June 27, 2024
Wayne Gudgell
Dixie Deer SSD
316 North Lodge Road
Central, Utah 84722
Subject:Plan Approval, Pine Valley Highway Water Line Extension; Dixie Deer SSD, System #27003, File #15028
Dear Wayne Gudgell:The Division of Drinking Water (the Division) received the plans and specifications for the proposed Pine Valley Highway Water Line Extension Project from Steven M.
Kamlowsky, Brown Consulting Engineers, P.C., on May 17, 2024. Written review comments were provided to you and your consultant on May 17, 2024. The Division received the revised plans
and specifications on June 3, 2024. This project has met the conditions for receiving a plan approval.
Our understanding of the project is to extend a main water line from the corner of Mountain View Drive, east along the Pine Valley Highway, to provide water service to a new church that
is planned to be built. The water line extension will be approximately 3,400 linear feet of 8-inch diameter PVC C-900 pipe, including fire hydrants, isolation valves about every 800
feet, and appurtenant fittings. A Hydraulic Modeling Certification was also submitted by Nathan Wallentine, P.E., Sunrise Engineering, who maintains a water model of the Dixie Deer
SSD water system, certifying that pressures meet the minimum requirements of the Division’s rules.
We have completed our review of the plans and specifications, stamped, and signed bySteven M. Kamlowsky, P.E., dated June 3, 2024, and found they basically comply with the applicable
portions of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for Pine Valley Highway Water Line Extension are hereby approved.
This approval pertains to construction only. An Operating Permit must be obtained from the Director before this water line may be put in service. A checklist outlining the items required
for operating permit issuance is enclosed for your information.Approvals or permits from the local authority or the county may be necessary before beginning construction of this project.
As the project proceeds, notice of any changes in the approved design, as well as any change affecting the quantity or quality of the delivered water, must be submitted to the Division.
We may also conduct interim and final inspections of this project. Please notify us when actual construction begins so that these inspections can be scheduled.
This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter.
If you have any questions regarding this approval, please contact J. Paul Wright, P.E., DEQ Southwest District Office, at (435) 986-2590, or me at (385) 515-1464.
Sincerely,
Michael Newberry, P.E.
Permitting and Engineering Support Manager
JPW/mrn/mdbEnclosures –Operating Permit Checklistcc:Jeremy Roberts, Southwest Utah Public Health Dept., jroberts@swuhealth.orgNathan Wallentine P.E., Sunrise Engineering, nwallentine@sunrise-eng.comJ.
Paul Wright, P.E., DEQ Southwest District Office, pwright@utah.govWayne Gudgell, Dixie Deer SSD, wayne.dixiedeer@gmail.comAnthony Meadows, PC. Architects, Inc., anthony@pcarchinc.comSteve
Kamlowsky, Brown Consulting Engineers, steve@browncivil.comPWright 27003 15028 PA
Utah Division of Drinking Water ― Checklist for Issuing Operating PermitsWater System Name:System Number: Project Description:File Number:
Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7
and is not required to obtain an Operating Permit).
Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating
Permit if the water system has received items 1 and 4 below.☐1.Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished,
and if applicable, changes made during construction were in conformance with rules R309-500 through 550☐2.As-built or record drawings incorporating all changes to approved plans and
specifications (unless no changes were made to the previously approved plans during construction)☐3.Confirmation that as-built or record drawings have been received by the water system☐4.Satisfactory
bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards:
☐ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water MainsTwo consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch)☐ANSI/AWWA
C652-11 AWWA Standard for Disinfection of Water-Storage FacilitiesOne or more samples, none positive☐ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment PlantsTwo consecutive
samples per unit, none positive, no less than 30 minutes apart☐ANSI/AWWA C654-13 AWWA Standard for Disinfection of WellsTwo consecutive samples, none positive, no less than 30 minutes
apart☐5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be
taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.]☐6.If applicable, all other documentation that may have been required during the
plan review process☐7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility☐8.If applicable, location data of new storage tank, treatment
facility, or source