Loading...
HomeMy WebLinkAboutDSHW-2007-008303 - 0901a06880162899 (4) David P. Gosen, P.E. Director, Environmental Services ATK Launch Systems – Promontory P.O. Box 707 Brigham City, UT 84302-0707 RE: Response to Comments on the Pilot-Test Work Plan to Evaluate Enhanced Anaerobic Bioremediation of Perchlorate and Solvent Contaminated Groundwater, ATK Launch Systems - Promontory Facility, EPA I.D. #UTD009081357 Dear Mr. Gosen: This letter is in regard to ATK’s plan to conduct a pilot test in the M-136 Burn Ground area in order to evaluate the in-situ groundwater treatment method as described in the Work Plan referenced above. The Division of Solid and Hazardous Waste’s review of the original Work Plan generated a small number of questions and comments. These questions and comments were provided to you on November 8, 2006. A revised Work Plan and responses to the questions and comments were received from EarthFax Engineering on December 19, 2006. The Division has reviewed the revised Work Plan and responses to comments that were submitted. Based on our review, it appears that our concerns have been addressed. The ATK Liquid Thermal Treatment Area (M-136 Burn Grounds) Post-Closure Permit requires that corrective action be taken to cleanup contaminated groundwater at the facility. If the Pilot Test is successful, this technology may be used to comply with this requirement. In addition, based on internal communication with the Division of Water Quality (DWQ), Underground Injection Control (UIC), an “Authorization by Rule” status for the operation of the injection well that will be utilized during the pilot test is forthcoming. The Pilot Test Work Plan is hereby approved. Please notify Jeff Vandel of the Division seven days prior to implementing the work plan to allow for potential oversight of the effort. Jeff may be contacted at (801) 538-9413. Sincerely, ORIGINAL DOCUMENT SIGNED BY DENNIS R. DOWNS ON 1/23/07 Dennis R. Downs, Executive Secretary Utah Solid and Hazardous Waste Control Board DRD\JV\tm c: Lloyd C. Berentzen, M.B.A., Health Officer/Director, Bear River Health Dept. Carl Daly, USEPA Region VIII Paul Hancock, ATK Richard B. White, Earthfax Engineering File to: ATK Launch Systems - Promontory January 23, 2007 Page 2 January 23, 2007 TN200700100 288 North 1460 West • PO Box 144880 • Salt Lake City, UT 84114-4880 • phone (801) 538-6170 • fax (801) 538-6715 T.D.D. (801) 536-4414 • www.deq.utah.gov State of Utah Department of Environmental Quality Dianne R. Nielson, Ph.D. Executive Director DIVISION OF SOLID AND HAZARDOUS WASTE Dennis R. Downs Director JON M. HUNTSMAN, JR. Governor GARY HERBERT Lieutenant Governor