HomeMy WebLinkAboutDAQ-2024-008630
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820
Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF AIR QUALITY
Bryce C. Bird
Director
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
DAQC-570-24
Site ID 11572 (B1)
Boone Bolinder
Bolinder Resources
1830 West Highway 112
Tooele, UT 84074
Dear Mr. Bolinder:
Re: Bolinder Resources – Temporary Relocation/Operation, Notice of Intent – Tooele County
Your Notice of Intent dated June 5, 2024, to relocate portable aggregate equipment to the temporary
project for the Staker Parson Companies facility located at Mile Marker 50 on State Road 36, Bauer, UT,
was received by the Utah Division of Air Quality (DAQ) and has been reviewed.
The following equipment has been approved for operation for this temporary project:
CS 3055 jaw crusher
P202083 screen
MVP450X cone crusher
Cat 725 kW generator
The above referenced equipment has been authorized for operation in the State of Utah by the Bolinder
Resources, LLC portable Approval Order (AO) DAQE-AN133710008-20, dated October 1, 2020. The
referenced facility address is permitted by the Jack B. Parsons Company AO DAQE-AN115720002-14,
dated September 29, 2014. The production of aggregate cannot exceed the 12-month rolling total limit as
per Condition II.B.1.b or this permanent AO. The operation hours of this portable equipment shall be
restricted to 6:00 AM to 10:00 PM as per Condition II.B.3.c of your portable AO. The operation of the
referenced generator shall comply with the applicable Stationary Diesel-Fired Engine conditions II.B.10.a
through II.B.10.c.2 of your portable equipment AO. Approval is granted to relocate and operate this
equipment at the new location for a period not to exceed 180 operational days. As per Utah Administrative
Code (UAC) R307-401-17, the operation of equipment at this temporary site may be for up to 180 working
days in any calendar year not to exceed 365 consecutive days, starting from the initial relocation date.
The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the
above referenced equipment at this relocation site and have the ability to submit the information to the
DAQ upon the request of representatives of the Director. Please make certain that the plant operator is
aware of all the location specific requirements for this site and the conditions of the aforementioned AO.
2 + " Û Þ Û Ù Û Ý
DAQC-570-24
Page 2
Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations be
performed for all applicable portable crushers, screens, and attached conveyors. Subpart OOO also
mandates that all crushers constructed, modified, or reconstructed on or after April 22, 2008, which are not
enclosed, must install spray bars on the equipment and keep maintenance records to ensure proper spray
bar operations.
Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project.
Please refer to Utah DEQ Water Quality’s current Storm Water construction requirements for additional
information.
This approval for relocation in no way releases the owner or operator from any liability for compliance
with all other applicable federal, state, and local regulations including the UAC.
If you have any questions regarding this relocation authorization or the temporary relocation process please
contact Susan Weisenberg at (385) 306-6512.
Sincerely,
Jay P. Morris
Assistant Director
JPM:SPW:jl
Enclosure: Submitted Temporary Relocation Form and correspondence
cc: Tooele County Health Department
4 * - - $ . — 0 ) A @ v A ? A C @ F w A E ˜
Susan Weisenberg <sweisenberg@utah.gov>
Portable/Temporary Relocation Form
1 message
noreply@qemailserver.com <noreply@qemailserver.com>Wed, Jun 5, 2024 at 12:45 PM
Reply-To: trigger@qemailserver.com
To: sweisenberg@utah.gov
Susan/Chad:
Site # -- Bolinder Resources has requested a Temporary Relocation. Please see the information below. Any attachments
can be access by clicking on the links.
Recipient Data:
Time Finished: 2024-06-05 12:45:13 MDT
IP: 104.166.115.174
ResponseID: R_1kmc76FYuKTFgm5
Link to View Results: Click Here
URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/XT%
2EPmq8IdTFj4J1Gql4jHsS38KSCQsvE6NA25qZs1coMGewR50AtqSC-iOnG1OnX4rSxxV7l7mV2lZjs2zruC8
qcvxHKp987URP43avnW4Dc5xrXpOnCLjKz%2Ef8jFZPo88xg0Ke7AkOoUxQRQneo2
O5hzRcQUSULSEi7xj9l6o0c4fLLUbPD9fkQzr9T6FkEZoQLLIcJXIWxC07BVKkR-%2EbTY1ctziNhSqX8BOKiXmjGmBj1ck
k6JPVhas4-Oh-3OxxtAkeG8dOBaczYaWpoNj-f4aAP8QZbNEVVQhZsJOud%2ExtIY6Gyz4kx6ONOhtgtPJwXdkY9P
6qf4rmPhKDhJQ
Response Summary:
Please fill out the information below:
Contact Person: Boone Bolinder
Company Name: Bolinder Resources
Mailing Address: 1830 W Highway 112
City: Tooele
Zip: 84074
Phone Number: 4358306185
Email: boone@bolinderresources.com
Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea...
No
All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo...
57ABBB08FD
Briefly give directions to the site and/or physical address:
2830 Bauer Road
Tooele UT 84074
Proposed Relocation Information:
Closest City Stockton
County Tooele
UTM X Coordinates 385366.60
UTM Y Coordinates 4481115.13
Approximate distance to the nearest house/business 1.2 miles
UTM X Coordinates to nearest house/business 384752.05
UTM Y Coordinates to nearest house/business 4479497.08
6/10/24, 12:08 PM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1801047916168999286%7Cmsg-f:1801047916168999286&…1/2
Does this site currently have a permit with DAQ?
Yes
If yes, what is the Permit Holder's Name?
Staker Parsons Bauer Pit
Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX)
DAQE-AN133710006-15
Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine...
1
Equipment Type Jaw
Make/Model CS3055
Serial or ID# 419209
Manufactured Date 2020
Design Capacity 500
2
Equipment Type Screen
Make/Model 8203PMFC
Serial or ID# P202083
Manufactured Date 2020
Design Capacity 500
3
Equipment Type Cone
Make/Model MVP380
Serial or ID# 7075, 54139
Manufactured Date 2007
Design Capacity 400
4
Equipment Type Generator
Make/Model CAt C27
Serial or ID# T4z00242
Manufactured Date 2013
Design Capacity 725kw
Please attach a site diagram showing the equipment layout and general site dimensions for this re...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_2AHjNgMVoiFYibA
Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for...
No
Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re...
Total Hours of operation per 24 hr period 16
Starting time of operation (am/pm) 8am
Ending time of operation (am/pm) 12am
Maximum hourly production rate for project 500
Expected startup date 06/12/2024
Expected completion date 11/15/2024
What type of application is this for?
New Application
In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_D5XHzcHSn1lYXzb
Owner/Operator Representative:
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_12xqdpRPOtcwuyh
6/10/24, 12:08 PM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1801047916168999286%7Cmsg-f:1801047916168999286&…2/2
Susan Weisenberg <sweisenberg@utah.gov>
RE: Bauer Pit owner question
1 message
boone bolinderresources.com <boone@bolinderresources.com>Thu, Jun 6, 2024 at 11:05 AM
To: Susan Weisenberg <sweisenberg@utah.gov>
Susan,
I messed up on the pit it is actually mile marker 50 Hwy 36. Should I change the application and send it back over?
From: Susan Weisenberg <sweisenberg@utah.gov>
Sent: Wednesday, June 5, 2024 6:56 PM
To: boone bolinderresources.com <boone@bolinderresources.com>
Subject: Bauer Pit owner ques on
Hello, I just received your relocation request for the Bauer Pit operation located at 2830 Bauer Road. You mentioned that
it is a Staker Parson Pit. Our records indicate it is owned by Geneva Rock Products. Am I looking at the correct AO?
Thanks!
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
External Sender. Be Cautious.
6/10/24, 12:03 PM State of Utah Mail - RE: Bauer Pit owner question
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r5488539815796006636%7Cmsg-f:1801132213954097521…1/1
Susan Weisenberg <sweisenberg@utah.gov>
RE: Bauer Pit owner question
1 message
boone bolinderresources.com <boone@bolinderresources.com>Thu, Jun 6, 2024 at 11:08 AM
To: Susan Weisenberg <sweisenberg@utah.gov>
Staker ’s AO is DAQE-AN0115720001-09
From: Susan Weisenberg <sweisenberg@utah.gov>
Sent: Wednesday, June 5, 2024 6:56 PM
To: boone bolinderresources.com <boone@bolinderresources.com>
Subject: Bauer Pit owner ques on
Hello, I just received your relocation request for the Bauer Pit operation located at 2830 Bauer Road. You mentioned that
it is a Staker Parson Pit. Our records indicate it is owned by Geneva Rock Products. Am I looking at the correct AO?
Thanks!
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
External Sender. Be Cautious.
6/10/24, 12:12 PM State of Utah Mail - RE: Bauer Pit owner question
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r5488539815796006636%7Cmsg-f:1801132388062125715…1/1
Susan Weisenberg <sweisenberg@utah.gov>
FYI: hour of operation restrictions for portable equipment
1 message
Susan Weisenberg <sweisenberg@utah.gov>Thu, Jun 13, 2024 at 4:16 PM
To: "boone bolinderresources.com" <boone@bolinderresources.com>
Cc: Chad Gilgen <cgilgen@utah.gov>
Hello, just as a heads-up, the DAQ management has determined that the hours of equipment operation restrictions as
stated on the portable AOs (in Bolinder Resources case, Condition II.B.3.c), requiring the operation to be from 6:00 am to
10:00 pm, will be required for all temporary relocation projects even when the temporary equipment is operating at a
permanent site. The purpose of the restriction is to prevent extended night operations for when the air dispersion rates are
low.
Your relocation for the Staker Tooele County Pit requested hours starting at 8 am and ending at 12 am. Let me know if
you would like to request an exception for these hours. The relocation authorization will in the meantime be issued with a
statement of the above hourly requirement. Thanks
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
State of Utah Mail - Bolinder to Stockton (2).pdf
148K
6/13/24, 4:23 PM State of Utah Mail - FYI: hour of operation restrictions for portable equipment
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r9151629011578674147%7Cmsg-a:r-253651930344520721…1/1