Loading...
HomeMy WebLinkAboutDSHW-2008-004842 - 0901a068801589e1Hazardous Waste Storage Permit September 2008 Prepared by: The Utah Department of Environmental Quality Division of Solid and Hazardous Waste Hazardous Waste Facilities Section STATE OF UTAH HAZARDOUS WASTE STORAGE PERMIT September 30, 2008 PERMITTEE: ATK Launch Systems Inc. Promontory Facility Brigham City, Utah EPA Identification Number UTD009081357 Pursuant to the Utah Solid and Hazardous Waste Act, 19-6-101, et. seq., Utah Code Annotated 1953, as amended, and the regulations promulgated by the Utah Solid and Hazardous Waste Control Board, codified in the Utah Administrative Code R315, and pursuant to the Solid Waste Disposal Act, 42 U.S.C. 3251 et. seq., as amended by the Resource Conservation and Recovery Act of 1976, 42 U.S.C. 6901 et. seq., and the Hazardous and Solid Waste Amendments of 1984 (HSWA), a permit is issued to the ATK Launch Systems Inc. - Promontory facility (herein after called the "Permittee"). The facility is located in Box Elder County, Utah at 41 degrees, 39 minutes, 33 seconds north latitude and 112 degrees, 26 minutes, 17 seconds west longitude. The U.S. Environmental Protection Agency (U.S. EPA) has authorized the Executive Secretary ofthe Utah Solid and Hazardous Waste Control Board to issue such a permit under Section 3006(b) of the Resource Conservation and Recovery Act (RCRA). The Permittee shall comply with all the terms and conditions ofthis permit. The permit consists of Modules I through V and Attachments 1 through 10. The Permittee shall also comply with all applicable State rules, including R3I5-1 through R315-102. Applicable rules are those which are in effect on the date of issuance ofthis permit and any self-implementing provisions and related rules that, according to the requirements of HSWA, are automatically applicable to the . Permittee's hazardous waste management activities, notwithstanding the conditions ofthis permit. This permit is based on the premise that the information submitted in the original permit application, as modified by subsequent amendments, permit modification requests received throughout the term ofthe original permit, and the permit renewal application, as modified by subsequent amendments, is accurate. The Permittee's failure in the application or during the permit issuance process to disclose fully all relevant facts, or the Permittee's misrepresentation of any relevant facts at any time, may be cause for the termination or modification ofthis permit, the initiation of enforcement action, including criminal proceedings, or any combination of these remedies. The Permittee shall inform the Executive Secretary ofthe Utah Solid and Hazardous Waste Control Board of any deviation from or changes to the information on which the application was based which would affect the Permittee's ability to comply with the terms and conditions of this permit. HAZARDOUS WASTE STORAGE PERMIT ATK LAUNCH SYSTEMS INC. - PROMONTORY EPA ID# UTD009081357 Issued By: Utah Solid and Hazardous Waste Control Board September 29,2008 TABLE OF CONTENTS MODULE I - STANDARD PERMIT CONDITIONS l.A. EFFECT OF PERMIT I.B. ENFORCEABILITY I.C. OTHER AUTHORITY I.D. PERMIT ACTIONS I.E. SEVERABILITY I.F. DUTIES TO COMPLY I.G. DUTY TO REAPPLY I.H. PERMIT EXPIRATION LI. CONTINUATION OF EXPIRING PERMIT LJ. NEED TO HALT OR REDUCE ACTIVITY NOT A DEFENSE I.K. DUTY TO MITIGATE I.L. PROPER OPERATION AND MAINTENANCE I.M. DUTY TO PROVIDE INFORMATION I.N. INSPECTION AND ENTRY I.O. MONITORING AND RECORDS LP. REPORTING PLANNED CHANGES LQ. REPORTING ANTICIPATED NONCOMPLIANCE LR. CERTIFICATION OF CONSTRUCTION OR MODIFICATION LS. TRANSFER OF PERMIT LT. TWENTY-FOUR HOUR REPORTING I.U. MONITORING REPORTS I.V COMPLIANCE SCHEDULES LW. MANIFEST DISCREPANCY REPORT I.X. UNMANIFESTED WASTE REPORT I.Y. BIENNIAL REPORT LZ. OTHER NONCOMPLIANCE LAA. OTHER INFORMATION I.BB. SIGNATORY REOUIREMENT LCC. CONFIDENTIAL INFORMATION LDD. REPORTS. NOTIFICATIONS. AND SUBMISSIONS LEE. DOCUMENTS TO BE MAINTAINED AT THE FACILITY SITE I.FF. PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT MODULE II - GENERAL FACILITY CONDITIONS ILA. APPLICABILITY II.B. DESIGN AND OPERATION OF FACILITY II.C. REOUIRED NOTICE II.D. WASTE ANALYSIS PLAN ILE SECURITY II.F. GENERAL INSPECTION REOUIREMENTS II.G. PERSONNEL TRAINING ILH. GENERAL REOUIREMENTS FOR IGNITABLE. REACTIVE. OR INCOMPATIBLE WASTE II.I. LOCATION STANDARDS II.J. PREPAREDNESS AND PREVENTION ILK. CONTINGENCY PLAN ILL. MANIFEST SYSTEM II.M. RECORDKEEPING AND REPORTING II.N. CLOSURE/POST-CLOSURE ILO. COST ESTIMATES FOR HWMU CLOSURE II.P. FINANCIAL ASSURANCE FOR FACILITY CLOSURE II.Q. LIABILITY REOUIREMENTS II.R. INCAPACITY OF OWNER OR OPERATORS. GUARANTORS. OR FINANCIAL INSTITUTIONS MODULE III - STORAGE IN CONTAINERS III.A. APPLICABILITY III.B. WASTE IDENTIFICATION IILC. CONDITION OF CONTAINERS III.D. COMPATIBILITY OF WASTE WITH CONTAINERS III.E. MANAGEMENT OF CONTAINERS III.F. CONTAINMENT SYSTEMS III.G. SPECIAL REOUIREMENTS FOR IGNITABLE OR REACTIVE WASTE III.H. SPECIAL REOUIREMENTS FOR INCOMPATIBLE WASTE IILL INSPECTION SCHEDULES AND PROCEDURES IILL CLOSURE/POST-CLOSURE MODULE IV - MISCELLANEOUS UNITS IV.A. APPLICABILITY IV.B. ALLOWABLE WASTE STREAM IV.C. OPERATING REOUIREMENTS IV.D. INCOMPATIBLE WASTES IV.E. IGNITABLE OR REACTIVE WASTES IV.F. INSPECTION REOUIREMENTS IV.G. RECORD KEEPING AND REPORTING IV.H. CLOSURE MODULE V - TREATMENT OF WASTE HYDRAZINE V.A. APPLICABILITY V.B. RECORD KEEPING AND REPORTING V.C. CLOSURE ATTACHMENTS Attachment 1 - Waste Analysis Plan Attachment 2 - Inspection Schedules and Procedures Attachment 3 - Personnel Training Attachment 4 - Contingency Plan Attachment 5 - Closure Plans and Closure Plan Figures Attachment 6 - Facility Aerial Photographs and Drawings Attachment 7 - Security Plan Attachment 8 - Preparedness and Prevention Plan Attachment 9 - Container Management Procedures Attachment 10- T-29B Hydrazine Dilution Procedures ATK Launch Systems Inc. - Promontory September 2008 Module I - Standard Permit Conditions UTD009081357 MODULE I - STANDARD PERMIT CONDITIONS I.A. EFFECT OF PERMIT LA. 1. The Permittee is allowed to store hazardous waste in containers and to treat hydrazine, by dilution, in containers at the ATK Launch Systems-Promontory (ATK) Facility, Box Elder County, Utah in accordance with the conditions ofthis Permit. In addition, the Permittee is allowed to store and disassemble waste rocket motors at the facility in accordance with the conditions ofthis Permit. Any treatment, storage, or disposal of hazardous waste not authorized in this Permit, is prohibited. l.A.2. Compliance with this Permit, during its term, constitutes compliance for purposes of enforcement with applicable sections of Utah Administrative Code (UAC) R315 only for those management practices specifically authorized by this Permit. I. A.3. Issuance ofthis Permit does not convey property rights of any sort or any exclusive privilege; nor does it authorize any injury to persons or property, any invasion of other private rights, or any infringement of State or local law or regulations. I. A.4. This Permit has been developed in accordance with the applicable requirements of UAC R315-1 through 101 ofthe Utah Hazardous Waste Management Rules. All conditions within this Permit will supercede conflicting statements, requirements, or procedures found vwthin UAC R315-1 through 101 or attachments to this Permit. LB. ENFORCEABILITY I.B. 1 Violations documented through the enforcement process pursuant to Utah Code Annotated (UCA) 19-6-112 may result in penalties assessed in accordance with UAC R315-102, the Penalty Policy. I.C. OTHER AUTHORITY I.C. 1. The Executive Secretary expressly reserves any right ofentry provided by law and any authority to order or perform emergency or other response activities as authorized by law. LD. PERMIT ACTIONS I.D.I. This Permit may be modified, revoked and reissued, or terminated for cause, as specified in UAC R315-3-4. If the Executive Secretary determines that cause exists to modify, revoke, and reissue, or terminate this Permit, the action will proceed in accordance with UAC R315-4-1.5. The filing of a request for a permit modification, revocation, reissuance, termination, or the notification of plarmed changes or anticipated noncompliance on the part of the Permittee does not stay the applicability or enforceability of any permit condition. I.D.2. The Executive Secretary may modify this Permit, in accordance with UAC R315-3-4.2, when the standards or regulations on which the Permit was based have been changed by ATK Launch Systems Inc. - Promontory September 2008 Module I - standaid Permit Conditions UTD009081357 statute, through promulgation of new or amended standards or regulations, or by judicial decision after the effective date ofthis Permit. I. D.3. The Permit may be modified at the request ofthe Permittee according to the procedures ofUACR315-3-4.3. I.D.4. All Permit conditions supersede conflicting statements, requirements or procedures found in the Attachments to the Permit. I.D.5 If a conflict exists between conditions in this Permit, the most stringent condition, as determined by the Executive Secretary, shall be met. I.D.6. In accordance with the Utah Solid and Hazardous Waste Act, UCA, 19-6-108(13), this Permit shall be reviewed no later than five (5) years from the date of issuance or renewal and subsequently modified, if necessary. I.E. SEVERABILITY I.E. 1. The provisions ofthis Permit are severable and if any provision ofthis Permit, or the application of any provision ofthis Permit to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder ofthis Permit shall not be affected thereby. Invalidation of any State or federal statutory or regulatory provision which forms the basis for any condition of this Permit does not affect the validity of any other state or federal statutory or regulatory basis for said condition. LF. DUTIES TO COMPLY l.F.l. The Permittee shall comply with all conditions of this Permit, except to the extent and for the duration such noncompliance is authorized by an Emergency Permit issued in accordance with UAC R315-3-6.2. Any permit noncompliance, other than noncompliance authorized by an Emergency Permit, constitutes a violation ofthe Utah Solid and Hazardous Waste Act, and is grounds for enforcement action; for Permit termination, revocation and reissuance, or modification; or for denial of a Permit renewal application; or a combination of enforcement action and any ofthe other listed remedies. I.F.2. Compliance with the terms ofthis Permit does not constitute a defense to any order issued or any acfion brought under Sections 3007, 3008, 3013, or 7003 of RCRA (42 U.S.C. Sections 6927, 6928, 6934 and 6973), Section 106(a), 104, or 107 ofthe Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (42 U.S.C. 9606(a), 9604, and 9607, commonly known as CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), or any other State or federal law providing for protection of human health or the environment from any imminent and substantial endangerment. LG. DUTY TO REAPPLY I.G. 1. If the Permittee wishes, or is required by the Executive Secretarty, to continue an activity allowed by this Permit after the expiration date ofthis Permit, the Permittee shall submit a complete application for a new permit, in accordance with UAC R315-3- 2.1g and UAC R315-3-3.1(b), at least 180 days before this Permit expires. ATK Launch Systems Inc. - Promontory September 2008 Module I - standard Permit Conditions UTD00908I357 I.H. PERMIT EXPIRATION LH. 1. This Permit shall be effective for ten years from the date it is issued. LI. CONTINUATION OF EXPIRING PERMIT LL I. This Permit and all conditions herein shall continue in force until the effective date of a new permit, if the Permittee has submitted a timely and complete application, in accordance with applicable requirements of UAC R315-3 and R315-4, and through no fault ofthe Permittee, the Executive Secretary has neither issued nor denied a new permit under UAC R315-3-5.2 on or before the expiration date ofthis permit. LJ. NEED TO HALT OR REDUCE ACTIVITY NOT A DEFENSE I.J. 1. It shall not be a defense for the Permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions ofthis Permit. I.K. DUTY TO MITIGATE I.K. 1. In the event of noncompliance with the Permit, the Permittee shall take all reasonable steps to minimize releases ofhazardous waste, hazardous waste constituents, and perchlorate salts to the environment resulting from the noncompliance, and shall carry out such measures as are reasonable to prevent significant adverse impacts on human health or the environment. I.L. PROPER OPERATION AND MAINTENANCE I.L. 1. The Permittee shall, at all times, properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the Permittee to achieve compliance with the conditions ofthis Permit. Proper operation and maintenance includes effective performance, adequate funding, adequate operator staffing and training, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary equipment or similar systems only when necessary to achieve compliance with the conditions ofthis Permit. I.M. DUTY TO PROVIDE INFORMATION I.M. 1. The Permittee shall fumish to the Executive Secretary, within a reasonable time, any relevant information which the Executive Secretary may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this Permit, or to determine compliance with this Permit. The Permittee shall also fumish to the Executive Secretary upon request, copies of records required to be kept by this Permit. I.N. INSPECTION AND ENTRY I.N.I. Pursuant to the UCA 19-6-109, the Permittee shall allow the Executive Secretary, or an authorized representative, upon the presentation of credentials and other documents, as may be required by law, to: ATK Launch Systems Inc. - Promontory September 2008 Module 1 - Standard Pemiit Conditions UTD009081357 I.N. 1 .a. Enter, at reasonable times, upon the Permittee's premises where a regulated facility or activity is located or conducted, or where records are kept as required by the conditions ofthis Permit; I.N. 1 .b. Have access to and copy, at reasonable times, any records that are kept as required by the conditions of this Permit; I.N.I .c. Inspect at reasonable times any portion of the Facility, equipment (including monitoring and control equipment), practices, or operations regulated or required under this Permit; I.N. 1 .d. Sample or monitor, at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by the Utah Solid and Hazardous Waste Act, any substances or parameters at any location; and I.N, 1 .e. Make record of inspection by photographic, electronic, videotape, or any other reasonable medium. No audio recording devices shall be used without notice to all individuals in recording range prior to activation ofthe recording device. Photographic and video recording shall comply with the safety and security requirements ofthe Permittee. I.O. MONITORING AND RECORDS LO.l. The Permittee shall retain records of all monitoring information, including all calibration and maintenance records and, where applicable, all original strip chart recordings (or equivalent recordings) for continuous monitoring instrumentation, copies of all reports and records required by this Permit, the waste minimization certification required by UAC R315-8-5.3. (40 CFR § 264.73(b)(9) incorporated by reference), and records of all data used to comply with the conditions ofthis Permit, including any and all data to support human health and ecological risk assessments for cleanup and closure activities. All ofthe above referenced material shall be retained for a period of at least three years from the date ofthe sample, measurement, report, certification, or recording unless a longer retention period for certain information is required by other conditions ofthis Permit. The three-year period may be extended by the Executive Secretary at any time by written notification to the Permittee. The retention times are automatically extended during the course of any unresolved enforcement action regarding the facility to three years beyond the conclusion ofthe enforcement action. Recordkeeping may be accomplished using original documents, xerographic copies, document replicas, electronic facsimiles, electronic disk, CD-ROM computer drive files, microfilm, microfiche, photograph, magnetic tape or any other reasonable medium or similar recordkeeping technique. Any recordkeeping system shallbe capable of reproducing complete, accurate and legible records. i.0.2. Pursuant to UAC R315-3-3.1(j)(3), records of monitoring information shall specify at a minimum: 1.0.2.a. The date(s), exact place, and times of sampling or measurements; I.0.2.b. The name(s), title(s), and affiliation of individual(s) who performed the sampling or measurements; I.O.2.C. The date(s) analyses were performed; 4 ATK Launch Syslems Inc. - Promontory September 2008 Module 1 - Standard Permit Conditions UTD009081357 I.0.2.d. The individual(s) who performed the analyses; I.0.2.e. The analytical techniques or methods used; and I.0.2.f The results of such analyses. 1.0.3. Samples and measurements taken for the purpose of monitoring shall be representative ofthe monitored activity. The method used to obtain a representative sample ofthe waste to be analyzed shall be the appropriate method from UAC R315-50-6 or as specified or modified by this Permit.. Laboratory methods shall be those specified in "Test Methods for Evaluating Solid Waste; Physical/Chemical Methods SW-846 {Third Edition, November 1986)" or most currently promulgated edition, "Standard Methods for Examination of Water and Wastewater (17th Edition, 1989) " or most currently promulgated edition; or an equivalent method as approved by the Executive Secretary. The analysis of all samples shall be conducted by laboratories certified by the State of Utah. 1.0.4. When requesting substitute or additional analytical methods, the Permittee shall submit to the Executive Secretary a request for substitution ofanalytical methods which are equivalent to the methods specifically approved for use in this permit, in accordance with UAC R315-3-4.3. The request shall provide information demonstrating that the proposed methods are equivalent or superior in terms of sensitivity, accuracy, and precision (i.e. reproducibility). LP. REPORTING PLANNED CHANGES I.P. 1. The Permittee shall give written notice to the Executive Secretary 60 days prior to any planned physical alterations or additions to any Hazardous Waste Management Unit (HWMU) or system being permitted or previously permitted in accordance with UAC R315-3-3.1(1) and R315-3-4.3. Plarmed physical alterations or additions shall include all changes in any hazardous and solid waste activities, and to any non-waste underground storage tanks regulated under UAC R315-202 (40 CFR 280). Constmction or operation of new or modified HWMUs shall not begin unless the provisions of UAC R315-4-1.5 are met. I.Q. REPORTING ANTICIPATED NONCOMPLIANCE l.Q.l. The Permittee shall give written notice to the Executive Secretary 30 days prior to any planned changes in the permitted Facility or activity which may result in noncompliance with requirements ofthis Permit. Advance notice shall not constitute a defense for any noncompliance. I.R. CERTIFICATION OF CONSTRUCTION OR MODIFICATION I.R.I. The Permittee shall not commence storage, treatment, or disposal ofhazardous waste in a new hazardous waste management unit or in a modified portion of an existing permitted hazardous waste management unit, except as provided in UAC R315-3-4.3, until: I.R. 1 .a. The Permittee has submitted to the Executive Secretary by certified mail, express mail or hand delivery: ATK Launch Systems Inc. - Promontory . September 2008 Module I - Standard Permit Conditions UTD00908I357 I.R. 1 .a.i. A letter signed by the Permittee and an independent, Utah registered professional engineer qualified by experience and education in the appropriate engineering field certifying that the unit has been constmcted or modified in accordance with the approved modification request and this Permit; and I.R. 1 .a.ii. As-built engineering drawings and specifications as appropriate. I.R. I .b.. The Executive Secretary or designated representative has reviewed and inspected the modified or newly constmcted unit and has notified the Permittee in writing that the unit was found in compliance with the conditions ofthis Permit. LR.2. If within fifteen (15) calendar days ofthe date of receipt ofthe letter required by Permit Condition I.R.l.a.i., the Permittee has not received notice from the Executive Secretary, ofthe intent to inspect, prior inspection is waived and the Permittee may commence treatment, storage, or disposal ofhazardous waste in the permitted unit, if certified in accordance with Condition I.R. 1 .a.i. LS. TRANSFER OF PERMIT I.S. 1. This Permit may be transferred to a new owner or operator only if it is modified or revoked and reissued pursuant to UAC R315-3-4.1 and R315-3-4.2(b)(2). Prior to transferring ownership or operation ofthe Facility during its operating life, the Permittee shall notify the new owner or operator, in writing, ofthe applicable requirements of UAC R315-1 through R315-101, and this Permit. Failure by the Permittee to notify the new owner or operator of these requirements and this Permit in no way relieves the new owner or operator of his obligation to comply with all applicable requirements ofthe Rules and this Permit. I.T. TWENTY-FOUR HOUR REPORTING I.T.I. In accordance with UAC R315-3-3.l(l)(6)(i), the Permittee shall orally report to the Executive Secretary any noncompliance with this Permit which may endanger human health or the environment. Any such information shall be reported as soon as possible, but not later than twenty-four (24) hours from the time the Permittee becomes aware of the noncompliance. I.T.2. In accordance with UAC R315-9-1 (b), the Permittee shall immediately report to the Executive Secretary any spill of any hazardous waste or material which, when spilled becomes a hazardous waste, if the spilled quantity exceeds 100 kilograms or a lesser amount if there is a potential for endangerment to human health or the environment, or exceeds 1 kilogram if the material is an acute hazardous waste as defined by UAC R315-9-1 (b)(2). I.T.3. The Permittee shall immediately report to the Executive Secretary any spill that contains perchlorate, if the spilled quantity exceeds 100 kilograms and the perchlorate concentration ofthe spilled material is greater than 26 ug/L. Any such information shall be reported as soon as possible, but not later than 24 hours from the spill occurrence. I.T.4. The non-compliance and spill reports shall include, but not be limited to, the following: ATK Launch Systems Inc. - Promontory September 2008 Module I - Standard Permit Conditions UTD009081357 I.T.4.a. Information conceming the release of any hazardous waste which may endanger public drinking water supplies; and I.T.4.b. Any information of a release or discharge ofhazardous waste, or of a fire, or explosion at the Facility, which could threaten human health or the environment. I.T.4.C. A description ofthe occurrence and its cause; LT.4.d. The name, title, and telephone number ofthe individual reporting; I.T.4.e. The name, address, and telephone number ofthe owner or operator; I.T.4.f The name, address, and telephone number ofthe Facility; I.T.4.g. The date, time, and type of the incident; I.T.4.h. The location and cause ofthe incident; I.T.4.i. The name and quantity of materials involved; I.T.4.J. The extent of injuries, if any; LT.4.k. An assessment of actual or potential hazard to the environment and human health, where this is applicable; I.T.4.1. A description of any emergency action taken to minimize threat to human health and the environment; I.T.4.m. An estimated quantity and disposition ofthe recovered material that resulted from the incident; and I.T.4.n. Any other information necessary to fully evaluate the situation and to develop an appropriate course of action. I.T.5. Within 15 days ofthe time the Permittee is required to provide the reports specified in Conditions I.T.I. through I.T.4., the Permittee shall submit to the Executive Secretary a written report. I.T.6. The written report shall include, but not be limited to the following: I.T.6.a. The name, title, address, and telephone number ofthe individual reporting; l.T.6.b. A description including the date, time, location and nature ofthe reported incident; I.T.6.C. The extent of injuries, ifany; I.T.6.C. The name and quantity of material(s) involved in the spill; LT.6.d. An estimated quantity and disposition ofthe recovered material; I.T.6.e. An assessment of actual or potential hazards to human health and the environment, where this is applicable. The report shail aiso include whether or not the results ofthe ATK Launch Systems Inc. - Promontory September 2008 Module I - Standard Permit Conditions UTD009081357 incident remain a threat to human health and the environment (whether the noncompliance has been corrected and the release has been adequately cleaned up); and I.T.6.f If the release or noncompliance has not been adequately corrected or cleaned up, the anticipated time that the noncompliance or remediation is expected to continue; the steps taken or planned to reduce, eliminate, and prevent recurrence of the ' noncompliance; and/or the steps taken or planned to adequately remediate the release. I.U. MONITORING REPORTS I.U.I. Monitoring information shall be recorded and maintained as specified in Condition I.O. I.V COMPLIANCE SCHEDULES I.V. 1. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this Permit shall be submitted no later than 14 days following each scheduled date. LW. MANIFEST DISCREPANCY REPORT I.W.I. Manifest discrepancies shall be defined as differences between the quantity or type of hazardous waste designated on the manifest or shipping paper, and the quantity or type ofhazardous waste the permittee actually receives. Significant discrepancies in quantity are: (1) for batch waste, any variation in piece count, such as a discrepancy of one dmm in a tmckload, and (2) for bulk waste, variations greater than 10 percent in weight. Significant discrepancies in type are obvious differences which can be discovered by inspection or waste analysis, such as waste solvent substituted for waste acid, or toxic constituents not reported on the manifest or shipping paper. Ifa significant discrepancy is discovered in a manifest, the Permittee shall attempt to reconcile the discrepancy. If not resolved within 15 days, the Permittee shall submit a written report, including a copy ofthe manifest and efforts to reconcile the discrepancy, to the Executive Secretary in accordance with UAC R315-8-5.4. I.X. UNMANIFESTED WASTE REPORT I.X. 1. The Permittee shall submit to the Executive Secretary an Unmanifested Waste Report within 15 days of receipt of unmanifested waste in accordance with UAC R315-8-5.7. I.Y. BIENNIAL REPORT I. Y. 1. The Permittee shall submit to the Executive Secretary a Biennial Report covering facility activities during odd numbered calendar years. This report shall be submitted by March 1 ofthe following even numbered year in accordance with UAC R315-8-5.6. LZ. OTHER NONCOMPLIANCE LZ. I. The Permittee shall report all other instances of noncompliance with this Permit not otherwise required to be reported in accordance with Condition I.T., within seven days of discovering the noncompliance. The reports shall contain the information listed in Condition I.T. ofthis Permit. Reporting shall not constitute a defense for any noncompliance. ATK Launch Systems Inc. - Promontory September 2008 Module I - Standard Permit Conditions UTD009081357 LAA. OTHER INFORMATION LAA. 1. Whenever the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit modification, or in any report submitted to the Executive Secretary, the Permittee shall submit such facts or corrected information within seven working days. I.BB. SIGNATORY REOUIREMENT I.BB. 1. All reports, notifications, submissions or other information required by this Permit, requested by or submitted to the Executive Secretary, shall be signed and certified in accordance with UAC R315-3-2.2. I.CC. CONFIDENTIAL INFORMATION I.CC. 1. The Permittee may claim confidential any infonnation required to be submitted by this Pemiit in accordance with Utah Code Annotated 63-2-101 et seq. and Utah Code Annotated 19-1-306. LDD. REPORTS. NOTIFICATIONS. AND SUBMISSIONS I.DD. 1. All reports, notifications, or other submissions vvhich are required by this Permit to be transmitted to the Executive Secretary should be sent by certified mail or other means of proof of delivery to: Executive Secretary Utah Solid and Hazardous Waste Control Board Division of Solid and Hazardous Waste P.O. Box 144880 Salt Lake City, Utah 84114-4880 Phone (801)-538-6170 Normal business hours are 7 am to 6 pm, Monday through Thursday, except Utah State holidays. Required oral notifications shall be given only to the Executive Secretary or an authorized representative of the Executive Secretary. Notifications made at other times shall be made to the 24-hour answering service at (801) 538-4123. Notifications made to the 24-hour answering service shall include all applicable information required by this Permit. The Permittee shall give oral notification to the Executive Secretary or an authorized representative ofthe Executive Secretary on the first business day following notification to the 24-hour answering service. LEE. DOCUMENTS TO BE MAINTAINED AT THE FACILITY SITE I.EE. 1. The Permittee shall maintain at the facility, for the periods specified, current copies of the following documents and amendments, revisions and modifications to these documents; I.EE. 1 .a. A copy ofthe Permit until closure is certified in accordance with Condition II.N.; I.EE.I.b. Waste Analysis Plans (Attachment 1), and all associated analytical data, as required by UAC R315-8-2.4. and this Permit until closure is certified in accordance with Condition ILN.; ATK Launch Systems Inc. - Promontory September 2008 Module I - standard Permit Conditions UTD00908I357 I.EE. 1 .c. Inspection schedules and logs (Attachment 2), as required by UAC R315-8-2.6(b) and this Permit for a period of three years in accordance with UAC R315-8.2.6(d); I.EE. 1 d. Personnel training documents (Attachment 3), and records, as required by UAC R315- 8-2.7(d) and this Permit until closure for current employees, or for a period of three years for former employees in accordance with UAC R315-8.2.7(e); I.EE. 1 .e. Contingency Plan (Attachment 4), as required by UAC R315-8-4 and this Permit until closure is certified in accordance with Condition II.N; I.EE. 1 .f. Operating record, as required by UAC R315-8-5.3, and this permit until closure is certified in accordance with Condition II.N; I.EE. 1 .g. Closure Plans (Attachment 5), as required by UAC R315-8-7 and this permit, until closure is certified in accordance with Condition II.N; I.EE.l .h. Cost estimates (Attachment 5) for the closure and post-closure ofthe Hazardous Waste Management Units covered by this Permit, in accordance with UAC R315-8-8 and Condition ILO. of this Permit; I.EE.I .i. Manifest copies, as required by UAC R315-8-5 and this Permit for at least three years from the date the waste shipment was accepted at the facility or shipped off-site to an approved hazardous waste management facility; and I.EE. 1 .j. A copy of the Permittee's waste minimization statement until closure is certified in accordance with Condition II.N. LFF. PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT I.FF.l. Pursuant to Section 3005(C)(3) of RCRA (Section 212 of HSWA) and UAC R315-3- 3.3(b)(2) [40 CFR 270.32(b)(2)], this Permit contains those terms and conditions determined necessary to protect human health and the environment. 10 ATK Launch Systems Inc. - Promontory September 2008 Module II - General Facility Conditions UTD009081357 MODULE II - GENERAL FACILITY CONDITIONS ILA. APPLICABILITY II.A. 1. The requirements ofthis permit module pertain to all Hazardous Waste Management Units (HWMUs) identified within Modules I, II and III. II.B. DESIGN AND OPERATION OF FACILITY II.B. I. The Permittee shall design, constmct, maintain and operate all ofthe HWMUs and surrounding areas to minimize the possibility ofa fire, explosion, or any sudden or non- sudden release ofhazardous waste or hazardous waste constituents to the air, soil, groundwater or surface water which could threaten human health or the environment. II.B.2. Any constmction changes associated with a permitted HWMU at the facility shall be documented by as-built drawings and certified by a registered professional engineer in accordance with Condition I.R.I, and UAC R315-3-3.l(l)(2)(i). II.B.3. After review ofthe as-built drawings and field verification ofthe facility's HWMUs, the Executive Secretary will notify the Permittee in writing of any change which he concludes does not satisfy the operating requirements specified in this permit. H.C. REOUIRED NOTICE II.C.l. As required by UAC R315-8-2.3(a)(l), the Permittee shall notify the Executive Secretary in writing at least four weeks in advance ofthe date the Permittee expects to receive hazardous waste from a foreign source. Notice of subsequent shipments ofthe same waste from the same foreign source in the same calendar year is not required. II.C.2. When the Permittee arranges to receive hazardous waste from an off-site source (except where the Permittee is also the generator), the Permittee shall inform the generator in writing that he has the appropriate permit(s) for, and will accept, the waste the generator is shipping. The Permittee shall keep a copy ofthis written notice as part ofthe operating record as required by UAC R315-8-2.3(b). ILD. WASTE ANALYSIS PLAN II.D. 1. The Permittee shall follow the procedures of the Waste Analysis Plan included as Attachment 1 ofthis Permit. In addition, the Permittee shall comply with any other conditions involving waste analysis in Modules I, II, III and IV. II.D.2. The Permittee shall use the test methods described in the Waste Analysis Plan (Attachment 1) or an equivalent procedure that satisfies Condition 1.0.3. Changes in a test method described in the Waste Analysis Plan, as a result of an improvement or refinement of that method, may be adopted by the Permittee and incorporated into this Permit, in accordance with UAC R315-4-1.5 and Condition I.D. II.D.3. The Permittee shall characterize, using analytical techniques if necessary, all waste streams generated on or off-site in accordance with UAC R315-8-2.4 and Attachment 1. ATK Launch Systems Inc. - Promontory September 2008 Module II - General Facility Conditions UTD009081357 The waste characterization profiles shall be kept in the operating record. II.D.4. An annual evaluation of each waste stream shall be performed, as outlined in the waste analysis plan, to verify that the waste characterization is still accurate. These evaluations shall be kept in the operating record until the next annual evaluations are completed. Characterization of waste streams shall also be done each time the process generating the waste changes. II.D.5. Any waste analysis used to evaluate off-site waste for acceptance by the Permittee shall be accomplished using a laboratory that has been certified by the Utah State Division of Laboratories. II.D.6. At a minimum, the Permittee shall: II.D.6.a. Maintain properly functioning sampling and analytical equipment; II.D.6.b. Use approved sampling and analytical methods; and II.D.6.c. Submit an updated list of parameters, analytical methods, and sample preparation methods on an annual basis. The updated list shall be submitted to the Executive Secretary on or before January 15 of each calendar year. II.D.7. Whenever the Executive Secretary determines that the Permittee needs to update the analytical methodologies or the version(s) of SW-846 that are being used by the Permittee's analytical laboratory, the Executive Secretary will submit written notification to the Permittee. The Permittee shall notify the Utah Department of Health, Bureau of Laboratory Improvement ofthe requested update within 30 days of receipt of the Executive Secretary's determination. The Permittee shall have 180 days from the receipt ofthe Executive Secretary's written notification to complete the requested update. If it is not possible to complete the update within the prescribed time, the Permittee shall submit a written request for extension to the Executive Secretary for approval. II.D. 8. If the Permittee uses a contract laboratory to perform analyses, the laboratory must be certified by the State of Utah to perform the contracted analyses. For parameters for which certification is unavailable, the Permittee shall ensure that quality control/quality assurance data provided by the laboratory is sufficient to assess the validity ofthe data. The Permittee shall inform the laboratory in writing that it must operate under the Waste Analysis Plan conditions set forth in this Permit. ILE SECURITY ILE. I. The Permittee shall comply with the security conditions and procedures contained in Attachment 7 of this Permit. II.F. GENERAL INSPECTION REOUIREMENTS II.F. 1. The Permittee shall conduct inspections in accordance with UAC R315-8-2.6 and shall follow the inspection schedule found in Attachment 2. II.F.2. The Permittee shall remedy any deterioration or malfimction as required by UAC R315- ATK Launch Systems Inc. - Promontory September 2008 Module II - General Facility Conditions UTD00908I357 8-2.6(c). If the remedy requires more than 72 hours to implement from the time that the problem is detected, the Permittee shall submit to the Executive Secretary, before the expiration ofthe 72 hour period, a proposed time schedule for correcting the problem. II.F.3. Any problem which could endanger human health or the environment shall be corrected as soon as possible after the problem is discovered. The Permittee shall make every effort to eliminate the threat to human health or the environment within 24 hours. II.F.4. If, upon determination by the Executive Secretary or the Permittee, continued operation ofthe waste management unit involved in the inspection could endanger human health or the environment, the Permittee shall cease operation ofthe unit until the problem has been corrected. The Permittee shall be allowed to undertake those operations which are part of corrective activities. II.F.5. Records of inspections shall be kept as required by UAC R315-8-2.6(d). ILG. PERSONNEL TRAINING II.G. 1. The Permittee shall conduct personnel training as required by UAC R315-8-2.7. This training program shall follow the outline found in Attachment 3. New personnel working with or around hazardous waste shall complete the required personnel training within six (6) months of their hire date, assignment to the facility or assignment to a new position at the facility. II.G.2. Facility persormel shall take part in an annual review of their initial training for contingency and hazardous waste management procedures relevant to the positions in which they are employed. II.G.3. The Permittee shall maintain training documents and records as required by UAC R315- 8-2.7(d) and R315-8-2.7(e) [40 CFR 264.16(d) and 264.16(e)], in accordance with the Training Plan in Attachment 3. These records shall indicate the type and amount of training received. II.G.4. The Permittee shall maintain a copy ofthe Training Plan at the Facility until it is fully closed and closure is certified. II.G.5. Employees working at the rocket motor disassembly and storage building (M-603) shall receive task specific on-the-job-training in addition to the training outlined in Attachment 3. This training shall be documented and maintained in the operating record until the specific program is completed. ILH. GENERAL REOUIREMENTS FOR IGNITABLE. REACTIVE. QR INCOMPATIBLE WASTE II.H.I. The Permittee shall comply with the requirements of UAC R315-8-2.8. II.H.2. Inaddition to the requirements of UAC R315-8-2.8., the Permittee shall comply with the Conditions III.G and III.H pertaining to ignitable, reactive, or incompatible waste. ATK Launch Systems Inc. - Promontory September 2008 Module II - General Facility Conditions UTD009081357 ILI. LOCATION STANDARDS II.I. 1. The Permittee shall comply with the location standards specified by UAC R315-8-2.9. ILJ. PREPAREDNESS AND PREVENTION II.J. 1. The Permittee shall follow the Preparedness and Prevention Plan, Attachment 8. II.J.2. At a minimum, the Permittee shall equip and maintain in good operating condition at the facility the equipment set forth in Attachment 8, as required by UAC R315-8-3.3. II.J.3. The Permittee shall test and maintain the equipment specified in Condition II.J.2 as necessary to assure its proper operation in time of emergency. II.J.4. The Permittee shall maintain records ofthe preventative maintenance and repair activities specified in Condition II.J.3. and shall keep schedules, reflecting minimum and planned frequency for the performance of preventative maintenance activities in the Operating Record at the facility. II.J.5. The Permittee shall maintain access to the communications or alarm system as required by UAC R315-8-3.5. II.J.6. At a minimum, the Permittee shall maintain 30 inches of aisle space between containers or pallets ofcontainers at storage areas M-186 and E-501. 1I.J.7. The Permittee shall attempt to make arrangements (Coordination Agreements) with State and local authorities as required by UAC R315-8-3.7. Copies ofthe Coordination Agreements shall be kept in the Operating Record. The attempts to make such agreements, any refusals and all final agreements shall be documented in the Operating Record. ILK. CONTINGENCY PLAN II.K.l. The Permittee shall immediately carry out the provisions of Attachment 4, and follow the emergency procedures described by UAC R315-8-4.7 whenever there is a fire, explosion, or release ofhazardous waste or hazardous waste constituents which threatens or could threaten human health or the environment. The Permittee shall comply with Condition I.T. in reporting releases to the Executive Secretary. II.K.2. The Permittee shall provide copies ofthe Contingency Plan to emergency agencies who may be called in an emergency, shall maintain a copy ofthe Plan at the facility, and shall provide a copy upon request in accordance with UAC R315-8-4.4. II.K.3. The Permittee shall review the Contingency Plan, in accordance with UAC R315-8-4.5 and shall modify it in accordance with Condition I.D., if necessary. II.K.4. A trained emergency coordinator shall be available at all times in case of an emergency, in accordance with tjAC R315-8-4.6 and identified in Attachment 4. ATK Launch Systems Inc. - Promontory September 2008 Module II - General Facility Conditions UTD009081357 ILL. MANIFEST SYSTEM ILL. 1. The Permittee shall comply with the manifest requirements of UAC R315-5-2 and UAC R315-8-5. The manifest tracking number shall be recorded in the Operating Record with each waste load that arrives or leaves the Permittee's facility. ILM. RECORDKEEPING AND REPORTING II.M. 1. The permittee shall maintain an accurate written Operating Record at the facility in accordance with UAC R315-8-5.3 (40 CFR 264.73 incorporated by reference) and R315-50-2 (Appendix I to Part 264 incorporated by reference). II.M.2. The Permittee shall, by March 1 of each year, submit to the Executive Secretary a certification pursuant to UAC R315-8-5.3 [40 CFR 264.73(b)(9).incoiporated by reference], signed in accordance with UAC R315-3-2.2, that the Permittee has a program in place to reduce the volume and toxicity ofhazardous waste that he generates to the degree determined by the Permittee to be economically practicable; and that the proposed method of treatment, storage, or disposal is the most practicable method currently available to the Permittee which minimizes the present and fiiture threat to human health or the environment. II.M.3. The Permittee shall comply with the biennial report requirements of UAC R315-8-5.6, by March 1 of each even-numbered reporting year. The report shall include wastes generated, treated or stored at the Permittee's facility during the previous odd-numbered year. II.M.4. The Permittee shall submit additional reports to the Executive Secretary in accordance with UAC R315-8-5.8. II.M.5. All reports, notifications, applications, or other materials required to be submitted to the Executive Secretary shall be submitted in accordance with Condition I.DD. II.N. CLOSURE/POST-CLOSURE II.N.L The Permittee shall close the facility as required by UAC R315-8-7, UAC R315-101 and Attachment 5. II.N.2. For all HWMUs, minor deviations from the approved closure plan procedures, necessary to accommodate proper closure, shall be described in narrative form with the closure certification statements. The Permittee shall describe the rationale for implementing minor changes as part ofthis narrative report. Within 60 days after completion of closure of each HWMU, the Permittee shall submit the certification statements and narrative reports to the Executive Secretary. II.N.3. The Permittee shall amend the closure/post-closure plan in accordance with UAC R315- 8-7 and Condition I.D. whenever necessary, or when required to do so by the Executive Secretary. II.N.4. The Permittee shall notify the Executive Secretary in writing ofthe partial closure of any portion ofthe facility in accordance with UAC R315-8-7. The Permittee shall notify the Executive Secretary at least 180 days prior to the commencement of final ATK Launch Syslems Inc. - Promontory September 2008 Module II - General Facility Conditions UTD009081357 facility closure. The closure plan contained in Attachment 5 will be reviewed before commencing partial or final facility closure. If the closure plan requires modification, the plan shall be modified and submitted to the Executive Secretary for approval in accordance with Condition LD. II.N.5. After receiving the final volume ofhazardous waste, the Permittee shall treat or remove from the site all hazardous waste and complete closure activities in accordance with the schedule specified in Attachment 5. II.N.6. The Pennittee shall decontaminate or dispose of all facility equipment, stmctures, soil and rinsate as required by UAC R315-8-7, R315-8-9 and Attachment 5. Facility equipment, stmctures and soil which have not been decontaminated shall be disposed of only at a permitted hazardous waste treatment, storage or disposal facility. II.N.7. The Permittee shall certify that the facility has been closed in accordance with the specifications in Attachment 5 as required by UAC R315-8-7, and shall provide a certification by an independent, Utah registered professional engineer qualified by experience and education in the appropriate engineering field. II.N.8. In the event that any ofthe hazardous waste management units covered by this permit cannot be clean closed by decontaminating or removing contaminated structures or soil, or releases have occurred which have impacted soil or groundwater, the Permittee shall modify the Closure/Post-Closure Plan for tha,t hazardous waste management unit in accordance with Condition I.D. Within 30 days ofthe date that the Executive Secretary approves the modification, the Permittee shall close the unit in accordance with the applicable provision of UAC R315-8-7 and R315-101. II.N.9. If a HWMU can not be clean closed, the Permittee shall submit a survey plat and property description for the HWMU with the submission ofthe certification of closure for the HWMU, in accordance with UAC R315-8-7 and R315-101. ILO. COST ESTIMATES FOR HWMU CLOSURE ILO. 1. The Permittee's closure cost estimate for each HWMU shall be prepared and maintained at the facility in accordance with UAC R315-8-8 (40 CFR 264.142 incorporated by reference) and Attachment 5. II.0.2. On the one year anniversary date of Permit issuance, the Permittee shall submit to the Executive Secretary for approval updated closure plans and detailed closure cost estimates for each HWMU at the ATK facility. The closure cost estimates shall identify the costs, in current dollars, ofthe steps necessary to perform final closure for each HWMU in accordance with UAC R315-8-9.9 and UAC R315-8-8 (40 CFR 264.142 incorporated by reference). ILO.3. On the five year anniversary date ofthe submittal ofthe closure cost estimates required by Condition 11.0.2. above, the Permittee shall conduct a detailed evaluation ofthe closure cost estimates for each HWMU and determine whether the annual adjustments for inflation have been adequate to update the closure cost estimates. The Permittee shall submit a report on this assessment and if necessary, a modification ofthe Permit in accordance with Condition I.D. to the Executive Secretary 90 days after the report is submitted. ATK Launch Systems Inc. - Promontory September 2008 Module II - General Facility Conditions UTD00908I357 II.0.4. The Permittee shall revise the closure cost estimate within 30 days after the Executive Secretary has approved the request to modify the affected closure plan(s). ILO.5. For each new HWMU placed into operation, an updated closure cost estimate to the facility must be prepared which includes the new unit, 60 days prior to waste being placed on or into the new unit. II.P. FINANCIAL ASSURANCE FOR FACILITY CLOSURE II.P.l. The Permittee shall demonstrate continuous financial assurance compliance by providing a third party financial assurance certification of at least the amount ofthe closure/post-closure cost estimates established in Condition ILO. The Permittee may substitute other instmments of financial assurance provided the method, funding and wording requirements of UAC R315-8-8 are followed and approved by the Executive Secretary. II.P.2. The financial assurance document shall be updated within 60 days ofthe annual adjustment for inflation or within 60 days ofthe approval of a revised closure/post- closure cost estimate in accordance with UAC R315-8-8. II.Q. LIABILITY REOUIREMENTS II.Q. 1. The Permittee shall demonstrate continuous compliance with the liability requirements of UAC R315-8-8 (40 CFR 264.147 incorporated by reference). The Permittee shall have and maintain hazardous waste liability coverage for sudden accidental occurrences in the amount of at least one $1 million U.S. dollars per occunence with an annual aggregate of at least $2 million U.S. dollars, exclusive of legal defense costs. The Permittee shall submit an approved certificate of hazardous waste liability insurance worded as required by UAC R315-8-8. II.Q.2. Changes in liability coverage mechanisms shall be approved by the Executive Secretary 60 days prior to such a change. II.R. INCAPACITY OF OWNER OR OPERATORS. GUARANTORS. OR FINANCIAL INSTITUTIONS II.R. 1. The Permittee shall comply with the notification and financial requirements of UAC R315-8-8 (40 CFR 264.148 incorporated by reference). ATK Launch Systems Inc. - Promontory September 2008 Module III - Storage in Containers UTD009081357 MODULE III - STORAGE IN CONTAINERS III.A. APPLICABILITY III.A. 1. The requirements ofthis permit Module pertain to the operation ofhazardous waste container storage areas at the facility. The Permittee shall comply with R315-8-9 and all conditions ofthis Module. III.A.2. The designated hazardous waste storage areas are the bays of Buildings M-705S, E-501, M-47, M-603, M-186, the bum trays at M-136 and Bum Station 14 at M-136. Drawings of these storage areas are presented in Attachment 6. HLB. WASTE IDENTIFICATION III.B. 1. The Permittee shall, subject to the terms of this Permit, store only the following hazardous wastes, as listed by EPA hazardous waste code, in containers at storage areas M-186, M-705S and E-501: DOOl, D002, D003, D004, D005, D006, D007, D008, D009, DOIO DOl 1, D016, D018, D019, D021, D022, D023, D024, D026, D027,D028, D029, D035, D036, D038, D039, D040, D042, D043, FOOl, F002, F003, F004, F005, F006, F007, F008, F009, K044, P003, POI2, P022, P028, P029, P030, P047, P048, P064, P067, P077, P087, P092, P093, P095, P098, P105, P106, Pl 12, Pl 16, Pl 19, UOOl, U002, U004,U006, U008, U009, U019, U025, U028, U029, U031, U037, U041, U044, U048, U053, U056, U057, U069, U070, U072, U077, U079, UOSO, U085, U088, U092, U093, U095, U098, UlOl, U102, U103,U105, U108, U112, U113, U117, U118, U120, U121, U122, U123, U131, U133, U134, U140, U147, U148, U149, U151, U154, U156, U159, U160, U161, U162, U165, U168, U169, U170, U171, U185, U186, U188, U190, U196, U201, U209, U210, U211, U218, U219, U220, U221, U223, U224, U225, U226, U228, U238, U239, U240, U243, U244, U246, U253, U328, U353, U359, U404. III.B.2. The Permittee may store waste solid rocket motors and waste solid propellant, EPA hazardous waste code D003, in storage Building M-47 subject to the terms ofthis Permit. III.B.3. The Permittee may store and treat solid propellant/rocket motors, EPA hazardous waste code D003, in Building M-603 in accordance with Module IV ofthis Permit. III.B.4. The Permittee may store solid reactive waste, EPA hazardous waste code D003, received from off-site in bum trays at M-136 for up to 14 days prior to thermal treatment. Waste stored in bum trays shall be containerized only in covered dmms, boxes, plastic bags, woven bags or other US Department of Transportation (DOT) or United Nations (UN) approved shipping containers. Containers shall be labeled and managed as specified in Attachment 9. III.B.5. The Permittee may store waste rocket motors, EPA hazardous waste code D003, received from off-site that contain solid propellant, one at a time on the ground at M- 136, Bum Station 14 for up to 14 days prior to thermal treatment. The waste rocket motors shall be labeled and managed as specified in Attachment 9. ATK Launch Systems Inc. - Promontory Module 111 - Storage in Containers September 2008 UTD009081357 III.B.6. The Permittee is prohibited from storing hazardous waste that is not identified in Section III.B. ofthis Module. Any addition ofhazardous waste codes to Condition III.B.l. requires modification ofthe permit in accordance with Condition I.D.3. IILC. CONDITION OF CONTAINERS IILC. 1. If a container holding hazardous waste is not in good condition (e.g., severe msting, bulging, apparent stmctural defects) or it has begun to leak, the Permittee shall transfer the hazardous waste, or the container itself, to a UN approved container in accordance with Section 8-1-10 of Attachment 8. The transfer shall be completed as soon as possible but not later than 24 hours from the time the problem was first discovered. III.D. COMPATIBILITY OF WASTE WITH CONTAINERS IILD.l. The Permittee shall assure that the waste is compatible with the containers as required by R315-8-9.3. The Permittee shall follow the compatibility plan as indicated in Section 9-2.1 and Table 9-2 of Attachment 9. HLE. MANAGEMENT OF CONTAINERS III.E. 1. The Permittee shall manage containers in accordance with this module of the Permit, UAC R315-8-9.4 and the procedures identified in Attachment 9. A container holding hazardous waste shall always be closed during storage except when the Permittee is adding or removing waste from the container. The Permittee shall not open, handle, or store containers in a manner which may cause the containers to leak. III.E.2. The Permittee shall store liquid hazardous wastes in containers only at storage areas M-186, E-501 and M-705S. Drawings ofthe container storage areas are shown in Attachment 6. At capacity, the Permittee may store the following volumes of wastes: III.E.2.a. E-501 - 8,800 gallons, which is 160 55-gallon containers or the equivalent; III.E.2.b. M-l 86 - 22,000 gallons, which is 400 55-gallon containers or the equivalent; and III.E.2.c. M-705S - 1,760 gallons, which is 32 55-gallon containers or the equivalent. III.E.3. The Permittee shall store waste solid propellant in containers at storage areas M-47, M-603 and M-136. Drawings ofthe storage areas are shown in Attachment 6. At capacity, the Permittee may store the following amounts of wastes: III.E.3.a. M-47 - 840,000 lbs 1.3 or 21,000 lbs 1.1 solid propellant; III.E.3.b. M-603 - 120,000 lbs 1.3 on rail and 120,000 lbs 1.3 in the casting pit, not to exceed 240,000 lbs total 1.3 solid propellant or 8,000 lbs 1.1 on rail and 65,000 lbs 1.1 in the casting pit not to exceed 65,000 lbs total 1.1 solid propellant; and III.E.3.c. M-136 - 106,000 lbs of 1.3 solid propellant or 20,000 lbs of 1.1 solid propellant in bum trays or in a rocket case placed on the ground. ATK Launch Systems Inc. - Promontory Seplember 2008 Module III - Storage in Containers UTD009081357 III.E.4. The Permittee shall maintain an aisle space of 30 inches minimum between containers or pallets ofcontainers at storage areas M-186 and E-501. III.E.5. The Permittee shall store hazardous wastes at M-705S, M-47, M-603 and M-136 so that the container or waste rocket motor may be readily inspected and hazardous waste labels are visible. III.E.6. The Permittee may stack 55-gallon drums at a maximum of two high at storage areas M-186 and E-501. III.E.7. Hazardous waste containers shall not be stacked at storage areas M-705S, M-47, M-603 and M-136. III.E.8. The Permittee shall unload any transport vehicle hauling containers ofhazardous waste for storage within 10 days following arrival at the site. Arrival for purposes ofthis permit shall be the day the vehicle anives at the facility. III.E.9. The Permittee shall provide storage for and maintain on-site, 85 gallon Overpack drums at areas where liquid hazardous waste is stored. III.F. CONTAINMENT SYSTEMS III.F. 1. The Permittee shall maintain the containment systems in accordance with the attached plans and specifications contained in Attachment 9 and as specified in UAC R315-8- 9.6. III.F.2. Container management areas shall be inspected for the presence of free liquids in accordance with Attachment 2. If free liquids are discovered in the sumps or other containment areas, the Permittee shall identify the location in the inspection log. Any liquids discovered shall be removed immediately, but in no case later than twenty-four hours after the liquid is discovered and managed according to the spill contingency plan specified in Section 9-4.3 of Attachment 9. III.F.3. For purposes of inspections, all containers stored in the liquid hazardous waste storage area shall be considered full to their respective capacities with liquid hazardous waste. Gondolas/roll-offs that are used only for the storage of solid hazardous waste need not be considered in the calculations for containment. The area for storing solid waste shall be identified. III.F.4. The bum trays at M-136 are only permitted for the storage of solid reactive wastes in containers received from off-site for no more than 14 days. However since some ofthe containers contain small amounts of desensitizing fluid (e.g. diesel, shingle oil, etc.), the containment requirements, as specified in Attachment 9, apply to the storage of wastes in the bum trays. Inspection ofthe bum trays shall be conducted in accordance with Attachment 2. ATK Launch Systems Inc. - Promontory - September 2008 Module 111 - Storage in Containers UTD00908I357 III.G. SPECIAL REOUIREMENTS FOR IGNITABLE OR REACTIVE WASTE III.G. 1. The Permittee shall not locate containers holding ignitable or reactive waste within 15 meters (50 feet) ofthe facility boundary. IILG.2. The Permittee shall take precautions to prevent accidental ignition or reaction of ignitable or reactive waste and follow the procedures specified in Attachment 8, UAC R315-8-2.8 and UAC R315-8-9.7. III.H. SPECIAL REOUIREMENTS FOR INGOMPATIBLE WASTE III.H.l. The Permittee shall not place incompatible wastes, or incompatible wastes and materials, in the same container, in accordance with UAC R315-8-2.8 and UAC R315- 8-9.8(a). III.H.2. The Permittee shall not place hazardous waste or materials in an unwashed container that previously held an incompatible waste or material in accordance with UAC R315- 8-2.8 and UAC R315-8-9.8(b). III.H.3. A storage container holding a hazardous waste that is incompatible with any waste or other materials stored nearby shall be separated from the other materials or protected from them by means of a dike, berm, wall, or other device. IILL INSPECTION SCHEDULES AND PROCEDURES 111.1.1. The Permittee shall inspect the hazardous waste storage and treatment facilities identified in Condition III.B. ofthis Permit as specified in the Inspection Schedules contained in Attachment 2. The purpose ofthis inspection shall be to detect leaking containers, standing liquids, deterioration ofcontainers, and to detect deterioration of, or liquids in, the secondary containment system caused by conosion and other factors as specified in R315-8-9.5. 111.1.2. If problems are observed during the inspections, the Permittee shall correct the problem in accordance with Module II, Section F. III.J. CLOSURE/POST-CLOSURE III.J. 1. The Permittee shall close the storage areas in accordance with UAC R315-8-7, UAC R315-8-9.9, Condition II.N. and Attachment 5 ofthis Permit. III.J.2. Closure plans for each individual hazardous waste management area shall be submitted to the Executive Secretary for approval no less than 180 days prior to the commencement of closure activities. No closure activities shall take place that have not received prior approval from the Executive Secretary. ATK Launch Systemslnc. - Promontory Module IV-Miscellaneous Units September 2008 UTD009081357 IV.A. IV.A.l. IV.A.2. IV.B. IV.B.l. IV.B.2. MODULE IV - MISCELLANEOUS UNITS APPLICABILITY The Permittee may treat (disassemble) and store solid rocket motors, in accordance with the requirements ofthis Module, at Building M-603. Disassembly includes those steps that are necessary to prepare the rocket motor for treatment by open buming (or other appropriate treatment process). ALLOWABLE WASTE STREAM The Permittee may disassemble and store solid rocket motors that consist of class 1.1 or class 1.3 solid propellant. The quantity of solid propellant kept in Building M-603 at any one time shall not exceed the amounts tabulated in IV.B.2. The Permittee may not store liquid hazardous wastes at Building M-603. Propellant Class 1.1 1.3 Quantity on Rail 8,000 lbs 120,000 lbs Quantity in Casting Pit 65,000 lbs 120,000 lbs Total Quantity 65,000 lbs 240,000 lbs IV.C. OPERATING REOUIREMENTS IV.C.l. The Permittee shall follow intemal procedures for solid rocket motor disassembly. Detection or discovery of liquid NG shall be recorded in the Operating Record for the building. A description and date ofthe action taken to clean up the liquid NG shall also be recorded. IV.C.2. The Permittee shall comply with the requirements specified in the facility Contingency Plan, when there has been a release at Building M-603 that threatens human health or the environment. IV.C.3. The Permittee shall conduct disassembly operations in a manner that will ensure protection of human health and the environment. ATK Launch Systemslnc. - Promontory September 2008 Module IV- Miscellaneous Units UTD009081357 IV.D. INCOMPATIBLE WASTES IV.D. 1. The Permittee shall not mix incompatible wastes in Building M-603. IV.E. IGNITABLE OR REACTIVE WASTES IV.E. 1. The Permittee shall document compliance with the ignitable and reactive waste regulations as required by UAC R315-8-2.8, and place this documentation in the facility Operating Record. IV.F. INSPECTION REOUIREMENTS IV.F. 1. The Permittee shall inspect Building M-603 in accordance with Attachment 2. IV.G. RECORD KEEPING AND REPORTING IV.G.l. The Permittee shall record in the operating record the following: IV.G. 1 .a. The date the motor was received at M-603. IV.G.l.b. The date the motor and components were removed from M-603. IV.G. 1 .c. The components generated by the disassembly process at M-603 (gas generators, charges, etc.) including quantities. IV.G. I .d. The manifest number and the rocket motor type with each movement of waste. IV.G.l .e. The destination ofthe rocket motor stages and components removed from M-603. IV.G. 1 .f The detection or discovery of liquid NG in building or on rocket motor components. IV.G. 1 .g. Documents as required to demonstrate compliance with UAC R315-8-2.8 IV.H. CLOSURE IV.H. 1. The Permittee shall close Building M-603 in accordance with R315-8-7, R315-8- 9.9, Condition ILN. and the designated Closure Plan in Attachment 5 ofthis Permit. ATK Launch Systems Inc. - Promontory September 2008 Module V - Treatment of Waste Hydrazine UTD009081357 MODULE V - TREATMENT OF WASTE HYDRAZINE V.A. APPLICABILITY V.A.I. The Permittee may treat hydrazine, EPA hazardous waste code U133, by dilution, at Building T-29B, for the sole purpose Of safely shipping the resultant waste to an off-site disposal facility in accordance with this Module and Attachment 10. V.A.2. The treatment process shall be conducted in a marmer that will ensure protection of human health and the environment. V.A.3. After the waste hydrazine has been transfened to the treatment container, and the treatment process has been completed, the Permittee shall ship the diluted hydrazine directly to an approved hazardous waste management facility for disposal or transfer it to the M-l 86 Hazardous Waste Storage Facility. V.A.4. The Permittee shall comply with the requirements specified in the facility Contingency Plan (Attachment 4), when there has been a release at Building T-29B that threatens human health or the environment. V.A.5. The Permittee shall take precautions to prevent accidental ignition or reaction ofthe waste hydrazine and follow the procedures specified in UAC R315-8-2.8. V.A.6. The Permittee shall inspect Building T-29B in accordance with the inspection schedule contained in Attachment 2. V.B. RECORD KEEPING AND REPORTING V.B. 1. The Permittee shall record in the operating record the following: V.B. 1 .a. The date that waste hydrazine is received at T-29B; V.B. I .b. The quantity of waste hydrazine received; V.B. 1 .c. The date the waste hydrazine is treated by the dilution process; V.B.I .d. The quantity of diluted hydrazine after the dilution process is complete; and V.B. 1 .e. The date the diluted hydrazine is shipped off-site or to the M-186 storage facility. ATK Launch Systems Inc. - Promontory September 2008 Module V - Treatment of Waste Hydrazine UTD009081357 V.C. CLOSURE V.C. 1. The Permittee shall close Building T-29B in accordance with R315-8-7, R315-8-9.9, Permit Condition II.N. and the designated Closure Plan in Attachment 5 ofthis Permit. ATK Launch Systems Inc. - Promontory September 2008 Attachment I - Waste Analysis Plan UTD009081357 Attachment 1 WASTE ANALYSIS PLAN ATK Launch Systems Inc. - Promontory Attachment 1 - Waste Analysis Plan September 2008 UTD00908I357 1.0 WASTE ANALYSIS PLAN Ll INTRODUCTION 1.1.1 1.2 1.2.1 This Waste Analysis Plan (WAP) was prepared to support the Part B permit re-issuance for the ATK-Promontoty facility (ATK). The plan is intended to provide guidance and assistance in sampling and testing ofthe two general categories ofhazardous waste at ATK. These two groups include "reactive waste", and "chemical waste". The term "reactive waste" consists of propellant and explosive waste, as defined in R315-2-9(1). The term "chemical waste" is the term used to describe all non-reactive RCRA hazardous waste, or unknown potential RCRA hazardous waste. This category could include drummed waste, lab packs, bulk wastes, waste from offsite ATK facilities, etc. The plan outlines a process for making a hazardous waste determination for both of these general waste categories. This plan will be on file with the Environmental Services and Operations group. The WAP was developed to ensure that all reactive waste will be properly characterized prior to being stored and/or treated. The WAP also outlines how chemical wastes that are being stored priorto shipment to an offsite disposal facility will be characterized. Information on these waste chemicals is obtained from process knowledge, MSDSs, and chemical analysis. Site History ATK-Promontory (ATK) has been manufacturing explosives at this site for over 50 years. The facility manufactures rocket motors, military flares and related items. WASTE ACCEPTANCE PROTOCOL Acceptance of On-Site Reactive Waste for Storage and Treatment All reactive wastes must be characterized before they can be accepted for storage or treatment. The characterization will be accomplished through a profiling process which will identify the type of reactive waste as defmed in R315-2-9(1) and determine whether the waste exhibits any additional hazardous waste characteristics, and if it is listed in accordance with R315-2-9 and 10 UAC. The reactive waste profile is completed through process/generator knowledge, MSDS and testing, if needed. These profiles must be completed and approved before any waste is accepted at the bum grounds. Each profile includes the following infonnation: Reactive material family name and general formulation type Chemical composition with percentage ranges US DOT hazard classification or suspected classification for developmental materials EPA codes Physical characteristics Underlying hazardous constituents (ifany) Reactivite waste category as defined in figure 3-5 Packaging type and other applicable information The profile approval process includes approval by the Generator, Safety and Environmental Services ATK Launch Systems Inc. - Promontory September 2008 Attachment 1 - Waste Analysis Plan UTD009081357 Any new propellants or other reactive wastes will be characterized as described above before they are accepted for storage or treatment. Any waste that does not fit an existing profile, must be profiled before the waste can be accepted. In the event that a reactive waste cannot be properly characterized with existing information, additional information will be obtained, which may include laboratory analysis. Laboratory wastes can be characterized using generator knowledge. Upon receipt ofthe reactive waste at permitted storage facilities, all containers are inspected to verify proper labeling, and packaging. The total quantity and type of propellant is then recorded in the facility operating record. 1.2.2 Acceptance ofHazardous Chemical Waste for Storage and Offsite Disposal Hazardous chemical waste generated at the facility, and other ATK facilities are accepted for storage at M-186. Upon receipt of all hazardous waste at M-186, all containers are visually inspected to verify proper labeling, packaging and paper work. Upon acceptance, a unique container number is recorded in the chemical waste tracking system. All wastes received from an off site source have been characterized in advance, and are assigned a container number at the time of delivery. These shipments are visually inspected to verify that the type and quantity ofthe waste matches the profile and manifest. The manifest numbers for off-site generated hazardous waste are entered into the chemical waste tracking system upon acceptance. Most waste generated on-site is characterized before arrival at the permitted facility, through generator/process knowledge. However, some waste may be received at the TSDF without characterization. When this occurs, sampling and testing ofthe waste stream is conducted to properly characterize the waste. Whenever a waste is accepted, all ofthe pertinent information on the waste is entered into the operating record. This information shall, at a minimum, include the waste profile description, EPA codes, quantity, date of generation, date received, storage location and date it was shipped offsite for disposal,. The chemical waste tracking system will also include the manifest number(s) for all hazardous waste received firom an oflF-site source and all off-site shipments of hazardous waste to a TSDF. At a minimum the following resources are used to help characterize chemical waste: • R315-2 ofthe UAC • Generator process knowledge • MSDS • Laboratory analysis • National Institute for Occupational Safety and Health: Pocket Guide to Chemical Hazards 1.2.3 Acceptance of Off-site Generated Reactive Waste ATK periodically receives reactive waste from off-site ATK Launch Systems and non- ATK Launch Systems facilities. This waste is accepted by ATK for storage prior to on- site treatment at the M-136 bum grounds. All off-site generated wastes must be approved in advance through a waste acceptance and profiling process. The waste profile for wastes received from off-site contains the same infonnation as profiles for wastes generated on-site (described above). ATK Launch Systems Inc. - Promontory September 2008 Attachment 1 - Waste Analysis Plan UTD009081357 Before the waste is accepted, ATK reviews the shipping papers and visually inspects the container(s) to confirm that container(s) and shipping papers agree and that the waste description meets the previously approved waste profile. Discrepancies will be resolved with the generator before the waste is accepted. After the waste has been visually inspected and accepted by ATK, it will be entered into the reactive waste tracking system. Buildings/areas authorized to store reactive waste, and quantity limits are specified in Module III. 3.3 TESTING CRITERIA 3.3.1 Parameters and Rationale for Testing Reactive Wastes Reactive waste may carry several waste codes, but will always carry a D003 waste code for reactivity and such wastes are generally classified as explosives. Due to the inherent hazardous nature of reactive wastes, this material is not routinely sampled or analyzed as part ofthis WAP. In addition to classifying and characterizing the reactive waste managed at the ATK facility, in accordance with R315-2 ofthe UAC, ATK will assess emission hazards associated with the open buming of these hazardous wastes as required in 40 CFR 264.601, Environmental Performance Standards. Figure 3-2 the Reactive Waste Treatment and Disposal Decision Matrix, diagrams the steps and decisions that are addressed whenever reactive wastes are treated and subsequently disposed. 3.3.2 Parameters and Rationale for Testing Chemical Waste ATK generates two general categories of solid waste that can be defined as hazardous in accordance with R315-2 ofthe UAC: 1) off-specification commercial chemical products, and 2) spent materials. These wastes may be disposed of individually or consolidated with other hazardous waste streams. Figure 3-3 the Chemical Waste Characterization and Disposal Decision Matrix, identifies how ATK will decide whether a waste is hazardous as defined by R315-2 ofthe UAC. Off-specification commercial chemical products are chemicals that have not been altered from their original manufactured formulation but are discarded for some reason. The most common reason for discarding these chemicals is because they are no longer needed or the shelf life has been exceeded. Under this scenario, generator knowledge can be used to characterize these wastes. Detailed information on commercial chemical products is available on the MSDSs. A spent material is any material that has been used and as a result of contamination can no longer serve the purpose for which it was produced without being processed or reclaimed. ATK has process knowledge for most ofits spent material waste streams. Annual evaluation will be performed to verify chemica] composition and concentration ranges. All new or modified spent material waste streams will be initially assessed at the point of generation and annually thereafter to maintain proper characterization of all waste streams. 3.4 TEST METHODS AND SAMPLING 3.4.1 Test Method [40 CFR 264.13(b)(2)] ATK will make a hazardous waste determination for all waste streams generated, stored or treated onsite. This waste stream evaluation will be made utilizing process knowledge and/or analytical testing. All analytical testing will be completed at a Utah certified laboratory. Only EPA approved test methods, selected from the most current version of SW-846 list ("Test Methods for Evaluating Solid Waste, Physical and Chemical ATK Launch Systems Inc. - Promontory Attachment 1 - Waste Analysis Plan September 2008 UTD009081357 Methods"), will be used. Test method selection will be made, based on the most applicable method as described in Chapter Two ofthe SW-846 publication. New test methods will be used only after they have been approved by the EPA. The laboratory will certify new methods during the annual certification process. Specific methods which may be used to characterize wastes are listed in Figure 3-4. 3.4.2 Sampling Methods [40 CFR 264.13(b)(3), 261 Appendix I and UAC R315-8-2.4] Waste sampled at the ATK facility consists of new waste, unknown waste, waste from changed processes, and waste sampled for annual re-verification analysis. Representative samples will be collected and handled in accordance with the procedures and protocols identified in Table 3-1. At a minimum the following safety precautions are used when sampling waste materials: • Chemical resistant gloves and safety glasses will be used while sampling all waste. Based on the chemical hazards and splash potential, protective clothing and a splash shield or respirator may also be utilized. • Non-sparking tools will be used to sample any waste that presents a fire hazard. • All necessary equipment and materials will be available prior to sampling Table 3-1 Waste Matrix Free Flowing Liquids/Slurries Sludges Moist Powder/Granules Dry Powder/Granules Sand/Packed Powder Large Grained Solids Debris (i.e. Rags, Gloves, Towels, etc.) Container/Containment Type Drums, Totes Coliwasa Trier/Spoon Trier/Spoon Thiei7Spoon Auger/Spoon Large Trier/Spoon Rag' Boxes, Bags, Sacks N/A N/A Trier/Spoon Thief/Spoon Auger/Spoon Large Trier/Spoon Rag' Storage Tanks Pump/Dipper N/A N/A N/A N/A N/A N/A Ponds, Lagoons, Pits Dipper N/A N/A N/A N/A N/A N/A Tankers Dipper N/A N/A N/A N/A N/A N/A Roll-Off Bins N/A Trier/Bucket/Shovel Trier/Shovel Thief/Shovel Auger/Shovel Large Trier/Shovel Rag' ' The rag technique is used for sampling solid material such as rags, gloves and paper towels. After a conlainer has been selected, il is opened and a representative sample collected and placed in the sample container. One or more ofthe varied materials (e.g. gloves, tongue depressors, rags, paper, plastic, etc.) is sampled depending on the mix ofthe container. A variety of sampling equipment and materials will be used to collect waste samples, reusable equipment will be washed with a detergent solution and thoroughly rinsed All ATK Launch Systems Inc. - Promontory Attachment 1 - Waste Analysis Plan September 2008 UTD00908I357 before re-use. Disposable equipment may also be used. This equipment and specified sampling methods are described in the SW-846 publication. Drummed consolidation waste will be randomly sampled each year as outlined in the table below. "Average Monthly Drum Number" will be based on the previous calendar years average monthly drum inventory, for each waste stream. Samples will be obtained in the first quarter of each calendar year. Table 3.1 Average Monthly Drum Number 2 to 8 9 to 27 28 to 64 65 to 125 126 to 216 217 to 343 344 to 512 Aliquots Selected 2 3 4 5 6 7 8 The above table is based on a table found in ASTM D 140-70, "Standard Methods of Sampling Bituminous Materials," ASTM D 140-70. All sample containers used during a sampling event will be new, and certified clean from a reliable source. Container selection will be based on the chemical/container compatibility, physical state and sample volume. A label will be attached to each sample container which will include the following minimum information: Sample number Samplers name Date Time Location 3.5 3.5.1 In addition to the information included on the label, the chain ofcustody, which accompanies all waste characterization samples, will also include the following: • Composite or grab sample • Number of containers • Remarks section • Relinquishment signature block All samples will be preserved as specified in SW-846 while in storage at ATK and while in transit to the testing laboratory. FREQUENCY OF ANALYSIS Frequency of Analysis for Reactive Waste [40 CFR 264.13(b)(4) and UAC R315-8- 2.4] Reactive waste treated at the ATK bum grounds come from various ATK Launch Systems facilities, Autoliv ASP and occasionally from other Department of Defense facilities or contractors. These reactive wastes are derived from energetic materials that have been manufactured to strict specifications. Therefore, the chemical composition of ATK Launch Systems Inc. - Promontory Attachment I - Waste Analysis Plan September 2008 UTD009081357 each formulation is well known. As discussed above, ATK characterizes all reactive waste streams using generator knowledge. While these energetic waste streams are not analyzed prior to being treated, ATK does review the reactive waste profile on an annual basis or any time the manufacturing process changes. 3.5.2 Frequency of Analysis for Chemical Waste The industrial processes at ATK generate a number of routine waste streams. Figure 3-1 shows major waste streams and processes generating those wastes. These waste streams will be evaluated annually to verify waste characterization is still accurate. The waste characterization will also be re-evaluated whenever the process that generated the waste changes to determine if the process change altered the characteristics ofthe waste stream. Off specification commercial chemical products are well characterized by the information on their MSDSs. These wastes are not analyzed on a routine basis. ATK- Promontory Waste Generation Figure 3-1 Case Prep/Finishing Facility/Vehicle Maint Lab Waste Ground Water Carbon/Carbon Offspec Oil None Note; The EPA codes induded above are primary codes only; The above list includes major waste streams only. ATK Launch Systems Inc. - Promontory Attachment 1 - Waste Analysis Plan September 2008 UTD00908I357 Reactive Waste Treatment and Disposal Decision Matrix Figure 3-2 Reactive Waste and Contaminated Materials Treatinent by OB Large/solid Debris Positive Visual -( Reactivity Inspection Yes Ash Residue & Debris Positi\e Visual Reactivity Inspection Negative RCRA Non Haz" Negative Derived-From/ TCLP/UHC Testina if needed Non-Haz Solid Waste Disposal Waste Profiled No Waste nol accepted For open burning RCRA Hazardous Orsubject to IIDR Haz Waste Disposal ATK Launch Systems Inc. - Promontory Atlachment 1 - Waste Analysis Plan September 2008 UTD00908I357 Chemical Waste Disposal Decision Matrix Figure 3-3 RCRA Solid W aste Is this an Exempt Solid W aste N on-H azardous D isposal Based on Process K now ledg e / M S D S , is the waste listed in Part 26 1 subpart D ? Based on process knowledge / M SDS. does the waste exhibit my characteristics specified in 26 1 subpart C ? Based on Lab analysis Based on Lab analysis fs the waste listed or characte ris tic N o Non-hazardous disposal Hazardous waste management and disposal Y es ATK Launch Systems Inc. - Promontory Attachment 1 - Waste Analysis Plan September 2008 UTD009081357 Figure 3-4 Parameter Arsenic Barium Beryllium Boron Cadmium Chromium Copper Lead Manganese Mercury Molybdenum Nickel Selenium Silver Thallium Vanadium Zinc Analytical Methods for Metals Analytical Method EPA 60IOB EPA 60IOB EPA 60IOB EPA 60IOB EPA 60IOB EPA 60IOB EPA 60IOB EPA 60IOB EPA 60IOB EPA7470A(W)&7471A(S) EPA 60IOB EPA 60IOB EPA 60IOB EPA 60IOB EPA 60IOB EPA 601 OB EPA 60IOB Preparation Method * EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA7470A(W)&7471A(S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) EPA 3005A (W) & 3050B (S) Parameter Volatle Organics Semivolatile Organics TPH TOC Oil & Grease Analytical Methods for Organics Analytical Method EPA 8260B EPA 8270C EPA 80I5B EPA 9060A (W only) EPA 1664A(Wonly) Preparation Method EPA 5030B (W) & 5035 (S) EPA3510C(W)&3550B(S) EPA3510C(W)&3550B(S) EPA 9060A (W only) EPA 1664A(Wonly) Miscellaneous Test Methods Parameter pH Ignitability Toxicity Explosives Perchlorate Anions TSS TS Analytical Method EPA 9040C (W) & 9045D (S) EPA I010A(W only) EPA 601 OB/7470 A (Metals) EPA 8260B (Volatile Organics) EPA 8270C (Semivolatile Organics) EPA 8330 . EPA 314.0 EPA 9056A SM2540D SM2540B Preparation Method EPA 9040C (W) & 9045D (S) EPA lOlOA(Wonly) EPA I311/3010A EPA131I/5030B EPA131I/3510C EPA 8330 EPA 314.0 EPA 9056A (W) & 5050 (S) SM 2540D SM 2540B * The ' W indicates a water matrix. Samples that are water soluble liquids (or aqueous phase) fit into this category. Non-aqueous liquids are usually treated as solids depending on the test method. In the case of an oil matix that cannot be analyzed by the solid preparation method, a waste dilution is often performed. The 'S" indicates a solid matrix. 10 ATK Launch Syslems Inc. - Promontory Attachment I - Waste Analysis Plan September 2008 UTD00908I357 Figure 3-5 REACTIVE WASTE CATEGORY Group A B C D E F G H Description Class 1.3 Composite Propellant without HMX, RDX or CXM-3 Class 1.3 Composite Propellant with HMX, RDX or CXM-3 Class 1.1/1.3 Nitrate Ester Containing Material High Explosive Material Class 1.3 Pyrotechnic, Illuminants, Metal Powders, or Autoliv ASP Products Oxidizers (does not include high explosives such as HMX, RDX or CXM-3) Developmental Materials-R&D Lab Use Only(small quantity) Unique Waste (small quantity) 11 ATK Launch Systemslnc. - Promontory September 2008 Attachment 2-InspectionScheduIes and Procedures UTD009081357 ATTACHMENT 2 INSPECTION SCHEDULES AND PROCEDURE ATK Launch Systemslnc. - Promontory September2008 Attachment 2- InspectionScheduIes and Procedures UTD009081357 INSPECTION SCHEDULES AND PROCEDURES ILA. Purpose and Scope The inspection schedule used by ATK for the hazardous waste management areas has been designed to meet the requirements of R315-8.2.6. The design of the schedule promotes the detection of malfunctions, deterioration, discharges, and other situations which may be causing or leading to a release ofhazardous waste constituents into the enviroimient or pose a threat to human health. Eight areas are designated for inspection: the container storage area at E-501, M-705S, M-186, the buming grounds at M-136 (including the LTTAs, bum trays and Bum Station 14), M-225, T-29B hydrazine dilution and the solid propellant/motor storage buildings, M-47 and M-603. Inspections are conducted by personnel trained to identify potential problem areas and to use the inspection schedule and the inspection log. The T-29B hydrazine dilution process uses a UN dnmi in which treatment occurs. The hydrazine waste collection tank is tested and certified annually. The Permittee may discontinue inspections ofa storage facility during extended periods of inactivity, as approved by the Executive Secretary. A facility must be inspected, however, prior to receiving hazardous waste for storage or treatment if inspections were discontinued during the period of inactivity. Ifany problems are identified with the areas of concern that are listed in the inspection schedules (contained in this attachment), they must be corrected before the facility is put back into use. II.B. Remedial Action or Maintenance Repairs or corrective action for any deterioration or malfunction discovered by an inspection shall be conducted as outlined in Module II, Section F. Repairs to security equipment shall be completed as soon as practicable, but not later than 72 hours after the problem is discovered. As stated in R315-8-2.6(c), where a hazard is imminent or has already occurred, remedial action shall be taken immediately. II.C. Inspection Records All records of inspections and remedial actions shall be retained in the Operating Record, for a period of at least three years. At a minimum, inspection records shall include the date and time ofthe inspection, the name ofthe inspector, a notation ofthe observations made, and the date and nature of any repairs or maintenance taken. ATK Launch Systemslnc. - Promontory Attachment 2- InspectionScheduIes and Procedures September 2008 UTD00908I357 II.D. Inspection Schedules The inspection schedules appear in detail in Tables II-A through II-F. Each inspection schedule is designed so that the items appearing on the schedule are inspected frequently enough to avoid any deterioration of equipment and thus reduce the probability of an environmental or human health incident between inspection times. Each inspection schediile is divided into individual categories and each category contains a specific list of items to be inspected. Inspections are also required within 24 hours after a storm event as outlined in the schedules below. A storm event is defined as precipitation in excess of 1.0 inch in a one- hour period. It shall be documented in the inspection log that the inspection was conducted in response to a storm event. TABLE II-A INSPECTION SCHEDULE FOR DRUM STORAGE AT JVH86 EOUIPMENT 1. Security Equipment Fences Signs Gates Lock 2. Area Roadway Loading/ Unloading Areas MINIMUM FREOUENCY Weekly Weekly Weekly Weekly Daily' Daily' Periphery Daily' AREAS OF CONCERN Visually inspect all fence lines and look for broken or downed fence lines, loose wires Readable signs, signs in place Able to properly close gate, safety flags in place In working order, able to lock Inspect road for spills, soil discoloration Inspect loading areas for spills, soil discoloration Inspect groimds for any spills, soil discoloration or stressed vegetation ATK Launch Systemslnc. - Promontory Attachment 2- InspectionScheduIes and Procedures September 2008 UTD009081357 3. Safety Equipment Eyewash/Shower Monthly Ensure in working order by testing, check water supply Telephone/Radio Monthly 4. Storage Containment Containers Weekly Pads Weekly^ Sumps/Pads Drainage Area Roof 5. Emergency Equipment Fire Extinguisher Absorbent Repack Drums 55-Gallon dmms Generator Pump Daily' Weekly^ Weekly Monthly Monthly Monthly Monthly Monthly Monthly Working condition Number ofcontainers, severe corrosion (i.e., flaking, large rust buildup, msty bungs), dented dmms, hazardous waste labels in place, properly marked, readable, open bungs, no standing liquid on drums, adequate aisle space (2.5 feet) Chips, cracks,or irregularities in concrete, general condition Standing liquid on pad or in sumps Spills, discolored soil General condition including holes or defects Fire extinguisher full, in working order Adequate supply (minimum 25 lbs) Two repack dmms with seals Six empty 55-gallon dmms with bungs in good condition, no dents, etc. Routine oil check, fill with gas, test startup Good working order, hoses intact, test startup and pump ATK Launch Systemslnc. - Promontory Attachment 2- InspectionScheduIes and Procedures September 2008 UTD009081357 When in use And after each storm event. A storm event is defined as more than one inch of precipitation in a one-hour period. TABLE II-B INSPECTION SCHEDULE FOR BURNING GROUNDS AT M-136 AREAS OF CONCERN Visually inspect all fence lines, look for loose wires or broken lines Readable signs, signs in place Able to properly close gate In working order, able to lock Spills, discolored soil Spills, discolored soil Spills, discolored soil, stressed vegetation 1. 2. 3. 4. EOUIPMENT Security Equipment Fences Signs Gates Lock Area Roadway Loading/ Unloading Areas Periphery Safety Equipment Telephone/Radio Bum Ground Area Erosion MINIMUM FREOUENCY Weekly Weekly Weekly Weekly Daily' Daily' Daily' Monthly Weekly^ Check operating condition of equipment Survey area and note severe erosion on grounds 5. Storage/Containment ATK Launch Systemslnc. - Promontory Attachment 2- InspectionScheduIes and Procedures September 2008 UTD00908I357 Bum tray Weekly 2,3 Container Weekly 6. Emergency Equipment Fire Extinguisher Monthly Tray is intact and liquid tight, accumulation of liquids Closed, labeled, signs of leaks or spills Fire extinguisher full and in working order 1 When in use 2 Inspect upon arrival, then each calendar week 3 And after each storm event. A storm event is defined as more than one inch of precipitation in a one-hour period. TABLE II-C INSPECTION SCHEDULE FOR BURNING GROUNDS AT M-225 AREAS OF CONCERN EOUIPMENT 1. Security Equipment Fences Signs Gates Lock 2. Area Roadway Loading/Unloading Areas MINIMUM FREOUENCY Weekly Weekly Weekly Weekly Daily' Daily' Visually inspect all fence lines, look for loose wires or broken lines Readable signs, signs in place Able to properly close gate In working order, able to lock Spills, discolored soil Spills, discolored soil Periphery Daily' Spills, discolored soil, stressed ATK Launch Systemslnc. - Promontory Attachment 2-InspectionScheduIes and Procedures 3. Safety Equipment Telephone/Radio 4. Bum Ground Area Erosion Weekly Bum Tray Weekly 5. Emergency Equipment Fire Extinguisher Monthly September 2008 UTD009081357 vegetation Monthly Check operating condition of equipment Survey area and note severe erosion on grounds Tray is intact and liquid tight, accumulation of liquids Fire extinguisher full and in working order ' When in use "^ And after each storm event. A storm event is defined as more than one inch of precipitation in a one-hour period. TABLE II-D INSPECTION SCHEDULE FOR STORAGE AND CONSOLIDATION ROOM AT M-705S EOUIPMENT MINIMUM FREOUENCY 1. Security Equipment Signs Weekly 2. Area Roadway Daily' Loading/Unloading Daily' Areas Periphery Daily' AREAS OF CONCERN Readable signs, signs in place Spills, discolored soil Spills, discolored soil Spills, discolored soil, stressed vegetation ATK Launch Systemslnc. - Promontory Attachment 2- InspectionScheduIes and Procedures September 2008 UTD009081357 3. Safety Equipment Eyewash/Shower Monthly Telephone/Radio Monthly 4. Storage containment Containers Weekly Pads, Sumps Weekly Portable Secondary Daily Roof Weekly Sump, pads Daily' 5. Emergency Equipment Fire Extinguisher Monthly Absorbents Monthly Repack Drums Monthly 55-Gallon Drums Monthly Ensure in working order by testing, check water supply Check operating condition of equipment Number ofcontainers, severe corrosion (i.e. flaking, large mst buildup, msty bungs), dented dmms, hazardous waste labels in place, properly marked, readable, no open bungs, no standing liquid on the dmms Chips, cracks, or irregularities in the concrete, general conditions Cracks, liquid, containment integrity General condition including holes or defects Check for standing liquids in the sump and containment system Fire extinguisher full and in working order Adequate supply (minimum 25 lbs.) Two repack dmms with seals Six empty 55-gallon dmms with bungs in good condition, no dents, etc. When in use ATK Launch Systemslnc. - Promontory Attachment 2- InspectionScheduIes and Procedures September 2008 UTD009081357 TABLE II-E INSPECTION SCHEDULE FOR M-47, M-603 EOUIPMENT 1. Security Equipment Signs Bay Doors Lock 2. Area Roadway MINIMUM FREOUENCY Weekly Weekly Weekly Daily' Loading/Unloading Areas Daily Periphery 3. Communications Equipment Telephone 4. Storage Containers Motors/bags, etc. Building Roof Daily' Monthly Weekly Weekly Weekly AREAS OF CONCERN Readable signs, signs in place Fimction properly Function properly Inspect road for spills, soil discoloration Inspect loading areas for spills, soil discoloration Inspect grounds for any spills, soil discoloration or stressed vegetation Working condition; place call to verify operation Verify condition of motors/bags, properly marked and labeled, out of place material and check for leakage, or liquid discharge from waste solid rocket motors and propellant. Verify no damage done to exterior of facility General condition including holes or defects ATK Launch Systemslnc.-Promontory Attachment 2- InspectionScheduIes and Procedures September 2008 UTD009081357 5. Emergency Equipment Fire Extinguisher Monthly In working order and full When in use TABLE II-F INSPECTION SCHEDULE FOR DRUM STORAGE PAD AT E-501 EOUIPMENT 1. Security Equipment Fences Signs Gates Lock 2. Area Roadway Loading/ Unloading Areas MINIMUM FREOUENCY Weekly Weekly Weekly Weekly Daily' Daily' Periphery Daily' 3. Safety Equipment Eyewash/Shower Monthly AREAS OF CONCERN Visually inspect all fence lines and look for broken or downed fence lines, loose wires Readable signs, signs in place Able to properly close gate, safety flags in place In working order, able to lock Inspect road for spills, soil discoloration Inspect loading areas for spills, soil discoloration Inspect grounds for any spills, soil discoloration or stressed vegetation Ensure in working order by testing, check water supply ATK Launch Systemslnc. - Promontory Attachment 2- InspectionScheduIes and Procedures September 2008 UTD009081357 Telephone/Radio Monthly 4. Storage Containment Containers Weekly Pads 5. Emergency Equipraent Weekly Sumps/Pads Drainage Area Roof Daily' Weekly^ Weekly Fire Exfinguisher Absorbent Repack Dmms 55-Gallon dmms Monthly Monthly Monthly Monthly Working condition Number ofcontainers, severe corrosion (i.e., flaking, large mst buildup, msty bungs), dented dmms, hazardous waste labels in place, properly marked, readable, open bungs, no standing liquid on dmms, adequate aisle space (2.5 feet) Chips, cracks,or irregularities in concrete, general condition Standing liquid on pad or in sumps Spills, discolored soil General condition including holes or defects Fire extinguisher full, in working order Adequate supply (minimum 25 lbs) One repack dmm with seals Three empty 55-gallon drums with bungs in good condition, no dents, etc. When in use And after each storm event. A storm event is defined as more than one inch of precipitation in a one-hour period. ATK Launch Systemslnc. - Promontory Attachment 2- InspectionScheduIes and Procedures September 2008 UTD00908I357 TABLE II-G INSPECTION SCHEDULE FORT-29 Hydrazine Dilution Bay EOUIPMENT MINIMUM FREOUENCY AREAS OF CONCERN 1. Security Equipment Signs Weekly' Readable signs, signs in place Door Locked 2. Area Roadway Periphery Weekly' Daily' Loading/ Daily' Unloading Areas Daily' 3. Safety Equipment Eyewash/Shower Monthly In working order, locked Inspect road for spills, soil discoloration Inspect loading areas for spills, soil discoloration Inspect grounds for any spills, soil discoloration or stressed vegetation Ensure in working order by testing, check water supply Telephone(cell) 4. Storage Containment Containers Floor Monthly Weekly' Weekly' Working condition Number ofcontainers, severe corrosion (i.e., flaking, large mst buildup, rusty bungs), dented dmms, hazardous waste labels in place, properly marked, readable, open bungs, no standing liquid on dmms Chips, cracks,or irregularities in concrete, general condition ATK Launch Systemslnc. - Promontory Attachment 2- InspectionScheduIes and Procedures September 2008 UTD009081357 Roof 5. Emergency Equipment Fire Extinguisher Absorbent Collection tank ' When in use Weekly' Monthly Monthly' Annual General condition including holes or defects Fire exfinguisher full, in working order Adequate supply (minimum 25 lbs) Verify certificafion ATTACHMENT 3 PERSONNEL TRAINING ATK Launch Systemslnc. - Promontory September 2008 Attachment 3-Personnel Training UTD00908I357 Annual On-Going Up-Date Training Outline I. Introduction to Hazardous Waste A. Major Laws B. Govemment Publicafions (29, 40, 49 CFR) C. EPA, DOT, OSHA Interface II. Hazardous Waste Determination A. 40 CFR 261 III. Hazardous Waste Accumulation Areas A. 40 CFR 262.34 IV. Container Management A. 40 CFR 265 Subpart I V. DOT Shipping Criteria A. 49 CFR 172.101 VI. Reportable Quantities A. 49 CFR 172.101 Appendix VII. Implementation ofthe Contingency Plan Training is held throughout the year for all TSDF operators that handle or are expected to handle hazardous waste. ATK Launch Systemslnc. - Promontory September 2008 Attachment 3-Personnel Training UTD00908I357 OUTLINE FOR THE TRAINING OF PERSONNEL WHO GENERATE, PICKUP/TRANSPORT/DISPOSE OF, AND MANAGE HAZARDOUS WASTE INTRODUCTION This training will teach employees and contractors (if they work with hazardous waste) to properly handle, pickup/transport/dispose of, and manage hazardous waste. It will enable employees to safely handle hazardous waste and ensure that facility personnel are able to respond effectively to emergencies in order to protect human health and the environment. It will also ensure that the Company is in compliance with all applicable laws and regulations as they pertain to training. AUDIENCE The audience is made up of three major groups. 1) Those individuals who generate hazardous waste. 2) Personnel who pickup, transport, and dispose of hazardous waste. 3) The technical people who manage hazardous waste operations at the Company. ATK Launch Systemslnc, - Promontory September2008 Attachment 3- Personnel Training UTD009081357 CONTENT OF THE PROGRAM: REOUIRED FOR (The employee will be able to:) GROUP^s) 1) Define hazardous waste terms 1,2,3 2) Understand the importance of and follow procedures 1,2,3 3) List characterisfics ofhazardous waste 1,2,3 4) List various hazardous waste materials 1,2,3 5) List examples of and consequences of improper disposal 1,2,3 6) Comply with Federal and State Laws 1,2,3 7) Comply with Company 1,2,3 8) List the major functions performed in their work area as 1,2,3 related to hazardous waste 9) List their job responsibilities as related to hazardous waste 1,2,3 10) Use resources and references related to hazardous waste 1,2,3 11) Operate various hazardous waste handhng equipment 1,2 12) Proper use of safety equipment 1,2,3 13) Avoid shortcuts when handling hazardous waste 1,2,3 14) Proper use of monitoring equipment 2,3 15) Identify hazardous waste 1,2,3 16) Segregate incompatible materials 1,2,3 17) Proper useof package materials 1,2,3 18) Label materials 1,2,3 19) Inspection requirements for TSDFs 2 20) Requirements for the pickup of hazardous waste 2,3 21) Requirements for the transport of hazardous waste 2,3 22) Dispose of hazardous waste in a timely manner 1,2 23) Respond properly under emergency conditions 1,2,3 24) Procedures to cleanup spills 1,2,3 25) Understand the importance of properly handling and 1,2,3 disposing ofhazardous waste to protect employees and the environment 26) Understand the basis for these requirements 1,2,3 ATK Launch Systemslnc. - Promontory September 2008 Attachment 3-Personnel Training UTD00908I357 APPROACH The training is divided into the following three categories: 1. Orientafion training. Items number 1, 2, 3,4, and 5 and parts of number 6, 7, 8, and 9 listed above will be covered in orientation training. These items will also be reinforced on the j ob. 2. Formal. Stmctured on-the-iob-training. Parts of items 6, 7, 8, and 9 and items 10 through 26 will be covered on the job. 3. Specialtv training. This is classroom instruction indirectly related to hazardous waste operations. Some of these courses are: Asbestos, Propellant Material Handling, Environmental awareness and Hazardous Waste Disposal and Hazardous Waste for Dock Coordinators. All training must be recorded. Employees will not be allowed to handle hazardous waste unsupervised until they have successfully completed the training program. Training will be completed within six months of the employee's hire date. There will also be annual refresher training (similar to new hire training) conducted for all employees affected by the program to assure they are always adequately trained. This training will consist of, at a minimum, a review of their inifial training in both contingency procedures and the hazardous waste management procedures relevant to the posifions in which they are employed. All training will be evaluated to ensure compliance and safety. Performance will be measured against specific standards set out at the beginning ofthe program. TRAINING DOCUMENTATION The following documents and records will be maintained at the facility and made available for review by DSHW upon request: 1. The job title for each position at the facility related to hazardous waste management, and the name ofthe employee filling each job; 2. A written job description for each position listed under number one above. The descripfion will include the requisite skill, education, or other qualificafions and dufies ofthe employees assigned to each position; 3. A written description ofthe type and amount of both introductory and continuing training that will be given to each person filling a posifion under number one above. 4. Records that document that the required training or job experience has been given to, and completed by the appropriate personnel; Records ofthe training will be kept until closure ofthe facility or for three years after the employee leaves the Company. ATK Launch Systemslnc. - Promontory September 2008 Attachment 3-Personnel Training UTD009081357 CONCLUSION The training program presented in this outline is made up of a number of different components, all ofwhich work together and supplement each other. All of these components are under the guidance, supervision, and management ofa combinafion of professional trainers, line supervision, and hazardous waste management professionals. The trainers are skilled in current instructional technologies, have appropriate educational backgrounds, and the work experience to qualify them for this assignment. Much ofthe training is already being done in one form or another. Throughout its life, the program will continue to be evaluated and revised. This will assure that it is continually improved, current, and in compliance. The program will meet the needs ofthe employees, the environment, the law, and the Company. HAZARDOUS WASTE MANAGEMENT Contingency Plan and Emergency Procedures For Spills of Hazardous Materials July 2008 ATK Launch Svstems Promontory Plant P.O. Box 689 Brigham City UT 84302-0689 (435) 863-8545 ATK Launch Systems- Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 PREFACE This document, HAZARDOUS WASTE MANAGEMENT CONTINGENCY PLAN AND EMERGENCY PROCEDURES FOR SPILLS OF HAZARDOUS MATERIALS, (herein refeired to as Contingency Plan), provides written instructions on how to take care of spills ofhazardous substances. It is intended to meet the requirements of the Utah Hazardous Waste Rules and Subpart D of the EPA Resource Conservation and Recovery Act. This CONTINGENCY PLAN does not replace, nor is it to be used instead of, the ATK Launch Systems - Promontory EMERGENCY AND DISASTER RESPONSE PLAN, or any other plan which outlines procedures to be followed during general emergencies, disasters, civil disturbances, riots, bomb threats, etc. Most spills involving hazardous substances will not require use ofthe EMERGENCY AND DISASTER RESPONSE PLAN. Spills that create an emergency situation involving possible injury to personnel or damage to property will require use ofthe EMERGENCY AND DISASTER RESPONSE PLAN to take care ofthe emergency. This CONTINGENCY PLAN applies to containment and cleanup of a hazardous waste spill. Definitions in the HAZARDOUS WASTE MANAGEMENT CONTINGENCY PLAN AND EMERGENCY PROCEDURES reflect EPA and State of Utah environmental language while those in the EMERGENCY AND DISASTER RESPONSE PLAN reflect OSHA, UOSH, FEMA, and ATK Launch Systems language. The user must be careful not to be confused by differences in language between these documents and must evaluate the applicability of each document to the particular situation. ATK Launch Systems- Promontory September 2UU8 Attachment 4 - Contingency Plan UTD009081357 TABLE OF CONTENTS INTRODUCTION A. PURPOSE..., B. SCOPE C. NOTIFICATION D. POSTING E. REVISIONS AND UPDATING F. DEFINITIONS 2 G. PLANT LOCATIONS AND SITE INFORMATION 5 H. PREVENTION OF RECURRENCE OR SPREAD OF FIRES, EXPLOSIONS, OR RELEASES 7 II. REPORTFNG PROCEDURES AND INCIDENT IDENTIFICATION 7 A. EVACUATION CRITERIA 7 B. IDENTIFICATION OF A HAZARDOUS WASTE FN A SPILL 7 C. REPORTING OF EMERGENCY INCIDENTS 8 D. PERSONNEL RESPONSIBILITIES 8 E. ALARM SYSTEMS 19 F. LOCAL LAW-ENFORCEMENT AGENCIES, FIRE DEPARTMENTS, AND HOSPITALS 15 III. SPILL CONTAINMENT AND CLEANUP 16 A. CONTROL PROCEDURES 16 B. SPILL CONTAFNMENT AND CONTROL 16 C. SPILL CLEANUP 16 D. FOLLOWUP PROCEDURES 17 E. fNCOMPATIBLE WASTE 18 F. CLEANUP MATERIAL AND EQUIPMENT 18 G. DECONTAMfNATlON EQUIPMENT AND PROCEDURES 20 H. EQUIPMENT DECONTAMfNATlON AND REPLENISHMENT 20 IV. INSTALLATION RESPONSE TEAM TRAINING 21 A. TRAINING 21 B. SIMULATION 22 V. TRAINING PLAN 22 A. SCOPE AND PURPOSE OF THE CONTINGENCY PLAN 22 B. REVIEW OF LEGAL REQUIREMENTS 22 C. LOCAL ATK CORPORATION REQUIREMENTS 22 D. CUSTOMER REQUIREMENTS 22 E. REVIEW AUTHORITY AND FUNCTION OF EACH RESPONSE TEAM MEMBER . 22 F. EMERGENCY COMMUNICATION SYSTEM 22 G. FIRE PLANS/FIRE DRILL 22 H. BOMB SEARCH TECHNIQUES 22 I. FIRE BARRICADE/CORDON AREAS 23 J. EMERGENCY MEDICAL TREATMENT 23 K. SECURITY OF SITE 23 L. INVESTIGATION 23 M. PUBLIC RELEASE OF INFORMATION 23 N. FACT-FINDING METHODS 23 O. SAFING THE AREA 24 P. CONTROL OF THE CURIOUS 24 ATK Launch Systems- Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 Q. HANDLING OF REMAINS 24 R. NOTIFICATION PROCEDURES 24 S. RESCUE EFFORTS 24 TABLES TABLE I COMPATIBIUTY INFORMATION 25 TABLE II EMERGENCY COORDINATOR CALL LIST 26 FIGURES FIGURE! DECONTAMINATION/SPILL SCENE : 27 FIGURE 2. DECONTAMINATION 28 APPENDIX I NORTH PLANT SITE MAP 30 SOUTH PLANT SITE MAP 31 TEST AREA SITE MAP 32 PLANT 3 SITE MAP 33 M-136 BURNING GROUNDS FACILITY FUNCTION TABLE 34 M-186 HAZARDOUS WASTE AREA FACILITY FUNCTION TABLE 34 M-136 SITE MAP AND EVACUATION PLAN 35 M-l 86 SITE MAP AND EVACUATION PLAN 36 E-501 STORAGE YARD FACILITY FUNCTION TABLE 37 E-501 SITE MAP AND EVACUATION PLAN 38 M-225 BURNING GROUNDS FACILITY FUNCTION TABLE 39 M-225 SITE MAP AND EVACUATION PLAN 40 T-29B SATELLITE ACCUMULATION AREA FUNCTION TABLE 41 T-29B SITE MAP AND EVACUATION PLAN 42 M-705 WASTEWATER TREATMENT FACILITY FUNCTION TABLE 43 M-705 HAZARDOUS WASTE CONSOLIDATION ROOM 43 M-705 SITE MAP AND EVACUATION PLAN 44 M-47 PROPELLANT STORAGE FUNCTION TABLE 45 M-47 SITE MAP AND EVACUATION PLAN 46 M-603 PROPELLANT STORAGE FUNCTION TABLE 47 M-603 SITE MAP AND EVACUATION PLAN 48 ATK Launch Systems-Promontory September 2008 Attachment 4 - Contingency Plan . UTD009081357 APPENDIX II A. BULK FLAMMABLE LIQUID STORAGE AREAS 50 B. PRACTICAL CONSEQUENCES OF A CATASTROPHIC FAILURE 51 APPENDIX III ARRANGEMENTS WITH LOCAL AUTHORITIES 52 ATK Launch Systems- Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 L INTRODUCTION A. PURPOSE This plan may be activated by requesting emergency response on phone number 2222 or 911. The purpose ofthis Contingency Plan and Emergency Procedures is to set forth responsibilities, establish organizational structure, and outline the procedures required to ensure effective waming, response, and control to minimize hazards to human health or the environment from fires, explosions, or any unplaimed sudden or non-sudden release ofhazardous waste or hazardous waste constituents to air, soil, or surface water. B. SCOPE This organizational plan is intended to meet requirements ofthe Utah Hazardous Waste Management Rules and Subpart D ofthe Resource Conservation and Recovery Act. The provisions ofthis plan will be carried out immediately whenever there is a fire, explosion, or release ofhazardous waste or hazardous waste constituents at one ofthe permitted facility that could threaten human health or the envirorunent. This plan specifically addresses company actions to be initiated in the event ofa spill or release ofhazardous materials. C. NOTIFICATION Incidents covered by this contuigency plan and which meet applicable State of Utah and U.S. EPA reporting requirements will be reported to the appropriate agencies by Environmental ^ecialists. The Environmental Specialist should confer with the Director or Manager of Environmental Services prior to notification. D. POSTING Copies ofthe Contingency Plan and all revisions must be: 1. Maintained at the facility and the Fire Department's Spill Response vehicle. 2. Submitted to all local police departments, fire departments, hospitals, and State and local emergency response teams that may be called upon to provide emergency services. (Arrangements have been made between ATK Launch Systems- Promontory and the hospitals located at Brigham City and Tremonton regarding emergency services that would be provided as required. Letters of agreement are kept in the Envirotmiental Services Central Files.) E. REVISIONS AND UPDATING This contingency plan will be reviewed and amended whenever: 1. Applicable regulations are revised. 2. The plan fails in an emergency. 3. The facility changes its design, construction, operation^ maintenance, or other circumstances in a way that materially increases the potential for fires, explosions, or release ofhazardous waste or hazardous waste constituents, or changes the response necessary in an emergency. ATK Launch Systems- Promontory September 2008 Attachment 4 - Contingency Pian UTD00908I357 4. The list of emergency coordinators change. 5. The list of emergency equipment changes. F. DEFINITIONS 1. Disaster - An event in which loss of life, serious and/or multiple injuries, major property or environmental damage, or major disrupfion of normal operaions has occurred. This includes serious fires or major hazardous material spills, explosions, injuries to multiple people, and acts of nature such as floods, violent storms, or earthquakes. 2. Discharge - The accidental or intentional spilling (see Spill), leaking, pumping, pouring, emitting, emptying, or dumping ofhazardous waste on or into the air, land, or water. 3. Emergency - A situation which, if not quickly controlled, can lead to death, serious and/or multiple injuries, major loss or damage to property, significant damage to the environment, or disruption of normal operations. 4. Emergency Command Unit - The group of personnel selected by the emergency commander to assist in the fiill scope administration ofthe emergency. 5. Emergency Commander - The General Manager or his designee, as head ofthe Command Unit, is responsible forthe overall direction, coordination, and function of all units charged with providing countermeasures to cope with conditions and/or events within the scope of ths plan. The Command Unit will consist of any and all persons selected by the Emergency Commander. NOTE The Emergency Commander -will be the head ofthe Command Unit for all civil disturbances, bomb threats, national emergencies, and natural disasters. The Command Unit will operate from a pre-designated Emergency Operations Center specified by the Emergency Disaster Response Plan or the Emergency Commander. 6. Emergency Operations Center (E.O.C.) - The location of senior management where decisicns and incident specific policies are made. 7. Environmental Specialist - The Environmental Specialist is the Spill Team Leader from Environmental Services. He or his designated altemate will assist the Incident Commander in the evaluation ofthe impact on the environment resulfing from any emergency, disaster, or hazardous substance discharge. NOTE When required, notification of Federal, State, and/or local environmental agencies shall be through the Environmenial Specialist. Company policy requires that the event be discussed with the Vice President ofthe applicable division and ATK Corporate Environmental. Fire Brigade - A group of employees, generally from maintenance, who have received HAZWOPER training and are called on as needed to assist the full-time fire department in emergency response. ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 9. Fire Warden - A designated individual assigned in advance to assist the fire department in evacuation procedures and give information on the building and surrounding area. 10. Hazardous Waste - Identified in 40 CFR 261 and in Utah Hazardous Waste Management Rules, Section 2.1 on the basis of specific listed material and general characteristics. Specific listed wastes are found in these documents. The EPA regulations provide detailed technical specifications of four characteristics: Ignitable (DOOl)- Cortosive (D002) - Reactive (D003) - An ignitable compressed gas, an oxidizer, a liquid having a flashpoint < 140^F, or a non-liquid capable of causing fire, under standard temperature and pressure, through friction, absorption, moisture, or spontaneous chemical changes. A solid waste that (1) is aqueous and has a pH < 2 or > 12.5; or (2) is a liquid and has a corrosion rate > 0.25 inches/year on steel. A solid waste that: a. Is unstable and readily undergoes violent change without detonafing. b. Reacts violently with water. c. Forms potentially explosive mixtures with water. d. Generates toxic gases, vapors or fiimes in a quantity sufficient to present a danger to human health or the environment when mixed with water. e. Is a cyanide or sulfide bearing waste which can generate toxic gases, vapors, or fiimes in a quantity sufficient to present a danger to human health or the envirotmient when exposed to pH conditions between 2 and 12.5. TCLP Toxicity - (as determined by Toxicity Characteristic Leachate Procedures)- Presence of certain listed toxic materials at levels greater than those specified in the regulation. 11. Hazardous Communication Web (Haz Com Web)- a computer based system which contains a scaimed image ofthe MSDS, plus additional safety and disposal information. 12. Hazardous Waste ProHle Data (HWPD) Sheet - An ATK document that lists all EPA, DOT, and chemical information needed for marking, labeling, and identifying waste streams on plant. 13. Hazardous Waste Operations and Emergency Response (HAZWOPER) - Refers to specific training requirement for handling hazardous materials and for emergency operations. These requirements are found in 29 CFR 1910.120. 14. Human Resource Coordination - An intermediate between management and personnel who deals with employee concems and interests. 15. Incident Commander/Emergency Coordinator - The Incident Commander will be the on-duty Assistant Fire Chief/Incident Commander. The Incident Commander will direct the activities of all Field Units from a designated control 3 ATK Launch Systems - Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 point at the scene ofthe emergency, disaster, or other event. The Security Manager will be the Incident Commander for countermeasures in situafions caused by hostile persons. The Fire Prevenfion Captain will act as Incident Commander until relieved by an Assistant Fire Chief The following items are identified as principles for the Emergency Commander and Incident Commander to apply to the unique circumstances ofthe emergency or disaster: a. Assist the injured. b. Stabilize situation and site. c. Assure evidence is not destroyed, lost, or moved. d. Record situation through text, photographs, videos, and/or mapping. e. Notify State and local officials. f Secure and admit only qualified essential personnel to the site, g. Debrief participants. 16. Material Safety Data Sheet (MSDS) - Provides information on safe handling , proper PPE, and disposal information for each chemical. This document is prepared by the chemical manufacture. For additional information, contact your local Industrial Hygienerepresentative. 17. Non-sudden Release - The accidental discharging (see Discharge), spilling, leaking, pumping, pouring, emitting, emptying, or dumping ofhazardous wastes or materials which, when spilled become hazardous wastes, into or on any land or water over an extended period of time. This also includes spills onto asphalt or concrete pads. 18. Post Emergency Remediation Team - A group of employees made up of environmental professionals and technicians who have received appropriate training as stated in 29 CFR 1910.120 for hazardous waste operations and who respond to post emergency remediation projects as needed. 19. Reportable Spill (Discharge) - A hazardous waste spill which must be reported to the Utah Department ofEnvironmentai Response and Remediation, National Response Center and/or other applicable Federal, State or local authorities. The Utah Hazardous Waste Management Rules list reportable spill quantities as: a. One kilogram (2.2 lb) of material in accordance with R315-9-1(b)(1). A spill ofa lesser quantity must be reported if there is a potential threat to human health or the environment. b. One-hundred kilograms (220 lb) ofhazardous waste or material which, when spilled, becomes hazardous waste, in accordance with R315-9-1(b)(2). A spill ofa lesser quantity must be reported if there is a potential threat to human health or the environment. c. Subpart J of 40 CFR Part 265 ofthe Resource Conservation and Recovery Act sfipulates that a spill of 1 lb fi-om a leaking hazardous waste sump is a reportable quantity. ATK Launch Systems-Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 NOTE For complete descriptions and listings, contact Environmental Services or refer to R3I5-9 ofthe Utah Hazardous Waste Management Rules. The following is a partial list of materials used at ATK and the quanfities which, if spilled, would require State or Federal notification: EPA Utah Material Acetone Methanol Methylchloroform Methylene Chloride Methyl Ethyl Ketone Methyl Isobutyl Ketone Nitroglycerin Propellants, reactive materials (HMX) oxidizers (AP) Sodium Azide Toluene Xylene Quantity 5000 lbs. 5000 lbs. 1000 lbs. 1000 lbs. 5000 lbs. 5000 lbs. 10 lbs. 100 lbs. 1000 lbs. 1000 lbs. IOO Ibs. Quantitv 220 lbs. 220 lbs. 220 lbs. 220 lbs. 220 lbs. 220 lbs. 2.2 lbs. 220 lbs. 2.2 lbs. 220 lbs. 220 lbs. A more complete list of reportable quantities is found in GM3.1, Table IX. 20. Solid Waste - Any discarded material that is a solid, liquid, semi-solid or contained gaseous material resulting from industrial, commercial, mining, or agricultural operations and is not excluded under 40 CFR 261.4(a), 260.30, or 260.31. 21. Spill - The accidental discharging (see Discharge), spilling, leaking, pumping, pouring, emitting, emptying, or dumping ofhazardous wastes or materials which, when spilled become hazardous wastes, into or on any land or water. This also includes spills onto asphalt or concrete pads. 22. Environmental Services - A department with expertise in the areas ofhazardous waste, air and water management, including envirorunental regulations in these areas. PLANT LOCATIONS AND SITE INFORMATION 1. The ATK Launch Systems - Promontory (ATK) plant is located in Box Elder County approximately 30 miles northwest of Brigham City. The 30-square mile plant site is remote from any major population centers and is reasonably isolated from ranches located at varying distances from the area boundaries. The plant site is composed of four major areas in which manufacturing and testing activities take place: South Plant, North Plant, Test Area, and Plant 3. There are approximately 675 buildings located on the plant site, (See Appendix I for facility site maps). ATK owns and operates these 4 areas. All of these areas are contiguous and waste disposal is managed by one organization. From the beginning of operations in 1956 to the present time, plant activities have encompassed a wide range of programs requiring the production of solid rocket propellants, rocket motor testing, and industrial support necessary to achieve each 5 ATK Launch Systems- Promontory September 2008 Attachment 4 ~ Contingency Plan UTD009081357 program's objectives. Solid rocket motors manufactured during this period vary from motors containing 7-9 Ib of propellant to 1,100,000 Ib. Programs have included Space Shuttle SRM, Peacekeeper, Trident, SRAM, HARM, Standard, Genie, Minuteman, Poseidon and a variety of ground and air launched flares. 2. The plant site has eight hazardous waste treatment and storage facilities: Burning Grounds at M-136, and M-225; Drum Storage areas at E-501 and M-186; the T-29B Hydrazine Dilution Facility; the M-705 Wastewater Treatment Plant; the M-705S Hazardous Waste Consolidation Room; the soiid propellant waste storage facilities at M-47and building M-603 which will be used for storage and treatment of solid propellant, rocket motors, and non-hazardous liquids. The site maps and evacuation plans for these facilities are shown in Appendix I. These nine facilities serve as waste management units for the entire facility. Reactive wastes treated at the burning grounds include waste propellants, waste explosives, oxidizers, or solid waste contaminated with propellants, explosives, or oxidizers. No propellants or explosives are ever stored in the drum storage areas; hazardous wastes that are flammable, toxic, or corrosive are stored in these units. The Hydrazine Dilution Facility at T-29B dilutes waste hydrazine to between 5 to 50 percent by volume for shipment to an off-plant disposal site. The M-705 Wastewater Treatment Facility treats hazardous and industrial waters from building sumps. Hazardous wastes are consolidated and lab packed at the M-705S Hazardous Waste Consolidation Room. 3. Approved hazardous waste accumulation areas are described in Table I. 4. Fire hydrants are located as follows: 101 hydrants in the Administrative and Manufacturing area, 95 at North Plant, 47 in the Test Area, and 9 in Plant 3. Static and dynamic pressure heads have been measured for each hydrant and the Fire Department maintains this information. The fire protection system at the plant site meets the NFPA codes for fire protection. ATK owns and operates two pumper fire engines and two brush trucks which are used for emergency response. The following water tanks are interconnected: Location X-1 X-2 M-131 M-132 M-133 M-587 (North Plant) M-696 T-59 (Test) Caoacitv (aal) 200,000 20,000 50,000 50,000 100,000 1,000,000 20,000 1,000,000 The M-203 (Propellant Development Area) water tank with a 100,000 gallon capacity is not interconnected to the other tanks. Fire hydrants throughout the plant are color coded according to capacity. Color Code Flow Capacity (gpm) Green Fire Hydrant 1,000 or more Orange Fire Hydrant 500 -1,000 Red Fire Hydrant 500 or less ATK Launch Systems- Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 5. Information depicting the capacity, location, and practical consequences of a catastrophic failure of large hazardous material storage areas is found in Appendix II C, p.67. 6. All buildings with 10 or more regular occupants have an evacuation plan posted at all major exits of the building. (See Appendix I for the site maps and evacuation routes of the hazardous waste treatment and storage facilities). H. PREVENTION OF RECURRENCE OR SPREAD OF FIRES, EXPLOSIONS, OR RELEASES 1. There are many steps that can be taken to prevent the recurrence and spread of fires, explosions, or releases at the drum storage areas, burning grounds, and operating buildings. These include limiting propellant quantities placed in the burning trays, following safe handling procedures, personnel training, segregating incompatible and reactive materials in the burning trays and in the drum storage areas, practicing good housekeeping procedures, proper labeling, regular inspections, and separating the burning trays by safe distances. These procedures are outlined in company operating manuals. 2. Each fire, explosion, or release into the environment is unique. The Incident Commander must be an experienced individual who will take all possible steps to prevent a recurrence, to limit the extent ofthe damage, and to stop the discharge. These steps may include: a. Stopping processes and operations. b. Collecting and containing released wastes. c. Removing and isolating containers. d. Preventing additional harm to the environment through knowledge of the potential hazards associated with storage areas (found in Appendix II, A and B, pp. 65 and 66, their locations, capacities, and identification. 3. User organizations conduct regular inspections on items such as bulk storage containers that store hazardous wastes or materials which, if released to the environment, would become hazardous wastes. Audits are taken on volumes of stored materials versus consumption to ensure that non-sudden releases are not occurring. If a non-sudden release of materials is discovered, steps are taken immediately to minimize the impact on the environment II. REPORTING PROCEDURES AND INCIDENT IDENTIFICATION A. EVACUATION CRITERIA 1. A fire that is a threat to human safety. 2. A spill that is a threat to human safety. B. IDENTIFICATION OF A HAZARDOUS WASTE IN A SPILL 1. The building personnel working the operation identify the material. 7 ATK Launch Systems- Promontory September zuu6 Attachment 4 - Contingency Plan UTD009081357 2. The Material Safety Data Sheet(MSDS) is referred to for chemical constituents, health hazards and protective clothing. 3. The Hazardous Waste Profile Data sheet, Haz Com Web, GM 3.1 or MSDS is referred to for proper disposal of the waste. REPORTING OF EMERGENCY INCIDENTS 1. Spilled material is reported to Security. 2. Security contacts the Environmental Service's Spill Advisory Team and Safety for technical support and advice. 3. Environmental Services contacts the State and EPA to report the incident (if required). 4. Environmental Services obtains the log from Security to prepare the written report to the State. 5. Within 15 days, Environmental Services submits the written report to the State and maintains a permanent copy in the Environmental Services' Central File as required. PERSONNEL RESPONSIBILITIES 1. EMERGENCY MANAGER a. At all times, there shall be at least one employee either present on the facility premises or on call with the responsibility for coordinating all emergency response measures. b. The facility emergency coordinator is thoroughly familiar with all aspects of the facility's contingency plan, all operations and activities at the facility, the location and characteristics of waste handled, the location of manifests and all other records within the facility, and the facility layout, or has immediate access to persons with this information. c. This person shall have the authority to commit the resources needed to carry out the contingency plan. d. Arranges for and directs a spill contingency plan simulation. 2. EMPLOYEES, FIRST LINE SUPERVISORS AND FIRE WARDENS a. Report all fires or emergencies by activating the fire alarm or calling the emergency number. b. Report from a safe telephone location: Your name and phone number Type of incident (fire, explosion, injury, spill, etc.) Location of incident c. Stay on the line when possible until released by the emergency operator. d. Do not attempt to fight fires involving live or possibly toxic hazardous materials. 8 ATK Launch Systems - Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 e. Do not attempt to contain spills that are beyond capability or training. FIRST LINE SUPERVISORS a. Ensure personnel evacuate buildings or areas to the assembly point indicated on the Emergency/Evacuation Plan located in each building. NOTE Handicapped personnel must be provided priority and assistance during evacuation and assembly. b. Advise the Fire Captain and the Incident Commander of conditions at the scene. c. Account for all employees that were in or assigned to the affected building or area. d. Report any injured or missing personnel to the Incident Commander. e. Remain at the assembly point until released by the Incident Commander, f Notify appropriate Safety Department and fill out a Mishap Report. INCIDENT COMMANDER a. Initiate the first response actions. b. Contact line supervision at the assembly point to determine the details of the situation: i. Nature of incident ii. Number of personnel injured or not accounted for and the location of their last known assignment. iii. Location and type of hazardous materials that may be exposed to fire or explosion (Quantity Distance Criteria). c. Applicable Quantity Distance Criteria. d. Assume control of emergency area. e. Declare severity of event such as an emergency or disaster as appropriate. f Establish emergency scene, coordinate road blocks, cordon the site, and control entry/exit from the area. g. Make an initial assessment of situation. h. Notify the Security Radio Dispatcher as appropriate, close the switchboard, if absolutely necessary. The Environmental Specialists must be included if a building deluge system has been activated and the building sump has overflowed or another known spill of hazardous material has taken place. i. Identify safe response routes for follow-on units. j. Coordinate activities with other emergency units. 9 ATK Launch Systems- Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 k. Commit rescue and first aid crews as necessary. I. Obtain emergency rescue and ambulance as required. m. Keep the Emergency Commander informed of the emergency situation. n. Request outside assistance from the EOC as needed. p. Check with building's supervision to identify propellant ingredients and hazardous constituents in any building or building sump which must be pumped by Water Operations personnel. Evaluate what hazards, if any, exist which may hinder safe access to the building. q. Perform actions in accordance with 29 CFR 1910.120 (HAZWOPER). SECURITY a. Set up road blocks as directed by the Incident Commander to preclude unauthorized entry of personnel and provide clear traffic flow for emergency vehicles. b. Coordinate with Incident Commander to ensure orderly evacuation of personnel. c. Provide protection for classified information, valuable records, and special equipment. d. Ensure protection of Company and Government property from theft or sabotage. e. Provide proper disposition, storage, and protection of classified material in accordance with the Department of Defense Industrial Security Manual. f Establish perimeter boundary for emergency scene, set up road blocks, cordons, etc. g. Above actions must be consistent with HAZWOPER requirements. SECURITY RADIO DISPATCHER a. When directed by the Incident Commander, notify appropriate personnel in accordance with the Emergency and Disaster Response Plan. b. Monitor and record all emergency radio communications, and establish required communications between radio units. c. Upon direction ofthe Incident Commander, notifies appropriate ATK management. TELEPHONE OPERATORS a. When directed by the Incident Commander, refuse incoming and outgoing calls unless directed otherwise by the Emergency Commander. INDUSTRIAL HYGIENIST a. Report to the Incident Commander at the assembly point or Field Command Post b. Advise the Incident Commander on emergencies involving toxic chemical or 10 ATK Launch Systems- Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 radiation hazards. c. Perform the following activities as necessary: i. Sample air at the scene, including any sumps which have to be pumped, (if determined to be necessary by the Industrial Hygienist (IH) on the scene) ii. Monitor radioactivity at the scene, (if determined to be necessary by the IH on the scene) iii. Advise Emergency Response Team concerning proper decontamination controls. iv. Notify Medical Services of personnel exposure to toxic chemicals or radioactive materials. V. Advise the Incident Commander to notify public health authorities. d. Performs these duties in accordance with HAZWOPER requirements. 9. MAINTENANCE CRAFTS PERSONNEL a. Respond to all alarms when notified by the Security Police Radio Dispatcher and report to the Incident Commander at the command post. b. Control distribution of air, water, steam, and electrical power as directed by the Incident Commander. c. Provide equipment, barricading, and shoring as necessary per direction of Incident Commander. d. As Fire Brigade, assist when needed. e. Provide construction type materials and services for containment of hazardous material spills. f Performs these duties per direction of Incident Commander. 10. ENVIRONMENTAL SERVICES PERSONNEL NOTE The propellant collection crews are not trained for emergency response. Trained operators for HAZWOPER emergency sump truck response are on plant to operate the sump truck on day shift, Monday thru Friday. A Remediation Team has been trained to respond to spill clean-ups larger than building personnel are normally able to handle, contact Gene Curtis at Ext 4479 for assistance. Sump truck services are available on off-shifts at the discretion of the remediation team leader If emergency sump truck service is needed during off-shift hours, call the waste management company contracted by ATK. a. Report to the Incident Commander at the command post, when notified by Security Police Radio Dispatch. 11 ATK Launch Systems-Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 b. Perform duties as directed by the Incident Commander after material to be collected has been identified, any hazards associated with the material have been identified, and safe procedures to handle the material have been established. c. Perform these duties in accordance with HAZWOPER requirements. d. Advise the Incident Commander on potential environmental hazards, safe handling, and disposal options. 11. MEDICAL SERVICES PERSONNEL a. Remain at or report to the Dispensary to receive and treat patients. b. Report to the emergency area when requested by the Incident Commander. c. Coordinate with surrounding community hospitals and doctors for the receipt and treatment of injured. d. Requisition supplemental medical supplies, equipment, and personnel as needed. May request helicopter transportation in life or death situations. e. Conduct and supervise treatment for injured personnel. f Review MSDS and other relevant information, and transmit same to receiving hospital. 12 TRANSPORTATION PERSONNEL (IN-PLANT TAXI SERVICE) a. Coordinate with Incident Commander to ensure adequate transportation of plant personnel. 13. EMERGENCY COMMANDER a. Control and coordinate overall activities of the emergency situation. The Emergency Commander will work from the Emergency Command Center, and will assist and direct the On-Scene Incident Commander as needed. b. Evaluate situation and determine need to convene the Emergency Command Unit. c. Direct the Telephone Operators to open or close the switchboard according to the nature of the emergency. d. Open the Emergency Operations Center as necessary. e. Identify the disaster potential posed by the emergency. f Make the disaster declaration when necessary (disaster responsibilities are listed in Section III). 14. PHOTOGRAPHER a. Report to the Incident Commander at the Command Post. b. Advise the Incident Commander on photo coverage. c. Photograph the scene as directed. 12 AlK Launch Systems-Fromonlory September/uu» Attachment 4 - Contingency Plan UTD009081357 d. Expedite printing and delivery ofthe photographs. e. Interpret the photographs as required. 15. HUMAN RESOURCES COORDINATOR a. Provide food and assistance with personal needs for emergency team members and those affected. b. Notify next of kin of injured persons when advised by Emergency Commander. (See Section IV, the Emergency and Disaster Response Plan for procedures). 16. ENVIRONMENTAL SPECIALIST a. Assess possible environmental hazards resulting from the incident including assessment of spills caused by the activation ofa building deluge system which in turn caused the building sump to overflow. b. Initiate reports required by the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) and Utah Solid and Hazardous Waste Regulations. c. In conjunction with trained personnel from the area involved, supervise the clean- up activities (Remediation Team), taking control from the Fire Department as the emergency is concluded. d. Determine (along with the responding local emergency agency) whether the facility has had a discharge, fire, or explosion which could threaten the environment outside of the facility. Assure immediate implementation of emergency procedures. e. Notify the State and Federal environmental agencies as required. f The Environmental Specialist contacts either the government official designated as the on-scene coordinator or the National Response Center, (800) 424-8802, and Utah Dept. of Environmental Response and Remediation (DERR) at (801) 536- 4123 to relaying the following information: Name and telephone number of reporter. i. Name and address of facility. ii. Time and type of incident (such as discharge, fire, etc.). V. Name and quantity of material(s) involved, to the extent known. V. The extent of injuries, if any. vi. The possible hazards to human health or to the environment outside the facility. g. Notify the Corporate Environmental Engineer if the spill is reportable. David Shead (952) 351-2663 13 ATK Launch Systems- Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 h. Utah Hazardous Waste Management Rules require that the Environmental Specialist note in the operating record the time, date, and details of any incident that requires implementing the contingency plan. Within 15 days after the incident, he must submit a written report on the incident to the Executive Secretary of the Solid and Hazardous Waste Control Board. The report must include: i. Name, address, and telephone number of the owner or operator. ii. Name, address, and telephone number of the facility. iii. Date, time, and type of incident (such as fire, explosion, etc.). iv. Name and quantity of material(s) involved. v. The extent of injuries, if any. vi. An assessment of actual or potential hazards to human health or the environment where this is applicable. vii. Estimated quantity and disposition of material recovered from the incident. i. Notify the community emergency coordinator for the local emergency planning committee in compliance with requirements outlined in 40 CFR 355.40, where applicable. j. Immediately after an emergency, the Environmental Specialist must provide direction for treating, storing, or disposing of recovered waste, contaminated soil or surface water, or any other material that results from a discharge, fire, or explosion at the facility. k. The Environmental Specialist and the Incident Commander must ensure that, in the affected area(s) ofthe facility: i. A determination is made who will do the spill remediation work (Building Personnel, ATK Spill Remediation Team, or Off-Site Contractor). ii. No waste that may be incompatible with the discharged material is stored or disposed of until cleanup procedures are completed; and iii. All emergency equipment listed in the contingency plan is cleaned and ready for its intended use before normal operations are resumed. 17. CORPORATE PUBLIC AFFAIRS a. Establish liaison with representatives of public information media. b. Prepare drafts of general/public information press releases relating to the emergency. c. Release information as directed by the Emergency Commander, according to ATK Policy. 18. RECORDER a. Record incoming and outgoing communications at the EOC. 14 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 b. Record all significant events and actions. c. Initiate and maintain record information in a time line log. d. Assist in the preparation of interim and final reports. ALARM SYSTEMS 1. Alarm systems are available at ATK for fires or building evacuations if an emergency or disaster situation exists: lype Fire and Building Evacuation Hazardous Waste Storage and Thermal Treatment People/Materials People People Materials Sound Fire Alarm Verbal Signal (or fire alarm, if available) Verbal Signal (fire alarm or air horn, if available) 2. The hazardous waste storage facilities at M-186 and E-501 are located outdoors in open areas, evacuation of personnel will be in any direction away from the problem. The assembly area for E-501 is directly across the street (to the north) from the entrance gate. The assembly point for M-186 is at the M-381 trailer. 3. The hazardous waste storage facility at the M-705 Consolidation Room is a single room equipped with two exits, a single door on the west and a double door on the east. Both sets of doors open directly to an open outdoor area where personnel are to evacuate to an area near the intersection of the main in-plant road and the M-705 access road. The room is equipped with a heat sensor alarm, a fire alarm and a carbon monoxide alarm on the supplied air system. 4. M-47 is a storage building only, and is equipped with evacuation doors on the west side of the building only. These exits are delineated in the evacuation plans in Appendix I. 5. M-603 is a storage and disassembly building with multiple exits as outlined in the evacuation plan in appendix I. 6. Tables and maps showing the function of the various hazardous waste sites and area evacuation plans are found in Appendix I, p. 40. LOCAL LAW-ENFORCEMENT AGENCIES, FIRE DEPARTMENTS, AND HOSPITALS 1. Local law-enforcement agencies, fire departments, and hospitals have been contacted to respond to or treat any ATK emergency. The most recent copy of this Contingency Plan is sent to each agency in order to familiarize them with the layout, description of hazardous wastes handled, and evacuation plan for the plant. Copies of the letters sent to each agency are kept in the Operating Record. 2. All emergency response units from off-plant will be escorted from the gate to the 15 ATK Launch Systems - Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 fire/explosion/spill site by an ATK authorized agent. This will ensure the units reach the location as quickly and efficiently as possible. IIL SPILL CONTAINMENT AND CLEANUP A. CONTROL PROCEDURES 1. Detailed emergency response procedures whenever there is a fire, explosion, or release (spill) are found in the current Emergency and Disaster Response Plan. 2. Specific directives for cleaning up spills are given in the GM 3.1 and the Hazardous Waste Profile Data (HWPD). There are over 1,000 chemical entries in the HPWD. Approximately 800 of the chemicals in current use exhibit hazardous properties. The MHSI documents are generated in-house to provide a standard format for easy use. Each entry contains Material Safety Data Sheet (MSDS) information as well as other information. There are approximately 100 sets of MHSI distributed throughout the facility. In addition, a complete MHSI is accessible through over 1,000 computer terminals at the facility. 3. The Wastewater Treatment Facility (M-705) is designed to treat wastewater containing hazardous waste constituents. The responsible building foreman or supervisor should report to the M-705 facility personnel any spill or accidental discharge to a sump suspected of containing chemicals at concentrations above the levels normally discharged. The report should include the incident location, name of person reporting, chemical involved, and approximate quantity. The treatment facility personnel will then be able to determine how best to handle the wastewater. 4. The propellant storage buildings will be inspected daily or weekly as required when in use. While the propellants stored in these buildings are solid, occasionally a small amount of nitro glycerin or similar material can ooze from the motor and drip to the floor. These drips will be checked for during the inspections, and cleaned up using rags and acetone within 24 hours of discovery or as soon as is practicable. B. SPILL CONTAINMENT AND CONTROL §265.56(e) of the Resource Conservation and Recovery Act (RCRA) states: "During an emergency, the Emergency Commander must take ail reasonable measures to ensure that fires, explosions and releases do not occur, recur, or spread to other hazardous waste at the facility. These measures must include where applicable, stopping processes and operations, collecting and containing released waste and removing or isolating containers." Confine hazardous material spills to the affected area with dams, Quicksorb, or other approved means. Hazardous material properties may be determined by consulting the Hazardous Waste Profile Data Sheet, MHSI, or the DOT Emergency Response Guidebook. No attempt will be made to contain a spill until the hazardous properties are known. Secondary containment is provided for most storage tanks. For those tanks without secondary containment, consult Appendix II for spill containment considerations. C. SPILL CLEANUP 1. Waste Management and Environmental Services will be responsible for the coordination of spill cleanup activities. Building personnel will clean up smaller sized spills, incidental to the work process, that are deemed within the skills and level of training possessed by 16 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan September 2008 UTD00908I357 available building personnel, where the spill occurred. All other spills will be cleaned up by the Spill Remediation Team or a company contracted by ATK. Proper procedures will be followed for every release of hazardous wastes. Because of the extensive inventory of hazardous materials managed at ATK Corporation, each release will require specific safety precautions, cleanup procedures, and/or disposal methods. See Table II p. for chemical compatibility information. WARNING Do not attempt to contain or clean up any spill until hazards associated with the material are known and proper safety precautions are taken. Response procedures to be used during container spills or leaks are as outlined: a. Identify the material From the hazardous waste label From Waste Management and Environmental Services inventory records Through laboratory analysis From carrier manifest or placard DOT guide number Protect personnel through the use of personal protective equipment specific to the identified material (refer to MHSI or Material Safety Data Sheet, available from Industrial Hygiene.) c. d. Stops the spill or leak Contain the material Eliminate the source Use Quicksorb, or other approved methods e. Clean up the material ! Re-drum ! Wipe up, use absorbent material, excavate soil f Dispose of the material (refer to Haz Com Web and Disposal Instructions for Waste Materials, GM-3.1) g. Decontaminate the site and clean the equipment D. FOLLOWUP PROCEDURES 1. When the spill has been properly contained and stopped, appropriate equipment will be used to remove the spilled material to a disposal site designated by the Environmental Specialist. 2. Spills involving very large quantities of material caused by the failure of a large storage tank should be dealt with as quickly as possible to minimize exposure to the environment. The method of pickup generally will be pumping material into a tank truck, the original tank after repairs, or into another tank. An alternative may be to use the Environmental Waste Disposal sump truck to pump liquid hazardous wastes and transfer them to a 5,000 gallon storage tank trailer at M-705. Contact 17 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 Waste Management and Environmental Services for use. 3. Proper steps will be taken to repair equipment and facilities and/or remove the cause ofthe spill. 4. Operating procedures will be changed, if necessary, to prevent recurrence of a spill. 5. Safety and Operational Training will be instigated, if required. 6. When possible, all reasonable effort will be made to salvage reusable material. INCOMPATIBLE WASTE The Environmental Coordinator and Incident Commander will ensure no waste is incompatible with any material during the cleanup ofa discharge. Table II, p. lists the information and its available location to the Environmental Coordinator and Incident Commander to make decisions regarding compatibility. All of these matenals are available for inspection at the plant site. CLEANUP MATERIAL AND EQUIPMENT The following is a partial list of safety equipment that may be used for cleanup as required per Haz Com Web. All items can be obtained from Stores or from a call contract. Item Coveralls Smocks Tyvek Suit (m) Tyvek Suit (I) Tyvek Suit (xl) Tyvek Sack Suit Tyvek Hood Polyethylene- Tyvek Suit Saranex Tyvek Suit Booties (Yellow) Booties (Clear) Boots (Rubber) Glasses, Safety Monogoggles Ear Plugs Gloves, Rubber (s) Gloves, Rubber (m) Gloves, Rubber (1) Gloves, Leather Gloves, Cotton Gloves Gloves, NBR (s) Gloves, NBR (m) Gloves, NBR (I) Respirator, Half Mask Air f^urifying Respirator, Full-face Cart Stock No. Use Live Operations Manufacturing Area Asbestos & Dust Asbestos & Dust Asbestos & Dust Asbestos & Chemical Spills Asbestos & Chemical Spills Asbestos & Chemical Spills Chemical Spills Asbestos & Chemical Spills Asbestos & Chemical Spills Chemical Spills Spills-Less than 1 quart Spills-Greater than 1 quart Noise-Greater than 90 B(A) Methyl Ethyl Ketone Methyl Ethyl Ketone Methyl Ethyl Ketone General Use General Use Solvent Resistant Methyl Chloroform Methyl Chloroform Methyl Chloroform In O2 Sufficient Areas Only In O2 Sufficient Areas Only 18 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 Respirator, Fresh Air Respirator, No. 8710 Filter S (Gray) Filter H (Purple) Filter GMA (Black) Filter GMC (Yellow) Filter GMD (Green) Filter (Purple/Black) GMA-H Filter (Purple/ Yellow) GMC-H Filter (Black/Olive) GMP Acetone Rumple cloth Chemliner bag Velostat bag In O2 Deficient Areas Only Dust, Single-use Only Dusts, Mists, Fumes, Radon Daughters, Asbestos Dusts, Mists, Fumes, Radio- nuclides, Asbestos Organic Vapors Organic Vapors, Acid Gases Ammonia & Methylamine Organic Vapors, Dusts, Mists, Fumes, Radionuclides, Asbestos Organic Vapors, Acid Gases, Dusts, Fumes, Mists, Radionuclides, Asbestos Pesticides Propellant solvent wipe Contain solvent rags Conductive bag to contain chemiliner In addition, the following materials are available if required: Item Location Ext Description Lumber Sawdust Pipe Quicksorb (27-200002) Absorption Clay Hydrated Lime (54-426006 Chemical Spill Neutralizer Acids (General) Bases (General) Flammable Solvents Mercury Cleanup Kits NG Spill and Detector Kit Bulldozer (Space/DLV) Front-end Loader Portable Lights and Generator Sump Tank M-90 M-90 M-90 M-3 (Stores) Landfill M-3 (Stores) J. T, Baker M-53 M-53 M-53 M-53 M-585 M-55/M-321 M-55/M-321 M-6 M-136 Portable Diaphragm Pumps M-55/M-321 General Trucks SCBA Respirators Water Ops. Equip Spill Response Truck M-55/M-321 Fire Dept M-705 Fire Dept 2680/2757 2680/2757 2680/2757 2757 2837 2757 2617 2617/7436 2617 2617 8446 2837/2455 2837/2455 3431 2520 2837/2455 2837/2455 2222 2222 2222 Plywood, Lumbers Bulk All dimensions 50 Ib Bag Bulk 50 Ib Bag 3.2 kg 1.2 kg (1.1 kg) (18 kg) 0.9 kg 5 liter bottle D-8 r/4and 3 yd bucket 2 Mercury Lamps 3,000 gal r/2-5Ton 30 Min. Tank Sump Trucks, Etc. Spill Response and Rescue 19 ATK Launch Systems-Promontory September zuus Attachment 4 - Contingency Plan UTD009081357. G. DECONTAMINATION EQUIPMENT AND PROCEDURES 1. Equipment available for decontamination includes \wo disposable wading pools, a wood-framed plastic pool carried on the spill truck for tool and spill team decontamination, and fire trucks to supply wash down water. Decontamination procedures outlined on Figures 1 and 2 will be followed to ensure spill containment and to minimize the area of contamination. 2. The M-186 hazardous waste drum storage site is located near the burning pits: This area is serviced by the E-522 Fire Station which is located 3-5 minutes away. The M- 705 Hazardous Waste consolidation room and the E-501 drum storage yard are also serviced by the E-522 Fire Station which is located 1-2 minutes away. Both the E-522 and M-11 Fire Stations are outfitted with quick-response spill control equipment (See maps. Appendix I). In addition, spill response kits are available at the M-53 and M-585 Laboratories. H. EQUIPMENT DECONTAMINATION AND REPLENISHMENT 1. The Incident Commander, or his designee, will ensure all equipment has been properly decontaminated, cleaned, and replaced before normal operations are resumed. The following guidelines are to be used for decontamination of equipment after a discharge has occurred. These steps are also supplemented by the information found in the sources listed in Paragraph F. 2. As much as possible, measures should be taken to prevent contamination of equipment Any delicate instrument which cannot be decontaminated easily should be protected while it is being used. It should be bagged and the bag taped and secured around the instrument Openings can be made in the bag for sample intake. a. Sampling Devices Sampling devices require special cleaning. The instruction and care manuals provide information on proper decontamination methods for each instrument used. b. Tools and Equipment Equipment and tools designated for spill response should be disposable; however, some tools and equipment require decontamination. Decontamination equipment, materials, and supplies are generally selected based on availability. Soft-bristle scrub brushes or long-handle brushes are used to remove contaminants. Water in buckets is used for rinsing. Large galvanized wash tanks or stock tanks can hold wash and rinse solutions; children's wading pools can also be used. Open top (55-gallon) drums or similar containers lined with plastic bags can be used to store contaminated clothing and equipment. Contaminated liquids can be stored temporarily in metal or plastic cans or drums. Other supplies include paper or cloth towels for drying protective clothing and equipment. Personal protective equipment, sampling tools, and other equipment are usually decontaminated by scrubbing with detergent-water using a soft-bristle brush followed by rinsing with copious amounts of water. While this process may not be fully effective in removing some contaminants, it is a relatively safe option compared with using a chemical decontaminating solution. Occasionally, a decontamination chemical is then needed to change the contaminant into a less 20 ATK Launch Systems-Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 harmful substance during decontamination. The Environmental Coordinator and Incident Commander, or his designee, may consult the information sources in Table I, p. 33, to determine the necessity of using a chemical decontamination solution. All materials and equipment used for decontamination must comply with proper disposal. Clothing, tools, buckets, brushes, and all other equipment that are contaminated must be secured in drums or other containers and labeled. Clothing not completely decontaminated onsite should be secured in plastic bags before being removed from the site. Contaminated wash and rinse solutions should be contained to hold spent solutions. The spent solutions are transferred to drums which are labeled and properly disposed of The Environmental Specialist and Incident Commander, or his designee, will ensure the disposal of these materials is done in an appropriate manner. c. Respirators Certain parts of contaminated respirators, such as the harness assembly and leather or cloth components, are difficult to decontaminate. If grossly contaminated, they may have to be discarded with the other spill cleanup wastes. Rubber components can be soaked in soap and water and scrubbed with a brush. Regulators must be maintained according to manufacturer's recommendations. Persons responsible for decontaminating respirators should be thoroughly trained in respirator maintenance. d. Heavy Equipment Bulldozers, trucks, back-hoes, bulking chambers, and other heavy equipment are difficult to decontaminate. The method generally used is to wash them with water under high pressure and/or to scrub accessible parts with detergent/water solution under pressure, if possible. Shovels, scoops, and lifts may be sandblasted or steam cleaned. Particular care must be given to those components in direct contact with contaminants such as tires and scoops. Wash water generated during the decontamination process must be contained and disposed of in a proper manner. IV. INSTALLATION RESPONSE TEAM TRAINING Building/area personnel responding to spills of hazardous materials incidental to the normal processes within their building/area will not need training beyond that required by ATK's Hazard Communication Program. Personnel responding to spills, who are not assigned to the building/area where the spill occurred, are to be members ofthe Spill Remediation Team with the proper OSHA training. NOTE Hazard Communication Plus Program is a combination of the HAZ-COM Program required by OSHA 29 CFR 1910.1200 and HAZWOPER first awareness level required by OSHA 29 CFR 1910.120. A. TRAINING All personnel involved in cleanup operations will be trained. This training will include an 21 ATK Launch Systems - Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 awareness of the locations of cleanup materials and equipment and the procedures for the operation of such equipment B. SIMULATION The Spill Contingency Plan will be simulated annually under the direction ofthe Emergency Commander. V. TRAINING PLAN One of the most important objectives of the Contingency Plan is to ensure that the emergency responders are properly trained. Training should include teaching, exercise and critique phases. Re- training and review should be completed at least annually. The following is an outline of training plan elements: A. SCOPE AND PURPOSE OF THE CONTINGENCY PLAN B. REVIEW OF LEGAL REQUIREMENTS 1. Authority 2. OSHA requirements 3. State requirements 4. EPA requirements 5. State Fire Marshall requirements 6. Law enforcement requirements 7. Medical Examiner/Coroner requirements C. LOCAL ATK REQUIREMENTS D. CUSTOMER REQUIREMENTS Contract review E. REVIEW AUTHORITY AND FUNCTION OF EACH RESPONSE TEAM MEMBER F. EMERGENCY COMMUNICATION SYSTEM 1. Initial notification and follow-up 2. Verification of information 3. Radio discipline 4. Communication intercept G. FIRE PLANS/FIRE DRILL 1. Use 2. Exercise 3. Evaluate 4. Evacuation 5. Assembly points H. BOMB SEARCH TECHNIQUES 1. Outside to Inside 2. Left to right 3. Bottom to Top 22 ATK Launch Systems - Promontory ileptember 2008 Attachment 4 - Contingency Plan UTD009081357 4. Evacuation 5. Suspect items (Isolate; don't touch or disturb) J. K. L. M. N. FIRE BARRICADE/CORDON AREAS 1. 2. Function Initiate/release EMERGENCY MEDICAL TREATMENT 1. 2. EMT training, equipment First response first aid SECURITY OF SITE 1. 2. 3. Purpose Authority Who authorizes access INVESTIGATION 1. 2. 3. 4. 5. 6. OSHA EPA Local Law enforcement Medical Examiner/Coroner Customer ATK PUBLIC RELEASE OF INFORMATION 1. 2. 3. 4. 5. Who authorizes Importance of controlling Who releases Who reviews Next of kin FACT-FINDING METHODS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11, 12. Initial interview Follow-up interview Recordings Photo Coverage Mapping damage a. Who? b. How? c. Why? Personnel security checks Drug and alcohol tests Weather conditions Product status Operational status Equipment records and history Facility, tooling, modification and history 23 ATK Launch Systems - Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 SAFING THE AREA 1. Electric Power 2. Water 3. Steam 4. Toxic chemicals 5. Falling hazards 6. Explosives CONTROL OF THE CURIOUS 1. Outsider 2. Employees 3. Press HANDLING OF REMAINS 1. Notification 2. Photo 3. Movement (after authorization by Medical Examiner) 4. Release (after authorization by Medical Examiner) NOTIFICATION PROCEDURES 1. When? 2. Who? 3. How? 4. Verification RESCUE EFFORTS 1. When? 2. When not to 3. How to determine 24 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 TABLE I COMPATIBILITY INFORMATION Source of Compatibility Information Location 1. Hazardous Waste Compatibility Chart Table 9-2 of Attachment 9 Available at Environmental Services offices 2. Material Health and Safety Information (example of informa- tion found in plan) Available in hard copy form at approximately 100 locations through- the plant; also available on 1,000 computer terminals throughout the plant* 3. Material Safety and Data Sheets 4. Work Experience Located on the Haz Com Web Knowledge of each member of the Response Team when responding to a discharge 25 ATK Launch Systems-Promontory Anachment 4 - Contingency Plan September 2008 UTD009081357 TABLE II EMERGENCY COORDINATOR CALL LIST Primary Coordinator Steve Winn Alternate Coordinator Ray Stokes Steve Batis Work No. 722175 6600 6600 Home No. 801-699-2473 435-245-4627 435-257-7116 Home Address 8538 S. WIdoak Drive West Jordan, UT 84088 161S. 200W. Wellsville, UT 84339 196 S. 1000 W. Tremonton, UT 84337 26 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 FIGURE 1. DECONTAMINATION/SPILL SCENE Difficult Decontamination Situations Some situations, such as a solvent spilled on tiles or large spills on unprotected ground require the removal and disposal of the affected material. Other situations, such as contaminated equipment or fixtures, require steam cleaning and the use of a detergent. Frequently, the rinse from steam cleaning is best controlled with a wet/dry vacuum. Steam cleaners, detergents, and wet/dry vacuums can be obtained from local rental companies. The rinse should be tested for the contaminant and managed appropriately. 27 AlK Launch Systems-Promontory Attachment 4 - Contingency Plan oepieiiiDci zuuo UTD009081357 The Spill Scene While each spill is unique, every spill shares common features best referred to as the "Spill Scene." This allows a conceptual illustration of the work area which emphasizes the relationship of the various components. Complete decontamination of workers, tools, and the spill site must be performed before the spill response is completed. It is prudent to establish an area for worker decontamination through which all SPILL TEAM members must pass prior to leaving the site. In this TEAM DECONTAMINATION SITE (TDS) protective clothing can be thoroughly washed with detergent and rinsed with water, if necessary. The soles of ALL WORKERS SHOES MUST BE RINSED before they leave the area. Outer coveralls (Tyvek, etc.) must be removed in this area. These steps are necessary to prevent spreading the contamination or introducing toxic substances into workers homes. Tools can be rinsed with detergent and water prior to removal from the spill scene. All rinses from these decontamination procedures must be treated as hazardous waste. Dry decontamination may be used when appropriate. It is frequently necessary to test the site for completeness of decontamination prior to declaring the emergency resolved. Spills which contaminate soil, asphalt, concrete, or other absorbent materials will require that samples be obtained and analyzed. After all residual contamination is removed, asphalt and concrete areas must receive a thorough wash-down with fresh water. FIGURE 2. DECONTAMINATION 28 ATK Launch Systems - Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 APPENDIX I FACILITY FUNCTION TABLES, SITE MAPS, & EVACUATION PLANS NORTH PLANT SITE MAP 30 MANUFACTURING AREA SITE MAP 31 TEST AREA SITE MAP .....32 PLANT 3 SITE MAP 33 M-136 BURNING GROUNDS FACILITY FUNCTION TABLE 34 M-186 HAZARDOUS WASTE AREA FACILITY FUNCTION TABLE 34 M-136 SITE MAP AND EVACUATION PLAN 35 M-186 SITE MAP AND EVACUATION PLAN 36 E-501 STORAGE YARD FACILITY FUNCTION TABLE 37 E-501 SITE MAP AND EVACUATION PLAN 38 M-225 BURNING GROUNDS FACILITY FUNCTION TABLE .: 39 M-225 SITE MAP AND EVACUATION PLAN 40 T-29B SATELLITE ACCUMULATION AREA FACILITY FUNCTION TABLE 41 T-29B SITE MAP AND EVACUATION PLAN 42 M-705 WASTEWATER TREATMENT FACILITY F UNCTION 43 M-705 HAZARDOUS WASTE CONSOLIDATION ROOM 43 M-705 SITE MAP AND EVACUATION PLAN .44 M-47 PROPELLANT STORAGE FUNCTION TABLE 45 M-47 SITE MAP AND EVACUATION PLAN 46 M-603 PROPELLANT STORAGE FUNCTION TABLE 47 M-603 SITE MAP AND EVACUATION PLAN 48 29 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 i I * I w ' MMm i» NORTH PLANT SITE MAP 30 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD00908I357 MANUFACTURING AREA SITE MAP (South Plant) 31 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 TEST AREA SITE MAP 32 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 TBf * n^f F vxm nORTHDW JTAH FACUTT PEVUDPUWT MKA (PUHT i) • WSm SJTE WP 33S PLANT 3 SITE MAP 33 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD00908I357 M-136 BURNING GROUNDS FACILITY FUNCTION: Propellant, explosives, unstable and pyrotechnic waste disposal Waste Products Into Area Class 1.1 and 1.3 propellant wastes, propellant con- taminated wastes, and unstable waste. Method of Disposal Burning Spill Cleanup/Handling Flashing in waste propellant disposal areas M-186 HAZARDOUS WASTE AREA FACILITY FUNCTION: Receive hazardous waste materials and store for shipment Waste Products Into Area Methyl Chloroform Methyl Ethyl Ketone Xylene Toluene Paint Thinners Oil Lab Chemicals Photographic Fixer Solution Rags & debris Method of Disposal Store for off-plant shipment Store for off-plant shipment Spill Cleanuo/Handlinq Six UN Drums Quicksorb, 100 Ib Two shovels One broom One fire extinguisher Emergency shower/eye wash Two overpack drums Saranex suit (level B) 34 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 EVACUATE AREA, THEN PROCEED TO ASSEMBLY POINT 200 FEET WEST ON APPROACH ROAD f~ NEW POND TANK 2 D TANK1 ^ > BURNING PIT 19 PIT 18 PIT 17 PIT 16 PIT 15 PIT 14 |-| PIT 13 . L J N M-136 -X X X DETONATION PITS D D D D ^ NO. 11 NO. 10 NO.9 NO.S PIT 7 PITS PITS PIT 4 PIT 3 • O PIT 1 PIT 2 PROPELLANT BED •>C^-'—1A% X- LEGEND: # FIRE EXTINGUISHER IVI-136 AND BURNING PITS 35 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 EVACUATE, THEN PROCEED TO ASSEMBLY POINT, SOUTHWEST AT M-381 STORAGE SHED ^ LEGEND: • FIRE EXTINGUISHER HAZARDOUS WASTE TREATMENT, STORAGE, DISPOSAL, AND FACILITIES M-186 36 ATK Launch Systems-Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 BUILDING E-501 STORAGE YARD FACILITY FUNCTION: Hazardous Waste Storage Yard Waste Products Into Area Various Other assorted materials that may be recycled Method of Disposal Shipment off-plant for disposal N/A Spill Cleanup/Handlinq Two fire extinguishers Absorbent Two repack drums Electrical pump Telephone/radio Eyewash/shower Safety gates Safety flags Six UN 55-gal drums (empty) Saranex suit (level B) 37 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan isepiemoer zuue, UTD009081357 EVACUATE AREA, THEN PROCEED TO ASSEMBLY POINT ON 200 STREET, 200 FEET EAST LEGEND: • FIRE EXTINGUISHER E-501 and SALVAGE YARD 38 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 M-225 BURNING GROUNDS FACILITY FUNCTION: Disposal of waste products from High Performance Propellant Development Area and miscellaneous rocket motors, igniters, and related materials Waste Products Into Area Composite propellant, uncured from M-209 Composite propellant, cured Burn from M-221 NG propellant, uncured from M-208, M-241 NG propellant, cured from M-221 HMXfrom M-208, M-210 AP from M-210 (fine only) Binder premix (NG or other nitrate, etc.) PEP contaminated waste (rags, containers, etc.) Miscellaneous (motor, igniters) Method of Disposal Burn Burn Burn Burn with diesel Burn with propellant Spill Cleanup/Handlinq Dampened rags (wipes) Pick up, soft brush or wet rags (wipes) Solvent dampened rags followed by NG detector to verify cleanliness Pick up, soft brush and/or wet rags Soft brush and/or water-damp rags. If possible, wet HMX with water before handling Sweep with soft brush. Wipe with composite water-wet rag. Flush with water into sump Burn or Contain, absorb into sawdust or pulp, detonate pick up with wipes, wet rags. Apply NG depending detector to verify cleanliness on materials and/or condition Burn with respective propellant Burn or detonate depending on materials and/or con- dition Pick up, clean with method used for respective propellant or ingredient Each case must be dealt with on an individual basis 39 ATK Launch Systems- Promontory AUachment 4 - Contingency Plan September 2008 UTD009081357 EVACUATE AREA TO M-22eA BUNKER M-225 40 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 T-29B SATELLITE ACCUMULATION AREA BUILDING FUNCTION: Hydrazine Storage and Dilution Facility Waste Product Method of disposal From Buildinq Pure hydrazine Hydrazine-citric acid solution 5-50% dilute hydrazine contaminated waste Disposal Dilute with water to 5-50% solution by volume. Waste hydrazine is shipped for disposal/Treatment. Contaminated waste is also shipped for disposal/treatment Spill Cleanup/Handlinq All areas where normal operations are performed have a drainage system which culminates in a common sump. Spills should be flushed thoroughly with large amounts of water. The wash water is then drummed and shipped for disposal • 41 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD00908I357 N EVACUATE BUILDING, THEN PROCEED TO ASSEMBLY POINT 300 FEET NORTH OF BUILDING I I I © ^ T-29B 42 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 M-705 WASTEWATER TREATMENT FACILITY BUILDING FUNCTION: Removal of reactive wastes from sump water Waste Products From Area Lime Sludge (Heavy Metals) Potassium Perchlorate Classifier Decanter Solids Method of Disposal Shipment to off- plant disposal company Burning Burning Spill Cleanup/Handlinq Two shovels One broom Plastic gloves One bin Saranex suit (level B) M-705 HAZARDOUS WASTE CONSOLIDATION ROOM BUILDING FUNCTION: Consolidation and lab packing of hazardous wastes Waste Products From Area Consolidated hazardous wastes Lab packed hazardous wastes Method of Disposal Shipment to M-186 for eventual off-plant disposal Spill Cleanup/Handlinq Two shovels One broom Plastic Gloves One Fire Extinguisher Emergency shower/eyewash Quicksorb, 100 Ib Two overpack drums Six UN drums Saranex suit (level B) 43 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 EVACUATE BUILDING 300 FEET, THEN PROCEED TO ASSEMBLY POINT ON DR" AVENUE NEAR M-366 M-705 44 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 M-47 PROPELLANT STORAGE FACILITY BUILDING FUNCTION: Storage of waste and non-waste propellant and motors Waste and non-waste Products 1.3C Propellant and Motors Method of Disposal Burning/slurried recovery/neutralization Spill Cleanup Materials Obtain clean up material as needed 1.1C Propellant and Motors Burning/slurried explosives/AP recovery/neutralization Obtain clean up material as needed 45 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 EVACUATE BUILDING, THEN PROCEED TO ASSEMBLY POINT 500 FEET SOUTH ON 6TH AVENUE • FIRE EXTINGUISHER N M-47 46 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 M-603 PROPELLANT STORAGE FACILITY BUILDING FUNCTION: storage and Disassembly of waste and non-waste propellant and motors Waste and non-waste Products 1.3C Propellant and Motors 1.1C Propellant and Motors Method of Disposal Burning/slurried explosives/AP recovery/neutralization Burning/slurried explosives/AP recovery neutralization Spill Cleanup Materials Obtain clean up material as needed Obtain clean up material as needed 47 ATK Launch Systems - Promontory Attachment 4 - Contingency Plan beptemoer iuv6 UTD009081357 EVACUATE BUILDING 500 FEET, THEN PROCEED TO ASSEMBLY POINT AT BUILDING M-643 CALL HEADQUARTERS WITH HEADCOUNT N "9- J TRUCK BAY El IHl E E (. LEGEND: FIRE EXTINGUISHER MANUAL ALARM ALARM RESET EVACUATION HORN A SYSTEM RISER El HEAT DETECTOR $ INSPECTORS TEST o 0 m M-603 48 ATK Launch Systems - Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 APPENDIX 11 BULK STORAGE AREAS INFORMATION A. BULK FLAMMABLE LIQUID STORAGE AREAS 50 B. PRACTICAL CONSEQUENCES OF A CATASTROPHIC FAILURE 51 APPENDIX III ARRANGEMENTS WITH LOCAL AUTHORITIES 57 49 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 BULK FLAMMABLE LIQUID STORAGE AREAS Location M-4 M-53 M-55 M-66 1-10 M-585 M-711 E-510 E-512 E-517 Type of Flammable Liquid Butanol Ethanol Isopropanol Methanol Methyl Ethyl Ketone Paint Paint Thinner Acetone Ethanol Heptane Methanol Methyl Ethyl Ketone Gasoline Assorted Methanol Methyl Ethyl Ketone Acetone Ethyl Acetate Methanol Toluene Gasoline Ethanol Isopropanol Methanol Acetone Isopropanol Paint Thinner Polyester Resin Toluene Xylene Isopropanol Kerosene Methyl Ethyl Ketone Capacity (Gallons) 40 60 530 500 . 400 500 120 60 10 10 50 60 17,000 80 15 50 50 15 10 30 10,000 100 1,660 35 100 50 50 160 50 160 170 50 450 Above/Below Ground Above Above Above Above Above Above Above Above Above Above Above Above Below Above Above Above Above Above Above Above Below Above Above Above Above Above Above Above Above Above Above Above T-29B Hydrazine 100 Above 50 ATK Launch Systems- Promontory Attachment 4 - Contingency Plan September 2008 UTD009081357 B. PRACTICAL CONSEQUENCES OF A CATASTROPHIC FAILURE Building Number 1-10 M-4" M-8" M-43B M-53A M-66 M-504 M-585 M-605 E-512 E-517 Location Shed west of building Building north of M-3 system Two sheds west of building Shed south of building Shed south of building Shed southwest of building Shed south of building Shed east of building Waste dock north of building Shed west of building Shed north of building Direction of Flow* Has self-containment concrete berm Liquid would run west across asphalt into drain Spill would drain down west hill Self-contained storage building Self-contained storage building Spill would run into ditch (trench or grading needed to keep surface runoff from accumulating in containment area) Spill would flow into ditch Spill would drain into ditch Spill would drain into ditch Spill would drain into ditch Spill would drain into ditch All other storage areas have self-containment Fire flows and/or spilled material from these buildings will flow into a gated spill containment structure below M-2. The gates are hand operated. 51 ATK Launch Systems - Promontory September 2008 Attachment 4 - Contingency Plan UTD009081357 APPENDIX III Arrangements with Local Authorities ATK has a well trained and full time Fire Department and Security Department onsite. ATK's roads and grounds and Water Operations departments maintains a fleet of trucks, tractors, vacuum trucks and other equipment that could be used during an emergency response. The facility also has a nursing staff during normal business hour, and a 24/7 ambulance service operated by ATK firemen with EMT certifications. Due to these capabilities, the need for outside assistance is greatly reduced. The most likely need for outside assistance would be that of hospital service. Arrangement will be made with both the Bear River Valley Hospital and the Brigham City Community Hospital to accept employees that may have been injured due to an explosion, chemical exposure or other accident. This arrangement will include information on the types of chemicals used at ATK Promontory as well as explosive hazards and other mechanical hazards associated with work performed at ATK. The most likely scenario that would require assistance from a police agency would be the need to control traffic on Highway 83. Arrangements for assistance in this area will be made with the Box Elder County Sheriffs Department and the Utah Highway Patrol. All on plant traffic control will be handled by ATK's security department. ATK has established contracts with three different emergency response/remediation contractors for use as needed. While we do not anticipate the need for emergency service assistance, these companies are on call to provide service if needed. All emergency response at the plant will be handled by the ATK Fire Department, who will act as the primary emergency authority. Arrangements will also be made with the Box Elder County Fire Department and the Tremonton Fire Department. We do not anticipate any need for assistance from the Utah Department ofEnvironmentai Response and Remediation, although notification of emergencies will be made to this department as required. In addition to those agencies listed above, ATK will also provide a copy ofthe contingency plan to the Box Elder County Emergency Planning Committee for review and comment. Below is a summary list of those agencies/service providers for which service arrangements will be sought: Bear River Valley Hospital Brigham City Community Hospital Box Elder County Sheriffs Department Utah Highway Patrol Box Elder County Fire Department Tremonton Fire Department The most recent copy ofthe Contingency Plan will be sent to each of these agencies in order to familiarize them with the layout, description ofhazardous wastes handled, and evacuation plans for the plant. All correspondence with these agencies, in regard to the Contingency Plan and service arrangements will be kept in the Operating Record. 52 ATTACHMENT 5 CLOSURE PLANS ATK Launch Systems Inc. - Promontory September 2008 Attachment 5 - Closure Plan UTD009081357 CLOSURE PLANS AND FINANCIAL REQUIREMENTS This Closure Plan describes the steps that will be taken in order to close the hazardous waste management units (HWMUs) at the ATK Launch Systems Inc. - Promontory (ATK) facility. Estimates ofthe closure costs associated with these steps are also detailed in this Plan. Closure Plans are included in this document for the following HWMUs: M-186; M-705S; E-501; M-136; M-225; T-29B; M-47 and M-603. The closure plans for each HWMU were developed in order to comply with R315-8-7 and R315- 8-9.9 ofthe Utah Administrative Code (UAC). UAC R315-8-7 incorporates by reference the requirements of 40 CFR 264 Subpart G. The closure cost estimates were made in accordance with UAC R315-8-8, which incorporates by reference the requirements of 40 CFR 264 Subpart H. All facilities in current operation are being managed in a marmer that we believe will facilitate clean closures. Historical sites, such as the LTTAs do require post closure care, and are covered in our Post Closure Permit. LO Closure Plans [40 CFR 270.14(b)(13), 270.23(a)(2), and 264.112(a)(1) &(2) and UAC R315-3, R315-8] This closure plan identifies all ofthe steps needed to close ATK's storage and treatment facilities, as identified above, at the end of their operating life. Copies ofthis plan will be maintained by ATK Environmental Services in central files at the Promontory site. The closure plans will be followed as written, unless modification to the original plans have been submitted and approved by the Utah Department ofEnvironmentai Quality, Division of Solid and Hazardous Waste (DEQ). Upon update/revision approval, revised pages or complete documents will be sent to all plan addressees. 1.1 Closure Performance Standards [40 CFR 264.111 and UAC R315-8-7| Closure standards specified under RCRA are designed to be protective of human health and the enviroimient. These goals can best be achieved by one ofthe following closure methods: • Clean closure - this method refers to residential risk based levels. Cleanup to residential risk based levels, as outlined in UAC R315-101, will be considered clean closure. Clean closure is the most desirable approach, and includes removal of all contaminants, or removal to the risk based level. • Site Management - closure where waste remains in place and specific post- closure care is required. For the purposes of estimating closure costs, it is assumed that all ofthe HWMUs will be clean closed. Clean closure can be achieved by cleaning the units to background conditions or by meeting the clean closure equivalency as defined in UAC R315-101-6(c)(l). All closures will assess real and potential impacts to human and ecological exposures. ATK Launch Systems Inc. - Promontory September 2008 Attachment 5 - Closure Plan UTD009081357 Preliminary remediation goals can be established prior to implementing any ofthe closure plans. ATK may use the screening levels published by USEPA Region III "Risk-Based Concentrations" (RBC) and the USEPA Region IX "Preliminary Remediation Goals" (PRG), or they can establish site-specific, risk-based clean closure goals in accordance with UAC R315-101-5.2. If contamination in the form ofhazardous waste or constituents are discovered in the soil or ground water above risk based goals, further investigation will be performed to determine the extent ofthe contamination. Based on the results ofthis investigation, a Corrective Measure Study (CMS) may be prepared for review and approval by the DEQ, prior to implementation. If this investigation suggests that clean closure is not a practicable approach, ATK will prepare a Site Management Plan for DEQ's approval. Upon approval, the unit will be closed by implementing appropriate site management or post closure requirements. If this approach is necessary, the Post Closure Permit may be modified to provide post closure care for the sites that are not clean closed. 1.2 Partial Closure and Final Closure Activities [40 CFR 264.112(b)(1) through (b)(7) and UAC R-315-8-7J This plan is designed to accommodate both partial and final closure. The plan will include separate steps to close 1) storage, consolidation & disassembly areas and 2) open buming and open detonation areas. The maximum extent ofthe operations is shown in Closure Plan Figures 1 through 8 at the end ofthe Closure Plan. These figures also include the "area of influence" associated with each facility. The area of influence includes loading and offloading areas adjacent to the buildings, as well as areas around the bum grounds that may have been impacted by smoke from the bum grounds, based on soil and vegetation samples already obtained and tested by ATK. The area of influence figures are used for estimating closure costs only. The extent of sampling and remediation around the HWMUs will be based on sample results. ATK implemented annual soil monitoring ofthe M-136 and M-225 bum grounds in 1991. The purpose ofthis monitoring is to determine if ATK bum ground activities are adversely impacting the environment. The Zone of Engineering Control (ZOEC) Soil Sampling Plan used for this monitoring was prepared and submitted in the original permit application in 1991 as appendix 13.H. WTiile some aspects ofthis plan are outdated, ATK believes the sample selection protocol and total number of samples obtained each year are valid. Semiannual groundwater monitoring is conducted, in accordance with ATK's Post-Closure Permit. ATK is currently investigating the need for remediation of contaminated groundwater as described in the Post-Closure Permit. It is not expected that the storage and treatment activities addressed in this Permit are impacting groundwater. 1.3 Maximum Waste Inventory and Disposal Method [40 CFR 264.112(b)(3) and UAC R315-8-7] The maximum inventory ofhazardous waste onsite at any one time during the life ofthe facilities is based on permit limitations for inert facilities, and Quantity/Distance(QD) limitations for live materials, based on Department of Defense Explosive Safety Standard 4145.26M or a ATK Launch Systems Inc. - Promontory September 2008 Attachment 5 - Closure Plan UTD009081357 lesser designated amount. If storage capacities change, the Permit will be modified. These quantity limitations are listed below: M-186 (inert) 400 ea. 55 gallon drum equivalent M-705 S (inert) 32 ea. 55 gallon drum equivalent E-501 (inert) 160 ea. 55 gallon drum equivalent M-136 (live) 106,000 lbs 1.3 / 20,000 lbs 1.1 M-225 (live) — 50,000 lbs 1.3 /1,500 lbs 1.1 T-29B (inert) 1 ea. 55 gallon dmm (pure) equivalent M-47 (live) 840,000 lbs 1.3 / 21,000 lbs 1.1 M-603 (live) 240,000 lbs 1.3/65,000 lbs 1.1 ATK treats reactive hazardous wastes on-site at the M-136 and M-225 open buming grounds. These two waste treatment units are currently operated vmder interim status. Wastewater is loaded onto ATK ovmed vacuum tmcks and transported to two on-site UPDES permitted treatment facilities. All other hazardous wastes are transported via a commercial carrier to fully permitted disposal or recycling facilities. 1.4 Schedule for Closure [40 CFR 264.112(b)(6) and UAC R315-8-7] Tables 1 - 3 ofthis plan provide an estimated closure schedule for all activities associated with implementation ofthis closure plan. If sample results indicate the need for additional investigation or a CMS, the schedule will be modified to accommodate the changes. Final closure will be certified by an independent professional engineer licensed in Utah. 1.4.1 Time Allowance for Closure [40 CFR 264.113(a) and (b) and UAC R315-8-7] Final closure is expected to be initiated within 30 days of receipt ofthe final volume of hazardous waste. If more time is required, ATK will submit a request to the Executive Secretary. All hazardous wastes will be removed or treated within 90 days of (1) plan approval, .or (2) after receiving the fmal volume ofhazardous waste, whichever is later. Final closure activities will be completed within 180 days of (1) plan approval, or (2) after receiving the final volume ofhazardous waste, whichever is later. 1.4.2 Extensions for Closure time [40 CFR 264.113(a) and (b) and UAC R315-8-7] If closure activities cannot be completed within the time designated in this closure plan, a permit modification and request for additional time will be submitted to the DSHW. The request will state the reason for needed additional time and the status of the closure underway. It will also address any added measures that must be followed to minimize any threats to human health or the environment during the extension period. 1.5 Closure Procedures [40 CFR 264.112 and 264.114 and UAC R315-8-7[ Past disposal practices have created many solid waste management units throughout the Promontory plant. These sites have been, and are being investigated to determine the appropriate ATK Launch Systems Inc. - Promontory September 2008 Attachment 5 - Closure Plan UTD009081357 actions needed to close these areas. This plan does not address these sites, but deals with our permitted storage and treatment facilities. All permitted treatment and storage facilities have been designed and managed to minimize possible contamination. This includes chemical resistant concrete coatings, blind containment sumps, regular inspections and maintenance, prompt clean up of any spilled materials, and annual ZOEC sampling and testing of our bum grounds as mentioned above. These practices should greatly reduce the need for significant remediation efforts upon closure. 1.5.1 Soil and Ground Water Sampling Groundwater sampling is not covered under this plan, but a groundwater monitoring program is currently in place as discussed above. Soil sampling should not be required for any ofthe permitted facilities, except for the two bum ground areas (M-136, M225). In preparation for closure, soil samples will be collected at the bum ground areas to supplement the ZOEC soil sample data that has been collected at these HWMUs. Soil sampling will include samples taken within the top 12" ofthe surface. Soil samples will first be collected at those locations that are most likely impacted by waste management practices - as approved by DEQ personnel. 20 soil samples will be collected at M-136 and 12 soil samples will be collected at M-225. These samples will be sent to a State of Utah certified laboratory for analysis. Sample collection, preservation and handling methods will follow those outlined in the Waste Analysis Plan ofthis permit, and will be in compliance with all applicable SW-846 methods. Tables 4 & 5 include lists of potential contaminants based on a review of profiles for materials treated at these facilities. These tables will serve as the analytical constituent list for all soil samples obtained from the respective bum ground. While this list is not 100% complete, it is a good indicator of potential contamination from the open buming operation. Ifany of these constituents are found above the risk based level, an additional sampling plan will be submitted to the State for approval. 1.5.1.1 Sampling Equipment Decontamination Procedures All field sampling equipment will arrive on site pre-cleaned, and will be decontaminated following standard protocol and the waste analysis plan in this permit. A mobile decontamination station will be utilized to clean all sampling equipment that could come in contact with soil samples. 1.5.1.2 Sampling Waste Management All waste generated from field sampling and decontamination operations will be managed in accordance with the current 40 CFR and UAC R315 mles. Water used in the decontamination process will be sent to the M-705 wastewater treatment plant onsite and discharged in accordance to its UPDES permit. Soils will be stored in UN dmms pending lab results. Any soil determined to be hazardous waste, in accordance with 40 CFR 261.3, will be managed appropriately. Soils exceeding the Universal Treatment Standard levels will also be managed as a hazardous waste. ATK Launch Systems inc. - Promontory September 2008 Attachment 5 - Closure Plan UTD009081357 All non-aqueous hazardous waste generated by the sampling operation will be transported by a third party contractor off site to a fully permitted TSDF for disposal. Any waste determined not to be hazardous under EPA regulations will be sent via third party to a non-hazardous landfill for disposal. A field log will be maintained to track and identify all samples. This log will include sample numbers, dates, times, sample depth, samplers name, weather conditions and test methods and constituents for which to analyze. 1.5.1.3 Health and Safety Procedures Soil and water sampling will be performed by trained and qualified personnel. A determination of appropriate PPE to be utilized for this effort will be determined at the time of closure. PPE selection will be based on potential hazards as determined at the time of closure, and in consuhation with Industrial Hygiene. Soil sampling should only be required at the bum grounds, because of well maintained secondary containment and waste management practices during the entire life of all other permitted facilities. Protective clothing appropriate for the task will be used during removal of waste and during decontamination of containment areas for the permitted storage and treatment units. 1.5.2 Determining Cleanup Goals For the purposes of estimating closure costs, it is assumed that all ofthe HWMUs will be clean closed. Clean closure can be achieved by cleaning the units to background conditions or by meeting the clean closure equivalency as defined in UAC R315-101-6(c)(l). All closures will assess real and potential impacts to human and ecological exposures. It is anticipated that the HWMUs will be clean closed and will not require post-closure care. 1.5.3 Site Cleanup 1.5.3.1 Inventory Removal [40 CFR 264.112(b)(3) and UAC R315-8-7] The maximum inventory ofhazardous waste on hand at any given permitted facility is based on the maximum allowed under this permit, or a quantity distance limit for explosives, imposed by the Department of Defense and ATK. These limitations are specified in section 1.3 ofthis closure plan. Transportation and disposal of all hazardous waste during closure ofa facility will be based on hiring of a third party company. The transportation contractor will be licensed and insured, and the disposal facility will be permitted with the EPA or State to accept the waste ATK sends. The only exception to the use of a third party disposal facility, will be for disposal of reactive hazardous wastes. ATK Launch Systems Inc. - Promontory September 2008 Attachment 5 - Closure Plan UTD009081357 Due to the inherent hazardous nature of reactive wastes, and limited disposal options nation wide, ATK plans to properly treat and dispose ofthis waste on site. Cost calculations for treatment, disposal and equipment decontamination will be based on maintaining an ATK staff sufficient to complete these efforts. 1.5.3.2 Disposal or Decontamination of Equipment and Structures [40 CFR 264.112(b)(4), 264,112(e), and 264.114 and UAC R315-8-7] Decontamination of equipment and stmctures at the Promontory facilities will follow one of two plans. These plans cover the open buming units, and all other facilities. The open buming facilities utilize bum trays, pipes, concrete vaults or rocket cases to contain the waste to be treated. Most ofthe material bumed is hazardous by characteristic only. Any waste that may be contaminated with, or contains solvents or hazardous heavy metals is designated as a derived waste, and the ash collected for offsite disposal. Therefore, except for the derived trays, all bum ash in trays, vaults, cases, and on the ground around these imits will be collected and sent to the on site ATK landfill for disposal. The bum trays will then be high pressure water washed and the rinsate sent to an off site disposal facility. After the final rinse, a composite sample from the trays will be collected and analyzed at an independent lab to verify proper tray decontamination. Each sample will include rinsate from 5 trays. Samples will be tested for those constituents specified in tables 4 & 5 as appropriate. All facilities except for the bum grounds, are designed with secondary containment. This containment includes a concrete pad with curbing and blind sump to simplify wash down and cleanup. The entire containment pad and sump is coated with a chemical resistant epoxy to prevent liquid migration through the concrete. These pads are inspected daily, when in use, and maintained as needed. After removal of all containerized waste, the containment pads will be high pressure water washed, and rinsate collected for third party offsite disposal. After final wash, rinse water samples will be collected from each sump and tested for the organics and metals found in table 4 or 5 ofthis plan, to verify cleanliness. All samples will be sent to a State certified third party laboratory for analysis. 1.5.3.3 Closure Containers [40 CFR 264.178,264.112(b)(3), and 270.14(b)(13) and UAC R315-8-9.9, R315-807, and R315-3-5(b)(13)| All hazardous ash, rinse water and other contaminated debris will be placed in a UN container or a bulk USDOT authorized containers for offsite shipment to permitted disposal facilities. Empty containers will be cleaned in compliance with 49 CFR, and sent for disposal. 2.0 Closure Certification [40 CFR 264.115 and UAC R315-8-7] Within 60 days ofcompletion of closure of each facility, ATK will submit to the DSHW, a certification by registered mail, that the hazardous waste management facility was closed in compliance with this closure plan. This certification will be signed by ATK and an independent registered professional engineer licensed in Utah. Documentation supporting the engineer's registration will be provided upon request. ATK Launch Systems Inc. - Promontory Attachment 5 - Closure Plan September 2008 UTD009081357 3.0 . Closure Cost Estimate [40 CFR 264.142] The total closure cost is estimated to be $704,082. A detailed breakdovm of these costs is presented below in the Closure Cost Estimate Figures 1 through 8 in current dollars. The entire estimate is based on hiring a third party, except for the thermal treatment and disposal of reactive waste, which will be handled onsite. 4.0 Financial Assurance Mechanism for Closure [40 CFR 264.143 and R315-309] ATK will maintain current financial assurance meeting the requirements outlined in the above referenced Federal and State regulations. ATK will provide documentation to DSHW supporting compliance with financial mechanism requirements. 5.0 Post Closure Plan If it is determined that a HWMU can not be clean closed, contaminants may be left in place, and ATK will develop a post-closure or site management plan for all areas ofthe unit(s) that can not be clean closed. Any proposal for post-closure care or site management will be developed in accordance with UAC R315-8-7, UAC R315-8-8 and 40 CFR 264 Subparts G and H and will be submitted to the Executive Secretary for approval. If this approach is necessary, the Post Closure Permit may be modified to provide post closure care for the sites that are not clean closed. TABLE 1 Estimated Closure Schedule for Each Facility ( Task 1 2 3 4 5 6 7 8 Closure Activity Mobilize Thermally treat reactive waste and place ash in landflll or prepare for off site disposal as appropriate. Decontaminate bum trays and clean area around trays. Collect soil samples and obtain lab results Demobilize Review and validate soil and water lab results Write closure report and obtain independent engineer closure certification Monitor and implement post-closure activities :M-136, M-225) Start Date Day-1 D-4 D-15 D-26 D-51 D-54 D-50 D-100 If required Completion Date D-3 D-14 D-25 D-50 D-53 D-74 D-100 To be determined ATK Launch Systems Inc. - Promontory Attachment 5 - Closure Plan September 2008 UTD009081357 TABLE 2 Estimated Closure Schedule for Each Facility (V Task 1 2 3 4 5 . 6 7 8 Closure Activity Mobilize Transport reactive waste to the M-l 36 Bum Grounds Thermally treat reactive waste Sweep and clean floor as needed Visually inspect building and loading area looking for signs of contamination Demobilize Obtain independent engineer closure certification Prepare and submit closure letter to DEQ 1-47, M-603) Start Date Day-1 D-4 D-15 D-26 D-37 D-48 D-52 D-83 Completion Date D-3 D-14 D-25 D-36 D-47 D-51 D-82 D-93 TABLE 3 Estimated Closure Schedule for Each Facility (M-186, M-705S, E-501, T-29) Task 1 2 3 4 5 6 7 8 Closure Activity Mobilize Profile and prepare waste for offsite shipment Ship waste to offsite permitted TSDF Sweep and wash down building floor as needed Visually inspect building and loading area looking for signs of contamination Demobilize Obtain independent engineer closure certification Prepare and submit closure letter to DEQ Start Date Day-1 D-4 D-45 D-66 D-71 D-74 D-78 D-l 09 Completion Date D-3 D-44 D-65 D-70 D-73 D-77 D-108 D-l 20 ATK Launch Systems Inc. - Promontory Attachment 5 - Closure Plan September 2008 UTD009081357 TABLE 4 M-136 constituents of concern Explosives HMX RDX Nitroglycerin Organics/other Ammonium Perchlorate 1,1,1 -Trichloroethane Tetrachloroethylene Acetone Pyridine Methylene Chloride Carbon Tetrachloride Benzene Metals Cadmium Barium Chromium Silver Lead Mercury Molybdenum Disulflde Cobah • TABLE 5 M-225 constituents of coneem Explosives HMX RDX Nitroglycerin Organics/other Ammonium Perchlorate 1,1,1 -Trichloroethane Tetrachloroethylene Acetone Pyridine Methylene Chloride Carbon Tetrachloride Benzene Metals Cadmium Baiium Chromium Silver Lead Mercury Molybdenum Disulfide Cobalt Sodium Azide 10 ATK Launch Systems Inc. - Promontory September 2008 Attachment 5 - Closure Plan UTD009081357 Figure 1 CLOSURE COST ESTIMATE, M-186 Removal of Waste Inventory Total ($) a. Transportation & Disposal (400 dmms @ $250/drum) 100,000 b. Technician Labor (32 hrs @ $35/hr) 1,120 Decontaminating Pad a. Technician Labor (16hrs @ $35/hr) 560 b. Transportation & Disposal 500 gal. of rinse water @ $4.00/gallon 2,000 Water Sampling & Analysis a. Technician Labor (4 hrs @ $35/hr) 140 b. Sample Analysis (4 @ 500/sample) 2,000 Closure Certification a. Engineer Labor (32 hrs @ $75/hr) 2,400 b. Engineer Expenses (4 days @ $100/day) 400 Subtotal $108,620 Contingency: 15 percent $16,293 Administration: 15 percent $16,293 Total $141,206 11 ATK Launch Systems Inc. - Promontory September 2008 Attachment 5 - Closure Plan UTD009081357 Figure 2 CLOSURE COST ESTIMATE, M-705S 1. Removal of Waste Inventory Total ($) a. Transportation & Disposal (32 drums @ $250/dmm) 8,000 b. Technician Labor (16hrs @ $35/hr) 560 2. Decontaminating Pad a. Technician Labor (16 hrs @ $35/hr) 560 b. Transportation & Disposal 500 gal. of rinse water @ $4.00/gallon 2,000 3. Water Sampling & Analysis a. Technician Labor (4 hrs @ $35/hr) 140 b. Sample Analysis (1 @ 500/sample) 500 4. Closure Certification a. Engineer Labor (32 hrs @ $75/hr) 2,400 b. Engineer Expenses (4 days @ $100/day) 400 Subtotal $14,560 Contingency: 15 percent $2,184 Administration: 15 percent $2,184 Total $18,928 12 ATK Launch Systems Inc. - Promontory September 2008 Attachment 5 - Closure Plan UTD009081357 Figure 3 CLOSURE COST ESTIMATE, E-501 Removal of Waste Inventory Total ($) a. Transportation & Disposal (160 dmms @ $250/dmm) 40,000 b. Technician Labor (16hrs @ $35/hr) 560 Decontaminating Pad a. Technician Labor (16 hrs @ $35/hr) 560 b. Transportation & Disposal 500 gal. of rinse water @ $4.00/gallon 2,000 Water Sampling & Analysis a. Technician Labor (4 hrs @ $35/hr) 140 b. Sample Analysis (1 @ 500/sample) 500 Closure Certification a. Engineer Labor (32 hrs @ $75/hr) 2,400 b. Engineer Expenses (4 days @ $ 100/day) 400 Subtotal $46,560 Contingency: 15 percent $6,984 Administration: 15 percent $6,984 Total $60,528 13 ATK Launch Systems Inc. - Promontory September 2008 Attachment 5 - Closure Plan UTD009081357 Figure 4 CLOSURE COST ESTIMATE, M-136 1. Removal of Waste Inventory Total ($) a. Treatment & Disposal (100,000 lbs @ $,20/lb) 20,000 2. Decontaminating Trays a. Technician Labor (32 hrs @ $35/hr) 1,120 b. Transportation & Disposal 1,000 gal. of rinse water @ $4.00/gallon 4,000 3. Water & Soil Sampling & Analysis a. Technician Labor (80 hrs @ $35/hr) 2,800 b. Sample Analysis (20 @ 600/sample) 12,000 4. Excavation & Removal of Contaminated Soil a. Excavate & Load Tmcks 30 hrs @ 100 3,000 b. Transportation & Disposal 50 tons @ 100 5,000 5. Closure Certification a. Engineer Labor (40 hrs @ $75/hr) 3,000 b. Engineer Expenses (5 days @ $100/day) 500 Subtotal $51,420 Contingency: 15 percent $7,713 Administration: 15 percent $7,713 Total $66,846 14 ATK Launch Systems Inc. - Promontory September 2008 Attachment 5 -- Closure Plan UTD009081357 Figure 5 CLOSURE COST ESTIMATE, M-225 1. Removal of Waste Inventory Total ($) a. Treatment & Disposal (50,000 lbs @ $.25/lb) 12,500 2. Decontaminating Trays a. Technician Labor (24hrs @ $35/hr) 840 b. Transportation & Disposal 500 gal. of rinse water @ $4.00/gallon 2,000 3. Water & Soil Sampling & Analysis a. Technician Labor (40 hrs @ $35/hr) 1,400 b. Sample Analysis (12 @ 600/sample) 7,200 4. Excavation & Removal of Contaminated Soil a. Excavate & Load Tmcks 20 hrs @ 100 2,000 b. Transportation & Disposal 25 tons @ 100 2,500 5. Closure Certification a. Engineer Labor (30 hrs @ $75/hr) b. Engineer Expenses (4 days @ $100/day) Subtotal Contingency: 15 percent Administration: 15 percent Total $40,418 2,250 400 $31,090 $4,664 $4,664 15 ATK Launch Systems Inc. - Promontory September 2008 Attachment 5 - Closure Plan UTD009081357 Figure 6 CLOSURE COST ESTIMATE, T-29B 1. Hydrazine Dilution and Removal of Waste Inventory Total ($) a. Transportation & Disposal (2 drums @ $400/dmm) 800 b. Technician Labor (16 hrs @ $35/hr) 560 2. Decontaminating Pad a. Technician Labor (10 hrs @ $35/hr) 350 b. Transportation & Disposal 500 gal. of rinse water @ $4.00/gallon 2,000 3. Water Sampling & Analysis a. Technician Labor (4 hrs @ $35/hr) 140 b. Sample Analysis (2 @ 500/sample) 1,000 4. Closure Certification a. Engineer Labor (16 hrs @ $75/hr) 1,200 b. Engineer Expenses (2 days @ $100/day) 200 Subtotal $6,250 Contingency: 15 percent $938 Administration: 15 percent $938 Total $8,126 16 ATK Launch Systems Inc. - Promontory Attachment 5 - Closure Plan September 2008 UTD00908I357 Figure 7 CLOSURE COST ESTIMATE, M-47 Removal and Disposal of Waste Inventory a. Transportation to Bum Grounds 80 hrs @ 75 b. Treatment & Disposal 840,000 lbs @ .25 Sweep/Clean Facihty Pad a. Technician Labor (10 hrs @ $35/hr) Closure Certification a. Engineer Labor (lOhrs @ $75/hr) b. Engineer Expenses (2 days @ $100/day) Total ($) 6,000 210,000 350 750 200 Subtotal Contingency: 15 percent flP Administration: 15 percent Total $217,300 $32,595 $32,595 $282,490 17 ATK Launch Systems Inc. - Promontory Attachment 5 - Closure Plan September 2008 UTD009081357 3. Figure 8 CLOSURE COST ESTIMATE, M-603 Removal and Disposal of Waste Inventory a. Transportation to Bum Groimds 60 hrs @ 75 b. Treatment & Disposal 240,000 lbs @ .25 Sweep/Clean Facility Pad a. Technician Labor (10 hrs @ $35/hr) Closure Certification a. Engineer Labor (10 hrs @ $75/hr) b. Engineer Expenses (2 days @ $ 100/day) Total ($) 4,500 60,000 350 750 200 Subtotal Contingency: 15 percent Administration: 15 percent $65,800 $9,870 $9,870 Total $85,540 18 .y I / \ • \ \ • ?^\ A v.y M-186 AREA OF INFLUENCE- PERMITTED AREA = DRAINAGE FLOW M-136 BURN GROUND CLOSURE PLAN FIGURE 1 = DRAINAGE FLOW M-225 BURN GROUND CLOSURE PLAN FIGURE 2 .,/ CHEMICAL RESISTANT CONCRETE FLOOR WITH CONTAINMENT CURBS AND SUMPS \ N*. PAD WITH CONTAINMENT CURB AND SUMP \ M-186 M-186 CLOSURE PLAN FIGURE 3 GRAVEL M-47 RAILS -riL tr t^ CONCRETE ASPHALT ROAD GRAVEL AREA OF INFLUENCE i M-47 CLOSURE PLAN FIGURE 4 / AREA OF INFLUENCE E-501 HAZARDOUS WASTE DRUM STORAGE PAD CONCRETE FLOOR WITH CONTAINMENT CURB & EPOXY COATING LOCKED VALVE \ BLIND SUMP / D / E-501 CLOSURE PLAN FIGURE 5 SCALE: 1' = 60r-OP 1 '•''•*-^. .. • •-"'' ^"•••\ '^^^, ASPHALT 1 1 •••\. / "^"-- .-'' •^. / ^^^ •' -. ^ ASPHALT ^^^^H^ ••-^^ AREA OF INFLUENCE -^ M-603 CLOSURE PLAN FIGURE 6 "\,, / ; r > M-603 <7 X "^ © SCALE: 1/16" »r-Cr f T-29B CLOSURE PLAN FIGURE 8 © SCALE: r = 3(r-(r o si if;....|r-^S/,> :..'•,,- - '-I. » ; ^•,:: , A.•-••.• :•'-,; ".^Sa»• •I'TyJ^jt' iiafe£i^^i!^ f^-* ATK Promontory Facility- Figure 6A o o o ti^.:ij-; ^ •'. * • .4 -..- •-;• -•••.*•>• ' > .' ''^ •i. > .-^x.^. ^'t >^"' ''' • «'•'•' .- '^r •••• 7' :• . •^•••' ^^ "C^-. ••J-, • •>". r- .. • r- -.• ri 1. rr%;\^i^ •y^a?!;^ .-- .-.:^ ;*•-.•••*• '••. ,•••••,: ••_•/-.;•;••- /. .••••,••;. ^;; .^ ;•:->: .; v ••^'^fiinE:^-'•• ^-'^'^ V -• .•> t.. k. •>.- • •••' •'-• ' c" •' ^'' -. -• *"< ' * ";? >" • i.- '-.• ••% •1 - ;;^ r»~--C'>' • * 'V '*..••• ,. • • i. iV •. _ i-- J Y v^ - . • • .. ^i- • .^^ .. •••"•; • '•• ^ -.» •• S"' .• - .. '•-.• •^ - .- i" •:' • • ':•: '.-' .• ' v ••' " :'-.-'*'.'^ ' -. ••••."^v•••. . • s ^^•- '- • r •" •„ -N -•••• :- -V • - ; '• V ''••••:• •^'- •::'^': ^' '••: -I^T^'-j^ ••.-•.-. .-•••• • * •.^•;- •-. •• • ^•^•^; •^•==.-'^>-^'r'- ••.• •; •i:--i; Y. ;:-;i\;--.' r- -.- r.: •> .'-'^-•.•> --V'^V •••• ^y- .;• • .-:-•-'•-.^-^'V'^,:!, j. . •' ..y, :••:. . -, , ..,.. "V.,^,,- .^>c^''^---^ \;-:f*.3- ••^. -..^ •>•• ,'3 -.•«,; • .--.}•• 7 i-'-':-'i '.:• iL' • :• •f'-iS' •'C1C3?. •• >•• ,•' •*:^ • -.( '•^ . ir.- :--^-^: .W •..•,••. ',•'•'••' .:.. S.,,...-.- . ! ..t-.:^'^:.-^'^';;,-4 ^•^.•i:- •••(•••• ./•.•••\i • •l "^.^:-'i^y- '-¥--;>•.-'•-V-'ST-.-'-'f^^.-V' Figure 6B EL. 100'-6" TOP OF WALL ^ EL. 100'-3" EL. lOO'-O" 35'-11" ^ £^ # o SLOPE CONCRETE FLOOR WITH CONTAINMENT CURB & EPOXY COATING COLUMN. OTHERS NOT SHOWN • 00 I oo THRU PIPE WITH LOCK VALVE EL. 99'-2 7/8" TOP OF WALL E-5Q1 PLAN VIEW SCALE: r = 20'-0"± EL. 100'-0" ro 3'-5 7/8" SECTION SCALE: 3/8" = T-O" e ^ z ROOF COLUMN TS4x4 EPOXY COATING .:,'^r"tfe '-h-- SECTION SCALE: 3/8"" = I'-O" E-501 PAD LAYOUT FIGURE B-1 r rn- A lh' •• '^ i*^^ ••-•••^. V •*•:• W*='^:^.Jt ••:• •.^•-^•>. >;•--',:> /'.-•'••••A;'.^ .-.^-f .i. ". -•ft' •'^.-!': -« -;• .-^J^JK- i, v*'> s 'v.-i: .J.i;--:.--:;fi' •'• ••';. :i t..tfuX A / . >• i.>>vi i .i^ *• -ii' :••«/••••:.•. :.'• ^ •••:• V-V ^;..iH'^-*- '^-t^-^^^ -^ t-^^"'^- ^'-^-^ <^ •.^v=>.-";;^?^^ ^r;^-^e-A'^^.*"-^^^ >.^mt-: .-.^•••v..:•^"••> ^1^ *-,?^-;• ^:^ ^••""^• * Y•:•: ^^?t^rT ^-^^.--T-;., --JmY J^.YYJt \ i-::^^v >.-i.:.- v ;-c^ ..:'.-^-A-.t-^-?. .(vV ft- •¥ <^ •< Figure 6C o I 16'-0" EPOXY COATED - FLOOR o z LU CH O z LU # <$> 7 1> r BLIND SUMP M-705S PLAN VIEW SCALE: 1/8" = T-O" 2'-0 SQ. -TRENCH COVER SECTION SCALE: 1/4" = 1 CMU- ^^ s:-K 8" 12' TRENCH COVER .^SJ^.- ^^^3^: SECTION W.S. (TYP:) B SCALE: 1/4" = I'-O" W.S. (TYP.) trt v-2 ^A $ CSJ •"^-"p—DOUBLE TEE WALL PANEL SECTION SCALE: 1/4" = I'-O" M-705S BUILDING LAYOUT FIGURE G-1 1 -^-i.-Y^ •:.•• ' •' •' •• "•• •• • l\:- •i^.: •:" ..:• J I. • -• •-... "'•T.-^f •.r^v*'^i ' '. J '•''• •'" •'^' ••^%t -,•• J' •' "^ •'^-.\'v. •' ^•- • • •••• ^ V ,-^i^'*:»^•!;.'''i^^ J* ^•vA«i:^^'--v:;''«i-• '^^f'K'^^^u.Y •••••Y/.Yihy". >•• A---4j;-.-|i,; •:V^:^^!v^3i-- ,:^ •^- •••-•.••% ••': •• • ''•• '"-••-'^'•'^Y '• f^^'/^- -^l^^ -'Y-'j^-'-^Y: Y .;f M'M- 'Y.''-r • •L-' '• J -± -i. ••«.-.;• -• . •-»-"••**•; '."I <i ••:-t v' '• A •• "'•••J ••• • •—• • ' -^ - c/- • * ~.;v >^"&- '%;• /- ^'.Yt--'YY-fy..^ ;f "•"<g'^ - ^'X •i, ••'i- ..'^. .3.:V:' Figure 6D JZ STORAGE AREA txT 11 Y LL L U^ RAIL STORAGE AREA z^n PIT .? 39'-9" 73'-0'' it',. EXTERIOR WALL PIT •;.•!•.; ::•'.•. •.:-•'•'• r-4" S33- '.'•' -v^ o SECTION SCALE: 3/32" = V-0"± e M-605 PLAN VIEW SCALE: 1/16" = V-0"± M-603 BUILDING LAYOUT FIGURE D-1 t: '-iffr^ h-Y^-- ^ii^- -^p,- •^r '"^^• " "'•*•'. '^•." -"*' . • "•^ •' . I'' :!S?'-'''v'^-^'^ "=*tf^ •:'• -^ • ^ J--Sv;"\^s •^•.--•i--\...-r:r:.. ^<.%:^-^^l.--:^V"^f^^"";;-t§'- -^ ••.^^Y.:,iy:*>^-^:^Y[^~ •*-• •••>. ?;^--'^ fr •;« ^-s^-'.. J'l i.ir'J •!1f^Y •^^'••'y.!^* •f-Y •• y-^^f — - 7 T ?: ^' ;•.'•>&.•.. .'v:.--^-;^#^.:4P^'^:'- .%4 ^^' '•••f:«: ••/• • r "•:¥.• '•if>: ••<i^.- ••«**• ." • --'••'•'.v '. "i' Y^ %'^^'^-f:^: ,,*S^>;# ,'.,tfp?r'»,5 • sl'SJ'.t^- tY'^- 'Yr- •^'''•.•% :•:. ^^. ^Y. • , V .•-^••••. •J^ ".••' ••:' ' '>'• • "•"-' ^,- .• •-• "'A . • S~7 Wf: J'-y .l':...:S ^YM^Y- m^ ••.^' •• .^^ •- :>3^: •• •:- -i'/' - • ^•'.- . • •. • , '^ • .V • "• y" . . " . •• ^C . -••%i'' f - ^f*-'^J- 'i^' .#•• "t* '^V '^v.^^H' >;:/- k-' -vxi.;-?.-*^''';:^^- •<^- .r. • /?-• ...Is*- -.. • 'V 'i .:••• • '->•• ' '^' ' ".• -»• ' •' V f- •.•#-•• ••"^•.-••'•'if*: -'^w "^•'••- •""f'.V ,-. • ¥^ ••^ r.r-. • -f • ••»-. n •f :'v'^t^.V*V.'":''^?5?>'- .-^^ 'JS. • .,^. 5^; -r'^' it}^' .'k^-i^.:.'-Y^iY %- ^ Ji?. • m. . -n': •. " * "^.• :'^- 'k • '^'^ •••f. • •^i •-.••' f; ^•..•.••.ri" '•.ji'i.V-V>=- ..a.' •..••*»»-. ..r^. ••••:^-^- .til- •••^•••......-: •.fei^H-i-rr' :Y^' rsi •• -fe' '"•iY- IVI-186 <"'•* .\.. •'.~.. -. ^- • it.. ' ,.iS:.; :4 S?^''.-"^ •••'••/^..:,T..*:' ^- •'•^- : .••^•'' •i •-. ••.. ••••';,. .-•r--'..^.y ri"--. ••••:| ^•.•^•"^•wc' •••••.- ^•.•/•••••X^hi--'4Y'f^^^^^^^^^ .•^ .''.V .> ' .•>. -. . ..- A . .A.'. . ,.. .. ;i. V. .- Figure 6E •!|llltl[==] • SECTION SCALE: 1/4' = I'-O" ¥ e SECTION --t B SCALE: 1/4" = I'-O" f^yjow."" SECTION SCALE: 1/4' = I'-O" l'-6" SQ. 2'-6" SS" CD I J CNI SECTION SCALE: 1/4" = I'-O" •II ^ LU Q_ o LJ Q CO cn 3: // a ^ CHEMICAL RESISTANT CONCRETE FLOOR WITH CONTAINMENT CURBS. TYP. i> SUMP TYP. ^ n:7 # ^^- 23'-8" 25'-0" I I o I 1^ M-186 BUILDING LAYOUT FIGURE E-1 Figure M-136 BURN GROUND FACILITY LAYOUT FIGURE F-1 SCALE: r = 600'-O'I ;.<,-...... ... '•. y . •p' ii •?^• ^ :•'. + :!: !'::}i*'\J:.i<; >>«* ' > - .? V.- j-''>"'/-, J- ,. ii^..•»',.;. !>.-'5> j , i'j'." ... /.•^'•> )' •• *•. •''^ '••«.. -i- ^ 'i; i>; i..-=-J^.4'. t:.'i''S--i^ .-.^..--^^ ^ '•(- k. •>••• h ->f .?^v;;.?;. ^ ^ ,.K.. ... 4->,^'"- i'vf"^ >-.•'•'•• 1 ^-- •^:/--"A-^-f^*'' - ^•.••^•.-Y-^.?-Sr,^ i '.:••>• ' ' ^-^ ••• •••• ^ '•-•^' -^^ ''"•• .V/t " . .', -••.• -. .; <^Ai .:.;vV'.^ -^^ r.^: yy.,fYyY, •i-"—YY-t"^ -v-l •?; -^-P-? .r' ^'-'•.' * •"•. '•• ^ ••^' V- , " '. •• . • . L* - - . . •.,.. i . ; - ¥ •.-:••' :•. . . . - - ..:•.-.,.••.»•• ^ - , LJ£—-I *—Ok Lu—a^ c . . ' ..^.^ :—• I. .—•— .• . _i L : 1 .—..J * • .* • J .. . : ; J^K.^ :—1 .—,Z. : I—.—^-:. :—.-^—^^ .^—^.. •),. > :i S . f. Y. ..'••[ "-J) . .->' -;.^ s. -,. ... • '"* i. •;. ...if •<, f •••:• •.•i Y -.U-S- -J: -#• •*• y;. '.; >' :^'- i -'• C ••? •.^•^•^' -•if f" •)> • 4" ••..'- • ' •«ii;.- Figure 6G ENCLOSED BLDG., NO FLOOR COATING OVER SLAB 51'-0" PERMinED AREA / 16" CONC WALL; SIDE AND BACK 6" CONC. SLAB Hl'-S" K 1 or XT -V-V- ROLL-UP DOOR M-47 PLAN VIEW SCALE: r = 30'-0"± M-47 BUILDING LAYOUT FIGURE G-1 Figure 6H 12" SQ. DRAIN PLATE WITH 2* PIPE UNDER FLOOR TO EXTERIOR SUMP PERMinED BAY T-29B PLAN VIEW SCALE: 1" = lO'-O" 2x4 FRAMED WALL WITH CORRUGATED ALUM. ON EXT.. 1/2° PLYWOOD WITH 16GA SST INT. ,^ CD 8" SECTION SCALE: 1/4' = I'-C 1 rm SECTION SCALE: 1/4" = I'-O" e T-29B BUILDING LAYOUT FIGURE H-1 © %ure 6/ M-225 BURN GROUND FACILITY LAYOUT FIGURE 1-1 © SCALE: 1" = 200--0"± ATTACHMENT 7 SECURITY PLAN ATK Launch Systems Inc. - Promontory September 2008 Attachment 7 - Security UTD009081357 07 HAZARDOUS WASTE MANAGEMENT 07.01.1 SECURITY PROCEDURES 07.01.1 Purpose and Scope The work performed at the ATK Launch Systems, Promontory facility primarily involves Department of Defense and NASA contracts; therefore, comprehensive security agreement measures have been instituted. These security measures meet the requirements ofthe Division of Solid and Hazardous Waste Administrative Rules R315-8-2.5. No waiver from these requirements is being sought as the facility has both a twenty-four hour surveillance system and an artificial barrier around the facilities to minimize the possibility of unknown entry of livestock or personnel. 07.01.2 Surveillance System Security is maintained by a trained security force which controls entry and exit from the facility and provides patrol, escort, and other activities within the plant. All plant entrances are maimed by a minimum of one security officer twenty-four hours per day, every day. All other gates are locked and only used when authorized by attending Security. All employees entering the facility must show identification badges at the gate and wear them in plain sight throughout the day. All visitors and vendors are required to wear special identification badges. 07.01.3 Artificial Barrier There are artificial or natural barriers around the entire plant. The primary barrier consists ofa chain link and barbed wire fence with controlled access at the main entrances to the plant. The chain link fence runs along the highway from building A until it runs into the gully formed by Blue Creek just west of M-46. A natural barrier is provided by the Blue Creek gully which is approximately 15 feet deep with near vertical sides. This barrier extends for approximately 8,000 feet to a five-foot, four-strand barbed wire fence. This fence extends to the north, changes to chain Unk, and runs around the north end ofthe Plant. The chain link fences are seven feet high and topped with barbed wire. This fence is continued by a five-foot, four-strand barbed wire fence, which completes the primary barrier by encircling North Plant, Test, and South Plant. Plant III is encircled by a five-foot, four-strand barbed wire fence and also has controlled access at the main entrance. Each hazardous waste management area also has an artificial barrier. ATK Launch Systems Inc. - Promontory September 2008 Attachment 7 - Security UTD00908I357 E-501: The Container Storage Area is surrounded by a seven-foot chain link fence and has controlled access. The gate is locked when no one is present. M-136: A five-foot, four-strand barbed wire fence surrounds the Buming Grounds area. It has a gate, which is locked when no one is present. M-186: A five-foot, four-strand barbed wire fence surrounds the Container Storage Area. It has a gate, which is locked when no one is present. M-225: The Buming Grounds are surrounded by an eight-foot, chain link fence. It has a gate, which is locked when no one is present. A five- foot, four-strand barbed wire fence surrounds the mnoff dispersion area. M-705 S: The hazardous waste management area is inside a building with lockable doors to provide access control. In addition, the facility uses the plant's artificial barrier. M-47: The propellant/motor storage area remains locked except when occupied by personnel for placement of material into storage or removal from storage. M-603: The propellant/motor storage and disassembly building is restricted and requires check in at building M-l92 before entry is permitted. T29B: Building T29B remains locked at all times and is controlled by authorized Test Service personnel. 07.01.4 Signs All hazardous waste management areas (i.e., E-501, M-136, M-186, M-225, M-705S, M-47, M-603 and T29B) have waming signs placed at the access approaches. All signs are legible from a distance of at least 25 feet. All signs have a legend which reads "Danger - Unauthorized Personnel Keep Out." The legend is in English and Spanish except at M- 705S, M-47 and M-603 which is only in English. ATTACHMENT 8 PREPAREDNESS AND PREVENTION PLAN ATK Launch Systems Inc. - Promontory September 2008 Attachment 8 - Preparedness and Prevention UTD009081357 8-1 PROCEDURES, STRUCTURES, AND EOUIPMENT 8-1-1 Purpose and Scope Precautions have been taken to minimize the accidental or sudden release of hazardous waste or waste constituents into the environment. The precautions comply with the requirements of R315-8-3.2. 8-1-2 Loading and Unloading Operations Several precautions have been taken to minimize hazards during the loading and unloading ofhazardous waste. These precautions are divided into three classes of Waste Management: Open Buming, Dmm Storage and Propellant^Explosives Storage. Open Buming of hazardous waste explosives and propellants requires special precautions. Precautions taken during loading and unloading operations are described in M-136 Buming Grounds Operating procedures and in M-225 Buming Grounds Operating procedures. Safe loading and unloading of explosive waste helps to minimize waste release into the environment and reduce the possibility of unplanned ignition of waste material. Waste energetic material received from off-site for storage prior to open buming, will be handled under the same precautions as all other wastes accepted for disposal at the burn grounds. Loading/off-loading areas will be inspected each day waste is received, and at a minimum of once per week. Several precautions are also taken at the Dmm Storage areas. Spill control equipment is located at each area and can be used in loading and unloading operations. All drums are on pallets and are loaded and unloaded by a forklift. The design ofthe Drum Storage facilities allows adequate aisle space for movement of dmms with a forklift to minimize the actual handling ofthe drums. Permit condifions II.J.6. and III.E.4. state that, at a minimum, the Permittee shall maintain 30 inches of aisle space between containers or pallets ofcontainers at storage areas M-186 and E-501. All forklift tmck operators must have a license to operate the forklift tmck. The operator receives this license by attending a training program which includes an actual driving test that must be passed. The hazardous waste operators must also participate in the Hazardous Waste Training Program discussed in Attachment 3. Waste propellant, explosives and rocket motors are carefully off loaded from tmcks using fork lifts, building cranes or a trailer mounted knuckle boom. Small containers, less than 50 lbs, may be off loaded by hand. All 1 ATK Launch Systems Inc. - Promontory September 2008 Attachment 8 - Preparedness and Prevention UTD009081357 operators ofthe equipment listed above, under go extensive training in the proper use ofthe equipment they operate. This training includes class room as well as hands on training. All ATK propellant moving, grounding and bonding procedures will apply. Many precautions are taken during the transfer of waste hydrazine during the dilution process that is used to prepare this waste for off-plant disposal. These precautions include medical certification, operator knowledge of chemical properties, special safety equipment, and specific operating instmctions. 8-1-3 Prevention of Run-on and Run-off Run-on and mn-off are controlled at the drum storage pads M-l 86 and E-501 by a concrete berm around the facility. The M-705 storage and consolidation room is totally enclosed preventing run-on from entering the facility and eliminating any possibility for mn-off. Details of these stmctures and how they control mn-off are found in Attachment 6 ofthis Permit. Run-on and mn-off at the Buming Grounds, M-225, and M-136 are controlled by diversion, collection ditches, and trenches. A diversion ditch directs rim-on around the Buming Grounds. The mn-off at M-136 is collected in a ditch and dispersed in a dispersion area. The mn-off at M-225 is dispersed in an area directly in front ofthe buming area. Both areas will be included in the zone of Engineering Control. Drawings showing the control systems for M-136 and M-225 are included in Attachment 6. Run-on and run-off at buildings M-47 and M-603 are controlled since the facilities are fully enclosed buildings which are elevated above the surrounding grade to prevent rain intmsion. Drawings of these buildings are found in Attachment 6 ofthis permit. 8-1-4 Prevention of Water Supplv Contamination The drum storage areas, M-186, E-501, and M-705S each have a containment system which is designed to prevent releases of contaminants to the environment. Each system is constmcted to be leak-proof and divert run-on. These containment systems are shown in the facility drawings contained in Attachment 6. The propellant/motor storage buildings store only solid materials, and do not require secondary containment. The nature ofthis solid waste, combined with ftilly enclosed storage buildings, greatly reduce the potential for contaminating water supplies. ATK Launch Systems Inc. - Promontory September 2008 Attachment 8 - Preparedness and Prevention UTD009081357 The materials in the trays at the buming grounds are normally destroyed on a biweekly basis, except those materials too sensitive to store which are bumed the same day. The bum trays are inspected weekly and prior to loading to look for cracks or holes. Minimizing free liquids and controlling run-on and mn-off prevent water supply contamination. It is not anticipated that groundwater or surface water will become contaminated from the storage operations. Historical management ofhazardous waste has resulted in groundwater contamination at ATK. Semiannual groundwater monitoring is conducted in the area ofthe M-136 Buming Grounds, and down-gradient, in accordance with ATK's Post-Closure Permit. Groundwater flow and transport models have been developed to help predict the migration of contaminant plumes. Risk assessments and potential corrective measures will be conducted once the Division of Solid and Hazardous Waste approves the groundwater models. 8-1 -5 Mitigating Effects of Equipment Failures and Power Outages A power outage or equipment failure will have little effect on the hazardous waste storage and treatment areas. Any equipment failures, such as tmck breakdowns, pump repairs, etc.; can be managed by on-plant maintenance. Power outages can occur, but all critical operations have backup generators so hazardous waste can be controlled. ATK maintains an electrical lineman crew that has the necessary equipment and experience to repair on plant power outages. In the event ofa very large power outage or repair. Rocky Mountain Power will.be contacted and necessary measures taken to restore power. 8-1-6 Prevention of Undue Exposure to Personnel Exposure to personnel handling hazardous waste is minimized by containing and safely packaging waste and supplying personnel with proper protection and safety equipment. Section 111 F ofthe Contingency Plan (Attachment 4) lists the equipment available to all plant personnel. Specific procedures and requirements for personnel protection during the handling ofhazardous waste are specified in area standard operating procedures. 8-1-7 Emergency Equipment This equipment is inspected on a monthly basis. The emergency equipment is intended to help respond to small emergencies such as leaks or spills. It is not intended to respond to major incidents, fires, nor explosions. It is limited to equipment that is manually operated and is easily portable. Monthly inspections assure there are adequate supplies of ATK Launch Systems Inc. - Promontory September 2008 Attachment 8 - Preparedness and Prevention UTD009081357 material on hand and mechanical items are operable so that immediate response to small emergencies can be safely handled. ATK maintains a spill response trailer which is used to respond to spills that are medium to large. The trailer contains safety and spill response equipment. This trailer is maintained by the fire department and is inspected weekly or after use to ensure that an adequate supply of material is on hand. 8-1-8 General Areas The general area of each hazardous waste storage site is inspected on a daily basis when in use. These inspections consist of observing the area for possible spills or mismanagement ofhazardous waste. These areas need daily inspections when in use to minimize potential for mismanagement ofhazardous wastes during loading, unloading, or handling. 8-1-9 Safety Equipment Safety equipment is inspected monthly. Monthly inspections include testing equipment to make sure it is in working order and ensuring that all equipment is complete and in place. These inspections help to maintain a safe work environment and minimize human health incidents. 8-1-10 Storage and Containment System The storage and containment system shall be inspected as directed in Attachment 2. In some cases, inspections are required, as stated in the attachment, after each storm event. A storm event is defined as more than one inch of precipitation in a one-hour period. This is not only a regulatory requirement, but these inspections help to operate the container storage area in a safe manner and minimize environmental incidents. Inclement weather and mismanagement are the primary sources of deterioration ofthe containment system and containers. Standing liquids in the containment system and/or sumps must be managed according to Section 9-4.3 of Attachment 9 - Container Management Procedures. Inspections are conducted in order to effectively manage standing liquid. These inspections minimize environmental impacts from the actual storage ofhazardous wastes in the storage areas. If a leaking or deteriorating drum is identified during the inspection, the contents or the entire container must be immediately transferred into a new container. The new container must be numbered and labeled with exactly the same number and label as the old container. The date and time of any ATK Launch Systems Inc. - Promontory September 2008 Attachmenl 8 - Preparedness and Prevention UTD009081357 transfer action must be noted in the inspection log. The transfer ofthe leaking or deteriorating dmm can be handled in two ways: the contents of the container can be transferred by pump to a new dmm,or the drum can be placed in an 85-gallon over-pack drum with the space between the two drums filled with an absorbent to control any possible leaks. 8-1-11 Buming Ground Area Buming of explosives and reactive wastes occurs normally on a biweekly basis, but can occur more often if conditions necessitate the increased frequency. Inspections ofthe area, equipment, and bum trays, are conducted weekly or as specified in Attachment 2. Items inspected under this category are subject to general wear or weathering. In addition, containers stored in bum trays at M-136 are inspected to ensure that they are in good condition, closed and labeled. Bum trays are inspected for cracks and gaps and accumulation of leaked liquids or precipitation. Inspections conducted as described above, provide the time necessary to correct maintenance and erosion or wear problems. They also minimize the environmental impact at the Buming Grounds. 8-1-12 General Facility Equipment and PPE required to properly manage hazardous waste and for spill clean up is kept at the permitted facilities and regularly inspected. New materials are purchased as needed to assure an adequate supply. 8-1-13 Fire Department Equipment The Fire department inspects their equipment on a routine basis and after each use. This equipment is especially important to aid in minimizing the effects from fires, explosions, and spills. The inspections are performed and records are kept by the Fire Department personnel. 8-1-14 Heavy Equipment Most ofthe heavy equipment is used on a regular basis for constmction services and for the management of solid wastes. It is also available for use in emergencies. This equipment is handled at the heavy equipment garage and is inspected on an hour-usage basis rate of 100-150 hours depending on the equipment type and working conditions. A detailed checklist is covered by Maintenance that is checked thoroughly by trained personnel. All inspection records on heavy equipment are kept on file at Maintenance Control and are available for inspection. ATK Launch Systems Inc. - Promontory September 2008 Attachment 8 - Preparedness and Prevention UTD009081357 8-1-15 Inspection Log All inspections are recorded. These forms are put into one of three inspection logs. Each log contains the most recent three years of records and is available for review. Environmental Services keeps the inspection logs ofthe results of all inspections on the security equipment, emergency equipment, general area, safety equipment, storage and containment system, buming grounds, and general facility categories. The Fire department keeps a log ofthe Fire department categories and Maintenance Control keeps a log for the heavy equipment category. 8-2 CONTINGENCY PLAN 8-2-1 Purpose and Scope ATK has developed and supplied a contingency plan as required by R315- 3-2.5(b)(7) and R315-8-4. This plan has been devised as a separate document so that it can be used independently of this permit. A copy ofthe contingency plan is in Attachment 4. The plan has been designed to minimize hazards to human health and the environment from fires, explosives, or any unplanned or sudden release ofhazardous wastes. 8-3 PREPAREDNESS AND PREVENTION 8-3-1 Purpose and Scope The hazardous waste treatment and storage facilities have been designed, constructed, maintained, and operated to minimize the possibility of unplanned fires, explosions, or discharges ofhazardous wastes. In the event of an emergency, the responsibilities of responders, organizational stmcture, and procedures required to ensure effective waming, response, and control to minimize hazards to human health or the environment are addressed in detail in the Contingency Plan (Attachment 4). 8-3-2 Required Equipment All hazardous waste facilities are equipped to respond effectively to an emergency situation. Should an emergency situation arise, such as a discharge ofhazardous waste, a fire, or an explosion, employees who are in hazardous waste management areas should be able to respond according to the procedures outlined in the Contingency Plan. All hazardous waste facilities are equipped with intemal and extemal communication systems. Intemal communications are provided by voice signals and commands specified in the Contingency Plan in Section E. All ATK Launch Systems Inc. - Promontory September 2008 Attachment 8 - Preparedness and Prevention UTD009081357 hazardous waste facilities are in open-space areas and there are no loud, industrial noises that could muffle voice commands or signals. These voice commands provide immediate onsite emergency instmctions to employees in the hazardous waste management areas. An extemal communication system using telephones is provided for employees at each area. These telephones can be used to contact Intemal Emergency Response or initiate the Contingency Plan. Storage buildings not equipped with alarms or hard wired phones, will utilize cellular phones to contact ATK's emergency responders if needed. To prevent encouraging personnel to fight fires in the waste rocket motor/propellant storage buildings and adjacent waste docks, fire extinguishers are not provided. All other hazardous waste storage areas are equipped with fire extinguishers. The buildings that have separate electrical rooms, have extinguishers that are to be used in the electrical rooms only. Spill clean up material will be provided in each of these buildings as outlined in section III.F ofthe Contingency Plan. The location ofthe fire extinguisher is shown on the evacutation plan in Appendix 1 ofthe Contingency Plan. Along with these portable extinguishers, ATK maintains a Fire department to respond to fires or explosions. Descriptions of fire equipment, available water, and the Fire department are described in Section I G of the Contingency Plan. Buildings M-47 does not have water immediately available, but rely on ATK's full time, fiilly equipped and trained Fire Department for any emergency response action. Building M-603 is equipped with a fire sprinkler system, which is checked at least annually. 8-3-3 Testing and Maintenance of Equipment All emergency and safety equipment is inspected on a routine basis to ensure it is in working order and in good repair. These inspections are documented and are available for inspection. 8-3-4 Access to Communications or Alarm Systems All employees who manage hazardous waste have immediate access to both intemal and extemal communication systems. All employees have access to telephones or cellular phones and are trained on how to summon extemal emergency assistance if required. 8-3-5 Required Aisle Space Aisle space has been designed into each drum storage pad. This type of drum storage allows easy access to thoroughly inspect the area around ATK Launch Systems Inc. - Promontory September 2008 Attachment 8 - Preparedness and Prevention UTD009081357 each dmm and allows adequate room to transfer hazardous waste into a new dmm if a dmm is found to be leaking or in poor condition. There is enough aisle space and clearance around each storage pad to allow free movement of fire protection equipment, spill control equipment, and any needed decontamination equipment. Detailed drawings ofthe dmm storage areas are found in Attachment 6 of this Permit. An aisle space of 30 inches minimum between containers or pallets ofcontainers will be maintained at storage areas M-186 and E-501. Hazardous waste stored in containers at M-705S, M-47, M-603 and M-136 will be stored so that they may be readily inspected and hazardous waste labels are visible. 8-4 PRECAUTIONS TO PREVENT IGNITION AND REACTION 8-4-1 Purpose and Scope Precautions to prevent accidental ignition or reaction are essential to the safety of all personnel. The precautions taken ensure compliance with R315-8-2.8. The precautions are a part of everyday manufacturing and production activities at ATK. 8-4-2 Precautions for Open Buming of Explosives and Propellants Many precautions are taken to prevent accidental ignition or reaction of hazardous waste materials at the Buming Grounds at M-136 and M-225. Because ofthe extremely sensitive nature of these wastes, special precautions are taken for each source of ignition. Safety procedures for handling energetic and sensitive materials are found in ATK's Hazardous Operations Standard Manual (AHOPS) and the Reactive Waste Disposal Instmctions (RWDI) which are available at the facility for inspection. 8-4-3 Precautions for Dmm Storage ofHazardous Waste The drum storage buildings have been designed to hold flammable liquids. The front of M-186 and all sides of E-501 are open to ensure that proper ventilation is maintained in each storage area. Doors are opened as needed at M-705S to provide adequate ventilation. Unauthorized personnel are kept out ofthe storage areas. The areas are inspected on a weekly or daily basis and all leaking or damaged containers are replaced as addressed above and in Attachment 9. In the event ofa spill ofhazardous waste or material which, when spilled, becomes hazardous waste, the person responsible for the material at the time ofthe spill shall immediately take appropriate action to minimize the 8 ATK Launch Systems Inc. - Promontory September 2008 Attachment 8 - Preparedness and Prevention UTD009081357 threat to human health and the environment and comply with UAC R315-9 and implement the Contingency Plan if necessary. 8-4-4 Precautions for Propellant/Motor Storage All propellants/motors will be safely handled in accordance with AHOPS. These procedures include, but are not limited to, proper grounding and bonding protocol. All permitted hazardous waste storage and treatment facilities are located more than 50 feet from any property line to help minimize the fire potential of adjoining property. General site maps which show these buildings, as well as the property lines, are found in Attachment 6. ATK Launch Systems Inc. - Promontory Attachment 8 - Preparedness and Prevention September 2008 UTD009081357 TABLE 8A Precautions Against Accidental Ignition and Reaction ofHazardous Waste Explosives and Propellants IGNITION SOURCE Smoking Open Flames Static Electricity Incompatible Materials Friction and Sparks Electrical Equipment " .::§»RECAUTIONS ^ Y .... Buming grounds are designated as areas where smoking is a fire hazard and as such must meet the requirements of company procedures. Requirements for smoking are strictly enforced by the Safety department. The use of a flame, heat, or spark-emitting device in any area requires a permit. Requirements for uses and restrictions of these permits are found in company procedures. These permits are issued prior to starting work. Static electricity can be an ignition source. To avoid static charges, all explosive or propellant waste is packed in a container with either a conductive or static dissipative liner. During storage and prior to and/or during transportation of wastes to the buming grounds, all conductive waste containers are grounded to prevent static spark. Upon placement in the metal bum tray, grounding is no longer required. Rocket motors for disposal will not be packaged in these liners, but will be grounded to the case prior to being placed into position for open buming. Incompatible materials are not placed in the same containers and incompatible wastes are segregated at each waste pickup dock. Vehicles hauling waste propellant must have spark arresters in the exhaust line. Non- sparking rakes are used in preparing the trenches for buming or re-buming. A porous, non-sparking tmck bed is also used. No electrical work is allowed in areas where explosives or propellant are present. 10 ATK Launch Systems Inc. - Promontory Attachment 8 - Preparedness and Prevention September 2008 UTD009081357 TABLE SB Precautions Against Accidental Ignition and Reaction ofHazardous Waste in Drum Storage IGNITION SOURCE Smoking Open Flames PRECAUTIONS The dmm storage areas are designed as areas where smoking is a fire hazard and as such must meet the requirements of company procedures. Requirements for smoking are strictly enforced The use of a flame, heat, or spark-emitting device in any area ofthe plant requires a permit. Requirements for uses and restrictions of these permits are found in company procedures. These permits are issued prior to starting work. 11 ATTACHMENT 9 CONTAINER MANAGEMENT PROCEDURES ATK Launch Systems Inc. - Promontory September 2008 Attachment 9 - Container Managemenl UTD009081357 CONTENTS USE AND MANAGEMENT OF CONTAINERS 3 9-1 PURPOSE AND SCOPE 3 9-1.1 Facility Description 3 9-2 MANAGEMENT OF CONTAINERS 4 9-2-1 Types of Containers for Storage 4 9-2-2 Waste Compatibility 5 9-2-3 Storage of Containers 6 9-2-4 Inspections 8 9-2-5 Operating Record 8 9-3 LAB PACKS AND WASTE CONSOLIDATION 8 9-3-1 Lab Pack Preparation 8 9-3-2 Lab Pack Labeling 9 9-3-3 Containment Sealer 9 9-3-4 Lab Pack Compatibility 9 9-4 CONTAINMENT 9 9-4-1 Capacity of Containment 9 9-4-2 Containment Sealer 10 9-4-3 Removal of Free Liquids From Containment Area 10 9-5 RUN-ON AND RUN-OFF CONTROL 11 9-6 REOUIREMENTS FOR IGNITABLE AND REACTIVE WASTES 12 ATK Launch Systems Inc. - Promontory September 2008 Attachment 9 - Container Management UTD009081357 9 USE AND MANAGEMENT OF CONTAINERS 9-1 PURPOSE AND SCOPE ATK Launch Systems - Promontory (ATK) currently manages the drum storage areas at M-186, E-501, M-705S, the solid propellant storage buildings at M-47 and M-603 and solid propellant storage in bum trays and at Bum Station 14 at M-136 in accordance with the Division of Solid and Hazardous Waste Administrative Rules R315-8-9. These waste storage areas are owned and operated by ATK. All containers are being temporarily stored waiting thermal treatment on-site, or shipment off-site for recycling, treatment and/or disposal. The dmm storage site at M-186 is designed to hold 400, 55-gallon dmms of various types of waste intended for treatment or disposal. The drum storage site at E-501 is designed to hold 160, 55-gallon drums of various types of waste intended for treatment or disposal. The M-705S storage and consolidation room is designed to store a maximum of 32, 55-gallon dmms, both rooms include palletainers of various types of waste intended for consolidation or lab packing. For solid propellant storage capacities, see Module III section E. 9-1.1 Facilitv Description The M-l 86 storage pad is permitted for the storage ofthe hazardous wastes identified in Permit Condition III.B.l. The storage pad is divided into five storage bays to keep incompatible materials separated. The pad is a coated concrete floor with secondary containment. The M-186 storage facility is shovwi in Figure E-l of Attachment 6. The E-501 storage pad is permitted for the storage ofthe hazardous wastes identified in Permit Condition III.B. 1. The pad is a coated concrete floor with secondary containment. The E-501 storage facility is shown in Figure B-l of Attachment 6. The M-705S Storage and Consolidation Room is a single room with a coated concrete floor and secondary containment. It is permitted for the storage ofthe hazardous wastes identified in Permit Condition III.B.l. The room is equipped with plastic containers to keep incompatible materials separated. Poly-spill pallets are used to provide separate containment for each consolidation dmm and lab pack dmm as needed. The M-705S storage facility is shown in Figure C-l of Attaclmient 6. M-47 is designed for storage of solid propellant/ explosives. This building is sited for the maximum quantity of propellant/explosives based on Quantity/Distance, DOD siting criteria found in the contractor safety ATK Launch Sy.stems Inc. - Promontory September 2008 Anachment 9 - Container Management UTD009081357 manual, 4145.26m. Each building is set up to permit proper grounding and cross bonding as appropriate. The M-47 storage facility is shown in Figure G-1 of Attachment 6. Building M-603 follows the same maximum quantity criteria as storage building M-47. This building is also permitted for treatment ofthe waste, in accordance with Module IV, through disassembly of motors or other procedures needed to prepare the waste for disposal through open buming or other similar techniques. The M-603 storage,and treatment facility is shown in Figure D-l of Attachment 6. The storage of solid propellant wastes received from off-site at M-136 is only permitted for a maximum of 14 days. This includes waste stored in containers placed in bum trays and waste rocket motors that contain solid propellant placed on the ground at Bum Station 14. The storage of waste materials received from off-site at M-136 is permitted in order to facilitate more efficient and safer waste handling practices, and to accommodate delays in waste treatment due to weather or other uncontrollable delays. Storage ofthis waste will be in compliance with this permit and R315-8-9. 9-2 MANAGEMENT OF CONTAINERS 9-2.1 Tvpes of Containers for Storage The containers to be used for storage, lab packing, or consolidation at M-186, E-501, and M-705S will meet the UN or USDOT criteria or will be a sturdy liquid tight altemative container. No more than 400 drums will be stored at M-186; 160 dmms at E-501; and 32 drums at M-705S. Substitute containers will reduce the number of drums that can be stored based on the volume ofthe container chosen. The containers that will be used for storing solid, reactive wastes at M-47 and M-603 include rocket motor cases, bags, dmms or other containers as approved by the UN or USDOT for the appropriate waste. All solid reactive waste received from off-site and stored in bum trays at M-136 will be stored in bags, drums or other containers as approved by the UN or USDOT for the appropriate waste. Storage of these containers is permitted in liquid tight bum trays or on the ground at Bum Station 14 for intact rocket motors. All containers will be kept closed during storage. Lab pack and consolidation dmms used for different compatibility groups will be separated using a portable secondary containment system (PSCS) such as a Poly-spill pallet. The PSCS will have the capacity to hold a minimum of 55 gallons. Most PSCSs are unsatisfactory for storing most ATK Launch Systems Inc. - Promontory Attachment 9 - Container Management September 2008 UTD009081357 organic waste; therefore, flammable/combustible waste lab packs or consolidation drums will be placed on a pallet and stored on the floor using the room's containment system. Lab pack and containment drums with non-hazardous waste will be stored on the floor. Non-hazardous waste found to be incompatible with solvents would be placed on a PSCS for which it was found to be compatible. All fiill consolidation or lab pack drums will be transferred from M-705S to a permitted storage facility to stay within M-705S's storage capacity. TABLE 9-2 HAZARDOUS WASTE COMPATIBILITY FOR STORAGE AT M-186, E-501, M-705S, M-47 and, M-603 General Compatibility Groups 1. Flammable/combustible liquids and non-flammable solvents DOT Hazard Class in Group a. Flammable Liquids b. Combustible Liquids 2. Corrosives (acids) 3. Corrosives (bases) 4. Reactive Chemicals a. Corrosive Liquids (acids only) a. Corrosive Liquids (bases only) a. Organic Peroxides b. Oxidizes 5. Toxic Chemicals a. Toxic b. Infectious 6. Explosives a. b. 1.1 1.3 9-2.3 Storage of Containers M-186, E-501 and M-705S Before any waste container is accepted at M-705S, E-501, and M-186, it shall be inspected to determine whether the waste matches the identity of the waste specified on the accompanying manifest or shipping paper. In addition, the containers shall be inspected to ensure that they are in good ATK Launch Systems Inc. - Promontory September 2008 Attachment 9- Container Management UTD009081357 condition, are closed, and labeled in accordance with 40 CFR 262.34 (incorporated by reference in R315-5-3.34) and R315-5-3.31. If the drum is found to be unacceptable, it must be immediately repacked and relabeled or the waste transferred to a new dmm. Each dmm or container must be entered into the operator's log (see Section 9-2.5) when the drum or the container is accepted in to the drum storage area. A forklift and/or pallet jack is used to move the pallet into the storage area. Dmms or containers in the holding bays at M-186 and at E-501 will be sampled according to Attachment 1 ofthis permit. The wastes are accumulated until enough containers exist to complete a load. The containers are then loaded into a tmck and shipped to the disposal facility for proper treatment and/or disposal. All drums stored at the M-705S, E-501, and M-186 storage areas will be stored with either both plugs closed or with the top ofthe drum sealed. No waste containers will be open unless waste is being added or removed. Adding or removing waste will only occur at these storage facilities ifa container is damaged, leaking, for sampling, for waste consolidation, and/or for lab packing. A container may be filled if spilled material is found in a sump during the transfer of waste containers. A container being filled or replaced will be located in the containment area. This will provide containment ifany spillage results from an incident during transferring procedures. Precautions to be taken during the transfer ofthe waste include: insuring all transfer equipment (i.e., hoses, pumps, funnels) is located inside the containment area; ensuring a proper dmm is used when transferring waste material. An aisle space of 30 inches minimum between containers or pallets of containers will be maintained at storage areas M-186 and E-501. Hazardous waste stored in containers at M-705S, M-47, M-603 and M-136 will be stored so that they may be readily inspected and hazardous waste labels are visible. 55-gallon drums may be stacked at a maximum of two high at storage areas M-186 and E-501 only. All storage containers shall have hazardous waste labels attached that meet the requirements of 40 CFR 262.34 (incorporated by reference in R315-5- 3.34). All personnel required to complete RCRA labeling shall receive training as appropriate. M-47 and M-603 All waste propellant/explosives stored at M-47 and M-603 must be entered into the operating record. Building inspections must begin upon first receipt of material and end when all hazardous waste has been removed from the building. All containers must be kept closed except when adding ATK Launch Systems Inc. - Promontory Seplember 2008 Attachment 9 - Container Management UTD009081357 or removing waste. Adequate aisle space must be provided to permit proper container inspection. Storage containers may not be stacked in these storage buildings. Total quantity limitations are as outlined in module III section E. All containers shall have hazardous waste labels attached that meet the requirements of 40 CFR 262.34 (incorporated by reference in R315-5- 3.34). M-136 Bum Trays and Bum Station 14 All solid reactive wastes received from off-site shall be inspected prior to placement into bum trays or Bum Station 14 at M-136 to determine whether the waste matches the identity ofthe waste specified on the accompanying manifest or shipping paper. In addition, the containers shall be inspected to ensure that they are in good condition, are closed, and labeled in accordance with 40 CFR 262.34 (incorporated by reference in R315-5-3.34) and R315-5-3.31. If a container holding hazardous waste is not in good condition, e.g., apparent stmctural defects, or if it has begim to leak, ATK personnel shall take steps as appropriate to prevent a release from the container to the environment. Prior to placement ofhazardous wastes into bum trays, the tray shall be inspected as outlined in Attachment 2. Once the container or waste rocket motor received from off-site is placed in a bum tray or Bum Station 14, the date ofthe placement shall be added to the hazardous waste label, begimiing the 14 day maximum period which the waste may be stored. Containers stored in bum trays at M-136 shall remain closed during storage, except when it is necessary to add or remove waste. A container holding hazardous waste shall not be handled or stored in a manner which may rupture the container or cause it to leak. Containers shall be stored such that the hazardous waste labels may be readily inspected. 9-2.4 Inspections All container storage areas are inspected on at least a weekly basis. Details ofinspection requirements for the storage areas are outlined in Attachment 2. If a container is found with severe corrosion, structural defects, rusty bungs, or leaking, the contents or the entire container must be immediately transferred into a new container. The new container must be numbered and labeled with exactly the same number and label as the old container. The date and time of any transfer action must be noted in ATK Launch Systems Inc. - Promontory September 2008 Attachment 9 - Container Management UTD009081357 the inspection log and the Environmental Waste Disposal technical staff must be notified. 9-2.5 Operating Record All waste brought into the M-186, E-501, M-705S, M-47, M-603 and M- 136 storage areas are entered into a hazardous waste log compliant with R315-8-5.3. This log is kept for all wastes. If a waste material is consolidated, the consolidation drum is recorded in the hazardous waste log in such a way as to allow the consolidated material to continue to be tracked. Waste materials to be lab packed are placed in a lab pack drum and recorded in a hazardous waste log in such a way as to allow the material and the drum to also be tracked. The operating record is kept for all hazardous wastes. These records are used to track wastes as they come in from on and off-plant generators and satellite generator facilities. 9-3 LAB PACKS AND WASTE CONSOLIDATION 9-3.1 Lab Pack Preparation ATK disposes of several hazardous wastes in lab packs. Completed lab packs are stored in the drum storage bays. Before a lab pack is accepted at the drum storage bay, it must be prepared, labeled, and documented in accordance with 40 CFR 262 Subpart C (incorporated by reference in R315-5-3.34) and R315-5-3.31. Materials in small containers may be stored at the lab packing and consolidation room at M-705S or at M-l 86 for lab packing or waste consolidation. The materials are separated into compatibility groups based on DOT hazard classification. The materials are generally in small containers ranging from one or two ounces to 5-gallon cans. The small containers are then stored in palletainers or on a shelf until ready to lab pack or consolidate. Incompatible materials are not allowed to be stored in the same palletainer, or containment bay. 9-3.2 Lab Pack Labeling Each waste container must be labeled with a complete hazardous waste label. 8 ATK Launch Systems Inc. - Promontory Attachment 9 - Container Management September 2008 UTD00908I357 9-3.3 Containment Sealer 9-3.4 The concrete containment area where consolidation and lab packing occur at M-186 and M-705S, is sealed with a high build polyamide epoxy coating system or equivalent. The Material Safety Data Sheet and compatibility chart for this material can be found on the manufacturer's web site. Lab Pack Compatibility Under no circumstances will a lab pack contain wastes that are incompatible. Compatibility of wastes will be determined by using the MSDS or other reference sources. Ifa waste is not found in the reference material, then the material will be assumed incompatible with all wastes and lab packed separately unless research by Environmental Waste Disposal's technical staff documents compatibility. Reactive wastes will be lab packed or thermally treated at the M-136 bum grounds. Lab packing will be done in accordance with USDOT regulations and the requirements ofthe disposal company. 9-4 9-4.1 CONTAINMENT Capacity of Containment All the container storage areas and consolidation/lab packing areas at M-186, E-501, and M-705S are designed to hold a minimum often percent ofthe volume of waste stored in the area or the volume ofthe largest container, which ever is greater. Table 9-5A summarizes the calculations. TABLE 9-5A Containment Capacity of Dmm Storage Areas Storage Container M-186 Storage Bay E-501 Storage Pad M-705S Room M-705S Poly-spill pallet Number of Dmms to be Stored 80 Dmms 160 Drums 16 Drums* 4 Dmms Needed Containment 440 Gal 880 Gal 88 Gal 55 Gal Containment Available 980 Gal 895 Gal 830 Gal 85 Gal * Includes Palletainers Buildings M-47and M-603 are not pennitted for storage of liquids. Each container will be inspected to assure no liquids are present upon arrival at the storage facility. These storage buildings are fully enclosed to prevent 9 ATK Launch Systems Inc. - Promontory September 2008 Attachment 9 - Container Management - UTD009081357 contact ofthe waste with rain water, and do not require secondary containment. Roof leaks must be repaired as soon as is practicable. 9-4.2 Containment Sealer The containment area at the M-186 and M-705S storage facilities are coated with an epoxy resin to resist liquid penetration. No leakage or spillage is anticipated during waste storage; however, in the event spills or leaks do occur, the epoxy will prevent the material form penetrating the concrete. The containment system at E-501 is coated with an epoxy sealer that is a high-build chemical resistant coating. The chemical compatibility and properties ofthis epoxy are available from the manufacturer. 9-4.3 Removal of Free Liquids From Containment Area Removal of free liquids at M-186, E-501, and M-705S must be done with a pump or vacuum tmck. When free liquids are found in the sump, a portable drum pump, either electric or hand operated, is used to transfer the liquid to a UN 55 gallon drum. A vacuum tmck can also be used to pump out collection of rain water and snow melt. Water pumped with the vacuum tmck will be taken to a UPDES permitted waste water treatment facility (M-705) for processing. All free liquids taken from the sumps will be managed as hazardous wastes until waste analysis or inspection dictates otherwise. Precautions will be taken to avoid spills. All spills are cleaned immediately, imless the size demands spill response. After the liquids are transferred into drums, a sample will be taken form each dmm according to the sampling procedure in the Waste Analysis Plan, contained in Attachment 1. The dmms will be managed as hazardous waste until a determination has been made classifying the contents. If the analysis indicates the liquid is a hazardous waste as defined by the Division of Solid and Hazardous Waste Administrative Rules R315-2, then the drums will continue to be managed as a hazardous waste. If the liquid is a wastewater, the liquid will be taken to M-705 Wastewater Treatment Facility. Occasionally, small amounts of liquid such as nitroglycerine can drip from rocket motors onto the concrete floor. These drips are typically less than 1 -inch in diameter and may drip as much as once per week. Any sign of out-of-place waste will be checked during the regular inspections outlined in Attachment 2. Clean up of dripped materials will be completed as soon as is practicable using rags and acetone or other appropriate cleaners. 10 ATK Launch Systems Inc. - Promontory Seplember 2008 Attachment 9 - Container Management UTD009081357 M-136 Bum Trays Although the bum trays at M-136 are only permitted for the storage of solid reactive wastes in containers for no more than 14 days, some of these containers contain small amounts of desensitizing fluid (e.g. diesel, shingle oil, etc.). Therefore, the containment requirements of R315-8-9.6, as discussed below, apply to the storage of wastes in the bum trays. The bum trays shall be free of cracks or gaps and be sufficiently impervious to contain leaks, spills, and accumulated precipitation until the collected material is detected and removed. Spilled or leaked waste and accumulated precipitation shall be removed from the bum trays in as timely a manner as is necessary to prevent overflow ofthe tray. Inspection requirements for bum trays and the accumulation of liquids are outlined in Attachment 2. If the collected material is a hazardous waste under R315-2, it shall be managed as a hazardous waste in accordance with all applicable requirements ofthe State of Utah Hazardous Waste Management Rules. If the collected material is discharged through a point source to waters ofthe United States, it is subject to the requirements of section 402 ofthe Clean Water Act, as amended. 9-5 RUN-ON AND RUN-OFF CONTROL Run-on and run-off water is prevented form entering the M-l 86 and E-501 drum storage pads. Three sides of each pad contain a curb that is six inches in height and a sloped grade in the front that is three inches above the ground surface. Each pad has sufficient height to prevent run-on from entering the dmm storage containment system. Detailed drawings of these facilities are contained in Attachment 6. The storage facility at M-705S is totally enclosed to prevent any run-on water from entering the building. Calculations have been performed for the M-l 86 storage pad and these indicate that no mn-on or run-off should enter the storage building and affect the capacity ofthe containment area. The calculations were based on a 24-hour, 25-year storm event and were submitted with the Part B Permit Application. The terrain around the bum grounds has been graded and drainage ditches surround the area in order to minimize mn-on. The topography and 11 ATK Launch Systems Inc. - Promontory September 2008 Attachment 9 - Container Management UTD009081357 drainage ditches at M-136 and M-225 are shown in Attachment 5, Figures 1 and 2. In addition, all waste will be in water tight bum trays to prevent run-on and mn-off Waste Rocket motors will be covered to eliminate contact with rain water, and will sit on chalks or pallets to avoid direct contact with flowing storm water. 9-6 REOUIREMENTS FOR IGNITABLE AND REACTIVE WASTES All container storage areas are located more then 50 feet from facility property lines. The aerial photograph contained in Attachment 6 (Figure 6A) shows the property boundaries and facility location. 12 ATTACHMENT 10 T-29B HYDRAZINE DILUTION PROCEDURES ATK Launch Systems Inc. - Promontory September 2008 Attachment 10 - Hydrazine Treatment UTD009081357 10 HYDRAZINE DILUTION PROCESS 3 101 PURPOSE AND SCOPE . 3 10-2 PROCESS DESCRIPTION 3 10-3 ENVIRONMENTAL PERFORMANCE STANDARDS 4 10-3-1 Prevention of Releases to Ground Water or Subsurface Environment 4 10-3-2 Prevention of Releases to Surface Water, Wetlands, or Soil Surface 4 10-3-3 Prevention of Releases to Air 4 10-4 MONITORING. ANALYSIS, INSPECTION, RESPONSE. REPORTING, AND CORRECTIVE ACTION 5 10-5 RECORD KEEPING AND REPORTING 5 10-6 CLOSURE 5 ATK Launch Systems Inc. - Promontory September 2008 Attachment 10- Hydrazine Treatment UTD009081357 10 HYDRAZINE DILUTION PROCESS 10-1 PURPOSE AND SCOPE ATK Launch Systems - Promontory (ATK) operates a small treatment process to dilute waste hydrazine at Building T-29B. This process dilutes hydrazine waste with water so that waste hydrazine solutions do not exceed hydrazine concentrations above 50 percent. The dilution process is necessary because ofthe extreme flammability and reactivity of hydrazine and the lack of a disposal facility for concentrated hydrazine. The diluted waste hydrazine is shipped off plant to an incinerator for destmction. 10-2 PROCESS DESCRIPTION The dilution of waste hydrazine with water is a simple process. ATK does not generate large amounts of waste hydrazine, but because hydrazine is extremely flammable and reactive, special care must be used in its disposal. The hydrazine is collected at a satellite accumulation site and taken to Building T-29B in a small, nitrogen purged, trailer mounted tank. This tank is equipped with a scmbber vent system which is utilized during initial transfer into the tank. Approximately 25 gallons of water is placed into a 55-gallon dmm at T-29B. A tube is mn from the tank into the bottom ofthe 55-gallon dmm. The hydrazine is then dispensed into the drum through the tube using nitrogen pressure. Once all hydrazine in the tank has been dispensed into the dmm, additional water will be added to bring the level to within approximately six inches ofthe top. This transfer is performed with personnel in Level A personal protective equipment (PPE). After the transfer is complete, the air in the room is tested to assure safety before the Level A PPE is removed. The system is designed and operated to prevent any releases and to safely transfer the material. After the material transfer has been completed, the material is shipped off plant for disposal or sent to the M-l 86 Hazardous Waste Storage Facility. Lab samples from quality assurance testing ofthe hydrazine product are also dumped directly into the water filled/hydrazine diluted dmm for disposal. ATK Launch Systems Inc. - Promontory September 2008 Attachment 10- Hydrazine Treatment UTD009081357 10-3 ENVIRONMENTAL PERFORMANCE STANDARDS The T-29 Hydrazine dilution process has been located, designed, operated, maintained and will be closed in a manner that will ensure protection of human health and the environment. This section addresses the prevention of releases due to migration ofhazardous constituents into the ground water or subsurface environment, surface waters, wetlands, surface soils, and in the air. 10-3-1 Prevention of Releases to Ground Water or Subsurface Environment Several parameters have been considered in determining the prevention of a release to ground water or subsurface environments. It is important to note that there will only be a limited amount of pure hydrazine, generally no more than 55 gallons, to dilute at any one time and that this process is all done within a containment system. The containment system is shown in the facility drawing contained in Attachment 6 (Figure H-l). Because ofthe secondary containment, there should be minimal potential for deposition or migration of waste constituents into the subsurface or groundwater. 10-3-2 Prevention of Releases to Surface Water, Wetlands, or Soil Surface The dilution area has secondary containment to ensure collection of any spill. A 7,500-gallon, emergency-use-only sump has been designed to contain any spill. The sump is only used ifa spill occurs; it is not used on a routine basis. The sump is designed to collect any large spill and has more than sufficient capacity to hold any spill during the dilution process. The use ofthis containment along with careful procedures and the low volume of waste reduces the potential for any adverse effect on human health or the environment. 10-3-3 Prevention of Releases to Air The transfer of hydrazine is conducted with strict safeguards and procedures to prevent the migration of waste constituents in the air. This process transfers the hydrazine using nitrogen. Escaping gases are minimized by discharging through a tube under water in the collection dmm. These procedures minimize the quantity of any hydrazine migration through the air and minimize the potential for any adverse effects to human health or the environment. ATK Launch Systems Inc. - Promontory September 2008 Attachment 10 - Hydrazine Treatment UTD009081357 10-4 MONITORING, ANALYSIS, INSPECTION, RESPONSE. REPORTING. AND CORRECTIVE ACTION Because hydrazine requires special handling precautions and safety procedures, ATK personnel shall follow intemal procedures for performing the dilution process. ATK will conduct the dilution process in a manner that will ensure protection of human health and the environment. ATK will comply with the requirements specified in the facility Contingency Plan (Attachment 4), when there has been a release at Building T-29B that threatens human health or the environment. ATK will comply with the ignitable and reactive waste regulations as required by UAC R315-8-2.8. ATK will inspect Building T-29B in accordance with the inspection schedule contained in Attachment 2. 10-5 RECORD KEEPING AND REPORTING ATK will record in the operating record the following: 1. The date that waste hydrazine is received at T-29B; 2. The quantity of waste hydrazine received; 3. The date the waste hydrazine is treated by the dilution process; 4. The quantity of diluted hydrazine after the dilution process is complete; and 5. The date the diluted hydrazine is shipped off-site or to the M-186 storage facility. 10-6 CLOSURE ATK will close Building T-29B in accordance with R315-8-7, R315-8-9.9, Permit Condition II.N. and the designated Closure Plan in Attachment 5 of this Permit. A