DWQ-2024-004986
Page 1 of 19 CHANGE ORDER NO.: 5 The Contract is modified as follows upon execution of this Change Order: Description: In compliance with EJCDC C-700, Article 13.03.E.1.(a)(b) and EJCDC C-700, Article 5.04.A, Article 5.04.D, and Article 5.04.E.3 the purpose of this Change Order is to incorporate the following changes into the Bid Documents: 1. During the construction and installation of the 21” sewer gravity main in SR-165, unstable soil conditions adjacent to the trench excavation were encountered. As a result of these conditions, some of the pavement adjacent to the trench separated in construction seams. This required the removal and replacement of additional pavement by UDOT. Estimated Quantity overrun 1,443 SY. 2.During the construction and installation of the 21” sewer gravity main in 2900 South, it was required by the City of Nibley to provide Granular Backfill Borrow in the sewer trench in place of native material for the section of the trench between the pipe zone and asphalt pavement sections. The original bid was based on native material being placed in this section of the trench. Additionally, during the construction and installation of the 21” sewer gravity main in 2900 South, the native soils adjacent to the trench excavation sloughed off into the trench during excavation. Because of this, the estimated amount of Granular Backfill Borrow required for this work increased significantly. Reference Work Change Directive #14. 3.Due to the trench sloughing and the poor condition of the asphalt pavement on 2900 South, it became necessary to replace all the asphalt pavement in 2900 South west of SMH M10 to SR- 165.The original bid only included asphalt pavement replacement for the sewer trench excavation. Estimated Quantity overrun 1,213 SY. The costs associated with this Change Order are to cover material costs for the Granular Backfill Borrow and the material and installation costs associated with the asphalt overruns are shown in the following table: DESCRIPTION QUANTITY UNITS UNIT COST TOTAL COST Item #1: Overrun of Bid Tab #81 1419 SY $ 63.00 $ 89,397.00 Item #2: New scope of work per Work Change Directive #14, Material & Trucking Costs 1 LS $115,162.18 $ 115,162.18 Item #3: Overrun of Bid Tab #80 1213 SY $ 28.00 $ 33,964.00 Total Chage Order #5 Cost $ 238,523.18 Attachments: 1.Work Change Directive #142.Whitaker Costs for Import Material for Work Change Directive #143.Asphalt overruns Confirmation Emails4.Franson Estimated Asphalt Quantities Based on Survey Data Provided by Whitaker Owner: Millville City Owner’s Project No.: Engineer: Franson Civil Engineers Engineer’s Project No.: 20037 Contractor: Whitaker Construction Contractor’s Project No.: Project: Millville Sewer Project Contract Name: Millville Sewer Project Date Issued: June 11, 2024 Effective Date of Change Order: October 24,2023 Page 2 of 19 Change in Contract Price Change in Contract Times [State Contract Times as either a specific date or a number of days] Original Contract Price: $ 29,350,870.00 Original Contract Times: Substantial Completion: October 31, 2025 Ready for final payment: December 31, 2025 [Increase] [Decrease] from previously approved Change Orders No. 1A to No. 4: $ 399,287.00 Increase from previously approved Bid Documents to Change Orders No.3: Substantial Completion: October 31, 2025 Ready for final payment: December 31, 2025 Contract Price prior to this Change Order: $ 29,750,157.00 Contract Times prior to this Change Order: Substantial Completion: October 31, 2025 Ready for final payment: December 31, 2025 [Increase] [Decrease] this Change Order: $ 238,523.18 Increase this Change Order: Substantial Completion: October 31, 2025 Ready for final payment: December 31, 2025 Contract Price incorporating this Change Order: $ 29,988,680.18 Contract Times with all approved Change Orders: Substantial Completion: October 31, 2025 Ready for final payment: December 31, 2025 Recommended by Engineer Accepted by Contractor By: Title: Date: By: Title: Project Manager Date: Authorized by Owner Approved by Funding Agency (RDA) By: Title: By: Title: Millville City Recorder Date: Date: Approved by Funding Agency DEQ) By: Title: Date: EJCDC® C-941, Change Order EJCDC® C-941, Change Order, Rev.1. Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies and American Society of Civil Engineers. All rights reserved. Millville Sewer Project Project Manager State Engineer-USDA Rural Development Corey Twedt (Jun 13, 2024 13:46 MDT) Corey Twedt en (.on (Jun 1ш, 2024 0ч:ф1 MDT) 1eQ .DPVoQ Mtt#ew D1$.on (ur' De1e'o+(ent) (Ju' 1, 2024 1ф:34 MDT) 3DttKew *DYLVoQ 8XrDO *eYeOoSPeQt et# ond$(u (Ju' 2, 2024 0ц:1ч MDT) (etK =oQdLPX Page 3 of 19 ATTACHMENT 1 WORK CHANGE DIRECTIVE #14 Page 4 of 19 Page 5 of 19 Page 6 of 19 Page 7 of 19 Page 8 of 19 Page 9 of 19 Page 10 of 19 Page 11 of 19 ATTACHMENT 2 WHITAKER MATERIAL AND TRUCKING COSTS FOR WORK CHANGE DIRECTIVE 14 Page 12 of 19 Page 13 of 19 Page 14 of 19 Page 15 of 19 ATTACHMENT 3 ASPHALT OVERRUNS CONFIRMATION EMAILS Page 16 of 19 Page 17 of 19 Page 18 of 19 ATTACHMENT 4 FRANSON ESTIMATED ASPHALT QUANTITIES BASED ON SURVEY DATA PROVIDED BY WHITAKER CONSTRUCTION Page 19 of 19