111 and UAC R315-8-7] Closure standards specified under RCRA are designed to be protective of human health and the environment These goals will be achieved by one of the following closure methods • Clean closure - this method refers to residential risk based levels Cleanup to residential risk based levels, as outlined in UAC R315-101, will be considered clean closure Clean closure includes removal of all contaminants, or removal to the risk based level • Site Management - closure where waste remains in place and specific post closure care IS required For the purposes of estimating closure costs, it is assiuned that all of the HWMUs will be "clean closed" Clean closure can be achieved by cleaning the units to background conditions or by meeting the clean closure equivalency as defined in UAC R315-101 -6(c)( 1) All closures will assess real and reasonably likely impacts to human and ecological exposures ATK Launch Systems Inc - Promontory May 2010 Attachment 5 - Closure Plan UTD009081357 Preliminary remediation goals can be established prior to implementing any of the closure plans Screening levels published by USEPA or site-specific risk based levels based on UAC R315- 101-5 2 may be used If contammation from hazardous waste or constituents is discovered at a HWMU above risk based goals, further investigation will be performed to determine the extent of the contamination Based on the results of this investigation, a Corrective Measure Study (CMS) may be prepared for review and approval by the DEQ, prior to implementation If investigation suggests that clean closure is not a practicable approach, a Site Management Plan will be prepared Upon approval, the unit will be closed by implementing appropriate site management or post closure requirements If this approach is necessary, the Post Closure Permit may be modified to provide post closure care for the sites that are not clean closed 1 2 Partial Closure and Final Closure Activities [40 CFR 264 112(b)(1) through (b)(7) and UAC R-315-8-7] This plan is designed to accommodate both partial and final closure The plan includes separate steps to close storage, consolidation & disassembly areas, and open burning/open detonation areas Details for closing permitted facilities are provided in Tables 1 through 8 Soil monitoring has been conducted at the M-136 and M-225 bum grounds since 1991 Semi- annual groimdwater monitoring is also conducted, in accordance with ATK's Post-Closure Permit 1 3 Maximum Waste Inventory and Disposal Method [40 CFR 264 112(b)(3) and UAC R315-8-7] The maximum inventory of hazardous waste onsite at any one time durmg the life of the facilities IS based on permit limitations for inert facilities, and Quantity/Distance(QD) limitations for live materials, based on Department of Defense Explosive Safety Standard 4145 26M or a lesser designated amount If storage capacities change, the Permit will be modified These quantity limitations are listed below M-186 (inert) 400 ea 55 gallon drum equivalent M-705S (inert) 32 ea 55 gallon drum equivalent E-501 (inert) 160 ea 55 gallon drum equivalent M-136 (live) 106,500 lbs 1 3 / 20,000 lbs 1 1 M-225 (live) 55,000 lbs 1 3 / 1,500 lbs 1 1 T-29B (inert) 1 ea 55 gallon drum (pure) equivalent M-47 (live) 300,000 lbs 1 3 / 21,000 lbs 1 1 M-603 (live) 240,000 lbs 1 3 / 65,000 lbs 1 1 S-633 (live) 75,000 lbs 1 3/20,000 lbs 1 1 ATK treats reactive hazardous wastes on-site at the M-136 and M-225 open buming grounds These two waste treatment units are currently operated under interim status Wastewater is ATK Launch Systems Inc - Promontory May 2010 Attachment 5 - Closure Plan UTD009081357 collected and treated on site and discharged through one of two UPDES permitted treatment facilities All other hazardous wastes are transported by commercial carrier to fully permitted disposal or recycling facilities 1 4 Schedule for Closure [40 CFR 264 112(b)(6) and UAC R315-8-7] Section 1 4 1 of this plan provides an estimated closure schedule for all activities associated with implementation of this Closure Plan If sample results indicate the need for additional investigation or a CMS, the schedule will be modified to accommodate the changes Final closure will be certified by an independent professional engineer licensed in Utah 1 4 1 Time Allowance for Closure [40 CFR 264 113(a) and (b) and UAC R315-8-7] Final closure is expected to be initiated vsathm 30 days following shipment of the final volume of hazardous waste If more time is required, a request will be submitted to the Executive Secretary All hazardous wastes will be removed or treated within 90 days of (1) plan approval, or (2) after receiving the final volume of hazardous waste, whichever is later Final closure activities will be completed wathin 180 days of (1) plan approval, or (2) after receiving the final volume of hazardous waste, whichever is later 14 2 Extensions for Closure time [40 CFR 264 113(a) and (b) and UAC R315-8-7] If closure activities cannot be completed within the time designated in this Closure Plan, a permit modification and request for additional time will be submitted to the DSHW The request will state the reason for needed additional time and the status of the closure underway It will also address any added measures that must be followed to minimize any threats to human health or the environment during the extension period 1 5 Closure Procedures [40 CFR 264 112 and 264 114 and UAC R315-8-7] All permitted treatment and storage facilities have been designed and managed to minimize possible contamination This includes chemical resistant concrete coatings, blind containment sumps, regular inspections, regular maintenance, and prompt clean up of any spilled materials These practices should greatly reduce the need for significant remediation efforts upon closure 15 1 Soil and Groundwater Sampling Groundwater sampling is not covered under this plan A groundwater monitoring program is currently in place as discussed above Soil sampling should not be required for any of the permitted facilities, except for the two bum groimd areas (M-136 and M-225) and S-633 Soil samples will be collected within the top 12" of the surface Samples will first be collected at locations most likely to have been affected by waste management practices - as approved by DSHW persormel Twenty soil samples will be collected at M-136, twelve soil samples will be collected at M-225 and eight soil samples will be collected at S-633 These samples will be sent to a State of Utah certified laboratory for analysis Sample collection, preservation and handlmg ATK Launch Systems Inc - Promontor>' Attachment 5 - Closure Plan May 2010 UTD009081357 methods will follow those outlined in the Waste Analysis Plan of this permit, and will be in compliance with all applicable SW-846 methods All samples will be processed and analyzed by a Utah Certified Laboratory in accordance with R444-14-3(2)UAC Analytical and extraction methods to be used are shown below Analytical and Extraction Methods Parameter Analytical procedure Extraction Procedure Volatiles SW-846, 8260B SW-846, 5030B(W), 5035S Semi-Volatiles SW-846, 8270C SW-846, 3510C(W), 3550(S) RCRA Metals SW-846, 601 OB SW-846, 3005A(W),7471A(S) Mercury SW-846, 7470A/7471A SW-846,7470A(W), 7471A(S) Explosives SW-846,8330 Modified SW-846, 8330 Modified Perchlorate EPA 314 0 EPA 314 0 15 11 Samplmg Equipment Decontamination Procedures All field sampling equipment will arrive on site pre-cleaned, and will be decontaminated following standard protocol and the waste analysis plan in this permit A mobile decontamination station will be used to clean all sampling equipment that could come in contact with soil samples 15 12 Sampling Waste Management All waste generated from field sampling and decontamination operations will be managed in accordance with the current UAC R315 mles Water used in the decontamination process will be sent to the M-705 wastewater treatment plant onsite, and discharged in accordance with UPDES permit requirements Soils will be stored in UN containers pending lab results Any soil determined to be hazardous waste will be managed appropriately All non-aqueous hazardous waste generated by the sampling operation will be transported by a third party contractor off site to a fully permitted TSDF for disposal Any waste determined not to be hazardous under EPA regulations will be sent via third party to a non-hazardous landfill for disposal A field log will be maintained to track and identify all samples This log will include sample numbers, dates, times, sample depth, samplers name, weather conditions, test methods and constituents for which to analyze 15 13 Health and Safety Procedures Soil and water sampling will be performed by trained and qualified personnel A determination of appropriate personal protective equipment (PPE) to be used for this effort will be determined at the time of closure PPE selection will be based on potential hazards as determined at the time of closure, and in consultation with Industrial Hygiene professionals ATK Launch Systems Inc - Promontory May 2010 Attachment 5 - Closure Plan UTD009081357 Soil sampling should only be required at the bum grounds, because of well maintained secondary containment and waste management practices during the entire life of all other permitted facilities Protective clothing appropriate for the task will be used durmg removal of waste and during decontamination of contamment areas for the permitted storage and treatment units 15 2 Determinmg Cleanup Goals For the purposes of estimating closure costs, it is assumed that all of the HWMUs will be clean closed Clean closure can be achieved by cleaning the units to background conditions or by meeting the clean closure equivalency as defined in UAC R315-101-6(c)(l) All closures will assess real and reasonably anticipated potential impacts to human and ecological exposures It is anticipated that the HWMUs will be clean closed and will not require post-closure care 15 3 Site Cleanup 15 3 1 Inventory Removal [40 CFR 264 112(b)(3) and UAC R315-8-7] The maximum mventory of hazardous waste on hand at any given permitted facility is based on the maximum allowed under this permit, or a quantity - distance limit for explosives, imposed by the Department of Defense and ATK These limitations are specified in Section 1 3 of this Closure Plan Transportation and disposal costs of all hazardous waste during closure of a facility will be based on hiring a third party The transportation contractor will be licensed and insured, and the disposal facility will be a permitted facility Reactive hazardous wastes may be open bumed on site Cost calculations for treatment, disposal and equipment decontamination will be based on maintaining an ATK staff sufficient to complete these efforts 1 5 3 2 Disposal or Decontamination of Equipment and Structures [40 CFR 264 112(b)(4), 264,112(e), and 264 114 and UAC R315-8-7] Decontamination of equipment and stmctures at the Promontory facilities will follow one of two plans These plans cover the open buming units, and all other facilities The open burmng facilities use bum trays, pipes, concrete vaults or rocket cases to contain the waste to be treated Most of the material bumed is hazardous by characteristic only Any waste that may be contaminated with, or contains solvents or hazardous heavy metals is designated as a denved waste, and the ash collected for offsite disposal Therefore, except for the derived trays, all ash in trays, vaults, cases, and on the ground around these units will be collected and disposed on-site The bum trays will then be high pressure water washed and the rinsate collected for disposal After the final rinse, a composite sample from the trays will be collected and analyzed at a Utah certified lab to verify proper tray decontamination Each sample will include rinsate from 5 trays Samples will be extracted and analyzed as described in 1 5 1 All facilities except for M-136, M-225 and S-633 are designed with secondary contairmient The secondary containment includes a concrete pad with curbing and blind sump to simplify ATK Launch Systems Inc - Promontory May 2010 Attachment 5 - Closure Plan UTD009081357 cleaning The containment pads and sumps are coated with a chemical resistant epoxy to prevent liquid migration through the concrete Secondary containments are mspected daily, when in use, and maintained as needed After removal of all containerized waste, the containment pads will be high pressure water washed, and the rinsate will be collected for disposal After the final wash, rinse water samples will be collected from each sump and characterized for disposal Samples will be sent to a State certified laboratory for analysis 1 5 3 3 Closure Containers [40 CFR 264 178,264 112(b)(3), and 270 14(b)(13) and UAC R315-8-9 9, R315-807, and R315-3-5(b)(13)] Non-reactive hazardous waste requiring off-site disposal will be placed in a UN or a bulk USDOT authorized containers for offsite shipment to permitted disposal facilities Empty containers will be cleaned in compliance with 49 CFR, and sent for disposal 2 0 Closure Certification [40 CFR 264 115 and UAC R315-8-7] Within 60 days of completion of closure of each facility, ATK will submit a certification to the DSHW by registered mail, that the hazardous waste management facility was closed in comphance with this Closure Plan This certification will be signed by ATK and an independent registered professional engineer licensed in Utah Documentation supporting the engineer's registration will be provided upon request 3 0 Closure Cost Estimate [40 CFR 264 142] Closure costs are summarized in Table 11 A detailed breakdown of these costs is provided in Tables 1 through 8 The entire estimate is based on hiring a third party, except for the thermal treatment and disposal of reactive waste, which will be handled onsite 4 0 Financial Assurance Mechanism for Closure [40 CFR 264 143 and R315-309] ATK will maintain current financial assurance meeting the requirements outlined m the above referenced Federal and State regulations ATK will provide documentation to DSHW supporting compliance with financial mechanism requirements 5 0 Post Closure Plan If It IS determined that a HWMU can't be clean closed, contaminants may be left in place, and a post closure or site management plan will be developed Any proposal for post closure care or site management will be developed in accordance with UAC R315-8-7, UAC R315-8-8 and 40 CFR 264 Subparts G and H, and will be submitted to the Executive Secretary for approval If this approach is necessary, the Post Closure Plan may be modified to provide post closure care for the sites that are not clean closed ATK Launch Systems Inc - Promontory Attachment 5 - Closure Plan May 2010 UTD009081357 Table 1 M-136 Closure Cost Estimate* Item No Description Means No /Source Units Est Quan Unrt Price Total Pnce 1 Site prep (CIH) 33-22-0111 x2 hr 20 83 44 1 669 2 Site prep (technician) 33-22-0112x2 hr 40 50 96 2 038 3 Treat remaining waste ATK Ib 106 500 0 25 26 625 4 Excavate contaminated soil 17-03-0231 hr 20 105 63 2 113 5 Load soil and burned waste 17-03-0222 hr 8 68 13 545 Haul waste and soil to Clean 6 Harbors 33-19-0221 truck-mi 1 050 2 50 2 625 7 Landfill disposal waste and soil 33-19-7214 ton 50 169 45 8 473 8 State disposal fee waste and soil Utah DEQ ton 50 32 50 1 625 9 Steam clean burn pans 33-17-0812 sf 1 000 0 39 390 10 Load rinsate 33-19-0103 drum 5 4 87 24 11 Haul rinsate to Clean Harbors^ 33-19-0243 truck-mi 350 2 26 791 12 Landfill disposal rinsate^ 33-19-7214 drum 5 145 00 725 13 State disposal fee nnsate^ Utah DEQ ton 1 28 00 28 14 Demolish pans 17-02-0105 cf 2 000 0 14 280 15 Load pan debns 17-03-0222 hr 4 68 13 273 16 Haul pan debns to Clean Harbors 33-19-0221 truck-mi 350 2 50 875 17 Landfill disposal pan debns 33-19-7263 ton 50 169 45 8 473 18 State disposal fee pan debns Utah DEQ ton 50 32 50 1 625 19 Sample collection Site crew hr 40 65 00 2 600 20 Sample analyses metals Chemtech-Ford ea 20 210 00 4 200 21 Sample analyses explosives Chemtech-Ford ea 20 210 00 4 200 22 Sample analyses volatiles Chemtech-Ford ea 20 250 00 5 000 SUBTOTAL 75 196 INFLATION ADJUSTMENT=1 204^ 90 536 Misc costs as a percent of the inflation-adjusted subtotal Mob/demob 5 % 4 527 Engineenng/permitting 10 % 9 054 DSHW oversight 10 % 9 054 Contingency 10 % 9 054 TOTAL ESTIMATED COST 122 225 ATK Launch Systems Inc - Promontory Attachment 5 - Closure Plan May 2010 UTD009081357 Table 2 M-225 Closure Cost Estimate' Means Item No Descnption No /Source Units Est Quan Unrt Pnce Total Pnce 1 Site prep (CIH) 33-22-0111 x2 hr 8 83 44 668 2 Site prep (technician) 33-22-0112x2 hr 20 50 96 1 019 3 Treat remaining waste ATK Ib 55 000 025 13 750 4 Excavate contaminated soil 17-03-0231 hr 12 105 63 1 268 5 Load soil and burned waste 17-03-0222 hr 4 68 13 273 6 Haul waste and soil to Clean Harbors 33-19 0221 truck-mi 350 2 50 875 7 Landfill disposal waste and soil 33-19-7214 ton 25 169 45 4 236 8 State disposal fee waste and soil Utah DEQ ton 25 32 50 813 9 Steam clean burn pans 33-17-0812 sf 400 0 39 156 10 Load nnsate 33-19-0103 drum 3 4 87 15 11 Haul nnsate to Clean Harbors^ 33-19-0243 truck-mi 350 2 26 791 12 Landfill disposal nnsate^ 33-19-7214 drum 3 145 00 435 13 State disposal fee nnsate^ Utah DEQ ton 1 28 00 28 14 Demolish pans 17-02-0105 cf 800 0 14 112 15 Load pan debns 17-03-0222 hr 4 68 13 273 16 Haul pan debns to Clean Harbors 33-19-0221 truck-mi 350 2 50 875 17 Landfill disposal pan debns 33-19-7263 ton 20 169 45 3 389 18 State disposal fee pan debns Utah DEQ ton 20 32 50 650 19 Sample collection Site crew hr 20 65 00 1 300 20 Sample analyses metals Chemtech-Ford ea 5 210 00 1 050 21 Sample analyses explosives Chemtech-Ford ea 5 210 00 1 050 22 Sample analyses volatiles Chemtech-Ford ea 5 250 00 1 250 SUBTOTAL 34 274 INFLATION ADJUSTMENT = 1 204^ 41 266 Misc costs as a percent of the inflation-adjusted Subtotal Mob/demob 5 % 2 063 Engineenng/permitting 10 % 4 127 DSHW oversight 10 % 4 127 Contingencv 10 % 4 127 TOTAL ESTIMATED COST 55 710 ATK Launch Systems Inc - Promontory Attachment 5 - Closure Plan May 2010 UTD009081357 Table 3 M-47 Closure Cost Estimate' Item Means Est Total No Descnption No /Source Units Quan Unrt Pnce Pnce 1 Matenals prep (CIH) 33-22-0111 x 2 hr 12 83 44 1 001 2 Materials prep (technician) 33-22-0112x2 hr 20 31 58 632 3 Load waste motor (crane) Crew SIWSM hr 8 393 57 3 149 4 Haul motor to burning ground Crew C0ET2 hr 16 93 31 1 493 5 Off-load motor Crew SIWSM hr 8 393 57 3 149 6 Handling evaluation/planning Site personnel hr 80 65 00 5 200 9 Motor handling Site personnel hr 40 65 00 2 600 10 Disposal at burning ground ATK Ib 300 000 0 25 75 000 11 Sweep area 33-22-0112x2 hr 8 31 58 253 12 Steam clean floor 33-17-0812 sf 5 680 0 39 2215 13 Load nnsate/sweepmgs 33-19-0103 drum 10 4 87 49 14 Load drums 33-19-0103 ea 10 3 05 31 15 Haul to Clean Harbors 33-19-0243 truck-mi 350 2 26 791 16 State disposal fee Utah DEQ ton 1 28 00 28 17 Sample collection 33-22-0112x2 hr 4 31 58 126 18 Sample analyses metals/exp Chemtech-Ford ea 2 210 00 420 SUBTOTAL 96 135 INFLATION ADJUSTMENT = 1 204^ 115 747 Misc costs as a percent of the inflation-adjusted subtotal Mob/demob 5 % 5 787 Engineenng/permitting 10 % 11 575 DSHW oversight 10 % 11 575 Contingency 10 % 11 575 TOTAL ESTIMATED COST 156 258 ATK Launch Systems Inc - Promontory Attachment 5 - Closure Plan May 2010 UTD00908n57 Table 4 M-603 Closure Cost Estimate' Item Means Est Total No Descnption No /Source Units Quan Unrt Pnce Pnce 1 Matenals prep (CIH) 33-22-0111 x2 hr 8 83 44 668 2 Materials prep (technician) 33-22-0112x2 hr 12 31 58 379 3 Load waste motor (crane) Crew SIWSM hr 8 393 57 3 149 4 Haul motor to burning ground Crew C0ET2 hr 12 93 31 1 120 5 Off-load motor Crew SIWSM hr 8 393 57 3 149 6 Handling evaluation/planning Site personnel hr 40 65 00 2 600 9 Motor handling Site personnel hr 20 65 00 1 300 10 Disposal at burning ground ATK Ib 120 000 0 25 30 000 11 Sweep area 33-22-0112x2 hr 8 31 58 253 12 Steam clean floor 33-17-0812 sf 1 830 0 39 714 13 Load nnsate/sweepings 33-19-0103 drum 4 4 87 19 14 Load drums 33-19-0103 ea 4 3 05 12 15 Haul to Clean Harbors 33-19-0243 truck-mi 350 2 26 791 16 State disposal fee Utah DEQ ton 1 28 00 28 17 Sample collection 33-22-0112x2 hr 4 31 58 126 18 Sample analyses metals/exp Chemtech-Ford ea 2 210 00 420 SUBTOTAL 44 727 INFLATION ADJUSTMENT = 1 204^ 53 851 MISC costs as a percent of the inflation-adjusted subtotal Mob/demob 5 % 2 693 Engineenng/permitting 10 % 5 385 DSHW oversight 10 % 5 385 Contingency 10 % 5 385 TOTAL ESTIMATED COST 72 699 10 ATK Launch Systems Inc - Promontory Attachment 5 - Closure Plan May 2010 UTD009081357 Table 5 M-186A Closure Cost Estimate Item Means Est Total No Descnption No /Source Units Quan Unrt Pnce Pnce 1 Site prep (CIH) 33-22-0111 x2 hr 8 83 44 668 2 Site prep (technician) 33-22-0112x2 hr 24 31 58 758 3 Load drums 33-19-0103 ea 400 3 05 1 220 4 Haul drums to Clean Harbors 33-19-0243 truck-mi 1 750 2 26 3 955 5 Landfill disposal 33-19-7214 drum 400 145 00 58 000 6 State disposal fee Utah DEQ ton 100 28 00 2 800 7 Truck washout/decon 33-19-0311 ea 1 158 00 158 8 Steam clean floor 33-17-0812 sf 1 930 0 39 753 9 Rinsate sample collection Site crew hr 4 65 00 260 10 Sample analyses metals Chemtech-Ford ea 1 210 00 210 11 Sample analyses explosives Chemtech-Ford ea 1 210 00 210 SUBTOTAL 68 991 INFLATION ADJUSTMENT = 1 204^ 83 065 Misc costs as a percent of the inflation-adjusted subtotal Mob/demob 5 % 4 153 Engineenng/permitting 10 % 8 307 DSHW oversight 10 % 8 307 Contingency 10 % 8 307 TOTAL ESTIMATED COST 112 138 11 ATK Launch Systems Inc - Promontory Attachment 5 - Closure Plan May 2010 UTD009081357 Table 6 M-705S Closure Cost Estimate' Item Means Est Total No Descnption No /Source Unrts Quan Unrt Pnce Pnce 1 Site prep (CIH) 33-22-0111 x2 hr 4 83 44 334 2 Site prep (technician) 33-22-0112x2 hr 8 31 58 253 3 Load drums 33-19-0103 ea 32 3 05 98 4 Haul drums to Clean Harbors 33-19-0243 truck-mi 350 2 26 791 5 Landfill disposal 33-19-7214 drum 32 145 00 4 640 6 State disposal fee Utah DEQ ton 8 28 00 224 7 Truck washout/decon 33-19-0311 ea 1 158 00 158 8 Steam clean floor 33-17-0812 sf 1 850 0 39 722 9 Rinsate sample collection Site crew hr 4 65 00 260 10 Sample analyses metals Chemtech-Ford ea 1 210 00 210 11 Sample analyses explosives Chemtech-Ford ea 1 210 00 210 SUBTOTAL 7 899 INFLATION ADJUSTMENT = 1 204^ 9510 Misc costs as a percent of the inflation-adjusted subtotal Mob/demob 5 % 475 Engineenng/permitting 10 % 951 DSHW oversight 10 % 951 Contingency 10 % 951 TOTAL ESTIMATED COST 12 838 12 ATK Launch Systems Inc - Promontory Attachment 5 - Closure Plan May 2010 UTD009081357 Table 7 E-501 Closure Cost Estimate' Item Means Est Total No Description No /Source Units Quan Unrt Pnce Pnce 1 Site prep (CIH) 33-22-0111 x2 hr 4 83 44 334 2 Site prep (technician) 33-22-0112x2 hr 8 31 58 253 3 Load drums 33-19-0103 ea 160 3 05 488 4 Haul drums to Clean Harbors 33-19-0243 truck-mi 700 2 26 1 582 5 Landfill disposal 33-19-7214 drum 160 145 00 23 200 6 State disposal fee Utah DEQ ton 40 28 00 1 120 7 Truck washout/decon 33-19-0311 ea 1 158 00 158 8 Steam clean pad 33-17-0812 sf 1 760 0 39 686 9 Rinsate sample collection Site crew hr 4 65 00 260 10 Sample analyses metals Chemtech-Ford ea 1 210 00 210 11 Sample analyses explosives Chemtech-Ford ea 1 210 00 210 SUBTOTAL 28 501 INFLATION ADJUSTMENT = 1 204^ 34 315 MISC costs as a percent of the inflation-adjusted subtotal Mob/demob 5 % 1 716 Engineenng/permitting 10 % 3 431 DSHW oversight 10 % 3 431 Contmgency 10 % 3 431 TOTAL ESTIMATED COST 46 325 13 ATK Launch Systems Inc ~ Promontory Attachment 5 - Closure Plan May 2010 UTD009081357 Table 8 T-29B Closure Cost Estimate' Item Means Est Total No Descnption No /Source Unrts Quan Unrt Pnce Pnce 1 Site prep (CIH) 33-22-0111 x2 hr 4 83 44 334 2 Site prep (technician) 33-22-0112x2 hr 8 31 58 253 3 Extra drum for dilution 33-19-0402 ea 1 80 00 80 4 Transfer and dilute hydrazine Site crew hr 4 65 00 260 5 Load drums 33-19-0103 ea 2 3 05 6 6 Haul drums to Clean Harbors 33-19-0243 truck-mi 350 2 26 791 7 Landfill disposal 33-19-7214 drum 2 145 00 290 8 State disposal fee Utah DEQ ton 1 28 00 28 9 Truck washout/decon 33-19-0311 ea 1 158 00 158 10 Steam clean floor 33-17-0812 sf 200 0 39 78 11 Rinsate sample collection Site crew hr 4 65 00 260 12 Sample analyses metals Chemtech-Ford ea 1 210 00 210 13 Sample analyses explosives Chemtech-Ford ea 1 210 00 210 SUBTOTAL 2 958 INFLATION ADJUSTMENT = 1 204^ 3 561 MISC costs as a percent of the inflation-adjusted subtotal Mob/demob 5 % 178 Engineenng/permitting 10 % 356 DSHW oversight 10 % 356 Contingency 10 % 356 TOTAL ESTIMATED COST 4 807 14 ATK Launch Systems Inc - Promontory Attachment 5 - Closure Plan May 2010 UTD009081357 Table 9 S-633 Closure Cost Estimate' Item Means Est Total No Descnption No /Source Units Quan Unrt Price Pnce 1 Site prep (CIH) 33-22-0111 x2 hr 4 83 44 334 2 Site prep (technician) 33-22-0112x2 hr 8 50 96 253 3 Disposal at Burning Ground ATK hr 75 000 0 25 18 750 4 Sample Collection Site crew Ib 8 65 00 520 5 Sample analyses metals Chemtech-Ford ea 5 210 00 1 050 6 Sample analyses explosives Chemtech-Ford ea 5 210 00 1 050 7 Sample analyses volatiles Chemtech-Ford ea 5 210 00 1 250 SUBTOTAL 23 207 INFLATION ADJUSTMENT = 1 204^ 27 941 MISC costs as a percent of the inflation-adjusted subtotal Mob/demob 5 % 1 397 Engineenng/permitting 10 % 2 794 DSHW oversight 10 % 2 794 Contingency 10 % 2 794 TOTAL ESTIMATED COST 37 720 Closure Cost Estimate Footnotes ' All cost estimates were provided by EarthFax Engineering, Inc , using Means 2005 Remediation Cost Data adjusted for inflation except as otherwise noted Cost estimates assume usmg Level C PPE Subtotals multiplied by an inflation adjustment (1 204) based on July 2005 cost index of 151 6 from Means 2009 Heavv Constmction Cost Data and July 2009 cost index of 182 5 from the Means web site Closure cost estimates are based on rinsate from M-136 and M-225 being shipped off-site for disposal Rinsate from the other HWMUs will be treated on-site and discharged in accordance with the UPDES permit 15 ATK Launch Systems Inc - Promontory Attachment 5 - Closure Plan May 2010 UTD009081357 Table 10 Summary of Closure Cost Estimates Hazardous Waste Management Unit Estimated Cost ($) M-136 122,225 M-225 55,710 M-47 156,258 M-603 72,699 M-186 112,138 M705S 12,838 E-501 46,325 T29B 4,807 S-633 37,720 Total 620,720 16 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 II 0 PROCESS INFORMATION All reactive waste management operations at the facility are conducted and are under the management of ATK The reactive waste management process is described in the following text III Facihty Description The ATK Promontory facility is located in a remote area of west Box Elder County, Utah, approximately 30 miles northwest of Brigham City, and approximately 11 miles north of the Great Salt Lake The facility was purchased by Thiokol in 1956, with the exception of a 1,500-acre tract that was sold to the U S Air Force in 1958 and then repurchased in 1995 The facility has been held in its entirety since purchase ATK Launch Systems conducts thermal treatment of reactive hazardous wastes at two treatment units (1) the main facility, M-136, located centrally to the two mam manufacturing sites, and (2) M-225 located in a remote development location called Plant III M-136 IS the pnmary treatment area for conducting open buming at the Promontory facility Open detonation is also conducted at M-136 which is a secured fenced facility within the main facility fence The M-225 treatment area receives small amounts of the reactive hazardous waste materials from the Plant III propellant development area The M-225 treatment unit is surrounded with an 8-foot high chain link fence The waste matenals are treated via open buming or open detonation The M-136 and M-225 treatment areas are fenced and are located withm a controlled and fenced facility that is patrolled and mamtamed by a secunty department The treatment areas have wammg signs posted around the peruneter The vegetation is controlled within the treatment areas through application of herbicide and puttmg m place loads of gravel and road base Surroundmg both treatment areas are a large system of fu-e breaks that are constmcted usmg large equipment to till and cultivate a large strip of land removmg any vegetation The system of fire breaks are designed to contain a fire within its boundaries Contamed withm the boimdaries of the M-136 treatment area are twelve former surface impoundments called Liquid Thermal Treatment Areas (LTTAs) These impoundments were used for the disposal of hazardous waste and wastewater and then capped and closed The units are currently under post closure care and managed through a Post Closure Permit which includes requirements for groimdwater monitormg and corrective action The Post- Closure groundwater monitormg program mcludes all wells around the M-136 and M-225 treatment areas as part of the groundwater monitormg system These wells are routmely monitored thorough the permit requirements which mcludes the Samplmg and Analysis and Quality Assurance Plans The Promontory facility is located in the Blue Spring Valley which is bounded on the east by the Blue Spring Hills and on the west by Engineer Mountain and the Promontory Mountain ranges Within the Blue Spring Valley, the terrain is characterized by topography that slopes down from the mountain crest at an elevation of approximately 6,050 feet above mean sea level (AMSL) toward the center of the Blue Creek Valley at an elevation of 4,250 feet AMSL As a result, the surrounding 4 1 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 environment extending out to 6 2 miles (10 kilometers) from both treatment units can be characterized as complex terrain GEOLOGY The ATK facility is located in the Southem Blue Creek Valley, northwest of the Salt Lake Valley, which is the eastem most structural valley of the Basin and Range physiographic province, which includes parts of Utah, Idaho, Nevada, Arizona, and New Mexico The Basm and Range province consists of a number of north-south aligned mountain ranges and valleys bounded by high-angle normal faults The Blue Creek Valley, m which ATK is located, is bounded on the east and west by the Blue Springs Hills and the Engineer and Promontory Mountain ranges, respectively Movement along the faults has displaced the mountains upward relative to the adjacent valley Likewise, the mountains immediately west of ATK are bounded on their eastem margin by one or more fauhs which are partly buried by recent deposits Bedrock, composed of Middle Paleozoic shale, sandstone, and limestone, is exposed in the ranges adjacent to the site The bedrock is highly fractured with some folding During the Mississippian and Permian Periods, marine sediments consisting of sand, clay, and calcareous detritus were deposited in shallow marine environments In the late Cretaceous Period, compressional forces from the west resulted in folding and thrast faulting in conjunction with uplift of the region into mountain ranges Extensive jointing and fracturing of the bedrock were caused by this folding and faulting episode Tensional stresses in the early to middle Tertiary Period resulted in north south trending normal faults that formed a series of high linear mountain ranges with intervening basins which received sediment from adjacent highlands This activity was associated with volcanism and ancient lake deposition In the late Tertiary Period, a series of geologic units tentatively identified as the Salt Lake Group were formed from deposition of sediments in large lakes which developed within the valleys These lake deposits are composed primarily of silts and clays with minor amounts of sand and gravel and are characterized by low to moderate permeabilities, extensive deposits of volcanic ash are also present in the Salt Lake Group The alluvial fan deposits were overlapped by more recent lake sediments of Pleistocene Lake Bonneville, the predecessor to the present Great Salt Lake Lake Bonneville covered much of westem Utah and parts of Idaho and Nevada between about 23,000 and 12,000 years ago Deposits associated with the lake consist of lakebed and alluvial materials reworked by lake bottom and shoreline processes Lake Bonneville sediments thicken southward The most recent sedimentary deposits consist of stream alluvium and mud and debris flows The stream alluvium consists primarily of silty and clayey sand and gravel The mud and debris flow deposits are characterized by a broad gradation of sediments from clay-size fines to boulders as large as 3 feet in diameter HYDROGEOLOGY Ground water in Blue Creek Valley occurs under unconfined and confined conditions These two conditions exist in fractured and faulted bedrock, lake clays and gravels, unconsolidated alluvium, gravel, and sandy deposits Precipitation, surface water infiltration, and plant discharges that infiltrate into sediments may migrate slowly, vertically, and horizontally to form perched water tables above the 50- 150-foot depth of 4 2 ATK Launch Systems Part B Operational Plan Promontory Facility Process Infonnation UTD 009081357 May 2010 the regional water zone The perched ground water may eventually migrate to the deeper regional system The regional system ranges from 50- 600 feet in depth depending on the topographical location Blue Creek may recharge shallow aquifers in the center of the Blue Creek Valley The direction of movement within the faulted and fractured bedrock will be controlled by the connection of faults and fractures Regionally, the ground water flow trend is from north to south Depth to groundwater at the M-136 treatment units is an average 300 feet Depth to groundwater at the M-225 treatment unit is 600 feet The ground water quality in Blue Creek Valley is generally poor due to naturally occurring chlorides and total dissolved solids Levels of dissolved solids range from 400 to over 12,000 mg/1 Quality of ground water depends upon the sediments, which it has contacted Quality is quite good in local, up gradient areas of water recharge, but degrades rapidly as it moves from mountain to the valley axis High levels of total dissolved solids m lowland areas are probably due to slow migration through Tertiary sediments Down gradient from the ATK sites, quality deteriorates rapidly as it enters the mudflats of the Great Salt Lake CLIMATE ATK has a 10-meter meteorological tower and instraments to measure and record air temperature, barometric pressure, relative humidity, solar radiation, precipitation, vertical and horizontal wind speed, and direction The ATK plant site is classified as semiand, with an average annual total precipitation of 14 88 inches at the ATK meteorology station During the winter months, the average total snowfall amounts to 24 inches Precipitation typically occurs on 95 days out of the year (includes trace precipitation) During the year, it would be expected that 35 percent of the days would be clear, 30 percent of the days would be partly cloudy, 34 percent would be cloudy, and fog would be expected to occur about 1 percent of the time According to interpreted weather data for the ATK facility, the 25-year storm with 24-hour duration would result in 2 4 inches of precipitation Evaporation rates are high throughout the year, with the Great Salt Lake averaging 66 in a year The average area evapotranspiration rate is 46 6 inches The consistently low precipitation and high evaporation allow little if any percolation into subsurface soils The average annual temperature in the ATK Promontory area is in the 45 to 50 degree range, with generally hot, dry summers Relative humidity averages between 20 and 30 percent during summer afternoons Nights are usually cool, but daytime maximums occasionally exceed 100 degrees F On clear nights, cold air usually drains from the slopes of the adjacent ranges and accumulates on the valley floor, while the foothills and bench areas, such as at Thiokol, remain relatively warm The average daily temperature ranges from about 11 to 32 degrees F in January and from about 54 to 91 degrees F in July On an annual basis, the winds for the valley tend to prevail from the north during the earlier moming hours and south to southeast, averaging about 10 mph, during the afternoon 4 3 ATK Launch Systems Part B Operational Plan Promontory Facility Process information UTD 009081357 May 2010 Blue Creek is the only perennial stream in the valley drainage basin and is the closest water body to the M-136 treatment unit Blue Creek originates some 15 miles north of the Promontory facility from a warm saline spring, which flows along the westem boundary of the facility The Promontory area is characterized as a very sparsely populated rural region, with primarily dry farms and ranching activities Low growing perennial grasses and shrubs characterize the vegetation in the area The ecological habitat found at the Promontory facility includes many head of mule deer and large populations of vanous birds, rabbit, and predator species 11 2 WASTE CHARACTERIZATION Wastes will be characterized to identify hazardous properties to ensure they are properly managed The Waste Analysis Plan (see Attachment 1) will be used to characterize and classify reactive wastes 11 3 REACTIVE WASTE DESCRIPTION The primary products produced at the facility include solid rocket motors, military and aviation flares, and high explosive/high energy compounds Solid rocket motors are typically cast with composite propellants Composite propellants are classified as a DOT 1 3 material, and typically contain a non-explosive liquid binder mixed with aluminum powder and ammonium perchlorate Flares are generally classified as a DOT 1 3 material, and typically contain an inert binder, a metal powder, and an oxidizer High explosive compounds are generally classified as DOT 1 1 material and are generally nitramine compounds developed for specific military requirements Reactive wastes are produced from the manufacturing process include, but are not limited to the following cured and uncured propellants, rocket motors, small initiating devices, explosives articles, propellant scrap, and explosive ingredients such as HMX, RDX, CL-20, explosive contaminated metal powders such as aluminum and magnesium and oxidizers such as ammonium perchlorate and potassium perchlorate The facility also contams both quality assurance and research and development laboratories The quality assurance laboratories generate wastes similar to manufacturing wastes The Research and Development laboratones generate a small quantity, but a wide variety of both explosive compounds and precursors to explosive compounds Reactive wastes are characteristic hazardous wastes for reactivity (D003) Nearly all of the reactive wastes are reactive due to the presence of propellants and explosives Some reactive wastes, such as those from laboratory operations, may contain solvents which would also be a listed waste defined by R315-2 of the UAC Wastewater treatment sludge generated from the processing of explosives is a K044 listed hazardous waste Reactive wastes also include materials such as rags, gloves, other personal protective equipment, plastics, rubber and paper contaminated with explosive materials during the manufacturing process Reactive wastes may also be received from off-site sources With one exception, off- site wastes are rocket motors, propellants or explosives with similar formulations and ingredients to those generated on site The exception is wastes received from Autoliv 4 4 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 ASP Inc which are generally DOT Class 1 3 materials containing compounds similar in nature to flare compounds (provide additional information about Autoliv constituents , also explain that gas generates were developed here and we continue to do some development) 11 4 REACTIVE WASTE GENERATION AND COLLECTION ATK uses a variety of containers to store reactive wastes at the Facility The standard containers used at the Facility are described in this section However, due to the nature of our business, new types of containers may be required in the future, and can't be described in this application To ensure that all containers are safe to use, containers will be selected using the DOD Contractor's Safety Manual for Ammunition and Explosives (DOD 4145 26-M) All containers for reactive waste that are currently used, or will be used in the future will meet the DOD 4145 26-M requirements Operating buildings generating reactive wastes use a variety of collection containers as described below • Conductive Containers -Electncally conductive containers are typically bags made of opaque, volume-conductive carbon-impregnated polyolefin or polypropylene They can be grounded to prevent he build up of static electricity The bags are available in a variety of sizes from small containers to large than one cubic yard They are typically used to line other containers, but can be used without an outside container Typical conductive containers include Velostat® bags, Velostat® sheet material, and conductive sling bag and Super Sack® containers • Static Dissipative Contamers -Static dissipative containers are typically bags made of a polyethylene material The material prevents the build-up of static electricity by continually dissipating the charge These bags are typically used to line other containers, but may be used without an outside container Typical static dissipative containers include pink poly bags, pink poly sheet material and static dissipative Cromhmiq™ sack containers Fiberboard drums - Wastes may be collected directly into commercially available 30-gallon fiberboard drams These drums have a removable hd that can be sealed in place with a locking chime after the drum is filled Fiberboard drams selected for this application are approved by DOT for highway transportation of hazardous matenals and can be used to ship these wastes off-site for treatment and disposal Sumps- Explosive contaminated wastewater is collected in sumps at the point of generation When appropriate, propellant "chips" and other suspended solids are filtered out before the wastewater reaches the tank, and when the wastewater is pumped out of the tanks The wastewater is pumped into tanker tracks where it is treated at M-705 and discharged under a UPDES permit Filters containing "chips and other suspended solids are accumulated , and treated and disposed of in accordance with the applicable hazardous waste management rules Other Containers - Large blocks of cured propellant are containerized by wrapping the waste in plastic and placing it on wood pallets Ammunition cans are used to hold initiating and ordnance items Waste rocket motors are generally large 4 5 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 enough to be their own container Plastic buckets are used to hold conductive and static dissipative bags The buckets are reused and become contaminated with reactive material The buckets are cleaned by removing the contaminated material using a rag The contaminated rag is then collected for disposal and managed as directed in UAC 315-5 If a bucket cannot be cleaned, it is managed as a hazardous waste and treated by open buming Laboratory waste may come in a variety of sizes and types of containers such as plastic, metal or glass DOT containers for Class 1 1 and 1 3 reactive materials may also be used A plastic cover secured to a tray may be used as a container for unbumed residue or containers of off-site waste stored in a tray for up to 14 days from to thermal treatment Operating personnel accumulate reactive waste in these containers as it is generated When a reactive waste container is full or at the end of an operating shift, it is closed or sealed as applicable for the container A hazardous waste label is filled out and attached to the container Operators at the buildings that generated the waste enter pertinent information into the electronic waste tracking system described in Section 11 5 Most operating buildings that generate reactive waste have an explosive waste collection area located approximately 50 feet from the operating building Except as described below, waste containers are placed in the collection area to facilitate removal of waste propellant, explosive and reactive wastes from the operating buildings The collection sheds are constructed of wood or corrugated metal and are secured to a concrete floor When managing reactive wastes, ATK building operators use the temporary collection sheds as 90-day or satellite accumulation stations Reactive wastes are placed in the collection area either as they are generated or at the end of each operating shift Waste containers that are not fiill at the end of a shift are sealed, a hazardous waste label is attached to the container and they are moved to the temporary collection area Containerized explosive wastes are picked up from the collection location using a vehicle approved for the transport of explosive wastes Extreme care is used when handling all explosive wastes Wastes are transported directly to either the M-136 or M-225 burning ground Reactive wastes generated at Plant 3 are transported to M-225 All other reactive wastes are transported directly to M-136 Propellant and explosive operatmg buildings at the facility, including explosive waste 90-day storage and satellite accumulation areas, are designed and constracted in accordance with strict federal standards These standards identify the criteria that must be used to constract buildings where reactive material will be used and/or stored These standards also require that explosive buildings to be separated by sufficient distance, or a quantity-distance relationship, to prevent an explosive event in one building from propagating to another building Quantity-distance rules also control the location of propellant and explosive operatmg buildings with regard to public property (highways, parks, etc,) and private property All buildings used for temporary storage of waste explosives, including the temporary storage sheds, are correctly sited with respect to the applicable quantity-distance rules 4 6 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 11 5 QUANTITY DISTANCE DETERMINATION The facility uses the Department of Defense (DOD) guidance to calculate quantity distance relationships The evaluation was conducted according to NAVSEA OPS, Volume 1, Revision 4, Paragraph 11-32 The method used to determine safe quantity distance relationships for both Class 1 1 and I 3 propellants is provided below The quantity distance relationship for Class 1 3 propellant is determined by the following formula D = SW''' Where W is the weight of Class 1 3 propellant and D is the safe distance The formula applies to Class 1 3 propellant and Class 1 3 propellant mgredients The safe distance is defined as the mterline protection for mass fire for Class 1 3 propellant The quantity distance relationship for Class 1 1 propellant is determmed by the following formula D = ISW"'' Where W is the weight of a Class 1 1 explosive and D IS the safe distance The formula applies to Class 1 1 propellant and Class 1 1 propellant mgredients The safe distance is defined as the unbamcaded interline protection for Class 1 1 propellant 11 6 WASTE TRACKING ATK maintains an electronic waste tracking record to collect and manage information about reactive wastes generated at the facility This tracking system uses a combination of paper records and an electronic database Wastes being accumulated in containers at operating area within the facility are labeled and managed in accordance with R315-5 of the UAC for either a satellite accumulation or less than 90-day hazardous waste storage area The electronic tracking system maintains the following information to monitor cradle to grave waste handling practices ID# - container identification number Date - accumulation date Building # - identifies where the waste was generated, RWD1# - identifies the reactive waste disposal instraction Profile # - identifies the profile Quantity of PEP - quantity of propellant, explosive or pyrotechnic matenal, Quantity of Contaminated waste - Explosive and total weight of the container. Material Description - description of the material Propellant name - describes the propellant by type, program other identifier Log Date - date logged into the system The electronic tracking system maintains information on all containers of reactive waste in 90- day storage at M-136 and M-225 It also tracks the total weight of waste placed on each bum tray, and the total weight of waste bumed on any given day In the event reactive waste is shipped off-site for treatment, the system maintains the following information the manifest number, transporters, manifest ship date, and manifest retum date 4 7 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 In the event the electronic tracking system is not operable, the information will be tracked using paper copies until the electronic system is operable In the event this occurs, ATK will transfer all information to the electronic system within 72 hours of the system becoming operational again 117 REACTIVE WASTE STORAGE ATK may store hazardous wastes prior to disposal Reactive wastes are stored in designated facilities as described in this section, and are segregated according to compatibility requirements M-47 - This building can be used to store any of the explosive wastes listed in Section 11 2 All containers of waste m storage will be closed except when waste is being added to or removed from the container Adequate aisle space must be provided to permit proper container inspection, all containers will be labeled and managed in accordance with R315-5 of the UAC This building does not have water immediately available, and relies on the Fire Department for any emergency action Employees are not permitted to fight fires mside an explosive storage building This building IS a totally enclosed, so there are no precipitation run-on or run-off concems M-603 - This building can be used to store any of the explosive wastes listed in Section 11 2 All containers of waste in storage will be closed except when waste is being added to or removed from the container Adequate aisle space must be provided to permit proper container inspection All containers will be labeled and managed in accordance with R315-5 of the UAC This buildmg is equipped with a fire sprinkler system, which is checked annually Employees are not permitted to fight fires inside an explosive storage building This building is totally enclosed, so there are no precipitation run-on or ran-off concems M136- trays at M-136 can be used to store off-site waste for up to 14 days All containers of waste must be closed, labeled and managed in accordance with R315-5 ofthe UAC S-633- This storage pad can be used to store any of the explosive wastes listed in Section 11 2 All containers of waste in storage will be closed except when waste is being added to or removed from the container Adequate aisle space must be provided to permit proper container inspection S-633 is approximately 100' x 100' in size It IS secured by a perimeter fence, a vehicle access gate that can be locked, and has the appropriate waming signs for a storage area It has a road base surface, and has lighting protection All containers will be labeled, and managed in accordance with R315-5 of the UAC This area does not have water immediately available, and relies on the Fire Department for any emergency action Employees are not permitted to fight fires inside an explosive storage building Precipitation run-on or run-off is prevented by a combination of diversion ditches, collection ditches and trenches 4 8 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 11 8 TREATMENT OF REACTIVE WASTE The facility utilizes thermal treatment methods to safely dispose reactive hazardous wastes Thermal treatment methods include both open buming and open detonation Reactive hazard wastes may also be shipped off-site and treated at other permitted treatment storage and disposal facilities 118 1 OFF-SITE TREATMENT OF REACTIVE WASTE All hazardous reactive wastes treated off-site will comply with all applicable local. State and Federal regulations 118 2 ON-SITE TREATMENT The M-136 and M-225 facilities are thermal treatment units designed to treat reactive hazardous wastes using open buming or open detonation Treatment at M-136 is limited to a maximum of 106,500 pounds per day Each bum station 1-12 and 14 may treat all or a portion of the 106,500 pounds Bum station 13 can treat a maximum of 50,000 pounds per day Treatment by open detonation will be conducted at bum stations 13 and 14 only, and is limited to 600 pounds per event Figure 11-2 shows the security fence, control bunk, and vehicle access points for M-136 Treatment at M-225 is limited to a maximum of 4,500 pounds per day Each bum station 1-4 may bum all or a portion of the 4,500 pound limit Treatment by open detonation is limited to the 600 pounds per day in the M-225 open detonation area Figure 11-2 shows the security fence and vehicle access points for M-225 The process flow for open buming at both treatment areas is identified below 1 Pre-planned Activities 2 Post-bum Inspection and Cleanup 3 Wiring and Ignition 4 Post-bum Inspection and Cleanup The following precautions are used to ensure operator safety while working at the M- 136 and M-225 bum grounds 1 Emergency egress routes are always maintained while employees are working in the treatment areas 2 The firing systems are disabled using an interlock to prevent accidental ignition 3 Weather conditions are monitored to assure operators are not exposed to risks from lightning strikes 118 2 1 PRE- PLACEMENT ACTIVITIES OBOD operations at the facility are a continuous process Wastes are transported from the generation areas and brought into the treatment areas on a daily basis Wastes are off-loaded and placed in trays and managed under 90-day rules until treatment occurs When treatment is completed, the trays are cleaned, inspected and the loading process begins again Pre-placement inspections occur during the post-burn inspection and clean-up phase of the treatment process 4 9 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 Prior to placing reactive waste for treatment at the OBOD facilities, operators visually verify the following tasks were completed during post-bum inspection and cleanup activity 1 Any untreated waste and/or unbumed residue has been identified, collected and is being properly managed, 2 Storm water accumulated in the trays has been removed 3 Trays which do not meet the inspection criteria have been removed from service 118 2 2 PLACEMENT OF WASTE IN TREATMENT UNITS Reactive hazardous waste is transported to the OBOD facilities using a vehicle which meets explosive safety requirements Reactive hazardous waste may be offloaded by hand or mechanical means including a knuckle boom, forklift, crane, or other appropriate equipment Reactive hazardous waste is not collected, transported, or unloaded during a lighting waming, which is defined as lightning within 30 miles of the facility If collection, transportation, or unloading operation has started, the operation is brought to a safe halt Treatment units used to treat and contam waste are listed below but are not limited to, the followmg • Burn Trays - Metal trays constructed in several different sizes including, 4'X 10', 5'X16', 8'X8', and 8'X20' Typical construction is out off steel plate A36 grade steel ranging thicknesses of 3/8", 1/2", 74", and 1 inch • Clamshell Disposal Trays- Used for the disposal of items that have the potential to be propulsive Typical constraction is a square welded box 1-inch thick, A36 steel plate with a vented hd that enables treatment of potentially propulsive items, while safely containing the propulsive energy • Restraining Trays are fypically constracted of 1 -inch thick A3 6 steel plate welded into a square box that is filled with sand There are several different designs for restraining trays which include (1) steel tubes sitting on end in the sand are used to hold potentially propulsive items which are secured to the tube allowing the exhaust to vent out of the open end of the steel tubes, and (2) used without steel tubes where propulsive items are secured at the base for items where the exhaust will vent from the side of the item • Small Motor Disposal Vaults- Constructed from a concrete 10x10 foot sump filled with sand Small rocket motors such are placed into the sand with the aft end exposed perpendicular to the ground Motors are treated with the propulsive force directed into the concrete sump and the sand The vehicle is to be parked near the receiving tray with any side rails lowered to facilitate offloading of the waste Containers are transferred directly from the tmck and carefully placed mto the bum tray Items to be open detonated are offloaded from the vehicle by hand, knuckle boom, or by forklift and then placed on the ground for treatment 4 10 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 Items that have the potential to be propulsive are offloaded mto the clamshell, sandbox, or small motor disposal vault by hand, knuckle boom, or by forklift After offloading. Items are restrained using engineered restraints allowing for safe treatment Potentially propulsive items (e g rocket motors) may also be offloaded into station 14 using the knuckle boom, forklift, or crane The case may be placed on the ground, sand/dirt mounds, chocks, or other support media for treatment PEP waste which generates ash or residue which is listed or characteristic is segregated from PEP waste which generates non-regulated ash Ash and residue is managed as described in 11 7 2 3 1182 3 WIRING AND IGNITION After waste has been placed on a tray, the next step is to complete a resistance check on the ignition system As a safety precaution, a physical interlock (e g key) is used to prevent the firing panel from being accidently engaged during the resistance check The key remains in under the control of the operators during the resistance check and all subsequent operations until the operators retum to the control bunker to complete treatment Each firing stanchion must have 10 ohms or less A firing stanchion that has a resistance of 10 ohms or greater must be tagged out until repairs are made Once the resistance check is completed igniter installation is performed The igniter is attached to the firing system by connecting the lead wire from the initiating device to the firing stanchion Igniter installation operations are performed by a minimum of two operators The types of igniters commonly used are listed below 1 Bum Grounds Igniter -Propellant with a hot wire 2 Bag Igniters - Propellant, explosive, pyrotechnic with electric match or other electric initiation device 3 Blasting Caps - Small amount of pnmary explosive 4 Electric Matches - wire attached to small explosive device 5 Fuse - a tube, cord, or the like, filled or saturated with combustible matter 6 EBW - Exploding Bridge Wire, a fme that contacts explosives fired by a high voltage electricity source 7 TBI - Through Bulkhead Initiator, shock initiation of an energetic matenal provided through an integral barrier Linear shaped charge may also be used to facilitate thermal treatment of potentially propulsive wastes and items contaminated with reactive hazardous wastes Reactive hazardous wastes may be desensitized by adding one of the liquids listed below The addition of these liquids modifies the reactive nature of the waste making it safer to store, handle and transport It also slows the buming rate of the material during treatment 1 Oils 2 Water 3 Alcohol 4 Tnacetin 5 Physical Media (e g Conductive and static dissipative packaging) 4 11 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 When necessary, additional bum enhancers may be used to promote a more complete burn Additives include, but are not limited to, the followmg 1 Diesel Fuel 2 Wood (eg Pallets) 3 Propellant The buming ground operators verify the treatment area has been evacuated of all personnel before proceeding with ignition The buming ground operators retreat to the control bunker and close the door The lockout key is inserted into the control system which allows power to the firing panel Circuit continuity is checked at the firing panel which verifies that igniters were properly installed A flashing red light is activated once the firing system is operational to alert personnel inside the area that a treatment operation is about to begin The appropriate stanchion is chosen and the igniter fired by pressing the ignition buttons Two operators are required for this operation In the event of a misfire, operators must wait a minimum period before reentering the treatment area to correct the problem If a misfire occurs on the first tray, bemg bumed the process stops, and personnel are required to stay in the bunker for at least 30 minutes After 30 minutes, the igniter which failed in uninstalled This process requires two employees and is done by (1) the two employees performing the task remove the physical interlock and keep it in their possession, (2) the igniter wires are removed from the stanchion where the misfire occurred then twisted together to short the circuit The igniter is not physically removed from its position A new igniter is installed, and the operators retum to the control bunker and repeat the process If a misfire occurs and it is not the first tray in the bum sequence, the operators retum after 16 hours and repeat the process described above The Box Elder County Dispatch is notified prior to each treatment This notification can be made by telephone, fax or email, and may be made immediately prior to ignition or an undefined number of hours prior to igniting the waste Notification must be made the same day as the waste is treated 118 2 4 POST-BURN INSPECTION AND CLEANUP Following an open buming treatment event, the area where the bum occurred cannot be re-entered for at least 16 hours after completion of the bum without specific approval from ATK management A preliminary inspection is performed before the cleanup begins This inspection includes checking for hot spots and checking for unbumed reactive hazardous waste Hot spots include visual indications of hot material (flame, smoke, high temperature) If these conditions exist, post-bum clean is postponed until the hot spots are gone All residues remaining on the bum trays are visually inspected to determine if there is any unbumed reactive material Unbumed reactive material will be rebumed Depending on the nature of the material that did not bum, donor material or burn enhancers such as diesel or wood I may be used to ensure the material will completely bum Unburned waste ejected from the tray will be collected and placed on a bum tray, and treated in the same manner 4 12 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 Small amounts of untreated residue will be considered as newly generated waste and will be tracked as such in the tracking system Small amount is defined as less than or equal to 5% of the total volume placed on the tray or treatment area The primary option for managing this waste is to bum it by 6pm the following calendar day If untreated residue cannot be treated by 6pm the following calendar day then it will be managed in accordance with R315-5 of the UAC Unbumed waste that results from a misfire or an interrapted ignition can remain on a bum tray An interrapted ignition occurs when anything greater than 5% of the waste on the tray fails to ignite In this situation, the waste is considered unreacted waste instead of newly generated residue ATK will attempt to rebum the waste by 6 pm of the following calendar day If unforeseen circumstances prevent the bum from occurring by 6pm of the following day, the waste will be covered and the bum tray will be labeled and managed as a 90-day storage area in accordance with the requirements of R315-5 of the UAC The cumulative storage time for the waste both in storage prior to burning and on the bum tray may not exceed 90-days If it is necessary to storage this waste for greater than 90-days, an emergency permit would be requested The clean process begins after the preliminary inspection is completed Cleaning is accomplished using a variety of tools and equipment such as rakes, shovels, a forklift and a tractor Ash is classified for disposal as descnbed in 11 8 2 5 The majority of the waste treated is classified as EPA waste number D003 reactive only The ash resulting from treating D003 reactive waste is collected, and transported to the on-site landfill where it is disposed Ash classified as hazardous is collected and managed in accordance with the requirements of R315-5 of the UAC Ash resultmg from the treatment of K044 collected and disposed in the on-site landfill After the tray is cleaned, it is inspected for holes, weld cracks, and 6 inches of wall height If a tray fails the inspection criteria. It IS removed from service These inspections are maintained onsite in the operating record In the event a tray is not going to be used for an extended period, it is stored in a manner to prevent stormwater accumulation (e g stored upside down or with a lid) If accumulated liquid is present in a bum tray it is removed and delivered for treatment at a UPDES permitted facility Typically, the post-bum and cleanup activities described in this section will be conducted the next calendar day following treatment The only exception is when bulk reactive waste is being treated Bulk reactive waste is defined as waste in any amount containing no contaminated materials Bulk waste will completely bum and leave no listed or characteristic residue 11 8 2 5 Ash Classification A waste assessment is conducted prior to receiving waste for treatment The waste assessment is made using generator knowledge of the production process, the raw materials used to produce the material, and the chemical composition of the materials If the assessment identifies that, at the point of generation, the waste meets any of the following three criteria, all ash from the initial treatment is collected, and the ash is sampled and analyzed using the protocol described in Attachment 1 1 It could potentially contain 40 CFR 261 31 listed constituents 4 13 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 2 It could potential contain toxicity characteristic constituents above the 40 CFR 261 24 regulatory level 3 It could potentially contain underlying hazardous constituents above the 40 CFR268 48 treatment standards Based on the analytical results, the ash is managed using the logic in Attachment 1 Figure 3-2 All ash classified as hazardous based the above criteria is managed in accordance with the requirements of R315-5 of the UAC 11 9 RECEIVING HAZARDOUS WASTE FROM OFF-SITE ATK periodically receives reactive hazardous waste from off-site sources All hazardous waste received from an off-site source will be managed at one of the permitted storage units All off-site generated hazardous waste will be reviewed and approved prior to being accepted using the following criteria EPA hazardous waste number(s). Physical description. Chemical description. Source of the waste. Sampling frequency. Parameter for Analysis, Handling code, Tracking system number, DOT shipping description, and Safe handling instractions Upon receipt, all off-site generated hazardous waste will be visually inspected to ensure that it meets the acceptance criteria, the manifest is correct, and the containers are labeled, closed, m good condition and compatible with the waste All deficiencies will be resolved with the generator before the waste is received After the waste has been accepted, it will be managed using the tracking systems described in Sections 11 4 11 10 Environmental Performance Standards 11 10 1 40 CFR 264 600 contams requirements for treatment, storage and disposal facilities to meet environmental performance standards to ensure operations are conducted in a manner that ensures protection of human health and the environment The follow areas of concem have been or are in the process of being addressed to ensure compliance with the performance standard requirements Prevention of Releases Due to Migration of Waste Constituents in the Ground Water or the Subsurface Environment - the standard requires actions to prevent the releases that may have adverse effects on human health or the environment due to migration of waste constituents in the ground water or subsurface environment Topics that must be considered are • The volume and physical and chemical characteristics of the waste in the unit, including its potential for migration through soil, liners, or other containing structures, 4 14 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 The hydrologic and geologic characteristics of the unit and the surrounding area. The existing quality of ground water, including other sources of contamination and their cumulative impact on the ground water. The quantity and direction of ground-water flow, The proximity to and withdrawal rates of current and potential ground-water users. The pattems of land use in the region. The potential for deposition or migration of waste constituents into subsurface physical structures, and into the root zone of food-chain crops and other vegetation. The potential for health risks caused by human exposure to waste constituents, and The potential for damage to domestic animals, wildlife, crops, vegetation, and physical structures caused by exposure to waste constituents. Prevention of Releases Due to Migration of Waste Constituents in Surface Water, Wetlands or on the Soil Surface -The standard requires actions to prevent releases that may have adverse effects on human health or the environment due to migration of waste constituents in surface water, or wetlands or on the soil surface Topics that must be considered are • The volume and physical and chemical characteristics of the waste in the unit, • The effectiveness and reliability of containing, confining, and collecting systems and stractures in preventing migration, • The hydrologic characteristics of the unit and the surrounding area, including the topography of the land around the unit, • The pattems of precipitation in the region, • The quantity, quality, and direction of ground-water flow, • The proximity of the unit to surface waters, • The cunent and potential uses of nearby surface waters and any water quality standards established for those surface waters, • The existing quality of surface waters and surface soils, including other sources of contamination and their cumulative impact on surface waters and surface soils, • The pattems of land use m the region, • The potential for health risks caused by human exposure to waste constituents, and • The potential for damage to domestic animals, wildlife, crops, vegetation, and physical structures caused by exposure to waste constituents Prevention of Releases Due to Migration of Waste Constituents in the Air - the standard requires actions to prevent releases that may have adverse effects on human health or the environment due to migration of waste constituents in the air Topics that must be considered are • The volume and physical and chemical characteristics of the waste in the unit, including its potential for the emission and dispersal of gases, aerosols and particulates, • The effectiveness and reliability of systems and structures to reduce or prevent emissions of hazardous constituents to the air, • The operatmg characteristics of the unit. 4 15 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 • The atmospheric, meteorologic, and topographic characteristics of the unit and the surrounding area, • The existing quality of the air, including other sources of contamination and their cumulative impact on the air, • The potential for health risks caused by human exposure to waste constituents, and • The potential for damage to domestic animals, wildlife, crops, vegetation, and physical structures caused by exposure to waste constituents 1110 2 Compliance With Environmental Performance Standard Requirements All of these factors have been and will continue to be evaluated until closure of the facility to ensure waste treatment methods are conservative and will not adversely affect human health or the environment Control measures include, but are not limited to the following Human Health Risk Assessment - a Human Health Risk Assessment (HHRA) is being conducted to evaluate the risk to the public from open buming and open detonation operations at the facility Tasks associated with the HHRA include developing an air dispersion model, evaluating sources, source parameters, and waste materials, and characterizing emissions The HHRA will address the following environmental performance related concems • The volume and physical and chemical characteristics of the waste in the unit, including its potential for the emission and dispersal of gases, aerosols and particulates, • The effectiveness and reliability of systems and stractures to reduce or prevent emissions of hazardous constituents to the air, • The operating characteristics of the unit, • The atmospheric, meterologic, and topographic characteristics of the unit and the sunounding area, • The potential for health risks caused by hOuman exposure to waste constituents, and The methods used in the HHRA are based on the United States Environmental Protection Agency (U S EPA) modeling guidance, and to the extent possible, the dispersion modeling methodology within the Human Health Risk Assessment Protocol (HHRAP) for Hazardous Waste Combustion Facilities (U S EPA, September 2005) The completed HHRA will be reviewed and approved by the Utah Division of Solid and Hazardous Waste Limits on OBOD operations will be based on this assessment Ecological Risk assessment - an Ecological Risk Assessment (ERA) will be conducted to determine potential risks to ecological receptors that may be affected by OBOD operations It will evaluate the potential for damage to domestic animals, wildlife, crops, vegetation, and physical stractures The completed ERA will be reviewed and approved by the Utah Division of Solid and Hazardous Waste, and will be a factor in establishing limits on OBOD operations Soil Monitonng Plan - a Soil Monitoring Plan (SMP) will be developed to verify the air dispersion and deposition models developed by the HHRA The SMP will be used to evaluate the existing quality of surface waters and surface soils, including other sources 4 16 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 of contamination and their cumulative impact on surface waters and surface soils Risks to human health and the environment will be evaluated using the data collected during implementation of the SMP Ground Water Monitoring - a ground water monitoring program has been in place at the facility since 1986 The program addresses the following concems • The hydrologic and geologic characteristics of the unit and the sunounding area • The existing quality of ground water, mcluding other sources of contamination and their cumulative impact on the ground water, • The quantity and direction of ground-water flow, and • The proximity to and withdrawal rates of current and potential ground-water users The sampling method, constituents of concem, sampling frequency, sampling results and analytical methods are closely reviewed and monitored by the DSHW Annual Review of Limits - the operating permit requires ATK to conduct an annual review of emission factors established by the HHRA, the reference doses for selected health effects, and to review the potential health risk scenarios to assure that the scenarios have not changed An annual accounting of the types and quantities of reactive waste treated is also required Stormwater Management - Stormwater run-on and run-off is controlled by a combination of soil grading and drainage ditches The terrain around M-136 and M-225 has been graded and drainage ditches sunound the areas in order to minimize stormwater run-on and ran-off The topography is shown in Attachment 6, Figures F-l and I-l Stormwater collection and drainage is shown in Attach 11 Figure 11-1 and Figure 11-2 The combination of controlling run-on and run-off containing waste in water -tight bum trays, lack of precipitation, high evaporation rate and depth to groundwater prevents waste constituents from being released to the ground water and or subsurface environment Ongoing soil and groundwater monitonng are used to verify these controls are effective in preventing adverse effects to human health and the environment Actions to Prevent Releases to the Environment - all spills of hazardous materials are promptly cleaned up Intemal procedures require that chemicals be properly containerized, labeled, stored, used and disposed The workplace is routinely audited to ensure compliance with procedures When spills do occur, the released matenal is promptly cleaned up and R315 reporting requirements are followed Open Burning is Conducted in Steel Containers - Open buming is conducted in containers which minimizes the potential for waste constituents to migrate to the ground water, surface water or related environments The Operating Permit requires routine mspections to ensure the containers are properly maintained Containers requiring repair are removed from service until repairs are completed Ash Management - ash and residue from OBOD operations are promptly collected and disposed Ash is managed and classified as described in sections 8 2 4, and 8 2 5 of this attachment 4 17 ATK Launch Systems Part B Operational Plan Promontory Facility Process Information UTD 009081357 May 2010 Storage and Inspections - All PEP and residues from OBOD treatment are stored in accordance with Section 4 of this attachment and R315-5 Hazardous Waste Generator Requirements Storage and treatment areas are inspected as required by Attachment 2, and operated in accordance with Attachment 8 of this permit Regulatory Oversight- the facility is subject to strict regulatory oversight by the Utah Division of Solid and Hazardous Waste All aspects of hazardous waste management described in this Attachment are subject to their review When necessary deficiencies are observed and conective action is taken by the permittee llll RUN-ON RUN-OFF CONTROLS 40 CFR 264 601 contains performance requirements to prevent releases that adversely affect the groundwater or subsurface environment Stormwater run-on and run-off is controlled by a combination of soil grading and drainage ditches The tenain around M-136 and M-225 has been graded, and drainage ditches sunound the areas in order to minimize stormwater run-on and ran-off Drainage ditches are shown in Figure 11 1 and 11 2 The combination of controlling run-on and ran-off, containing waste in water -tight bum trays, lack of precipitation, high evaporation rate and depth to groundwater prevents waste constituents from being released to the groundwater and or subsurface environment Ongoing soil and groundwater monitoring are used to verify these controls are effective in preventing adverse effects to human health and the environment 4 18 0 60 120 SCALE 1 =60 M225G4 DWG ATK Launch Systems /nc FACajTIES ENGINEERING PO Boor707imimMSZ Brigham aiy Utth 14301 M-225 BURN GROUNDS DWG SIZE SCALE 1"=60' DRAWING NO FIGURE 11-2