Loading...
HomeMy WebLinkAboutDSHW-1997-001439 - 0901a0688013dc3aQUALITY HAZARDOUS WASTE Michael O. Leavilt Governor Dianne R. Nielson, Ph.D. Executive Director Denni.s R. Downs Director g if'"1 .; ;: A Vi i. '^ i ^' ^:. I ift i DEPARTMENT OF ENVIROr^MENTAL I DIVISION OF SOLID AND i 288 North 1460 West I P.O. Box 144880 % Salt Lake Cily, Utah 84114-4880 (801) 538-6170 Voice ii; (801) 538-6715 Fax t (801) 536-4414 T.D.D. July 11, 1997 Mr. Joe D. Thompson, Director Environmental, Fire and Security Thiokol Corporation P.O. Box 689 Brigham City, UT 84302-0689 RE: Approval of Request for Designation Corrective Action Managenient Unit hit m. 97. oo93~3 S6/UT CBkT lf=ie{) Dear Mr. Thompson: On July 31, 1996, Thiokol Corporation submitlted include a Corrective Action Management Unit (CfAMU) for the remediation of soils at Solid Waste modification was required in order to incorporate 264.552 (g)]. The second public comment perio j June 20, 1997. No comments on Thiokol's proposal comment period. The Division has determined requirements for the designation ofa CAMU (4C is hereby approved. ofa a request to modify its Post-Closure Permit to The designation of a CAMU was requested Ivlanagement Units #367 and #425. The permit the CAMU into the existing permit [40 CFR associated with the permit modification ended on were received from the public during either that the plan submitted by Thiokol meets the CFR 264.552). The requested permit modification Enclosed are the revised pages of Module VH ofthe Post-Closure Permit. Please insert these pages into your copy ofthe permit. Module VU was modified by adding a new condition (Vn.D.6.f), and inserting an appendix (Appendix C) at the end of the module. The new permit condition was added to allow for the incorporation of voluntary cleanup actions, or interim measures, into the permit. Voluntary cleanup actions that have been approved will be incorporated into the permit by reference in Appendix C. It i.s anticipated that the corrective action will be and that a corrective action report will be submitted conducted in accordance with the approved plan, at the conclusion of remedial activities at the Mr. Joe D. Thompson July 11, 1997 Page 2 site. In addition, it is understood that Thiokol Will give a 10-day advance notice of any construction, sampling or remediation activities. If you have any questions regarding this letter, please contact Jeff Vandel at 538-9413. Sincerely, T)ennis R. Downs, Executive Secretary Utah Solid and Hazardous Waste Control BoaJ-d DRDUCV\ts c: John C. Bailey,M.D.,M.S.P.H., Hlth Otficer/Dept.Director.Bear River District Hlth Dept Mindy Mohr, U.S. E.P.A., Region Viq fA,,,\jvandel\wp\thiokol\camu,apr file to: Thiokol CORRECTIVE ACTION FOR SCHEDUL VILA. VIl.A.l vri.B. VII.B.l. VII.B.2. vn.B.3. VII.B.4. VII.B.S. VII.B.6. MODULE VII SOLID WASTE MANAGEMENT UNTTS E OF COMPLIANCE SOLID WASTE MANACJEMENT UNITS The Permittee shall condilct Module VII, for each Solid RCRA Facility Assessment The Executive Secretary those listed in Thiokol's R315-3-15., based on adclitional Executive Secretary, the STANDARD CONDITIONS Failure to submit the infoi submitted information, is R315-3-16. The Permittee shall sign and subinissions to the Execulive The Permittee shall subinit notification, or other subpiiss Upon written approval to by the conditions in Modiile permit in accordance with plans and schedules shall Upon written approval frci the Permittee shall receive date(s) for the subiTuttal(s Thiokol Corporation PC Pennit Final: Seplember 1. 1992 Last Revision: July?. 1997 a corrective action investigation, in accordance with Waste Management Unit (SWMU) specified in Thiokol (RFA) Summary List (Attachment 5). may append additional Solid Waste Management Units to Summary List (AttachiTient 5), in accordance with information received by the Permittee, the ministrator, or any other knowledgeable source. RFA Ad mation required by Module VII or falsification of any ^rounds for teriTiination of this permit in accordance with certify all plans, reports, notifications, and other Secretary in accordance with Condition I.G. a minimum of three (3) copies ofeach plan, report, ions within Module VII, to the Executive Secretary. the Executive Secretary, all plans and .schedules required VII, shall be incorporated into Module Vll of this Condition VII.I. Ariy noncompliance with such approved 3e deemed noncompliance with this periTiit. m the Executive Secretary in accordance Condition VII.I., extension(s) ofthe specified compliance .schedule due ) required by Module VII. If the Executive Secretar} Module VII, or changes tp Executive Secretary shall determines that further actions beyond those provided by that which are stated herein, are warranted, the modify Module VII in accordance with Condition VII.1. Mod ile VII page VII.B.7. VII.C. VILC.l. VII.C. I.a. Vll.C.l.a.i. VIl.C.l.a.ii. VII.C. l.a. iii. Vll.C.l.a.iv. Vll.C.l.a.v. All raw data, such as data, and other supporting undertaken pursuant to Corporation, Box Elder labolratory reports, drilling logs, bench-scale or pilot-scale information gathered or generated during activities Cbnditions in Module VII shall be maintained at the Thiokol Ctounty, Utah during the effective term ofthis permit. RCRA FACILITY INVESTIGATION uct The Permittee shall cond and extent of known and waste constituent(s) from gather data to support the the RCRA Facility Investig Appendix A. a RCRA Facility Investigation to determine the nature :;uspected releases of hazardous wastes and/or hazardous each Solid Waste Management Unit at the Facility and to Corrective Measures Study. The Permittee shall conduct ation in accordance with the requirements specified in The Permittee shall Report, as specified in which a release of hazard documented. prepare and submit the RCRA Facility Investigation, Task I Appendix A, for each Solid Waste Management Unit in us waste or hazardous waste constituent(s) has not been The Permittee shall condijct with Appendix A, Task had a release of hazardou$ The Permittee shall evaluate Solid Waste Management RCRA Facility Investigatip Based on the data collected Pennittee shall prioritize additional investigation pursuant Solid Waste Management Based on the classificatio permit condition VII.C. I. recommend an alternate investigation of any Solid human health or the environment The Executive Secretary pursuant to permit cond under the RCRA Facility Thiokol Corporation PC Permit Final: September I, 1992 Last Revision: July?, 199? a RCRA Facility Investigation-Phase I, in accordance D, for each Solid Wa.ste Management Unit which has not waste. the RCRA FacUity Investigation-Phase 1 and identify Units that require additional investigation under the n Phase II (Task 11 and Task III). in the RCRA Facility Investigation-Phase 1, the ^ach Solid Waste Management Unit identified for to permit condition VIl.C.l.a.ii., according to the Unit's threat to human health or the environment. ofthe Solid Waste Management Unit(s), pursuant to .iii., the Permittee shall identify a need, ifapplicable, and RCRA Facility Investigation schedule(s) for the additional Waste Management Units' potential or irruTiinent threat to may modify the RCRA Facihty Investigation schedules, itions VII.1.1, and VII.1.3., to allow additional investigations nvestigation-Phase II (Task II and Task III) to be Module VII - page 2 VII.C. l.a.vi. VII.C. l.b. VII.C. I.e. VILC.l.d. VII.D. VII.D. 1. VII.D.2. V1I.D.3. VII.D.3.a. conducted according to the accordance with Conditio:is The Permittee shall prepaie Investigation-Phase I in the The Permittee shaU Management Units co accordance with the condujct the RCRA FacUity Investigation for the SoUd Waste ntaiied in Thiokol's RFA Summary List (Attachment 5), in schequle specified in Table One. -Phase The Permittee shaU FacUity Investigation SoUd Waste Management (Attachment 5), which has constituent(s). The RCRA with the Task 1 Report condulct a RCRA FaciUty Investigation, excludmg the RCRA I requirements, as specified m Appendix A, for each Unit contained ui Thiokol's RFA Summary List had a release of hazardous waste or hazardous waste FacUity Investigation shaU be conducted concurrently specified m Condition VII.C. I .a. The RCRA FacUity Investlgat be modified m accordance any cr If, during the course of conditions of Module VII deterrrdnes that a release waste constituent(s) from health and the environmeii(t interiiTi measures. The Executive Secretary perform the uiterim measures with Condition VII.D.3. ' Measures Plan alternative written notification. nn The Permittee shaU perfo accordance with the alteriiiative VlI.D.3.b. The Executive Secretary measures. The Executive written notification specifijed Thiokol Corporation PC Permil Final: September 1. 1992 La.";t Revision: July?. 199? prioritization ofthe SoUd Waste Management Units, in VII.C.l.a.Ui. and Vll.C.l.a.iv. and submit the results of the RCRA FacUity Task I Report. ion compUance schedules specified in Table One, shall with Condition VILL INTERIM MEASURES /\ND VOLUNTARY CLEAN UP ACTIONS activity initiated in compUance with the permit ofthis periTiit, the Executive Secretary or the Permittee potential release of hazardous waste and/or hazardous a SoUd Wa.ste Management Unit poses a threat to human , the Perinittee may be required to perform specific shaU notify the PeriTiittee m writmg of the requUement to specified ui the Interim Measures Plan, in accordance he Permittee shaU comply with the specified InterUn (Conditions VII.D.3.a. or VII.D.3.b.) designated in the the requirements ofthe Interim Measures Plan in spectfied ui either Condition VII.D.3.a. or shaU determine specific actions to implement the interim Secretary shaU provide an Interun Measures Plan with the Ul Condition VII.D.2. Or; Module VII - page 3 VII.D.3.b. VII.D.4. VII.D.5. VII.D.5.a. VII. D.S. b. VII.D.S.c. VILD.S.d. VII.D.S.e. VIl.D.S.f VII.D.S.g. VII.D.S.h. VII.D.S.i. VII.D.6. VII.D.6.a. WUhin thirty (30) calendai- Interim Measures Plan as Interim Measures Plan to days of receivuig the written notification requirmg the :;pecified in VII.D.2., the Permittee shaU provide, the ;he Executive Secretary for approval. The Permittee may mitiate VII.D.S and VII.D.6. In determining whether an (or the Permittee m the cape foUowing: Tune requked to develop Actual and potential exposure Actual and potential ecosystems; The potential for further d Presence of hazardous wa^te Presence and concentratio constituent(s) in soUs that water. Risks of fire, explosion, oi If the Executive Secretary Permittee shaU submit for Thiokol Corporation PC Permit Final: Seplember 1. 1992 Last Revision: July?, 199? voluntary clean up actions ui accordance with Conditions mterim measure(s) is required, the Executive Secretary of a voluntary cleanup action) shaU consider the md implement a final remedy; of human and environmental receptors; contalmination of drinking water suppUes and sensitive gradation of the medium absent of uiterim measures; Ul containers that may pose a threat of release; 1 of hazardous waste including hazardous waste have the potential to migrate to groundwater or surface Weather conditions that rnay affect the current levels of contamination; accident; and Other situations that may ])ose threats to human health and the environment. determines the need for an interim measure(s), the approval by the Executive Secretary an Interun Measures Plan. The Interim Measures Plan or a voluntary cleanup plan shaU identify specUic action(s) to be taken to unjplement the interun measures and a schedule for measures. The Interun Measures Plan or the voluntary clean up plan shaU be incoj-porated into this permit. The Interim Measures Plan or a voluntary clean up plan shaU include, but not be Umited to the foUowuig: Objectives of the interim potential threat to human measures shaU mclude how the measure is mitigating a health (health and safety requirements) and the Module VII - page 4 VIl.D.6.b. Vn.D.6.c. VILD.6.d. VII.D.6.e. VII.D.6.f. vn.E. VlI.E.l. VII.E.2. VlI.E.l. VlI.E.3.a. VII.E.3.b. Thiokol Corporation PC Permil Final: September 1. 1992 Last Revision: July?. 199? environment and/or is corsistent with and integrated into any long term solution at Thiokol; Data coUection quaUty asiiurance and data management mformation; Design plans and specifications, construction requirements, operation and mauitenance requirements, project schedules, and final design documents; Construction quaUty assurance requkements, and documentation Schedule for submittal of workplan, final design documents measures report. the foUowmg reports; progress reports, mterim measures , draft uiterim measures report, and final uiterun Voluntary Cleanup Action or provided by the Executive reference ui Appendix C Interim Measure shaU incl|ude Management UnU(s), or plan was approved, or pre Plans or Interun Measure Plans that have been approved Secretary, shaU be Uicorporated mto this pennit by this module. The reference to the Cleanup Action or the date and title ofthe plan, the SoUd Waste ajssociated release covered by the plan, and the date the vided by the Executive Secretary. NOTIFICATION REOUIREMENTS FOR AND ASSESSMENT OF NEWLY-IDENTIFIED SOLID WASTE MANAGEMENT UNITS The Permittee shaU notify SoUd Waste Management identified bi Condition VL SoUd Waste Management new SoUd Waste Managefnent wastes at the site. Within one hundred fifty ( Management Unit(s), the Assessment Plan to the E^iecutive Any groundwater, surface and analysis data needed objectives, mspection activities, sampling ; and the Executive Secretary m writing, of any newly identUned Unit(s) after the effective date of this permit, not .A., withui thUty (30) calendar days of discovering the Unit(s). The notification shaU include the location ofthe Unit(s) and information on the suspected or known 150) calendar days foUowing discovery ofthe SoUd Waste i'ermittee shaU subnnit a SoUd Waste Management Unit Secretary. The SoUd Waste Manageilnent Unit As.sessment Plan shaU include: A description of past and bresent operations at the unit(s); and to water, soU (surface or subsurface strata), or aU sampUng determine whether a release of hazardous waste and/or Module VII - page 5 VII.E.4. VII.E.4.a. VII.E.4.b. VI1.E.4.C. VII.E.5. VII.E.6. V11.E.7. VII.E.8. VII.E.S.a. Thiokol Corporation PC Permit Fhal: Seplember I, 1992 Last Revision: July?, 1997 hazardous waste constituent(s) from such unit(s) is likely to occur. The SoUd Waste Management Assessment ?lan shaU demonstrate that the sampling and analysis program, if appUcable, is capable of yielding representative samples and must mclude parameters sufficient to identUy migration of hazardous waste and/or hazardous waste constitue|nt(s) from the newly discovered SoUd Waste Management Units to the envkonment. The SoUd Waste Management Unit Assessment Plan shaU be evaluated by the Executive Secretary and; The Permittee shaU receive SoUd Waste Management The Permittee shaU receive Waste Management Unit specify a due date for su written approval from the Executive Secretary for the Unit Assessment Plan; or written notice from the Executive Secretary ofthe SoUd Assessment Plan's deficiencies and the written notice wUl bnjiittal of a revised assessment plan; or The Permittee shaU receive written notice from the Executive Secretary of the revisions incorporated by the Executive Secretary m the SoUd Waste Management Unit Assessment Plan. The revised assessment plan shaU become the approved SoUd Waste Management Assessment Plan. The SoUd Waste Managenient Secretary specified in Cond Ul accordance with Conditio approval of the permit moqificatio The Permittee shaU implentent Plan within thirty (30) cale modification approval specified schedule for a SoUd Waste Unit Assessment Plan, as approved by the Executive ition VII.E.4., shaU be uicorporated withm Module VII n VILL The Permittee shaU be notified in writing ofthe n. the approved SoUd Waste Management Assessment idar days of receiving written notice ofthe permit in CondUion VII.E.7. The SoUd Waste Management Unit Assessment Plan shaU contain a remediation Management Unit Assessment Report mcluding the date the Report wUl be submitted to the Executive Secretary. The SoUd Waste Management Unit As.sessment Report shaU describe aU resuks obtauied from the implementation ofthe approved SoUd Waste Management Unit Assessment Plan. For each newly Usted SoUd Waste Management Unit, the Report shaU provide: The SoUd Waste Managembnt Unit location, identified on a map; Moduk VII - page 6 VII.E.8.b. VILE.8.C. VII.E.8.d. VI1.E.9. VII.E. 10. VU.F VIl.F. 1. V1I.F.2. VII.F.3. The type and function of :he unit, including general dimensions and a structural description; The period durkig which i he unit was operated; and ag;d A Ust of aU wastes man sampling and analysis useji and/or hazardous waste occur from the unit. CD Based on the results of S( Executive Secretary shaU urUt(s) mcluded ui the Soljid Secretary determines that shaU requke the Permittee be reviewed for approval under Condkion VII.C. Ud Waste Management Unit Assessment Report, the determine the need for further uivestigations at specific Waste Management Unk Assessment. If the Executive such investigations are needed, the Executive Secretary to prepare a plan for such uivestigations. This plan shaU is part ofthe RCRA FaciUty Investigation Workplan Within fifteen (15) days o Secretary in writing, of ar(y constkuent(s) discovered investigation, envkonmental RCRA FaciUty Investigatio newly identified units. Th the new releases. A plan of the RCRA FaciUty Inve DETERMINATION OF The Permittee may petitio Action for SoUd Waste accordance with R315-3 The Corrective Action foi termination petition shaU Investigation that demonsfrates hazardous waste constituen envkonment, from SoUd Elder County, Utah. A determination of no further not preclude the Executivii Thiokol Corporation PC PermH Final: September 1. 1992 Last Revision: July?, 199? at the SoUd Waste Management Unit and results of aU to determine whether releases of hazardous wastes nstituent(s) have occurred, are occurring, or are likely to F discovery, the Permittee shaU notify the Executive release(s) of hazardous waste and/or hazardous waste durkig the course of groundwater monitorkig, field audituig, or other activities undertaken during the n. Such releases may be from akeady documented or e Executive Secretary shaU requke further mvestigation of 'or such mvestigation wiU be reviewed for approval as part stigation Workplan under Condition VII.C. NO FURTHER ACTIONS n the Executive Secretary to terminate the Corrective Management Units Schedule of CompUance (Module VII) in .5. SoUd Waste Management Units, Schedule of CompUance (j;ontam information based on the RCRA FaciUty that there are no releases of hazardous waste or t(s), that pose a threat to human health or the Wa.ste Management Units at the Thiokol Corporation, Box Module VII - page 7 action, in accordance with Condition VII.F. 1., shaU Secretary from requking contmued or periodic VII.F.4. vn.G. VIl.G.l. VII.G.2. VII.G.3. VII.G.4. VII.G.5. VII.G.S.a. monitoring of ak, soU, g ckcumstances kidicate Uicluduig hazardous wast^ that Thiokol Corporation PC Permil Final: September 1, 1992 Last Revision: July?. 1997 rpundwater, or surface water when site-specific there is a potential for releases of hazardous waste constituent(s) to occur. A determination of no further action, m accordance with Condition VII.F. 1., shaU not preclude the Executive Secretary from requkuig further investigations, studies, or remediation at a later date if new mformation or subsequent analysis kidicates a release or potential ofa release from a SoUd Waste Management Unit at the Thiokol Corporation, Box Elder C ounty, Utah. In such a case, the Executive Secretary shaU initiate either a modification to the Corrective Action Schedule of CompUance (Module VII) kl accordance wkh R315-3-15. to rescuid the determkiation of VILF.I. CORRECTIVE MEASl^RES STUDY AND IMPLEMENTATION Based on the results of the; RCRA FaciUty Investigation, the Permittee shaU describe the alternatives for remediation of the contamination, treatment and/or other remediation of the contamination. The Permittee shaU conduct the Corrective Measures Study ki accordance with the requkements specified in Appendix B (Task 1, IL in, and IV). Upon the Executive pursuant to Condition VII Secretary for approval, th^ specified in Appendix B, Upon the Executive Secre|;ary Implementation Program conduct the Corrective M^as Appendix B, Task IV [the construction of the correctlive Secrejlary's approval ofthe Corrective Measures Study, G.L, the Permittee shaU submit, to the Executive Corrective Measures Implementation Program Plan, IV.A. Task 's approval of the Corrective Measures Iflan, pursuant to Condition VII.G.2., the Perinittee .shaU iures Implementation Program Plan specified in corrective measures design (Task IV.B.) and measures (Task IV.C.)]. The Permittee shaU conduitt Corrective Measures lmpk;mentation VIl.G.l. and VILG.2., accbrdki The Permittee shaU submit schedule for conductmg tht requked by Condition VII The Permittee shaU provide; compUance schedule based Modu the Corrective Measures Study and prepare the Program Plan, as specified ki Conditions g to the schedule specified m Table Two. to the Executive Secretary for approval a compUance Corrective Measures Implementation Program Plan, as G.3. a justkication for each compUance date m the on the complexity ofthe Corrective Measures e VII - page 8 VII.G.S.b. VII.G.5.C. VII.G.6. VII.G.7. VILH. Vll.H.l. VILH.2. Vn.H.2.a. VII.H.2.b. VILH.2.C. VIl.H.2.d. VII.H.3. Implementation Program requkements. Thiokol Corporation PC Permit Final: September 1. 1992 Lasl Revision: July 7, 1997 'Ian and reasonable contract and administrative time On or before the compUance date for submittal of the draft Corrective Measures Implementation Program Plan specified in Table Two, the Permittee shaU submit the ubsequent justification, pursuant to permit condition Secretary for approval. compUance schedule and s VII.G.5., to the Executive Upon the Executive Secre :ary Implementation Program Plan be incorporated mto this p jrmit Implementation Program Plan 's approval of the Corrective Measures compUance schedule, the compUance schedule shaU concurrently with the final Corrective Measures m accordance with R315-3-15. The Permittee shaU conduct the Corrective Measures Implementation Program Plan, specified in Condition VI1.G.3., in accordance wkh Condition VII.G.S. The Corrective Measures Plan compUance schedules with Condition VILL 5itudy and Corrective Measures Implementation Program specified in Table Two, shaU be modified ki accordance REPORTING REOUIREMENTS The Permittee shaU submit reports of aU activities conducted Permittee shaU kUtiaUy subinit (90) calendar days after the The semi-annual progress reports shaU contam: A description of the work ci to the Executive Secretary wrkten semi-annual progress pursuant to the Condkions of Module VII. The the semi-annual progress reports no later than nkiety effective date of this permit. ompleted; Summaries of aU fmdkigs and aU raw data; Summaries of aU problems taken or to be taken to recti (mcountered durkig the reporting period and actions ify problems; and Projected work for the next The Permittee shaU mamtain Thiokol Corporation, Box permit. The Permittee shaU Executive Secretary upon reportmg period. copies of other reports, driUing logs, and data at the ^Ider County, Utah durkig the effective period of this provide copies ofthe said reports, logs, and data to the request. Module VII - page 9 VII.H.4. vn.i. VILLI. VII.I.l.a. VILL l.b. VILL I.e. 'VILL l.d. VILL I.e. VILL l.f VII.1.2. Vll.I.ia. Thiokol Corporation PC Permit Final: September 1. 1992 Last Revision: July?. 199? As spectfied under condition VII.B.S., the Executive Secretary may requke the Permittee to conduct new or more extensive assessments, uivestigations, or studies, as needed, based on information provided in these progress reports or other supportmg mformation. MODIFICATION OF TIHE CORRECTIVE ACTION SCHEDULE OF COMPLIANCE (MODULE VH) A request for modtficatior s conditions in Module VII approval, ki accordance Action Schedule of Comp of the final compUance dates pursuant to the permit shaU be submitted to the Executive Secretary for R315-3-15. Fkial compUance dates m the Corrective iance mclude: with The compUance date(s), as spectfied m Table One, for submittal of the RCRA FacUity Investigation Fmal The compUance date(s). Measures Study Report, ir spe The compUance date(s), as Corrective Measures Imp It VII.G.2.; Report (Appendbc A, Task IV); ckied m Table One, for submittal of the Corrective accordance with Condition I.G.I.; spectfied in Table Two, for submittal of the fmal ^mentation Program Plan, ki accordance with Condition Once estabUshed ki accordance with Condition VII.G.S., the compUance date(s) for submittal ofthe as buUt corrective measures fkial design and construction plans, ki accordance with Condition CompUance dates specified reports; and CompUance dates for semi VII.G.3.; in Table Two, for Unplementing the approved plans and annual submittal of progress reports. Pursuant to R315-3-IS., th; compUance schedules specified in Tables One and Two, shaU be modified tf the Exe;;utive Secretary determmes that good cause exists. FaUure to obtain adequate Implementation Program P good cause for modificatioi in Condition VII.1.2., only i funds to conduct the Corrective Measures an, pursuant to Condition VII.G.3., shaU be considered ofthe compUance schedule(s). Table Two, as specified iin accordance wkh: Module VII - page 10 VII.1.2.a.i. VII.L2.a.U. VII.I.2.a.m. VII.1.2.a.iv. VI1.1.2.b. V11.1.2.C. Vll.1.3. The Permittee's best effor: implementation of the requu-ements pursuant to the compUanqe Thiokol Corporation PC Permil Final: September 1, 1992 Last Revision: July?, 199? shaU be used to secure aU funds that may be requked for specified in Condition VII.G.3. ofthis permit schedule ki Table Two; The Permittee shaU seek, Dy the most expedkious means possible, appropriations funding to achieve the compUance schedule ki Table Two, If the Executive Secretary Conditions under VII.1.2. schedule. For any approved Two shaU be modified to tkneframes only for the after the end of such tkneframes specified prior FaUure to obtam adequate way release the Permittee Measures Implementation permit or RCRA. determines that good cause exists m accordance with the ., the Executive Secretary shaU modify the compUance modification, the compUance schedule specified m Tables One and provide reUef from the original compUance schedule subsequent calendar year. AU successive compUance dates calendar year shaU be modified to reflect the original to the modification request under Condition VII.1.2.a. funds or appropriations from Congress shaU not in any irom U's obUgation to comply with the Corrective (Condition Vn.G.3.) or any other requirement ofthis If adequate funds for Corrtetive Executive Secretary and the deemed necessary to protect judicial recourse or terminitio The Permittee shaU subinit dates that do not affect the approval. If the Executive modifications. Tables One Measures Implementation are not avaUable, the Control Board reserve the right to pursue any actions human health and the envkonment, not excluding n of this permit. a request for modifications of the kiterkn compUance final compUance dates to the Executive Secretary for Secretary approves the kiterkn compUance date and Two shaU incorporate the modified compUance dates as approved and such change shaU not be considered a permit modification under R315-3-IS. Moduk; VII - page Thiokol Corporation PC Pennit Final: Seplember 1. 1992 Lasl Revision: July 7. 1997 AP]^END1X C VOLUNTARY CLEANUP ACTIONS / INTERIM MEASURES Permit condition VII.D.6. requkes that Voluntary Cleanup Actions or Interun Measures that have been approved or provided by the Executive Secretary for the cleanup of SoUd Waste Management Units, or associated releases, be uicorporated mto this permit. The Cleanup Action Plans or Interun Measure Plans, that are mcluded by reference m this appendix, were incorporated into the Post-Closure Permit on the date(s) mdicated below. The SoUd Waste Management Unit(s), or associated releases, covered by the Voluntary Cleanup Action or Interun Measure are also mdicated below. The Cleanup Action or Interkn Measure objectives, design, construction, schedule, and reportmg requkements shaU be conducted in accordance wkh the approved plan. 1. Voluntary Cleanup Action: SWMUs Covered: Date Approved: Request for Corrective for Remediation of M- .luly 1996 Action Management Unit (CAMU) Designation 39, and M-636 Solid Waste Management Units - # 425 at M-39 and Investigation - Pha Units-April. J 993 # 367 at M-636 (as identkied ki RCRA Facility se I Workplan, Volume 3, Solid Waste Management Module VII - page 12