Loading...
HomeMy WebLinkAboutDAQ-2024-008642 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-623-24 Site ID 10055 (B1) Tyler Hodson Kilgore Companies dba LeGrand Johnson P.O. Box 869 Magna, UT 84044 Dear Mr. Hodson: Re: Kilgore Companies dba LeGrand Johnson Companies – Temporary Relocation/Operation, Notice of Intent – Cache County Your Notice of Intent dated June 14, 2024, to relocate portable generators to the temporary project for the Hyrum facility, located at 410 North 800 East, Hyrum, UT, was received by the Utah Division of Air Quality (DAQ) and has been reviewed. The following equipment has been approved for operation for this temporary project: Two (2) Cat C27 2014 725 kW generators The State of Utah has permitted the portable generators for Kilgore Contracting, LLC on the Approval Order (AO) DAQE-AN129310019-18, dated April 12, 2018. The above relocation address is a permitted aggregate facility with established emission and production limits as per the AO DAQE-100550003-20, dated September 15, 2020. The operation of the generators shall be in compliance with the portable AO’s stationary diesel-fired engine Conditions II.B.10.a through II.B.10.c.1. Condition II.B.3.c of this AO restricts the operation of all portable equipment to the hours of 6:00 am to 10:00 pm. Approval is granted to relocate and operate this equipment at the new location for a period not to exceed 180 operational days. The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the above referenced equipment at this relocation site and have the ability to submit the information to the DAQ upon the request of representatives of the director. Please make certain that the plant operator is aware of all the location specific requirements for this site and the conditions of the aforementioned AO. 2 + " Û à Û Ù Û Ý DAQC-623-24 Page 2 Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction requirements for additional information. This approval for relocation in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including the UAC. If you have any questions regarding this relocation authorization or the temporary relocation process please contact Susan Weisenberg at (385) 306-6512. Sincerely, Jay P. Morris Assistant Director JPM:SPW:jl Enclosure: Submitted Temporary Relocation Form and correspondence cc: Bear River Health Department 4 * - - $ . — 0 ) A E v A ? A C ? G w C G ˜ Susan Weisenberg <sweisenberg@utah.gov> Portable/Temporary Relocation Form 1 message noreply@qemailserver.com <noreply@qemailserver.com>Fri, Jun 14, 2024 at 10:01 AM Reply-To: trigger@qemailserver.com To: sweisenberg@utah.gov Susan/Chad: Site # -- Kilgore Companies dba LeGrand Johnson has requested a Temporary Relocation. Please see the information below. Any attachments can be access by clicking on the links. Recipient Data: Time Finished: 2024-06-14 10:01:05 MDT IP: 165.225.10.216 ResponseID: R_5h5Q5bbDeFTV3Gx Link to View Results: Click Here URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/ 7A5jyDAAgW5hjiJjt5Fg72RU3pjt18QC4tmUBouFJ-BVUunzPmzLxkn0LtlIJgScicutgJQQGvZ1hSDzFOAW3-Z9P2M8- VZgR3kLcG%2EMilmsIpwGwoTEo6U6k96Kp7aU-EDpEwET9EioY8DJBib6DPp3vXxx8Yy 8WKBMRRQ7TLVyeCRXklPPAAlS-wcJFJJA6v%2ER6kSmRMK35di1R-bzD-EORxrCesieDzbG4T0x4q9C6% 2E4FTblojFopDbZjxxoGr5LS2HkU-U8njUECW2BmV7qMcr7GvY7Np7DGC58nDpStjI6Yk1KTuY- jto2WwfW2CcPmuy4y8cnbEJlaaM-eMA Response Summary: Please fill out the information below: Contact Person: Tyler Hodson Company Name: Kilgore Companies dba LeGrand Johnson Mailing Address: PO Box 869 City: Magna Zip: 84044 Phone Number: 3852283653 Email: Tyler.hodson@kilgorecompanies.com Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea... No All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo... D7210D578C Briefly give directions to the site and/or physical address: From I-15 take exit 362 toward US89/US91. Take US 91 Northwest for 19 miles to UT-101 E/Main st. Continue straight onto 300 W, turn right onto 600 E, left onto 225 N/Anderson Ave, turn left on UT-165 North. Site will be on the right (east). Proposed Relocation Information: Closest City Hyrum County Cache UTM X Coordinates 431084.36 m E UTM Y Coordinates 4610291.75 m N Approximate distance to the nearest house/business 1,100 feet UTM X Coordinates to nearest house/business 430777.96 m E UTM Y Coordinates to nearest house/business 4609988.75 m N 6/19/24, 3:09 PM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1801852964498830171%7Cmsg-f:1801852964498830171&s…1/2 Does this site currently have a permit with DAQ? Yes If yes, what is the Permit (DAQ-AN) # ? DAQE-AN100550003-20 If yes, what is the Permit Holder's Name? Kilgore Contracting LLC Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX) DAQE-AN129310019-18 Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine... 1 Equipment Type Generator Make/Model Cat C27 Serial or ID# 0027PT4Z00341 Manufactured Date 2014 Design Capacity 725 kW 2 Equipment Type Generator Make/Model Cat 27 Serial or ID# 0027TT4Z00340 Manufactured Date 2014 Design Capacity 725 kW Please attach a site diagram showing the equipment layout and general site dimensions for this re... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_2DT9VrekVuwlLPJ Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for... No Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re... Total Hours of operation per 24 hr period 16 Starting time of operation (am/pm) 5 am Ending time of operation (am/pm) 9 pm Maximum hourly production rate for project 1425 kW Expected startup date 06/14/2024 Expected completion date 06/13/2025 What type of application is this for? New Application In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1IX9dC84fTy3iFS Owner/Operator Representative: https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_0CxnMcdDo8y5XK9 6/19/24, 3:09 PM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1801852964498830171%7Cmsg-f:1801852964498830171&s…2/2 Susan Weisenberg <sweisenberg@utah.gov> Hyrum Pit Generator TRP Request 1 message Tyler Hodson <Tyler.Hodson@kilgorecompanies.com>Fri, Jun 14, 2024 at 10:06 AM To: Susan Weisenberg <sweisenberg@utah.gov> Cc: Bryan Jorgensen <Bryan.Jorgensen@kilgorecompanies.com> Susan, I just wanted to add some clarification to our request to use generators at our Hyrum pit, as we just submitted a TRP application online. Unfortunately, we don’t have access to line power through the city that we need in order to run some of our aggregate processing equipment at that site. We are not sure when we might have access to the amount of electricity we would need to run all our equipment, so for now we are requesting a TRP in order to add two generators to the site. Adding these generators is a temporary solution and we will be in communication with both the city along with the consulting team we work with to modify and evaluate air quality permits so we can find a permanent solution to this situation. As a reminder this is in reference to TRP # C-189-24 for the following equipment to be used at our Hyrum site in Cache County: Equipment Type: Generator – Used to power Cedar Rapids 6x20 Screen Plant (one of II.A.6) Make/Model: Cat C27 Serial #: 00C27PT4Z00341 Manufactured Date: 2014 Design Capacity: 725 kW Equipment Type: Generator – Used to power Cedar Rapids Impactor Crusher (II.A.5) Make/Model: Cat C27 Serial #: 00C27TT4Z00340 Manufactured Date: 2014 Design Capacity: 725 kW Please let me know if you need any other information. Thank you, Tyler Hodson Administrative Environmental Manager (385)228-3653 Tyler.hodson@kilgorecompanies.com 6/19/24, 3:08 PM State of Utah Mail - Hyrum Pit Generator TRP Request https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1801853270359291321%7Cmsg-f:1801853270359291321&s…1/2 6/19/24, 3:08 PM State of Utah Mail - Hyrum Pit Generator TRP Request https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1801853270359291321%7Cmsg-f:1801853270359291321&s…2/2 Susan Weisenberg <sweisenberg@utah.gov> Re: Kilgore request to TRP generators to Hyrum facility 1 message Chad Gilgen <cgilgen@utah.gov>Fri, Jun 21, 2024 at 2:28 PM To: Alan Humpherys <ahumpherys@utah.gov> Cc: Susan Weisenberg <sweisenberg@utah.gov> Hi Susan, I think this looks good and can be processed as a TRP through eSign. Thanks, Chad Chad Gilgen | Manager | Minor Source Compliance 385-306-6500 (cell) Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. On Wed, Jun 19, 2024 at 3:41 PM Alan Humpherys <ahumpherys@utah.gov> wrote: Susan, As long as it is temporary, I don't think there would be an issue, but I will defer to you and Chad. Thanks, Alan On Wed, Jun 19, 2024 at 3:32 PM Susan Weisenberg <sweisenberg@utah.gov> wrote: Hello - Tyler Hodson, of Kilgore has requested a temporary relocation of two 725 kW generators to their Hyrum facility (10055) due to a delay in obtaining sufficient electrical power outlets. The Hyrum pit was not permitted for generators. Because of this, I asked Kilgore to submit a written request for why the TRP was necessary and how the generators would be used. See the attached email. I have written up a draft potential relocation letter, in the event that Kilgore's request is feasible. Let me know if you have any questions - Thanks Susan Weisenberg, Environmental Scientist Office: 385-306-6512 6/24/24, 10:51 AM State of Utah Mail - Re: Kilgore request to TRP generators to Hyrum facility https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r-3224872944811839543%7Cmsg-f:1802503947526636750…1/2 -- Alan Humpherys Manager | Minor NSR Section P: (385) 306-6520 F: (801) 536-4099 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 6/24/24, 10:51 AM State of Utah Mail - Re: Kilgore request to TRP generators to Hyrum facility https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r-3224872944811839543%7Cmsg-f:1802503947526636750…2/2