HomeMy WebLinkAboutDDW-2024-008594195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830
Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 903-3978
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF DRINKING WATER
Nathan Lunstad P.E.
Director
May 21, 2024
Mike Leonhardt
Garden City
69 N Paradise Parkway
Garden City, UT 84028
Subject: Notice of Increased Source Monitoring for Garden City; UTAH17002
Mike Leonhardt:
A recent statewide audit was conducted on all source monitoring schedules to ensure conformity
with applicable portions of R309-205.
During the review, the Division of Drinking Water (the Division) found that the Swan Creek
Spring (identified as WS001) is designated as groundwater under the direct influence of surface
water (UDI) and is treated to surface water standards at the Membrane Plant (TP002).
In accordance with R309-205-4(4), source samples are to be taken at the sources point of entry
into the distribution system after they have undergone treatment, making the Membrane Plant
(TP002) the designated sampling location. Additionally, surface water sources are subject to
more frequent monitoring.
The Membrane Plant (TP002) is now required to be sampled for the following contaminants at
the given frequencies by the listed due dates.
Facility with new
requirements Analyte(s) Required # of
samples
Sampling
Frequency Next Due Date Rule
Reference
TP002 Membrane Plant Inorganics & Metals 1 Yearly 01/01/2024-
12/31/2024
R309-205-
5(3)(a)
Nitrate 1 Quarterly 07/01/2024-
09/30/2024
R309-205-
5(4)(b)
Sulfate, Sodium, TDS 1 Yearly 01/01/2024-
12/31/2024
R309-205-
5(3)(a)
Radionuclides 1 Every six years 01/01/2023-
12/31/2028
R309-205-
7(1)(c)
Mike Leonhardt
Page 2 of 2
May 21, 2024
Volatile Organic
Contaminants 1 Every six years 01/01/2023-
12/31/2028 R309-205-6(2)
These changes are reflected in the enclosed monitoring schedule and can be viewed anytime
online at waterlink.utah.gov.
Please contact David Kruse at 385-566-7789 or dbkruse@utah.gov with any questions or
concerns about the sampling requirements given above.
Sincerely,
Mark Berger
Monitoring and Standards - Implementation Manager
cc: Mike Leonhardt, Garden City, mikel@gardencityut.us
Grant Koford, Bear River Health Department, gkoford@brhd.org
Mark Berger, Division of Drinking Water, mberger@utah.gov
David Kruse, Division of Drinking Water, dbkruse@utah.gov
Utah Department Of Environmental Quality
Division Of Drinking Water
Admin Contacts
Water Monitoring Report
BACTERIOLOGICAL MONITORING
Disinfection ByProduct Stage 2 Monitoring
Other Distribution Monitoring
MONITORING REQUIREMENTS BY FACILITY
GARDEN CITY PWS ID: UTAH17002 Rating: Approved 01/22/2013 Active
Legal Contact
GARDEN CITY
MIKE LEONHARDT
69 N PARADISE PARKWAY
GARDEN CITY, UT 84028
Phone: 435-946-2901
County: RICH COUNTY
System Type: Community
Population: 527
Site Updates
Last Inventory Update: 04/16/2024
Last Surveyor Update: 07/20/2021
Surveyor: HUNTER PAYNE
Operating Period: 1/1 - 12/31
Last IPS Update: 05/01/2024 07:10:00
Consumptive Use Zone
Irrigation Zone: null
Date:
Name Title Office Emergency Email
LEONHARDT, MIKE 435-881-3601 mikel@gardencityut.us
Sample Count Type Frequency Schedule Begin Schedule End Analyte Name
1 Routine Monthly 01/01/1991 COLIFORM (TCR)
Sample Count Type Frequency Sample Label
1 Routine Yearly UTAH17002 DS001 Sample ID
below
ID Site Last Sample Next Sample Due
MR001 DELOY HANSEN PROPERTY 08/29/2023 07/01/2024-09/30/2024
Please sample in June
Analyte Name ID Sample
Count Type Frequency Last Sampled Next Sample Due
LEAD AND COPPER DS001 10 Routine 3 Years 2022 06/01/2025-09/30/2025
ASBESTOS DS001 1 Routine 9 Years 08/15/2019 01/01/2020 - 12/31/2028
DEQ | Drinking Water
Run Date: 05/01/2024 10:55:53 | Rating: Approved UTAH17002 GARDEN CITY page 1 of 2
ID NAME
TP002 MEMBRANE PLANT
Name Sample
Count Type Frequency Last Sampled Next Sample Due
INORGANICS-COMPL 1 Routine Yearly 01/01/2024 - 12/31/2024
NITRATE 1 Routine Quarterly 07/01/2024 - 09/30/2024
RADS - COMPLIANCE 1 Routine 6 Years 01/01/2023 - 12/31/2028
SULFATE,SODIUM,TDS 1 Routine Yearly 01/01/2024 - 12/31/2024
VOC-COMPL 1 Routine 6 Years 01/01/2023 - 12/31/2028
WS002 PAYNE SPRING
Name Sample
Count Type Frequency Last Sampled Next Sample Due
INORGANICS-COMPL 1 Routine 3 Years 08/10/2021 01/01/2023 - 12/31/2025
NITRATE 1 Routine Yearly 08/29/2023 01/01/2024 - 12/31/2024
RADS - COMPLIANCE 1 Routine 6 Years 08/10/2021 01/01/2023 - 12/31/2028
SULFATE,SODIUM,TDS 1 Routine 3 Years 08/10/2021 01/01/2023 - 12/31/2025
VOC-COMPL 1 Routine 6 Years 07/27/2017 01/01/2023 - 12/31/2028
Open Compliance Schedule
Type Required Activities Severity Created Due
Lead Copper Rule Revisions COMPLETE INITIAL LSL INVENTORY 12/16/2021 10/16/2024
Lead Copper Rule Revisions SUBMIT LEAD SERVICE LINE INVENTORY 12/16/2021 10/16/2024
Lead Consumer Notice SUBMIT LCN CERTIFICATE 06/01/2022 12/29/2022
DEQ | Drinking Water
Run Date: 05/01/2024 10:55:53 | Rating: Approved UTAH17002 GARDEN CITY page 2 of 2