Loading...
HomeMy WebLinkAboutDSHW-2009-007216 - 0901a0688013a5c5Launch Systems Group P.O. Box 707 Brigham City, UT 84302 www.atk.com ECEIVI NOV 1 9 2007 UTAH DIVISION OF 13 November 2007 SOLID SijAZARDOUS WASTE 8200-FY08-044 07.^3^0 Mr. Dennis R. Downs, Executive Secretary State ofUtah . • ' , Department of Environmental Quality Division of Solid and Hazardous Waste 288 N. 1460 W. P.O. Box 144880 Salt Lake City, Utah 84114-4880 Subject: ATK Launch Systems Promontory Facility, SWMU Assessment Reporting Schedule, EPA ID #UTD009081357 Dear Mr. Downs The Post Closure Permit for the ATK Launch Systems Promontory facility requires under condition VI.B.3. that a schedule be provided to the Executive Secretary for submitting SWMU Assessment reports listed in Attachment 6 that have not yet been investigated. Attached, please find the Attachment 6 list with the proposed SWMU Assessment Report submittal schedule. Many ofthe SWMUs in several ofthe categories have already been investigated and submitted to the DSHW in the October 2000 RFI Phase 1 Report. These constitute the high priority SWMUs. The remaining SWMUs will likely require little or no formal investigation but rather will consist of providing the DSHW with justification for designafing the SWMUs as requiring "no further acdon". For example, the 24 hazardous waste satellite accumulafion sites were designated as no further action in the September 1990 DSHW RFA Report and ATK would submit a request that this designation be made official. Ifyou have questions regarding this schedule, please contact Paul Hancock at (435) 863-3344. Sincerely, David P. Gosen, P.E., Director Environmental Services Schedule for SWMU Assessment Report Submittal to the DSHW for ATK Launch Systems Promontory SWMU Categories November 2007 A B C D E F G H I J K L M N 0 P Q R S T U V W Description Permitted hazardous waste storage Open buming units Photographic waste discharge sites 90-day hazardous waste docks Satellite accumulation areas Sumps Landfills, disposal areas Spill sites Hazardous material tanks Historic hazardous waste storage Building discharge to surface Building discharge to subsurface Wastewater impoundments Dust and grit blast collectors Underground storage tanks Mine tailings Hazardous material storage Paint Booth Overspray Collecfion Wet Scrubber Fluorescein dye test area Dispersion areas Magnesium grinding area Activated sludge treatment plant # in Group 6 36 10 .111 45 104 31 7 18 2 120 41 10 24 3 2 5 1 1 1 2 1 1 Schedule Upon Permit closure 42 months or upon closure 36 months, see closures and 2000 RFI Submittal 180 Days 180 Days 18 months and see 2000 RFI 30 months and see 2000 RFI 48 months 18 months 2000 RFI submittal 24 months and see 2000 RFI 24 months and see 2000 RFI 18 months 12 months 18 months 180 Days 48 months 24 months 36 months 48 months See 2000 RFI submittal See 2000 RFI submittal See 2000 RFI submittal