Loading...
HomeMy WebLinkAboutDDW-2024-008598 State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF DRINKING WATER Nathan Lunstad P.E. Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor May 21, 2024 Jodi Davis Liberty Pipeline Company PO Box 1200 Eden, UT 84310 Subject: Notice of Increased Monitoring Requirements – Liberty Pipeline Company UTAH29008 Dear Jodi Davis: According to the Division of Drinking Water’s (the Division) records, Liberty Pipeline Company currently operates a corrosion control treatment plant on the Cutler Canyon Springs. In accordance with R309-215-6(2), this facility is subject to additional monitoring requirements not previously assigned. Additionally, after review, the monitoring requirements for the Durfee Creek Well (WS010) have been increased to conform with applicable portions of R309-205. Liberty Pipeline Company is now required to collect the following samples at the Cutler Canyon Spring TP No Chlorine (TP001) and the Durfee Creek Well Iron Mn TP No Chlorine (TP010) at the given frequencies: Facility with new requirements Analyte(s) Required # of samples Sampling Frequency Next Due Date Rule Reference TP001 Cutler Canyon Spring TP No Chlorine pH 1 Monthly 06/01/2024-06/30/2024 R309-215-6(2)(a) Temperature 1 Monthly 06/01/2024-06/30/2024 R309-215-6(2)(a) Alkalinity 1 Monthly 06/01/2024-06/30/2024 R309-215-6(2)(a) Calcium 1 Monthly 06/01/2024-06/30/2024 R309-215-6(2)(a) TDS 1 Monthly 06/01/2024-06/30/2024 R309-215-6(2)(a) Inorganics and Metals 1 Every three years 01/01/2023-12/31/2025 R309-205-5(3)(a) Nitrate 1 Yearly 01/01/2024-12/31/2024 R309-205-5(4)(a) Jodi Davis Page 2 May 21, 2024 Pesticides 1 Every three years 01/01/2023-12/31/2025 R309-205-6(1)(f) Radionuclides 1 Every six years 01/01/2026-12/31/2031 R309-205-7(1)(c) Sulfate, Sodium., TDS 1 Every three years 01/01/2023-12/31/2025 R309-205-5(3)(a) Volatile Organics 1 Every three years 01/01/2023-12/31/2025 R309-205-6(2) TP010 Durfee Creek Well Iron Mn TP No Chlorine Inorganics and Metals 1 One TimeA 01/01/2024-12/31/2024 R309-205-5(3)(a) Nitrate 1 One TimeA 04/01/2024-06/30/2024 R309-205-5(4)(a) Pesticides 1 One TimeA 01/01/2024-12/31/2024 R309-205-6(1)(f) Radionuclides 1 One TimeA 04/01/2024-06/30/2024 R309-205-7(1)(b) Sulfate, Sodium., TDS 1 One TimeA 01/01/2024-12/31/2024 R309-205-5(3)(a) Volatile Organics 1 One TimeA 01/01/2024-12/31/2024 R309-205-6(2) Iron 1 Monthly 05/01/2024-05/31/2024 R309-215-6(2)(a) Manganese 1 Monthly 05/01/2024-05/31/2024 R309-215-6(2)(a) pH 1 Monthly 05/01/2024-05/31/2024 R309-215-6(2)(a) A- Once sample results for these parameters are received, the routine monitoring frequencies will be determined. Sample Location Cutler Canyon Spring TP No Chlorine (TP001) The samples described above shall be collected from a location which represents the Cutler Canyon Springs water after it has undergone treatment and before it enters into the distribution system. In the event that Cutler Canyon Spring TP No Chlorine (TP001) is not accessible, the described samples shall be taken at the first available connection. Please label all samples collected as TP001 for both the Facility ID and Sample Point ID on all laboratory paperwork. The chemical samples required under R309-205 representing Cutler Springs were previously collected under the facility ID SS230 (Sampling Station - 01 02 03 04 05). These monitoring schedules have been moved to the treatment plant (TP001) facility ID. Please continue to collect the source samples given on waterlink.utah.gov at the locations described above. Durfee Creek Well Iron Mn TP No Chlorine (TP010) Jodi Davis Page 3 May 21, 2024 Samples representing the Durfee Creek Well post treatment shall be collected from the same location as the Iron, Manganese and pH samples have been collected from in the past. Lab Measurements Please send the required monthly Alkalinity, Calcium and TDS samples to a certified laboratory. Field Measurements Please collect the monthly pH and Temperature samples in the field using a calibrated pH probe and thermometer. pH and Temperature measurements are impacted by environmental factors such as exposure to the atmosphere, carbon dioxide off gassing and oxidation. Since these samples will not be sent to a certified laboratory, monthly measurements for pH and Temperature shall be reported to dbkruse@utah.gov by the 10th day of the following month using the enclosed template. Failure to submit the described samples will result in monitoring violations and IPS points assigned to the system. Durfee Creek Well Iron Mn TP No Chlorine Monitoring Frequencies In accordance with R309-205, active drinking water sources must be monitored for six classes of chemicals at varying frequencies, based on sample results. The Division does not have a record of current sample results for the parameters listed in the table above for this facility. Please submit the listed samples by the given due dates. Once the results are received, the routine monitoring frequencies will be determined. Please contact David Kruse at dbkruse@utah.gov or 385-566-7789 with any questions or concerns regarding the system's source and treatment plants monitoring schedules. Customer Complaint Response In accordance with R309-105-18(1)(c), reports of discolored water shall be investigated as an emergency incident and must be reported to the division within eight hours of receiving the complaint. The Division can be contacted twenty-four hours a day through our emergency response line at 801-560-8456. Water systems are responsible to respond to all customer complaints, including receiving, tracking, investigating, and taking reasonable action to resolve the complaint. In the event of a discolored water complaint, the system shall sample for lead, copper, iron, manganese and coliform bacteria, in addition to the analytes listed in the above table. Lead & Copper Monitoring Requirements The system must collect 10 routine lead and copper samples during the month of April 2025. The timing of monitoring has been adjusted in accordance with R309-210-6(3)(d)(iv)(D)(I). The system may be returned to the standard monitoring time frame of June 1 - September 30 during future monitoring periods depending on sample results. Jodi Davis Page 4 May 21, 2024 Questions regarding Lead and Copper monitoring should be directed to Dylan Martinez at dylanmartinez@utah.gov or at (385) 278-3807. An updated monitoring schedule has been enclosed to this letter. In addition, water monitoring requirements can be found on waterlink.utah.gov by searching the water system’s name and/or system number. Sincerely, Mark Berger Monitoring & Standards Section Manager Enclosures: Water Monitoring Report Water Quality Parameter Template cc: Jodi Davis, Liberty Pipeline Company, jodi@libertypipelinecompany.com Michelle Cooke, Weber-Morgan Health Dept, mcooke@co.weber.ut.us Mark Berger, Division of Drinking Water, mberger@utah.gov David Kruse, Division of Drinking Water, dbkruse@utah.gov Ryan Dearing, Division of Drinking Water, rdearing@utah.gov Dylan Martinez, Division of Drinking Water, dylanmartinez@utah.gov Utah Department Of Environmental Quality Division Of Drinking Water Admin Contacts Water Monitoring Report BACTERIOLOGICAL MONITORING Other Distribution Monitoring MONITORING REQUIREMENTS BY FACILITY LIBERTY PIPELINE COMPANY PWS ID: UTAH29008 Rating: Approved 04/14/1980 Active Legal Contact LIBERTY PIPELINE COMPANY JODI DAVIS PO BOX 1200 EDEN, UT 84310 Phone: 801-745-2088 County: WEBER COUNTY System Type: Community Population: 1,750 Site Updates Last Inventory Update: 12/26/2023 Last Surveyor Update: 09/14/2023 Surveyor: BRENT P ARNS Operating Period: 1/1 - 12/31 Last IPS Update: 05/20/2024 14:10:00 Consumptive Use Zone Irrigation Zone: null Date: Name Title Office Emergency Email DAVIS, JODI 801-745-2088 jodi@libertypipelinecompany.com Sample Count Type Frequency Schedule Begin Schedule End Analyte Name 2 Routine Monthly 03/01/2024 COLIFORM (TCR) Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due LEAD AND COPPER DS001 10 Routine Yearly 2023 04/01/2025-04/30/2025 DEQ | Drinking Water Run Date: 05/20/2024 16:10:07 | Rating: Approved UTAH29008 LIBERTY PIPELINE COMPANY page 1 of 3 ID NAME TP001 CUTLER CANYON SPRING TP NO CHLORINE Name Sample Count Type Frequency Last Sampled Next Sample Due ALKALINITY, TOTAL 1 Routine Monthly 05/01/2024 - 05/31/2024 CALCIUM 1 Routine Monthly 06/01/2024 - 06/30/2024 INORGANICS-COMPL 1 Routine 3 Years 01/01/2023 - 12/31/2025 NITRATE 1 Routine Yearly 01/01/2024 - 12/31/2024 PESTICIDES-COMPL 1 Routine 3 Years 01/01/2023 - 12/31/2025 PH 1 Routine Monthly 06/01/2024 - 06/30/2024 RADS - COMPLIANCE 1 Routine 6 Years 01/01/2026 - 12/31/2031 SULFATE,SODIUM,TDS 1 Routine 3 Years 01/01/2023 - 12/31/2025 TDS 1 Routine Monthly 06/01/2024 - 06/30/2024 TEMPERATURE (CENTIGRADE)1 Routine Monthly 06/01/2024 - 06/30/2024 VOC-COMPL 1 Routine 3 Years 01/01/2023 - 12/31/2025 TP010 DURFEE CREEK WELL IRON MN TP NO CHLORINE Name Sample Count Type Frequency Last Sampled Next Sample Due INORGANICS-COMPL 1 Routine One Time 12/31/2024 - 12/31/2024 IRON 1 Routine Monthly 04/03/2024 05/01/2024 - 05/31/2024 MANGANESE 1 Routine Monthly 04/03/2024 05/01/2024 - 05/31/2024 NITRATE 1 Routine One Time 06/10/2019 06/30/2024 - 06/30/2024 PESTICIDES-COMPL 1 Routine One Time 12/31/2024 - 12/31/2024 PH 1 Routine Monthly 04/03/2024 05/01/2024 - 05/31/2024 RADS - COMPLIANCE 1 Routine Quarterly 04/01/2024 - 06/30/2024 SULFATE,SODIUM,TDS 1 Routine One Time 12/31/2024 - 12/31/2024 VOC-COMPL 1 Routine One Time 12/31/2024 - 12/31/2024 WS006 UTAH29045 CAMP UTABA SPRING Name Sample Count Type Frequency Last Sampled Next Sample Due INORGANICS-COMPL 1 Routine 9 Years 01/01/2011 - 12/31/2019 NITRATE 1 Routine 9 Years 01/13/2009 01/01/2011 - 12/31/2019 PESTICIDES-COMPL 1 Routine 9 Years 01/01/2011 - 12/31/2019 RADS - COMPLIANCE 1 Routine 9 Years 01/01/2011 - 12/31/2019 SULFATE,SODIUM,TDS 1 Routine 9 Years 01/01/2011 - 12/31/2019 VOC-COMPL 1 Routine 9 Years 01/01/2011 - 12/31/2019 WS008 SMITH WELL Name Sample Count Type Frequency Last Sampled Next Sample Due INORGANICS-COMPL 1 Routine 3 Years 11/16/2022 01/01/2023 - 12/31/2025 NITRATE 1 Routine Yearly 05/09/2024 01/01/2025 - 12/31/2025 PESTICIDES-COMPL 1 Routine 3 Years 11/16/2022 01/01/2023 - 12/31/2025 RADS - COMPLIANCE 1 Routine 3 Years 03/08/2023 01/01/2026 - 12/31/2028 SULFATE,SODIUM,TDS 1 Routine 3 Years 11/16/2022 01/01/2023 - 12/31/2025 VOC-COMPL 1 Routine 3 Years 11/16/2022 01/01/2023 - 12/31/2025 DEQ | Drinking Water Run Date: 05/20/2024 16:10:07 | Rating: Approved UTAH29008 LIBERTY PIPELINE COMPANY page 2 of 3 Grouped Source Sampling Stations Sample Group ID Sample Group 8230.0 UTAH SAMPLING STATION SS230 Source ID Source Name Sample Group Details System WS001 CUTLER CANYON SPRING 1 UTAH29008 LIBERTY PIPELINE COMPANY WS002 CUTLER CANYON SPRING 2 UTAH29008 LIBERTY PIPELINE COMPANY WS003 CUTLER CANYON SPRING 2A UTAH29008 LIBERTY PIPELINE COMPANY WS004 CUTLER CANYON SPRING 2B UTAH29008 LIBERTY PIPELINE COMPANY WS005 CUTLER CANYON SPRING 3 UTAH29008 LIBERTY PIPELINE COMPANY Open Compliance Schedule Type Required Activities Severity Created Due Lead Copper Rule Revisions COMPLETE INITIAL LSL INVENTORY 12/16/2021 10/16/2024 Lead Copper Rule Revisions SUBMIT LEAD SERVICE LINE INVENTORY 12/16/2021 10/16/2024 Water Use Data WUD STANDARD SET, RESET DUE IN 3 YEARS 09/18/2023 09/18/2026 OPERATOR CERTIFICATION GWR CORRECT DEFICIENCY 120 DAYS SIG 02/05/2024 11/08/2024 DEQ | Drinking Water Run Date: 05/20/2024 16:10:07 | Rating: Approved UTAH29008 LIBERTY PIPELINE COMPANY page 3 of 3 Sample Date Sample Time Sample Collector pH Measurement Temperature Measurement Date sent to DDW ex: 5/15/2024 2:35pm John Doe 7.2 66.3F Cutler Canyon Springs (TP001) Monthly Reporting Please record a pH and temperature measurement each month. Afterwords, report these measurements by the 10th day of the following month by email to dbkruse@utah.gov and dylanmartinez@utah.gov.