Loading...
HomeMy WebLinkAboutDSHW-2010-031673 - 0901a0688016cfe0STRATEGIC OPERATIONS i-.' A \\ i /-. .... .... CORPORATION '-^•'^'iSlON Of ^"r" ,-^ AM '"'^- ' '••• January 16, 1995 •?'i8i8!]0,{i,lj,3,p,Q„, r'5,^ V300-FY95-L080 '=--.M. ^6-6011^ Dennis Downs Department of Environmental Quality Division of Solid & Hazardous Waste P.O. Box 144880 Salt Lake City, Utah 84114-4880 Dear Mr. Downs: Subject: Construction Certification for RD & D Permit Enclosed are copies of certifications from professional engineers dealing with the design and construction of the Solid Rocket Motor Disposal Facility (SRMD) along with the red-lined drawings. This is being submitted in accordance to the RD fit D Permit, Module II, part B. Enclosed is a copy of the certification for both the design of the SCWO tank system and construction. Please schedule an on-site visit at your earliest convenience to verify the design and construction. Your help in this matter is greatly appreciated. If you have any questions regarding this matter, please call Hal Jaussi at (801)863-4083 or myself at (801)863-2580. Sincerely J. P. Martin, Manager Environmental Permits JPM/HRJ Attachment P.O. Box 689. Brigham City. UT 84302-0689 (801) 863-35 7 / [.'d.6 y4 u/:^0/i5i. Uf:<14/1NU. joDU^ouDiu r o woTMiBaniNa esMBUL.TAfirra • seea SOUTH aaa we^r • suTEe-^eo • Mi.AnAv.ijTAHa^ia7 • pHa^E(B•1| November 10, 1994 r f-^ii CERTIFICATE OF DESIGN ASSESSMENT I, Nnrman T. Bennion. P.E., have perfbrmed a design assessment for a portion of a new tank system for the Solid Rocket Motor Disposal Fadlity (SRMD), located at ThiokDl's Plant near I^omontory Point, Utah, owned/operated by General Atomics. My duties were to attest tfae adequacy of the SCWO Reactor Skid Framework design, as shown on tbe drawings listed below, to satisfy seismic Zone m requirements as required by tfae Resource Conseivation and Recoveiy Act (RCRA) reguladons, namely 40 CFR 264.192, paragraphs (a)(5)(ii). The SCWO Reactor Skid and its framework, as designed, are capable of supporting all of die reactor components during a seismic zone UI evem without structural fiulure of tfae framework, and without overtuniing or sliding of tbe skid. SRMD PDS Reactor Skid Plan & Details General Atomics PrawiuF No. 620099 No. 1-10 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure tfaat qualified perscHmel properly gather aod evaluate the infbrmation submitted. Based on my inquiry of tfae person or persons who manage the system, or those persons directly responsible for gathering tfae information, tfae information submitted is, to tfae best of my knowledge aod belief, true, accurate, and complete. I am aware tfaat tfaere are «icnifiranf peoalties for submittmg false informatioii, including tfae possibility of fine and impiisomneat for knowing violations. I I DatB:Noveinher 10 1994 y J\^\y^^a^ j?T/^oyu^^ut^i^n^^ P.E. Professional Engineer Utah Ueense No.lSMIl R&M Engineering Consultants 5280 So. 320 West, Suite E-160 Munay, Utah 84107 Page 1 of 1 EL ]#RADO ENGINEERING ir|>. OESIGNERS/CONSULTANTS 16 January 1995 J. R. Whimpey Thiokol Corporation P. O. Box 689, M/S 301 Brigham City, Utah 84302-0689 Attn: Mr. Jay R. Whimpey Subject: Solid Rocket Motor Disposal (SRMD) Project Equipment Installation Walkdown In accordance with your request, I have performed a walkdown of the SRMD equipment. The objectives of the walkdown were to verify that all major components and tank systems shown on the drawings were installed; installation was generally in accordance with the drawings, and that good engineering, construction and installation practices were generally followed. The walkdown took approximately 11/2 hours and was performed on January 16, 1995 against the following drawings: 620024 - SRMD PRS Equipment Arrangement, Sheets 2, 3 & 4 Rev C (See attached red lines) 620106 - HTO Equipment Arrangement, Sheet 1 of 1, Rev A (See attached red line) 620501 - SRMD Hydrolysis, Layout, Sheet 1 of 1, Rev N/C (See attached red line) The walkdown verified that all the equipment was installed and appeared ready for operation except as noted below. The equipment design appeared to be consistent with good/standard engineering practices. The installation appeared to be consistent with standard construction practices. No obvious deficiencies were observed. The walkdown was limited to visual inspections consistent with the level of detail shown on the referenced drawings. No measurements were made and operational performance was not verified. The following minor deviations from the referenced drawings were noted during the walkdown: 620024, Sheet 4 of 4: Major equipment not shown on drawing: 1. Warm air ducts installed along the north side of the motor washout fixture. 2. LNj boost pump (adjacent to high pressure pump). 3. Electrical panel/junction box adjacent to LNj tank #1. 4. Two LNj vaporizers adjacent to LNj tanks. 2964 WEST 4700 SOUTH, SUITE 109 • SALTLAKECITY, UTAH 84118 • (801) 966-8288 • (FAX (801) 966-8499 f J. R. Whimpey January 16, 1995 Page 2 620106, Sheet 1 of 1: 1. Equipment pad east of HTO building. The following equipment was not shown on the drawing: A. Pump adjacent to TM-3000 B. Valve panel in center of pad C. Vaporizer near valve panel 2. Inside HTO Building: A. Minor plumbing and valve connections incomplete throughout B. Air compressor not anchor bolted to floor and filter at discharge was not well supported C. Flow meter (FE-200) not anchor bolted to floor D. Pump P-700 inside building rather than outside as indicated by redlines E. Vertical reactor was not installed on reactor skid F. Polycarbonate panels not installed around reactor skid. 620501, Sheet 1 of 1: Major equipment not in place: 1. Pump P-2: not permanently installed on pads. A pump presently off the pad in use. 2. Hydrolysis tank off to the side on flat bed truck. 3. 600 gallon SCWO feed/transport tank not on site; to be same as horizontal plastic tank in place as T-5 per site engineer. 4. Tank T-5 is plastic horizontal tank rather than vertical cylindrical tank as shown on drawings. Please advise if you have any questions or require further assistance. Sincerely Date: "3"^? n \la.ry /(p J ^^S~ V\C.^ Kenneth T. Smith, P.E. Professional Engineer Utah License No. 3471 El Dorado Engineering Inc. 2964 West 4700 South, Suite 109 Salt Lake City, Utah 84118 V,Mrecv^y