July 11, 1997
Mr. Joe D. Thompson, Director
Environmental, Fire and Security
Thiokol Corporation
P.O. Box 689
Brigham City, UT 84302-0689
RE: Approval of Request for Designation
Corrective Action Managenient Unit
hit m.
97. oo93~3
S6/UT CBkT lf=ie{)
Dear Mr. Thompson:
On July 31, 1996, Thiokol Corporation submitlted
include a Corrective Action Management Unit (CfAMU)
for the remediation of soils at Solid Waste
modification was required in order to incorporate
264.552 (g)]. The second public comment perio j
June 20, 1997. No comments on Thiokol's proposal
comment period. The Division has determined
requirements for the designation ofa CAMU (4C
is hereby approved.
ofa
a request to modify its Post-Closure Permit to
The designation of a CAMU was requested
Ivlanagement Units #367 and #425. The permit
the CAMU into the existing permit [40 CFR
associated with the permit modification ended on
were received from the public during either
that the plan submitted by Thiokol meets the
CFR 264.552). The requested permit modification
Enclosed are the revised pages of Module VH ofthe Post-Closure Permit. Please insert these pages
into your copy ofthe permit. Module VU was modified by adding a new condition (Vn.D.6.f), and
inserting an appendix (Appendix C) at the end of the module. The new permit condition was added
to allow for the incorporation of voluntary cleanup actions, or interim measures, into the permit.
Voluntary cleanup actions that have been approved will be incorporated into the permit by reference
in Appendix C.
It i.s anticipated that the corrective action will be
and that a corrective action report will be submitted
conducted in accordance with the approved plan,
at the conclusion of remedial activities at the
Mr. Joe D. Thompson
July 11, 1997
Page 2
site. In addition, it is understood that Thiokol Will give a 10-day advance notice of any construction,
sampling or remediation activities.
If you have any questions regarding this letter, please contact Jeff Vandel at 538-9413.
Sincerely,
T)ennis R. Downs, Executive Secretary
Utah Solid and Hazardous Waste Control BoaJ-d
DRDUCV\ts
c: John C. Bailey,M.D.,M.S.P.H., Hlth Otficer/Dept.Director.Bear River District Hlth Dept
Mindy Mohr, U.S. E.P.A., Region Viq
fA,,,\jvandel\wp\thiokol\camu,apr
file to: Thiokol
CORRECTIVE ACTION FOR
SCHEDUL
VILA.
VIl.A.l
vri.B.
VII.B.l.
VII.B.2.
vn.B.3.
VII.B.4.
VII.B.S.
VII.B.6.
MODULE VII
SOLID WASTE MANAGEMENT UNTTS
E OF COMPLIANCE
SOLID WASTE MANACJEMENT UNITS
The Permittee shall condilct
Module VII, for each Solid
RCRA Facility Assessment
The Executive Secretary
those listed in Thiokol's
R315-3-15., based on adclitional
Executive Secretary, the
STANDARD CONDITIONS
Failure to submit the infoi
submitted information, is
R315-3-16.
The Permittee shall sign and
subinissions to the Execulive
The Permittee shall subinit
notification, or other subpiiss
Upon written approval to
by the conditions in Modiile
permit in accordance with
plans and schedules shall
Upon written approval frci
the Permittee shall receive
date(s) for the subiTuttal(s
Thiokol Corporation
PC Pennit
Final: Seplember 1. 1992
Last Revision:
July?. 1997
a corrective action investigation, in accordance with
Waste Management Unit (SWMU) specified in Thiokol
(RFA) Summary List (Attachment 5).
may append additional Solid Waste Management Units to
Summary List (AttachiTient 5), in accordance with
information received by the Permittee, the
ministrator, or any other knowledgeable source.
RFA
Ad
mation required by Module VII or falsification of any
^rounds for teriTiination of this permit in accordance with
certify all plans, reports, notifications, and other
Secretary in accordance with Condition I.G.
a minimum of three (3) copies ofeach plan, report,
ions within Module VII, to the Executive Secretary.
the Executive Secretary, all plans and .schedules required
VII, shall be incorporated into Module Vll of this
Condition VII.I. Ariy noncompliance with such approved
3e deemed noncompliance with this periTiit.
m the Executive Secretary in accordance Condition VII.I.,
extension(s) ofthe specified compliance .schedule due
) required by Module VII.
If the Executive Secretar}
Module VII, or changes tp
Executive Secretary shall
determines that further actions beyond those provided by
that which are stated herein, are warranted, the
modify Module VII in accordance with Condition VII.1.
Mod ile VII page
VII.B.7.
VII.C.
VILC.l.
VII.C. I.a.
Vll.C.l.a.i.
VIl.C.l.a.ii.
VII.C. l.a. iii.
Vll.C.l.a.iv.
Vll.C.l.a.v.
All raw data, such as
data, and other supporting
undertaken pursuant to
Corporation, Box Elder
labolratory reports, drilling logs, bench-scale or pilot-scale
information gathered or generated during activities
Cbnditions in Module VII shall be maintained at the Thiokol
Ctounty, Utah during the effective term ofthis permit.
RCRA FACILITY INVESTIGATION
uct The Permittee shall cond
and extent of known and
waste constituent(s) from
gather data to support the
the RCRA Facility Investig
Appendix A.
a RCRA Facility Investigation to determine the nature
:;uspected releases of hazardous wastes and/or hazardous
each Solid Waste Management Unit at the Facility and to
Corrective Measures Study. The Permittee shall conduct
ation in accordance with the requirements specified in
The Permittee shall
Report, as specified in
which a release of hazard
documented.
prepare and submit the RCRA Facility Investigation, Task I
Appendix A, for each Solid Waste Management Unit in
us waste or hazardous waste constituent(s) has not been
The Permittee shall condijct
with Appendix A, Task
had a release of hazardou$
The Permittee shall evaluate
Solid Waste Management
RCRA Facility Investigatip
Based on the data collected
Pennittee shall prioritize
additional investigation pursuant
Solid Waste Management
Based on the classificatio
permit condition VII.C. I.
recommend an alternate
investigation of any Solid
human health or the environment
The Executive Secretary
pursuant to permit cond
under the RCRA Facility
Thiokol Corporation
PC Permit
Final: September I, 1992
Last Revision:
July?, 199?
a RCRA Facility Investigation-Phase I, in accordance
D, for each Solid Wa.ste Management Unit which has not
waste.
the RCRA FacUity Investigation-Phase 1 and identify
Units that require additional investigation under the
n Phase II (Task 11 and Task III).
in the RCRA Facility Investigation-Phase 1, the
^ach Solid Waste Management Unit identified for
to permit condition VIl.C.l.a.ii., according to the
Unit's threat to human health or the environment.
ofthe Solid Waste Management Unit(s), pursuant to
.iii., the Permittee shall identify a need, ifapplicable, and
RCRA Facility Investigation schedule(s) for the additional
Waste Management Units' potential or irruTiinent threat to
may modify the RCRA Facihty Investigation schedules,
itions VII.1.1, and VII.1.3., to allow additional investigations
nvestigation-Phase II (Task II and Task III) to be
Module VII - page 2
VII.C. l.a.vi.
VII.C. l.b.
VII.C. I.e.
VILC.l.d.
VII.D.
VII.D. 1.
VII.D.2.
V1I.D.3.
VII.D.3.a.
conducted according to the
accordance with Conditio:is
The Permittee shall prepaie
Investigation-Phase I in the
The Permittee shaU
Management Units co
accordance with the
condujct the RCRA FacUity Investigation for the SoUd Waste
ntaiied in Thiokol's RFA Summary List (Attachment 5), in
schequle specified in Table One.
-Phase
The Permittee shaU
FacUity Investigation
SoUd Waste Management
(Attachment 5), which has
constituent(s). The RCRA
with the Task 1 Report
condulct a RCRA FaciUty Investigation, excludmg the RCRA
I requirements, as specified m Appendix A, for each
Unit contained ui Thiokol's RFA Summary List
had a release of hazardous waste or hazardous waste
FacUity Investigation shaU be conducted concurrently
specified m Condition VII.C. I .a.
The RCRA FacUity Investlgat
be modified m accordance
any
cr
If, during the course of
conditions of Module VII
deterrrdnes that a release
waste constituent(s) from
health and the environmeii(t
interiiTi measures.
The Executive Secretary
perform the uiterim measures
with Condition VII.D.3. '
Measures Plan alternative
written notification.
nn The Permittee shaU perfo
accordance with the alteriiiative
VlI.D.3.b.
The Executive Secretary
measures. The Executive
written notification specifijed
Thiokol Corporation
PC Permil
Final: September 1. 1992
La.";t Revision:
July?. 199?
prioritization ofthe SoUd Waste Management Units, in
VII.C.l.a.Ui. and Vll.C.l.a.iv.
and submit the results of the RCRA FacUity
Task I Report.
ion compUance schedules specified in Table One, shall
with Condition VILL
INTERIM MEASURES /\ND VOLUNTARY CLEAN UP ACTIONS
activity initiated in compUance with the permit
ofthis periTiit, the Executive Secretary or the Permittee
potential release of hazardous waste and/or hazardous
a SoUd Wa.ste Management Unit poses a threat to human
, the Perinittee may be required to perform specific
shaU notify the PeriTiittee m writmg of the requUement to
specified ui the Interim Measures Plan, in accordance
he Permittee shaU comply with the specified InterUn
(Conditions VII.D.3.a. or VII.D.3.b.) designated in the
the requirements ofthe Interim Measures Plan in
spectfied ui either Condition VII.D.3.a. or
shaU determine specific actions to implement the interim
Secretary shaU provide an Interun Measures Plan with the
Ul Condition VII.D.2. Or;
Module VII - page 3
VII.D.3.b.
VII.D.4.
VII.D.5.
VII.D.5.a.
VII. D.S. b.
VII.D.S.c.
VILD.S.d.
VII.D.S.e.
VIl.D.S.f
VII.D.S.g.
VII.D.S.h.
VII.D.S.i.
VII.D.6.
VII.D.6.a.
WUhin thirty (30) calendai-
Interim Measures Plan as
Interim Measures Plan to
days of receivuig the written notification requirmg the
:;pecified in VII.D.2., the Permittee shaU provide, the
;he Executive Secretary for approval.
The Permittee may mitiate
VII.D.S and VII.D.6.
In determining whether an
(or the Permittee m the cape
foUowing:
Tune requked to develop
Actual and potential exposure
Actual and potential
ecosystems;
The potential for further d
Presence of hazardous wa^te
Presence and concentratio
constituent(s) in soUs that
water.
Risks of fire, explosion, oi
If the Executive Secretary
Permittee shaU submit for
Thiokol Corporation
PC Permit
Final: Seplember 1. 1992
Last Revision:
July?, 199?
voluntary clean up actions ui accordance with Conditions
mterim measure(s) is required, the Executive Secretary
of a voluntary cleanup action) shaU consider the
md implement a final remedy;
of human and environmental receptors;
contalmination of drinking water suppUes and sensitive
gradation of the medium absent of uiterim measures;
Ul containers that may pose a threat of release;
1 of hazardous waste including hazardous waste
have the potential to migrate to groundwater or surface
Weather conditions that rnay affect the current levels of contamination;
accident; and
Other situations that may ])ose threats to human health and the environment.
determines the need for an interim measure(s), the
approval by the Executive Secretary an Interun Measures
Plan. The Interim Measures Plan or a voluntary cleanup plan shaU identify specUic
action(s) to be taken to unjplement the interun measures and a schedule for
measures. The Interun Measures Plan or the voluntary
clean up plan shaU be incoj-porated into this permit. The Interim Measures Plan or a
voluntary clean up plan shaU include, but not be Umited to the foUowuig:
Objectives of the interim
potential threat to human
measures shaU mclude how the measure is mitigating a
health (health and safety requirements) and the
Module VII - page 4
VIl.D.6.b.
Vn.D.6.c.
VILD.6.d.
VII.D.6.e.
VII.D.6.f.
vn.E.
VlI.E.l.
VII.E.2.
VlI.E.l.
VlI.E.3.a.
VII.E.3.b.
Thiokol Corporation
PC Permil
Final: September 1. 1992
Last Revision:
July?. 199?
environment and/or is corsistent with and integrated into any long term solution at
Thiokol;
Data coUection quaUty asiiurance and data management mformation;
Design plans and specifications, construction requirements, operation and
mauitenance requirements, project schedules, and final design documents;
Construction quaUty assurance
requkements, and documentation
Schedule for submittal of
workplan, final design documents
measures report.
the foUowmg reports; progress reports, mterim measures
, draft uiterim measures report, and final uiterun
Voluntary Cleanup Action
or provided by the Executive
reference ui Appendix C
Interim Measure shaU incl|ude
Management UnU(s), or
plan was approved, or pre
Plans or Interun Measure Plans that have been approved
Secretary, shaU be Uicorporated mto this pennit by
this module. The reference to the Cleanup Action or
the date and title ofthe plan, the SoUd Waste
ajssociated release covered by the plan, and the date the
vided by the Executive Secretary.
NOTIFICATION REOUIREMENTS FOR AND ASSESSMENT OF
NEWLY-IDENTIFIED SOLID WASTE MANAGEMENT UNITS
The Permittee shaU notify
SoUd Waste Management
identified bi Condition VL
SoUd Waste Management
new SoUd Waste Managefnent
wastes at the site.
Within one hundred fifty (
Management Unit(s), the
Assessment Plan to the E^iecutive
Any groundwater, surface
and analysis data needed
objectives, mspection activities, sampling
; and
the Executive Secretary m writing, of any newly identUned
Unit(s) after the effective date of this permit, not
.A., withui thUty (30) calendar days of discovering the
Unit(s). The notification shaU include the location ofthe
Unit(s) and information on the suspected or known
150) calendar days foUowing discovery ofthe SoUd Waste
i'ermittee shaU subnnit a SoUd Waste Management Unit
Secretary.
The SoUd Waste Manageilnent Unit As.sessment Plan shaU include:
A description of past and bresent operations at the unit(s); and
to
water, soU (surface or subsurface strata), or aU sampUng
determine whether a release of hazardous waste and/or
Module VII - page 5
VII.E.4.
VII.E.4.a.
VII.E.4.b.
VI1.E.4.C.
VII.E.5.
VII.E.6.
V11.E.7.
VII.E.8.
VII.E.S.a.
Thiokol Corporation
PC Permit
Fhal: Seplember I, 1992
Last Revision:
July?, 1997
hazardous waste constituent(s) from such unit(s) is likely to occur. The SoUd Waste
Management Assessment ?lan shaU demonstrate that the sampling and analysis
program, if appUcable, is capable of yielding representative samples and must
mclude parameters sufficient to identUy migration of hazardous waste and/or
hazardous waste constitue|nt(s) from the newly discovered SoUd Waste Management
Units to the envkonment.
The SoUd Waste Management Unit Assessment Plan shaU be evaluated by the
Executive Secretary and;
The Permittee shaU receive
SoUd Waste Management
The Permittee shaU receive
Waste Management Unit
specify a due date for su
written approval from the Executive Secretary for the
Unit Assessment Plan; or
written notice from the Executive Secretary ofthe SoUd
Assessment Plan's deficiencies and the written notice wUl
bnjiittal of a revised assessment plan; or
The Permittee shaU receive written notice from the Executive Secretary of the
revisions incorporated by the Executive Secretary m the SoUd Waste Management
Unit Assessment Plan. The revised assessment plan shaU become the approved
SoUd Waste Management Assessment Plan.
The SoUd Waste Managenient
Secretary specified in Cond
Ul accordance with Conditio
approval of the permit moqificatio
The Permittee shaU implentent
Plan within thirty (30) cale
modification approval specified
schedule for a SoUd Waste
Unit Assessment Plan, as approved by the Executive
ition VII.E.4., shaU be uicorporated withm Module VII
n VILL The Permittee shaU be notified in writing ofthe
n.
the approved SoUd Waste Management Assessment
idar days of receiving written notice ofthe permit
in CondUion VII.E.7.
The SoUd Waste Management Unit Assessment Plan shaU contain a remediation
Management Unit Assessment Report mcluding the date
the Report wUl be submitted to the Executive Secretary.
The SoUd Waste Management Unit As.sessment Report shaU describe aU resuks
obtauied from the implementation ofthe approved SoUd Waste Management Unit
Assessment Plan. For each newly Usted SoUd Waste Management Unit, the Report
shaU provide:
The SoUd Waste Managembnt Unit location, identified on a map;
Moduk VII - page 6
VII.E.8.b.
VILE.8.C.
VII.E.8.d.
VI1.E.9.
VII.E. 10.
VU.F
VIl.F. 1.
V1I.F.2.
VII.F.3.
The type and function of :he unit, including general dimensions and a structural
description;
The period durkig which i he unit was operated; and
ag;d A Ust of aU wastes man
sampling and analysis useji
and/or hazardous waste
occur from the unit.
CD
Based on the results of S(
Executive Secretary shaU
urUt(s) mcluded ui the Soljid
Secretary determines that
shaU requke the Permittee
be reviewed for approval
under Condkion VII.C.
Ud Waste Management Unit Assessment Report, the
determine the need for further uivestigations at specific
Waste Management Unk Assessment. If the Executive
such investigations are needed, the Executive Secretary
to prepare a plan for such uivestigations. This plan shaU
is part ofthe RCRA FaciUty Investigation Workplan
Within fifteen (15) days o
Secretary in writing, of ar(y
constkuent(s) discovered
investigation, envkonmental
RCRA FaciUty Investigatio
newly identified units. Th
the new releases. A plan
of the RCRA FaciUty Inve
DETERMINATION OF
The Permittee may petitio
Action for SoUd Waste
accordance with R315-3
The Corrective Action foi
termination petition shaU
Investigation that demonsfrates
hazardous waste constituen
envkonment, from SoUd
Elder County, Utah.
A determination of no further
not preclude the Executivii
Thiokol Corporation
PC PermH
Final: September 1. 1992
Last Revision:
July?, 199?
at the SoUd Waste Management Unit and results of aU
to determine whether releases of hazardous wastes
nstituent(s) have occurred, are occurring, or are likely to
F discovery, the Permittee shaU notify the Executive
release(s) of hazardous waste and/or hazardous waste
durkig the course of groundwater monitorkig, field
audituig, or other activities undertaken during the
n. Such releases may be from akeady documented or
e Executive Secretary shaU requke further mvestigation of
'or such mvestigation wiU be reviewed for approval as part
stigation Workplan under Condition VII.C.
NO FURTHER ACTIONS
n the Executive Secretary to terminate the Corrective
Management Units Schedule of CompUance (Module VII) in
.5.
SoUd Waste Management Units, Schedule of CompUance
(j;ontam information based on the RCRA FaciUty
that there are no releases of hazardous waste or
t(s), that pose a threat to human health or the
Wa.ste Management Units at the Thiokol Corporation, Box
Module VII - page 7
action, in accordance with Condition VII.F. 1., shaU
Secretary from requking contmued or periodic
VII.F.4.
vn.G.
VIl.G.l.
VII.G.2.
VII.G.3.
VII.G.4.
VII.G.5.
VII.G.S.a.
monitoring of ak, soU, g
ckcumstances kidicate
Uicluduig hazardous wast^
that
Thiokol Corporation
PC Permil
Final: September 1, 1992
Last Revision:
July?. 1997
rpundwater, or surface water when site-specific
there is a potential for releases of hazardous waste
constituent(s) to occur.
A determination of no further action, m accordance with Condition VII.F. 1., shaU
not preclude the Executive Secretary from requkuig further investigations, studies,
or remediation at a later date if new mformation or subsequent analysis kidicates a
release or potential ofa release from a SoUd Waste Management Unit at the Thiokol
Corporation, Box Elder C ounty, Utah. In such a case, the Executive Secretary shaU
initiate either a modification to the Corrective Action Schedule of CompUance
(Module VII) kl accordance wkh R315-3-15. to rescuid the determkiation of
VILF.I.
CORRECTIVE MEASl^RES STUDY AND IMPLEMENTATION
Based on the results of the; RCRA FaciUty Investigation, the Permittee shaU describe
the alternatives for remediation of the contamination, treatment and/or other
remediation of the contamination. The Permittee shaU conduct the Corrective
Measures Study ki accordance with the requkements specified in Appendix B (Task
1, IL in, and IV).
Upon the Executive
pursuant to Condition VII
Secretary for approval, th^
specified in Appendix B,
Upon the Executive Secre|;ary
Implementation Program
conduct the Corrective M^as
Appendix B, Task IV [the
construction of the correctlive
Secrejlary's approval ofthe Corrective Measures Study,
G.L, the Permittee shaU submit, to the Executive
Corrective Measures Implementation Program Plan,
IV.A. Task
's approval of the Corrective Measures
Iflan, pursuant to Condition VII.G.2., the Perinittee .shaU
iures Implementation Program Plan specified in
corrective measures design (Task IV.B.) and
measures (Task IV.C.)].
The Permittee shaU conduitt
Corrective Measures lmpk;mentation
VIl.G.l. and VILG.2., accbrdki
The Permittee shaU submit
schedule for conductmg tht
requked by Condition VII
The Permittee shaU provide;
compUance schedule based
Modu
the Corrective Measures Study and prepare the
Program Plan, as specified ki Conditions
g to the schedule specified m Table Two.
to the Executive Secretary for approval a compUance
Corrective Measures Implementation Program Plan, as
G.3.
a justkication for each compUance date m the
on the complexity ofthe Corrective Measures
e VII - page 8
VII.G.S.b.
VII.G.5.C.
VII.G.6.
VII.G.7.
VILH.
Vll.H.l.
VILH.2.
Vn.H.2.a.
VII.H.2.b.
VILH.2.C.
VIl.H.2.d.
VII.H.3.
Implementation Program
requkements.
Thiokol Corporation
PC Permit
Final: September 1. 1992
Lasl Revision:
July 7, 1997
'Ian and reasonable contract and administrative time
On or before the compUance date for submittal of the draft Corrective Measures
Implementation Program Plan specified in Table Two, the Permittee shaU submit the
ubsequent justification, pursuant to permit condition
Secretary for approval.
compUance schedule and s
VII.G.5., to the Executive
Upon the Executive Secre :ary
Implementation Program Plan
be incorporated mto this p jrmit
Implementation Program Plan
's approval of the Corrective Measures
compUance schedule, the compUance schedule shaU
concurrently with the final Corrective Measures
m accordance with R315-3-15.
The Permittee shaU conduct the Corrective Measures Implementation Program Plan,
specified in Condition VI1.G.3., in accordance wkh Condition VII.G.S.
The Corrective Measures
Plan compUance schedules
with Condition VILL
5itudy and Corrective Measures Implementation Program
specified in Table Two, shaU be modified ki accordance
REPORTING REOUIREMENTS
The Permittee shaU submit
reports of aU activities conducted
Permittee shaU kUtiaUy subinit
(90) calendar days after the
The semi-annual progress reports shaU contam:
A description of the work ci
to the Executive Secretary wrkten semi-annual progress
pursuant to the Condkions of Module VII. The
the semi-annual progress reports no later than nkiety
effective date of this permit.
ompleted;
Summaries of aU fmdkigs and aU raw data;
Summaries of aU problems
taken or to be taken to recti
(mcountered durkig the reporting period and actions
ify problems; and
Projected work for the next
The Permittee shaU mamtain
Thiokol Corporation, Box
permit. The Permittee shaU
Executive Secretary upon
reportmg period.
copies of other reports, driUing logs, and data at the
^Ider County, Utah durkig the effective period of this
provide copies ofthe said reports, logs, and data to the
request.
Module VII - page 9
VII.H.4.
vn.i.
VILLI.
VII.I.l.a.
VILL l.b.
VILL I.e.
'VILL l.d.
VILL I.e.
VILL l.f
VII.1.2.
Vll.I.ia.
Thiokol Corporation
PC Permit
Final: September 1. 1992
Last Revision:
July?. 199?
As spectfied under condition VII.B.S., the Executive Secretary may requke the
Permittee to conduct new or more extensive assessments, uivestigations, or studies,
as needed, based on information provided in these progress reports or other
supportmg mformation.
MODIFICATION OF TIHE CORRECTIVE ACTION SCHEDULE OF
COMPLIANCE (MODULE VH)
A request for modtficatior s
conditions in Module VII
approval, ki accordance
Action Schedule of Comp
of the final compUance dates pursuant to the permit
shaU be submitted to the Executive Secretary for
R315-3-15. Fkial compUance dates m the Corrective
iance mclude:
with
The compUance date(s), as spectfied m Table One, for submittal of the RCRA
FacUity Investigation Fmal
The compUance date(s).
Measures Study Report, ir
spe
The compUance date(s), as
Corrective Measures Imp It
VII.G.2.;
Report (Appendbc A, Task IV);
ckied m Table One, for submittal of the Corrective
accordance with Condition I.G.I.;
spectfied in Table Two, for submittal of the fmal
^mentation Program Plan, ki accordance with Condition
Once estabUshed ki accordance with Condition VII.G.S., the compUance date(s) for
submittal ofthe as buUt corrective measures fkial design and construction plans, ki
accordance with Condition
CompUance dates specified
reports; and
CompUance dates for semi
VII.G.3.;
in Table Two, for Unplementing the approved plans and
annual submittal of progress reports.
Pursuant to R315-3-IS., th; compUance schedules specified in Tables One and Two,
shaU be modified tf the Exe;;utive Secretary determmes that good cause exists.
FaUure to obtain adequate
Implementation Program P
good cause for modificatioi
in Condition VII.1.2., only i
funds to conduct the Corrective Measures
an, pursuant to Condition VII.G.3., shaU be considered
ofthe compUance schedule(s). Table Two, as specified
iin accordance wkh:
Module VII - page 10
VII.1.2.a.i.
VII.L2.a.U.
VII.I.2.a.m.
VII.1.2.a.iv.
VI1.1.2.b.
V11.1.2.C.
Vll.1.3.
The Permittee's best effor:
implementation of the requu-ements
pursuant to the compUanqe
Thiokol Corporation
PC Permil
Final: September 1, 1992
Last Revision:
July?, 199?
shaU be used to secure aU funds that may be requked for
specified in Condition VII.G.3. ofthis permit
schedule ki Table Two;
The Permittee shaU seek, Dy the most expedkious means possible, appropriations
funding to achieve the compUance schedule ki Table Two,
If the Executive Secretary
Conditions under VII.1.2.
schedule.
For any approved
Two shaU be modified to
tkneframes only for the
after the end of such
tkneframes specified prior
FaUure to obtam adequate
way release the Permittee
Measures Implementation
permit or RCRA.
determines that good cause exists m accordance with the
., the Executive Secretary shaU modify the compUance
modification, the compUance schedule specified m Tables One and
provide reUef from the original compUance schedule
subsequent calendar year. AU successive compUance dates
calendar year shaU be modified to reflect the original
to the modification request under Condition VII.1.2.a.
funds or appropriations from Congress shaU not in any
irom U's obUgation to comply with the Corrective
(Condition Vn.G.3.) or any other requirement ofthis
If adequate funds for Corrtetive
Executive Secretary and the
deemed necessary to protect
judicial recourse or terminitio
The Permittee shaU subinit
dates that do not affect the
approval. If the Executive
modifications. Tables One
Measures Implementation are not avaUable, the
Control Board reserve the right to pursue any actions
human health and the envkonment, not excluding
n of this permit.
a request for modifications of the kiterkn compUance
final compUance dates to the Executive Secretary for
Secretary approves the kiterkn compUance date
and Two shaU incorporate the modified compUance dates
as approved and such change shaU not be considered a permit modification under
R315-3-IS.
Moduk; VII - page
Thiokol Corporation
PC Pennit
Final: Seplember 1. 1992
Lasl Revision:
July 7. 1997
AP]^END1X C
VOLUNTARY CLEANUP ACTIONS / INTERIM MEASURES
Permit condition VII.D.6. requkes that Voluntary Cleanup Actions or Interun Measures that have been
approved or provided by the Executive Secretary for the cleanup of SoUd Waste Management Units, or
associated releases, be uicorporated mto this permit. The Cleanup Action Plans or Interun Measure Plans,
that are mcluded by reference m this appendix, were incorporated into the Post-Closure Permit on the
date(s) mdicated below. The SoUd Waste Management Unit(s), or associated releases, covered by the
Voluntary Cleanup Action or Interun Measure are also mdicated below. The Cleanup Action or Interkn
Measure objectives, design, construction, schedule, and reportmg requkements shaU be conducted in
accordance wkh the approved plan.
1.
Voluntary Cleanup
Action:
SWMUs Covered:
Date Approved:
Request for Corrective
for Remediation of M-
.luly 1996
Action Management Unit (CAMU) Designation
39, and M-636 Solid Waste Management Units -
# 425 at M-39 and
Investigation - Pha
Units-April. J 993
# 367 at M-636 (as identkied ki RCRA Facility
se I Workplan, Volume 3, Solid Waste Management
Module VII - page 12