Loading...
HomeMy WebLinkAboutDSHW-2009-012764 - 0901a0688013f441ATK ALLIANT TECHSYSTEMS^ October 11, 200.'i 8200-FY06-027 Dennis R. Downs, Direclor Division ol"Solid and Hazardous Waste Department of Envimnmental Quality P.O. Box 144880 Salt Lake City, Utah 84114-4880 Dear Mr. Downs Alliant Aerospace Company Tel (801) 250-5911 P.O. Box 98 Magna.UT 84044-0098 ^AND DELIVERED 0^.03351 OCT 1 2 2005 UTAH DIVISION OF SOLID & HAZARDOIJS WASTE KE: S-617 Emergency Treatment Permit ATK Thiokol- Promontory (Thiokol) requests an emergency permit to burn-in-place, one Castor 120 rocket motor. This motor is stored in the S-617 storage bunker. The roof of this bunker collapsed in April, and Thiokol has been determining iflhe motor was salvageable. Approximaiely 45 days ago, Thiokol delermined that il would be unsafe lo attempt to remove this motor from the bunker, and that the only safe way to handle the motor was lo burn il in-place. The motor has been stored under the less than 90 day rules since this determinalion was made. This motor conlains about 120,000 Ibs of J..3C propellant, and is expected lo burn to completion when ignited. Thiokol will place linear shaped charges down bolh sides lo split the case open, which will i-educe lhe over pressure, and lessen the chance of an unplanned event. This bunker is on the north plant, and the area suiTOunding the bunker will be evacuated to a safe distance lo prevent propagation to other energetics, or personal injury. Highway 83 will be closed during the burn, and close-by power lines de- cnergi/xd, as a precaution. The following entities have been, or will be notified prior lo the buiTi, and permits secured as required: Division of Air Quality, Bear River Heailh, Box Elder County Fire Mai-shall and UDOT. All surrounding neighbors including Autoliv and the City of Howell will also be notified in advance ofthe burn. When il is determined safe lo do so, Thiokol will inspect Hwy 83 and remove any unburned propellant or other debris from the motor burn, prior to re-opening the highway. The area surrounding lhe bunker will also be thoroughly inspected and debris removed and properly managed following the motor burn. In the event unburned propellant is discovered, and it is determined lo be unsafe to handle or move, we request permission to open burn il in place. The target date for buming this motor is October 22, 2005. However, weather conditions or other issues could delay the burn date. Thiokol requests this permit to be valid through November 22, 2005. Any fees associated with this modification should be billed to ATK for payment. If you have any questions or comments, 1 can be reached at (801) 699-0319, or you can contact Gene Curtis at (435) 863-4479. Sincerely; ^ ^-vVx^^ George Gooch, Manager Environmental Services Cc: Jeff Vandel